37-Plans - 46144401 Kirby SS Reconfiguration DrnPlan 2026-06-30.pdf
PDF 21 MB Posted
- Attached to
- Kirby Street Pump Station #08 Rehabilitation
- Solicitation number
- IFB-26-00404
- Issued by
- Hillsborough County, Florida
About this file
This is a drainage plan document for Hillsborough County Engineering and Operations Department in Florida, specifically for the Kirby Street Pump Station #08 Rehabilitation project. The project involves the construction of a new stormwater pump station on a County-owned parcel located north of the existing facility at 5201 E. Kirby Street, Tampa, FL 33617. The scope of work includes the design and construction of the new pump station facility as well as the subsequent decommissioning and demolition of the existing stormwater pump station. The estimated total project cost is $1,473,476.90. Questions and requests for interpretation must be submitted no later than 14 calendar days after the date of solicitation issuance, site visit, or pre-bid conference, whichever occurs later.
A Small Business Enterprise (SBE) goal of 10% has been established for subcontractor participation in this contract. The drainage plan document dated June 30, 2026, provides the technical specifications and design details necessary for qualified contractors to prepare competitive bids. This project represents a significant infrastructure improvement for stormwater management in the Kirby Street area and requires contractor expertise in pump station construction, site preparation, and demolition operations.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .