4. TMOS CLS CDRL Package (Exhibit A).pdf
PDF 2 MB Posted
- Attached to
- AN/TMQ-53 Tactical Meteorological Observing System (TMOS), Contractor Logistics Support (CLS) effort
- Solicitation number
- FA8730-20-R-0050
About this file
This solicitation requests proposals for Contractor Logistics Support (CLS) of the AN/TMQ-53 Tactical Meteorological Observing System (TMOS). Key details include:
-
Proposals are due by 12:00 p.m. EDT on August 17, 2020. The solicitation is a total small business set-aside for annual receipts less than $16.5M.
-
The resulting contract will be an indefinite delivery, indefinite quantity vehicle with a five-year base ordering period and a concurrent six-month option to extend performance. Minimum order and future orders will be funded via delivery orders, not the base contract.
-
The contractor will provide logistics support including maintenance, supply, engineering services and documentation for TMOS at multiple sites. The government seeks a single contractor to manage the system over the five-year period.
-
Evaluation will determine a single contract awardee. The government reserves the right to cancel the solicitation before or after the closing date without obligation for reimbursement. Funds are not available and no award will be made until funding is in place.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A
Aerospace Management Systems Division Air Force Life Cycle Management Center
Weather Systems / Weather Systems Branch
(AFLCMC/HBAW)
Contract Data Requirements List (CDRL)
Exhibit A
Solicitation Number: FA8730-20-R-0050
Tactical Meteorological Observing System (TMOS)
Contractor Logistics Support (CLS)
04 June 2020 Prepared by: AFLCMC/HBAW, 75 Vandenberg Drive, Building 1630
Hanscom AFB MA 01731
Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractors (Administrative or Operational Use) (June 2020). Other requests shall be referred to AFLCMC/HBAW, 75 Vandenberg Drive, Building 1630, Hanscom AFB, MA 01731-2103.
HANDLING AND DESTRUCTION NOTICE. For classified documents, DoD civ ilians or military personnel will follow procedures outlined in DoDM 5200.01, Volume 3, and Enclosure 3: DoD Contractors will follow procedures outlined in DoDM 5220.22, Sections 11-19. For sensitive unclassified documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
THIS PAGE INTENTIONALLY LEFT BLANK.
Approval Page
The DD Forms 1423-1 (A001 through A031) included in this package have been approved and digitally signed by the following individuals. This replaces the need to digitally sign Block G and Block I on Forms 1423-1.
Prepared by:
Sheila Jewell, CTR Configuration/Data Manager
Approved by:
Capt. Denis Vorobyov, Program Manager
REVISION HISTORY
Revision Date Description Pages / Sections Affected
Final 04 June 2020 Exhibit A - Final for solicitation All
EXHIBIT A
Contract Data Requirements List (CDRL)
Name Email CDRL # Sheila Jewell Sheila.Jewell.ctr@us.af.mil ALL Configuration/Data Mgr.
Claudette Parent Claudette.Parent.ctr@us.af.mil ALL Documentation Mgr.
Additional distribution requirements:
For CDRL #A009 TM-86-01P/T Technical Order and Associated Supplemental Data deliverables, please email the following contacts:
Oscar Seefried Oscar.Seefried.1@us.af.mil Tiffany Scott Tiffany.scott.13.ctr@us.af.mil Jarail Smith Jarail.smith@us.af.mil Samuel Williams Samuel.williams.3@us.af.mil mailto:Sheila.Jewell.ctr@us.af.mil mailto:Claudette.Parent.ctr@us.af.mil mailto:Oscar.Seefried.1@us.af.mil mailto:Tiffany.scott.13.ctr@us.af.mil mailto:Jarail.smith@us.af.mil mailto:Samuel.williams.3@us.af.mil
CDRL PREPARATION INSTRUCTIONS
1. Document of Data Requirements. Except for data requirements in the DOD Federal Acquisition Regulation Supplement (DFARS) clauses, DD Form 1423-1 must be used as the sole contractual list of data to be delivered under the contract.
2. Instructions for Completing Items A through J:
A. CONTRACT LINE ITEM NO. Enter the contract line item number (CLIN) that is associated with the CDRL.
B. EXH/ATCH NO. Enter the exhibit or attachment number for the Contract Data
Requirements List (CDRL).
C. CATEGORY: TDP, __TM__OTHER__. Check the appropriate category for
Technical Data Package (TDP), Technical Manual, or Other Types of data which comprise a TDP, as defined in attachment 1. Acquisition of TMs is covered by AFR 8-2, Air Force Technical Order System. Other data may be further categorized, such as provisioning, configuration management, etc. If the CDRL does not contain a specific category of data requirements, simply enter “Miscellaneous”.
D. SYSTEM/ITEM. Identify the system, item, or project by designator or name.
E. CONTRACT/PR NO. If known, enter the actual contract number: if not, enter the number of the PR or other appropriate designator.
F. CONTRACTOR. Enter the contractor’s name or acronym (inserted at award).
G and H. PREPARED BY, DATE: Enter the name, title, and office symbol of the
DMO responsible for preparation of the contract data requirements list.
Normally, these items are completed only on the first page of each exhibit or attachment.
I and J. APPROVED BY, DATE: Enter the name, title, and office symbol of the program manager or the designee responsible for approving the CDRL.
Normally these items will be filled in only on the first page of each exhibit or attachment.
3. Instructions for Completing Items 1 through 16:
1) DATA ITEM NO. Enter the CDRL sequence number (i.e. for exhibits, enter the
Exhibit Line Item Number (ELIN); for attachments, enter the data item sequence number). Reference DFARS 4.7106.) NOTE: When the CDRL contains less than 1,000 data line items, the last three digits of the exhibit line may be numbered numerically.
2) TITLE OF DATA ITEM. Enter the exact title as it appears in item 1 of the DD Form 1664.
3) SUBTITLE. If the title requires further identification, enter a subtitle. (If necessary, use item 16 for further identification of the data item).
4) AUTHORITY (Data Acquisition Document Number). Enter the number as it appears in item 2 of the DD FORM 1664. Add/T if the DID has been tailored.
5) CONTRACT REFERENCE. Enter document and paragraph numbers that identify the task or requirement from which the data flows (contract clause, statement of work paragraph, Integrated Master Plan paragraph, etc.) to help identify the data item authorized by item 4 (see item 4 above).
6) REQUIRING OFFICE. Enter the activity responsible for advising on the technical adequacy of the data. This may be the first addressee in item 14. When data require approval (see item 8 below), this activity is responsible for determining if the data submitted should be approved as submitted, or revised to meet contract requirements.
7) DD FORM 250 REQ:
a. DD Form 250 will only be required for data listed on the CDRL, which requires government inspection and acceptance. These are:
(1) Final Air Force technical Orders.
(2) Engineering drawings, which are delivered to an Air Logistics Center
Engineering Data Service Center.
(3) Data which will be used by Air Force personnel for operation, installation, or maintenance, even though equipment and/or software will not be transferred to AFLC (AFR 800-4).
b. Designate the location (contractor’s facility, or destination) for performance of government inspection and acceptance, by entering the applicable code for inspection and acceptance, as shown below:
Code Inspection Acceptance SS Source (DD Form 250) Source (DD Form 250) DD Destination (DD Form 250) Destination (DD Form 250) SD* Source (DD Form 250) Destination (DD Form 250) DS Destination (DD Form 250) Source (DD Form 250) LT Letter of Transmittal Only NO No Inspection or Acceptance Required
XX Inspection and Acceptance Requirements Specified Elsewhere in the Contract
S indicates the contractor’s facility.
D normally indicates the primary distribution point.
*SD will be used for all engineering data that are to be delivered to an Engineering Data Service Center.
8. APPROVAL CODE. Items of critical data requiring specific advance written approval prior to distribution of the final data item, such as test plans, are identified by an "A" placed in this item. Most of these data items require submission of a preliminary draft prior to publication of a final document. When block 8 is blank, approval is not required, although the Government has the inherent right to disapprove any data item.
9. DIST STATEMENT REQUIRED. References the distribution statement to be affixed to the deliverable in accordance with DODD 5230.24, Marking Technical Data Prepared By or For the Department of Defense.
