15-SBE Goal Participation SBE-1 Form Tutorial.mp4

MP4 file 37 MB Posted

Attached to
Kirby Street Pump Station #08 Rehabilitation
Solicitation number
IFB-26-00404
Issued by
Hillsborough County, Florida

About this file

This file is a tutorial video regarding Small Business Enterprise (SBE) goal participation requirements for state and local contract opportunities in Florida, specifically related to the Hillsborough County Engineering and Operations Department. The video serves as an instructional resource for contractors and subcontractors bidding on or participating in county projects subject to SBE participation mandates. The tutorial is designed to guide users through completion of the SBE-1 Form, which documents and certifies SBE subcontractor participation in solicited projects.

The Kirby Street Pump Station #08 Rehabilitation project, for which this tutorial applies, involves construction of a new stormwater pump station on a county-owned parcel north of the existing facility at 5201 E. Kirby Street, Tampa, Florida 33617, with subsequent decommissioning and demolition of the existing pump station. The estimated total project cost is $1,473,476.90, with a mandatory SBE subcontractor participation goal of 10%. Contractors and subcontractors must submit questions and requests for interpretation no later than 14 calendar days following the solicitation issuance date, site visit, or pre-bid conference, whichever occurs last, as outlined in Paragraph 4.7 of the Contract Terms and Conditions Document.

Other files

File Type Posted
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
35-IFB-26-00404 Contract Terms and Conditions.pdf PDF
27-Attachment G - KIRBY STREET TESTHOLE DATA FORM.pdf PDF
34-Agreement - Construction - Stand Alone.pdf PDF
20-Attachment B - GeotchRpt.pdf PDF
36-Attachment G - SUE Rpt.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
4-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
19-IFB-26-00404 Supplemental Specifications.pdf PDF
21-Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
32-Plans - Kirby Street Combined 04 10 2026.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
16-Bid Bond.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
18-Performance Bond.pdf PDF
37-Plans - 46144401 Kirby SS Reconfiguration DrnPlan 2026-06-30.pdf PDF
8-Insurance Certificate.doc.doc DOC document
29-Plans - Kirby St DDM Non Roadway Ditch SS Approval.pdf PDF
14-Subcontractor Letter of Intent .pdf PDF
7-Change Order Form.pdf.pdf PDF
28-Attachment H - Sluice-gates -installation-maintanance.pdf PDF
24-Attachment E - Drainage Report 2026-06-03.pdf PDF
31-Plans - Kirby Street Combined 03 05 2026.pdf PDF
26-Attachment G - Affected Utilities 2026-02-18.pdf PDF
22-Attachment C - SWFWMD ERP Permit.pdf PDF
17-Payment Bond.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
33-IFB-26-00404 Insurance Requirements.pdf PDF
25-Attachment F - TrafficControlOfficer.docx DOCX document
23-Attachment D - Project Map.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
3-Allowance Authorization Release Form.pdf.pdf PDF
30-Plans - 46144001 Kirby TopoSurvey.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .