This is a Supplemental Specifications document issued by Hillsborough County Engineering and Operations Department for the construction of CIP 46144001, the Kirby Street Pump Station #08 Rehabilitation project located at 5201 E. Kirby Street, Tampa, Florida. The project scope includes construction of a new stormwater pump station on a County-owned parcel north of the existing facility, followed by decommissioning and demolition of the existing stormwater pump station. The contract requires adherence to Hillsborough County Public Works Standard Specifications for Construction (October 2023 Edition), FDOT FY 2024-2025 Standard Plans and Specifications, the 2023 Manual of Uniform Minimum Standards for Design, Construction and Maintenance (Florida Greenbook), 2024 FDOT Drainage Manual, Hillsborough County Public Utilities Water, Wastewater and Reclaimed Water Technical Specifications, and ANSI-A300 American National Standard for Tree Care Operations. Standard work site operation hours are 8:00 AM to 5:00 PM for low-volume roadways, 9:00 AM to 4:00 PM for high-volume roadways, and 9:00 PM to 6:00 AM for level "F" roadways, Monday through Friday excluding County-observed holidays and weekends, unless alternative hours are approved by the County Project Manager with 72 hours' notice. The contractor must develop a Construction Phasing Plan and Maintenance of Traffic Plan, coordinate with utilities (including HCWRD conflicts), obtain necessary permits, and coordinate with affected residents and businesses, with particular attention to school traffic patterns.

The estimated total project cost is $1,473,476.90, with a 10% SBE (Small Business Enterprise) goal established for subcontractor participation. A Temporary Traffic Control Permit ($0.00 cost to contractor) and an ERP Individual Construction Major Modification permit (File #861283 / 43045273.001, expires May 31, 2028) have been obtained by the County. An allowance of $250.00 has been included in the bid proposal to reimburse the contractor for permit costs, with any unused allowance to be credited back to the County by Change Order. The contractor is responsible for all incidental items including bypass pumping, cofferdam, dewatering, cutting, patching, and site restoration at no additional cost to the County. A performance bond is required, and the County reserves the right to withhold up to $40,000.00 from final payment until all close-out documentation, including signed and sealed as-built plans, test reports, operational manuals, and warranties, are satisfactorily submitted. Geotechnical information has been provided for bidder reference only, with no relief of the contractor's duty to perform independent site examinations and subsurface investigations at the contractor's own expense.

View the file

Other files

File Type Posted
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
35-IFB-26-00404 Contract Terms and Conditions.pdf PDF
27-Attachment G - KIRBY STREET TESTHOLE DATA FORM.pdf PDF
34-Agreement - Construction - Stand Alone.pdf PDF
20-Attachment B - GeotchRpt.pdf PDF
36-Attachment G - SUE Rpt.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
4-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
21-Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
32-Plans - Kirby Street Combined 04 10 2026.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
16-Bid Bond.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
18-Performance Bond.pdf PDF
37-Plans - 46144401 Kirby SS Reconfiguration DrnPlan 2026-06-30.pdf PDF
8-Insurance Certificate.doc.doc DOC document
29-Plans - Kirby St DDM Non Roadway Ditch SS Approval.pdf PDF
15-SBE Goal Participation SBE-1 Form Tutorial.mp4 MP4 file
14-Subcontractor Letter of Intent .pdf PDF
7-Change Order Form.pdf.pdf PDF
28-Attachment H - Sluice-gates -installation-maintanance.pdf PDF
24-Attachment E - Drainage Report 2026-06-03.pdf PDF
31-Plans - Kirby Street Combined 03 05 2026.pdf PDF
26-Attachment G - Affected Utilities 2026-02-18.pdf PDF
22-Attachment C - SWFWMD ERP Permit.pdf PDF
17-Payment Bond.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
33-IFB-26-00404 Insurance Requirements.pdf PDF
25-Attachment F - TrafficControlOfficer.docx DOCX document
23-Attachment D - Project Map.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
3-Allowance Authorization Release Form.pdf.pdf PDF
30-Plans - 46144001 Kirby TopoSurvey.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIP 46144001 Kirby St (#08) Pump Station Relocation/Replacement

Supplemental Specifications

Section 1 - Specifications

1.01R Workmanship And Materials:

This project is to be constructed utilizing Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition; FDOT FY 2024-2025 (or most current Edition) of Standard Plans for Road and Bridge Construction; FDOT Standard Specifications for Road and Bridge Construction FY 2024-2025 (or Latest Edition); with the exception of Division I and Division II Sections 100 through 103 and 105; 2023 Manual of Uniform Minimum Standards for Design, Construction and Maintenance (Florida Greenbook); 2024 FDOT Drainage Manual, Florida Administrative Codes; Hillsborough County Public Utilities Water, Wastewater and Reclaimed Water Technical Specifications October 2023 (or most current) Edition; Hillsborough County Stormwater Technical Manual October 2021, Hillsborough County Public Works Stormwater Management Technical Bulletin; Hillsborough County October 2023 Transportation Design Manual; Tampa Electric Company Standard Electric Service Requirements 2019 (or Latest Edition); and ANSI-A300 American National Standard for Tree Care Operations – Tree, Shrub, and Other Woody Plant Management-Standard Practices (Root Management), and its companion publication Root Management, Best Management Practices by the International Society of Arboriculture, and the Supplemental Specifications herein. Any conflict between the documents shall be resolved in accordance with the requirements of the Hillsborough County General Terms and Conditions and ANSI-A300 American National Standard for Tree Care Operations – Tree, Shrub, and Other Woody Plant Management-Standard Practices (Root Management), and its companion publication Root Management, Best Management Practices by the International Society of Arboriculture, and the Supplemental Specifications herein.