All data deliverables in this Exhibit A shall contain the following Distribution Statement and Destruction Notice:
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational Use) (JUNE 2020) Other requests for this document shall be referred to AFMC/AFLCMC/HBAW, Weather Systems Branch, 75 Vandenberg Drive, Building 1630, Hanscom AFB, MA 01731 DESTRUCTION NOTICE. For classified documents, DoD civilians or military personnel will follow procedures outlined in DoDM 5200.01, Volume 3, and Enclosure 3: DoD Contractors will follow procedures outlined in DoDM 5220.22, Sections 11-19. For sensitive unclassified documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
10. FREQUENCY. The following are the codes used in this block:
Code Frequency
DAILY Daily
WEKLY Weekly
BI-WE Each 2 Weeks
MTHLY Monthly
BI-MO Each 2 Months
QRTLY Quarterly
ANNLY Annually
SEMIA Each 6 Months
OTIME One Time
ONE/R One Time and Revisions
R/ASR Revisions as Required
*ASREQ As Required
DFDEL Deferred Delivery
ONE/P One Time Preliminary Draft
2TIME Two OCTarate Submittals
* When ASREQ is used in Items 10, 11, 12, or 13, an explanation of the requirement will be entered in Item 16.
11. AS OF DATE (AOD). If the data will be submitted only once, enter the as of date (the cut-off date) as follows: year/month/day. If the data will be input on a recurring basis, which has been set by item 10, show the number of days between the cut-off date and the end of the input period. For instance, if the data are to be submitted 15 days before the end of the input period enter 15. If the data are to be submitted at the end of the input period enter 0. If necessary, use item 16 to explain further.
12. DATA OF FIRST SUBMISSION. Enter the date of submission as follows:
year/month/day. If the delivery of the data depends on the initiation of a specific event or milestone, identify this event or milestone. If you do not know the contract start date, enter the number of days the data is due after the contract start for example, 30 DAC (Days after Contract). If this data is not known nor needs more clarification, explain in item 16. If the data are subject to deferred delivery enter “DFDEL”. If an acronym is created to identify an event or milestone, define the acronym in item 16. NOTE: Do not insert classified dates.
13. DATE OF SUBSEQUENT SUBMISSION. If the data item will be submitted more than once, enter the dates of subsequent submission. If a draft was required, enter the date the final document is to be submitted.
14. DISTRIBUTION. Identify each addressee and give the number of copies (regular and reproducible) to be received by each one (for example, TIC-320/0). If appropriate, use office symbols, contractor initials, or DID Handbook E-4 code numbers and command initials: in this case, attach a list explaining these codes. If reproducible copies are required, give the type of reproduction request here or in item 16 (offset, mat, vellum, negative, floppy disk, magnetic tape, etc.). If the data are not actually to be delivered to the Government or to associated contractors, enter the appropriate instruction.
15. TOTAL. Enter the total number of copies (regular or reproducible) for one delivery;
this number should be the sum of all the copies specified in item 14. If distribution fluctuates, use a not to exceed number.
16. REMARKS: Use this space to explain the following:
a. Tailored features of the DID.
b. Items 1 through 15
c. Any re-submittal schedule or special conditions involved in updating data submitted for government approval.
CDRL GENERAL INSTRUCTIONS
1. The Data Items on the DD Forms 1423 are cross-referenced thereon in Block 5, to the associated Integrated Master Plan (IMP) tasks under which the basic information is generated. These data items shall be prepared in accordance with the applicable Data Item Descriptions (DIDs) set forth in DOD 5010.12-L, AMSDL, as tailored, or one-time DIDs.
a) Standard DIDs. These are identified in DOD 5010.12-M, and the “Assist Quick CDRL Search” Website: http://assistdocs.com/search/search_basic.cfm
b) Tailored DIDs. These are standard DIDs which have specific modifications or tailoring applied to them. These are identified with the suffix “/T” at the end of the DID number in Block 4 (e.g., DI-MISC-80711/T).
c) One-Time DIDs. These are DIDs approved for one-time acquisition use which is associated with a unique data requirement applicable to a single contract (e.g., OT-97-xxxxx).
d) Marking of Data. DODD 5230.24, OCTust 2012.
2. Block 10 of DD Form 1664 (DID) together with any tailoring of the DIDs contains instructions which shall be followed by the contractor in the preparation of data for delivery under this contract.
3. Data submitted in this contract shall be accompanied by a Letter of Transmittal (L\T) and be identified with the following elements:
a) Contractor
b) Contractor’s Transmittal Letter Number, including a running serial number and date
c) Contract Number
d) CDRL Data Item (Sequence) Number
e) DID number and Title
f) Revision Identification, if any
g) Block 14 (or modified) distribution list
4. Data shall be submitted for receipt by the customer in accordance with the delivery schedule specified on the individual DD Form 1423, except those due dates falling on non-working days (Saturdays, Sundays, and recognized national {legal} holidays) shall be construed to mean the next regular working day. All due dates (e.g. 30 DAC) are calendar days unless specified differently otherwise.
5. Existence of an “A” in Block 8 on the DD Form 1423 indicates written approval by the Procuring Contracting Officer (PCO) is required. Unless a different time period for approval is specified on the DD Form 1423, the Government will have 30 calendar days from the date of receipt on the data for notifying the contractor of the approval/disapproval disposition of a data submission. In the event that a data submission is disapproved, the PCO will advise the contractor of the reasons for disapproval and a resubmission shall be accomplished within thirty (30) days unless http://assistdocs.com/search/search_basic.cfm specified differently otherwise. Approval indicates Government concurrence to proceed to the next event.
In the absence of an “A” in Block 8, the Government has the inherent right to disapprove any data item. Approval does not ensure compliance with DID format and content requirements, since the Contractor is obligated to meet these requirements under the terms of the contract.
6. DD250s will be required upon completion of the last deliverable of each CDRL Exhibit.
7. Appropriate DODD5230.24 Distribution Statements identified in Block 9 on the DD Form 1423, and further defined in the CDRL “Remarks” Block, shall be placed on the document cover page.
8. Appropriate AFI61-204 documents shall be marked with the appropriate destruction notice and placed on the cover page under the distribution statement.
9. The contractor shall apply export control warning statements IAW MIL-STD-1806 to CDRL items identified as “TDP” in item C of each DD Form 1423-1.
10. The contractor shall address all letters of transmittal to the Procuring Contracting Officer.
11. Increases or decreases to CDRL quantities shall be in accordance with the Special Provision titled “Modification of Data Requirements”.
12. Data should be delivered by electronic media whenever possible. All data, electronic or otherwise specified, must comply with the distribution statements indicated in Block 9 of the DD Form 1423.
13. Requirements for periodic revisions to data, where no changes have occurred since the last submission, shall be satisfied by a record transmittal letter/form from the Contractor stating that “no changes have occurred since the last submission”. In such cases, the Contractor shall identify the data in question, the reporting period, and the transmittal letter and number of the prior data transmittal. Government disposition will not be provided for record transmittals; however, the Government reserves the right to non-concur with the reported negative status.
EXHIBIT A
Contract Data Requirements List (CDRL)
Introduction AFLCMC/HBAW has determined documentation required to support the AN/TMQ-53 TMOS Performance Work Statement (PWS).
CDRL Tailoring The Data Item Descriptions (DIDs) associated with the CDRLs have been reviewed and tailored as specified in the attached DD Form 1423s.
Distribution Statements Distribution statements, export control notices and destruction notices will be included on the title page of each deliverable in accordance with DoDD 5230.24.
Delivery of Data Items Deliverable documentation must be submitted via the instructions included on each DD Form 1423. In addition, the Contractor must email a signed Letter of Transmittal to the Program Office at Hanscom AFB.
The products must be compatible with MS Office Products, Adobe Acrobat and/or web browsers in accordance with direction located in Block 16 of each DD Form 1423.
CDRL No. DID CDRL Title A001 DI-ADMN-81249B Conference Agenda A002 DI-ADMN-81250B Conference Minutes A003 DI-ADMN-81373 Presentation Material A004 DI-SESS-80639D/T Engineering Change Proposal (ECP) A005 DI-SESS-80642D Notice of Revision (NOR) A006 DI-SESS-80640D/T Request for Variance (RFV) A007 DI-SESS-81253C/T Configuration Status Accounting Information (CSAI) A008 DI-MGMT-80368A Status Report (Monthly Status Report) A009 TM-86-01P/T Technical Order and Associated Supplemental Data A010 DI-MGMT-81797 Program Management Plan (PMP) A011 DI-MGMT-81804A Item Unique Identification (IUID) Marking Activity, Val/Ver Report A012 DI-MGMT-81803 Item Unique Identification (IUID) Marking Plan A013 DI-QCIC-81794A Quality Assurance Program Plan (QAPP) A014 DI-MGMT-80501/T Contractor’s Corrective Action Plan (CCAP) A015 DI-MGMT-81453B Data Accession List (DAL) A016 DI-SESS-80858C Supplier’s Configuration Management Plan (CMP) A017 DI-ILSS-80483 Spare Parts Usage Report (SPUR) A018 DI-NDTI-80603A/T Test Procedure A019 DI-NDTI-80809B Test Inspection Report A020 DI-ILSS-80727/T Government Furnished Material (GFM) by National Stock No. (NSN) A021 DI-MGMT-80441C Government Property Inventory Report A022 DI-MGMT-80368A/T Status Report (Finance Report) A023 DI-MGMT-80259/T Physical Inventories Report (CFO Report) A024 DI-MGMT-82001A/T DO.D. Risk Management Framework (RMF) Package A025 DI-SAFT-81563 Accident/Incident Report A026 DI-SAFT-81626 System Safety Program Plan (SSPP) A027 DI-MGMT-81948 Management Plan (Transition Plan)
A028 DI-QCIC-80125B Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report
A029 DI-QCIC-80126B Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Response
A030 DI-ADMN-81306 Program Protection Implementation Plan (PPIP)
A031 DI-MGMT-81948/T Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan
, Exhibit A
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
ADMN
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 Conference Agenda Agenda
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81249B PWS Para: 6.2.1, 6.3.1, 6.3.2, 6.3.3, 6.3.5
AFLCMC/HBAW
AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLOCKS 10, 11, 12 & 13: Agendas due no later than (NLT) seven (7) calendar days prior to meetings. The Government will review and provide comments within 3 (three) calendar days. The Contractor shall incorporate Government comments and resubmit the document within two (2) calendar days.
Revisions as required.
BLOCK 14: Initial and subsequent submittals (to include all revisions) shall be provided electronically via email to: (See CDRL POCs and Distribution Requirements List).
15. Total
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
AFLCMC/HBAW Data Management JUN 2020 JUN 2020
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
ADMN
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Conference Minutes Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81250B PWS Para: 6.2.1, 6.3.1, 6.3.2, 6.3.3, 6.3.5
AFLCMC/HBAW
AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLOCKS 10, 11, 12 & 13: Minutes due NLT ten (10) calendar days after conclusion of meetings and/or government directed travel. The Government will review and provide comments within three (3) calendar days.
AFLCMC/HBAW Data Management JUN 2020 JUN 2020
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
ADMN
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 Presentation Material
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81373 PWS Para: 6.2.1, 6.3.1, 6.3.2, 6.3.3, 6.3.5
AFLCMC/HBAW
AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLOCKS 10, 11, 12 & 13: Submit hard copy materials NLT the day meeting with electronic material NLT ten (10) calendar days after scheduled event.
The data shall be in a format compatible with Microsoft Office 2016.
AFLCMC/HBAW Data Management JUN 2020 JUN 2020
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
SESS
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 Engineering Change Proposal ECP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80639D/T PWS Paras: 8.1, 8.1.1, 8.1.2, 8.2.1, 8.3.1, 8.3.2, 8.4.1
AFLCMC/HBAW
AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
DD Form 1664, BLOCK 10 is tailored as follows:
Paragraph 2. Format and Content – Add item “H CDRL A007, provide update CSAI master list.
BLOCKS 10, 11, 12 & 13: Submittal due NLT fifteen (15) calendar days after identification of proposed change.
The Engineering Change Proposal (ECP) will be processed through the formal Government Configuration Control Process, and a response provided to the Contractor once a decision has been determined to accept or decline the proposed engineering change.
Revisions as required.
BLOCK 14: Initial and subsequent submittals (to include all revisions) shall be provided electronically via email to: (See CDRL POCs and Distribution
AFLCMC/HBAW Data Management JUN 2020 JUN 2020
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
SESS
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 Notice of Revision NOR
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80642D PWS Para: : 8.1, 8.1.1, 8.1.2, 8.2.1, 8.3.1, 8.3.2, 8.4.1
AFLCMC/HBAW
AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLOCKS 10, 11, 12, and 13: Submit Concurrently with Engineering Change Proposals (ECPs) – (A004).
AFLCMC/HBAW Data Management JUN 2020 JUN 2020
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
SESS
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 Request for Variance RFV
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80640D/T PWS Para: : 8.1, 8.1.1, 8.1.2, 8.2.1, 8.3.1, 8.3.2, 8.4.1
AFLCMC/HBAW
AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
DD Form 1664, BLOCK 10 is tailored as follows:
Paragraph 2. Format and Content – Add item “H CDRL A007, provide update CSAI master list.
BLOCKS 10, 11, 12 & 13: Submittal due NLT thirty (30) calendar days after identification of proposed variance.
The RFV shall be processed through the formal Government Configuration Change Control process. A response shall be provided to the Contractor once a decision has been determined to accept or decline the proposed RFV.
Revisions as required.
BLOCK 14: Initial and subsequent submittals (to include all revisions) shall be provided electronically via email to: (See CDRL POCs and Distribution
AFLCMC/HBAW Data Management JUN 2020 JUN 2020
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
SESS
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 Configuration Status Accounting Information CSAI
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81253C/T PWS Para: 8.3.1, 8.3.2, AFLCMC/HBAW AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLOCK 4: DD For 1664 tailored as follows:
Requirements paragraph 2 is changed to read as follows: “The following information (fields) shall be prepared and updated in REMEDY”.
• Site Location
• Hardware Item Description
• Prime Contractor Part Number
• Original Equipment Manufacturer/Vendor Name
• Original Equipment Manufacturer Part Number and Serial Number
• Total quantities
• Software/Firmware Item Description
• Software/Firmware Manufacturer/Vendor Name
• Software/Firmware nomenclature, version number, and release date
• License requirements/quantity
• Total quantity of licenses
• Item Unique Identifications (IUIDs)
• Peculiar Support Equipment (PSE)
• Test Equipment
• Spares
• On Site Spares
• Government Furnished Equipment (GFE)
BLOCKS 10, 11, 12, & 13: All information shall be entered into REMEDY ARS NLT ninety (90) calendar days after Contract Award. Subsequent updates due NLT seven (7) calendar days after changes are made to any items.
The Contractor shall make updates and notify the Government. The Government will review and provide comments within seven (7) calendar days. The Contractor will incorporate Government comments and update REMEDY within seven (7) calendar days. Any and all proposed change(s) shall first be passed through the formal Government ECP/CCB Process with updates to be made in REMEDY ARS. See CDRL A004 (ECP).
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
A007
B. EXHIBIT
A
C. CATEGORY: X
TDP ______ TM ______OTHER ___________________________________________________________________
D. SYSTEM/ITEM
AN/TMQ-53 TMOS
E. CONTRACT/PR NO.
F. CONTRACTOR
16. REMARKS (Continued)
BLOCK 14: Initial and subsequent submittals (to include all revisions) shall be provided electronically via email to: (See CDRL POCs and Distribution Requirements List).
DD FORM 1423-1, FEB 2001 Page ____ of____ Pages Reset
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
MGMT
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008 Status Report Monthly Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80368A PWS Para: 3.1, 3.2, 6.1.1, 6.3.1, 6.4, 6.5.1, 6.5.2, 7.2, 7.4, 7.4.1, 7.4.2, 7.4.6, 7.5.2.1, 7.6, 8.1.3, 8.2.1, 9.1.1, 9.1.2, 9.2
AFLCMC/HBAW
AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A N/A See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLOCKS 10, 11, 12, & 13: Initial submittal NLT thirty (30) calendar days after contract award. The Government will review and provide comments NLT seven (7) calendar days. The Contractor shall incorporate Government comments and resubmit NLT seven (7) calendar days.
Subsequent submittals shall be delivered on the fifteenth day of each month thereafter.
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All Applicable CLINs
B. EXHIBIT
A
C. CATEGORY
TDP _________ TM _________ OTHER _____________________________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TMQ-53 TMOS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 Technical Order and Associated Supplemental Data TO
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
TM-86-01P/T PWS Para: 6.3.1, 6.3.2, 6.3.3, 8.1, 8.1.1, 8.1.2, 8.4.1.1, 10, 10.3, 10.4, 10.5, 10.6, 10.7, 10.8, 10.9
AFLCMC/HBAW
AN/TMQ-53 TMOS Program Office
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT See Blk 16 See Blk 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
DRAFT
FINAL
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLOCKS 10, 11, 12, & 13: Refer to TM-86-01P for this information (pages 25-30 of Exhibit A).
Revisions as required.
be provided electronically via email to:
(See CDRL POCs and Distribution Requirements List).
17. PRICE GROUP
Air Force Technical Manual Contract Requirements (TMCR) for
TMQ-53
(Program/Modification/Military System)
ATTACHMENT , TO CDRL SEQUENCE NUMBER , EXHIBIT
REQUEST FOR PROPOSAL/CONTRACT:
Date:
Technical Manual/Technical Order requirements contained herein have been cleared for use by OMB Paperwork Reduction Project No. 0704-0188.
Section 1. Technical Order (TO) Program Requirements
1. TMCR Tailoring. This TMCR has been tailored by the program office, including the associated tables, matrices and Specification/Standard Interface Records (SIRs). The Contractor may propose and submit, in writing additional tailoring to the TO Manager Agency/Agent (TOMA) and Procuring Contracting Officer (PCO) for consideration. The tailored TMCR shall be attached to the CDRL for TO delivery, and shall be included in the proposal as a separate exhibit, referenced in the proposal SOW. Proposals shall be compatible with the TMQ53 Technical Order Concept of Operations. Air Force TO Acquisition procedures, including procedures for tailoring this document, are found in TO 00-5-3, AF Technical Order Life Cycle Management, located on the Internet at http://www.tinker.af.mil/Home/TechnicalOrders.aspx. A copy may also be obtained from the Program TO Manager.
Any terms or procedures found in this document may be researched there.
2. TO Program Scope. The Contractor may recommend additional Section 2 tailoring to propose new TO types (Table 1) and source data and TO updates (Table 2) required to support the TMQ-53 program’s objectives.
3. Commercial Manuals. Contractors shall recommend the use of existing commercial manuals to the maximum extent possible without impairing program support objectives. All proposed commercial manuals are subject to government review and approval.
NOTE: a) Contractors shall use Data Item Description (DID) DI-TMSS-80067, Technical Manual (TM) Contractor Furnished Aeronautical Equipment or Contractor Furnished Equipment (CFAE/CFE) Notices, to provide recommendation data. A copy is available from the TOMA upon request. b) Government activities will use MIL-PRF-32216, Evaluation of Commercial Off-The-Shelf (COTS) Manuals and Preparation of Supplemental Data, as a guide for review and acceptance of all recommended commercial manuals.
3.1. All commercial manuals shall be delivered with either unlimited data rights or as a minimum, Government Purpose License, to allow the AF to electronically store, print, distribute and decollate the commercial manual to allow for printing.
3.2. Approved COTS Manuals shall be delivered with an Identifying TO Publication Sheet, IAW MIL-PRF-32216.
All PDF files of commercial data shall be non-password protected.
3.3. If the proposed COTS data is found to be insufficient after review by the government, the contractor shall prepare supplemental data for the COTS manual as required IAW MIL-STD-38784. If the COTS data cannot be supplemented sufficiently the contractor may be tasked to develop new TM data IAW the applicable TMSS listed in Section 2 Table 1. All symbols will be NEMA or ANSI compliant.
4. Technical Manual Specifications and Standards (TMSS) Tailoring. TMSS are tailored by selecting between tailoring options offered in each TMSS. The tailoring is recorded in SIRs and added to Section 3 of this document for each TMSS required. NOTE: Tailoring must not change or delete mandatory requirements which are part of the Document Type Definition (DTD) structure or XML schema structure located in Section 2 Table 1.
4.1. AF options in some Joint-Service TMSS have been documented in preliminary SIRs included in Section 3.
These preliminary SIRs provide the starting point for further tailoring. Contractors may recommend additional tailoring of the Joint-Service TMSS SIRs and provide recommended SIRs for other TMSS as applicable.
NOTE: TMSS requirements marked “(F)” are specifically for Air Force use; “(A)” is for Army, “(M)” is Marine Corps and “(N)” is Navy. Comply with all unmarked and “(F)” TMSS requirements as modified by the tailoring options in each TMSS.
http://www.tinker.af.mil/Home/TechnicalOrders.aspx
4.2. Questions concerning TMSS requirements may be resolved by written request and justified suggestions for resolution submitted through the Procuring Contracting Officer (PCO) and TOMA, 3580 D Avenue bldg. 201W post 74 Tinker AFB OK 73145. Deficiencies and suggested improvements shall be submitted to the TMSS Preparing Activity (PA). Approved recommendations, corrections and clarifications will be maintained with contract documentation.
5. Subsequent TO/Data Requirements. When new TO requirements are identified the Contractor shall notify the government utilizing DI-TMSS-80067B, Technical Manual (TM) Contractor Furnished Aeronautical Equipment or Contractor Furnished Equipment (CFAE/CFE) Notices, or approved contractor formats. This process shall require government review and approval of recommended additional requirements prior to developing additional data.
6. TO Development. TOs shall be written to a scope and depth of coverage sufficient to support the TMQ53 operations and maintenance concepts developed by the government.
6.1. TO Data shall be developed to the specifications listed in table 1. Approved COTS Manuals shall be delivered with an Identifying TO Publication Sheet, IAW MIL-PRF-32216.
7. TO Numbering. Contractors shall notify the government of manuals which require TO numbers. TO numbers are not required for manuals to be used exclusively by the Contractor’s own personnel. Requests for new TO numbers shall be submitted to the TOMA utilizing the TO numbering worksheet.
8. Data Rights. Contractors shall provide Unlimited Rights for all source data and TOs prepared specifically for the contract. Government rights in data are specified in the Defense Federal Acquisition Regulation Supplement (DFARS), 252.227-7013, Rights in Technical Data, Noncommercial Items, 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, and 252.227-7015, Technical Data- Commercial Items. The government shall be given unlimited rights for all business rules (tailoring and application methods and procedures) and documented business processes developed for use in TO development. Government data rights shall extend to the common source database, transformation style sheets, and other tools or products used to author or display technical data.
9. Classification, Distribution, Destruction, Disclosure, and Export Control Notices. Contractors shall determine the correct markings and controls for classified and restricted distribution data and TOs IAW the program’s Security Classification Guide (SCG) and DODM 5200.01, DODI 5230.24, AFI 31-401, AFI 61-204, and MIL-STD-38784 (available at http://www.e-publishing.af.mil/ or https://assist.dla.mil/online/start/index.cfm ). The markings and notices shall be reviewed during In-Process Reviews (IPR). NOTE: Distribution limitations will be determined on a case-by-case basis as TOs are developed, dependent upon TO content.
10. TO Quality. Contractors’ proposals shall describe how the government will be allowed to interact with the contractor’s TO development team. The contractors’ shall ensure TOs prepared are: a) technically accurate and safe;
b) written to a scope and depth of coverage sufficient to support the operations and maintenance concepts, and c) properly classified and marked with export control and distribution limitation statements. The contractor shall maintain a Technical Manual Quality Assurance Program (TMQAP) plan for this effort. The TMQAP shall be available for review at the TO Guidance Conference. The TMQAP shall be sufficiently detailed to support TO certification to include actual performance of procedures or desk-top analysis for non-procedural data. Simulation (walk-through/talk-through) should be reserved for those procedures which would activate explosive devices or present a hazard to personnel or equipment.
10.1. Guidance Conference. Working through the TOMA, the contractor shall co-host and participate in a guidance conference for this effort to be held within 60 calendar days after award of contract. The Technical Order Status and Schedule (TOSS) will be formalized at this conference. The contractor shall present a briefing on their interpretation of the basic contract, SOW, CDRLs, Data Item Descriptions (DIDs), MIL-SPEC, MIL-STD, SIRs, this document and the planned preparation and delivery of the TOs and related data.
10.3. TO Delivery Requirements for In-Process Reviews. IPR TO data shall be technically edited and reviewed according to the TMQAP. Manuscript (handwritten) data is not acceptable for any data to be reviewed. All tech data must be in the correct TO format. At each review, all TOs must be delivered in order to perform a full PPR.
The TMQAP checklists shall be available for review by the government during the PPRs.
10.4. TO Certification. The contractor shall certify that new TO procedures and data developed to support the program are accurate, adequate, current, and usable for their intended purpose. The Government may witness the certification activities. The contractor shall incorporate comments generated by the certification process into http://www.e-publishing.af.mil/ https://assist.dla.mil/online/start/index.cfm the TOs prior to submitting the TOs for verification. At the completion of the certification, the contractor shall submit a letter to the TOMA stating that certification has been completed and that any deficiencies identified during the process have been corrected. The contractor will ensure all necessary changes and corrections to affected manuals are accomplished in time to meet contract delivery schedule requirements. The contractor shall notify the government at least 180 days prior to the need date of any Government Furnished Information/Government Furnished Equipment (GFI/GFE) required to perform certification tasks. Technical order 00-5-1 and 00-5-3 shall be referenced for additional information on TO Certification requirements.
10.5. Verification…