Hillsborough County Specification 333003: Wastewater Pumping Station Specifications are included in the contact documents. Any conflict between the documents shall be resolved in accordance with the requirements of the Hillsborough County General Terms and Conditions.

With the exception of the Specifications contained herein and the Hillsborough County Public Utilities Water, Wastewater and Reclaimed Water Technical Specifications October 2023 (or most current) Edition, Hillsborough County Public Works has adopted the FDOT FY 2023-2024 (or most current Edition) of Standard Plans for Road and Bridge Construction and FDOT Standard Specifications for Road and Bridge Construction FY 2023-2024 (or Latest Edition) for use on Public Works Construction Projects, with the following exceptions/clarifications:

A. FDOT Standard Specifications for Road and Bridge Construction Division I, Sections 1 through 9 and Division II Sections 100 through 103 and 105 are omitted from this CONTRACT and replaced in their entirety by Hillsborough County’s General Terms and Conditions and Standard Specifications 01010 through 01700. References contained in Division II and Division III of the FDOT Standard Specifications related to Division I shall be replaced with the appropriate corresponding Article(s) or Technical Specifications referenced above. References to FDOT Division I Specification(s) that do not have a corresponding Article(s) or Technical Specification shall be clarified by the county’s PROJECT MANAGER.

B. Paragraph Not Applicable.

https://assets.contentstack.io/v3/assets/blteea73b27b731f985/blt2f95697d515cb87c/Standard%20Specifications%20for%20Construction%202023.pdf https://assets.contentstack.io/v3/assets/blteea73b27b731f985/blt2f95697d515cb87c/Standard%20Specifications%20for%20Construction%202023.pdf https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25 https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25 chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/fy2024-25ebookfinalcomp-revised3-4-24.pdf?sfvrsn=16ab03d_1 chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/fy2024-25ebookfinalcomp-revised3-4-24.pdf?sfvrsn=16ab03d_1 https://www.fdot.gov/roadway/floridagreenbook/fgb.shtm https://www.fdot.gov/roadway/floridagreenbook/fgb.shtm https://www.fdot.gov/roadway/drainage/design-guide https://flrules.org/gateway/ChapterHome.asp?Chapter=14-15 http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/assets.contentstack.io/v3/assets/blteea73b27b731f985/bltb859e75c281dd885/Stormwater%20Management%20Technical%20Manual%202023.pdf chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/assets.contentstack.io/v3/assets/blteea73b27b731f985/bltb859e75c281dd885/Stormwater%20Management%20Technical%20Manual%202023.pdf chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/assets.contentstack.io/v3/assets/blteea73b27b731f985/blt7df545b72dae865d/SMTM%2023-01%20Minimum%20Pipe%20Cover%20and%20Clearances%20for%20Stormwater%20Culverts.pdf chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/assets.contentstack.io/v3/assets/blteea73b27b731f985/blt7df545b72dae865d/SMTM%2023-01%20Minimum%20Pipe%20Cover%20and%20Clearances%20for%20Stormwater%20Culverts.pdf https://hcfl.gov/government/cip-projects-and-resources/publications-and-technical-bulletins/hillsborough-county-transportation-design-manual https://hcfl.gov/government/cip-projects-and-resources/publications-and-technical-bulletins/hillsborough-county-transportation-design-manual https://www.tampaelectric.com/files/content/sesr.pdf https://www.tampaelectric.com/files/content/sesr.pdf http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications https://www.fdot.gov/design/standardplans/2024/24.shtm https://www.fdot.gov/design/standardplans/2024/24.shtm https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/specbooks/fy-2023-24/fy2023-24ebook.pdf?sfvrsn=6b69416d_6 https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/specbooks/fy-2023-24/fy2023-24ebook.pdf?sfvrsn=6b69416d_6

C. The following FDOT Standard Specifications for Roadways and Bridges are replaced and/or modified with the corresponding Hillsborough County Standard Specification sections contained herein:

204 Graded Aggregate Base 283 Reclaimed Asphalt Pavement Base 320 Hot Bituminous Mixtures; Plant, Methods and Equipment, 327 Milling of Existing Asphalt Pavement, 330 Hot Bituminous Mixtures General Construction Requirements, 334 Superpave Asphalt Concrete, 336 Asphalt Rubber Binder, 337 Asphalt Concrete Friction Courses, 341 Asphalt Rubber Membrane Interlayer, 600 Traffic Signal Overview 603 General Requirements for Installation and Evaluation of Traffic Control

Equipment and Material 611 Signal Installation Acceptance Procedures 620 Signal Installation Grounding 630 Conduit 632 Signal and Interconnect Cable 634 Span Wire Assembly 635 Pull and Junction Boxes 639 Electrical Power Service Assemblies 650 Vehicular Signal Assemblies 652 24/7 Solar Flashing Beacon Assembly 653 Pedestrian Signal Assemblies 660 Inductive Loop Detectors 662 3-M Opticom™ Priority Control Preemption Detection 665 Pedestrian Detector Assembly 670 Traffic Controller Assembly 676 Controller Cabinets 699 Internally Illuminated Signs 901 Coarse Aggregate, 902 Fine Aggregate, 916 Bituminous Materials, and 919 Ground Rubber Tire.

The CONTRACTOR Quality Control requirements outlined in these Sections are required as described herein.

D. CONTRACTOR Quality Control (CQC) program requirements referenced within the

FDOT Standard Specifications are not required on Hillsborough County projects.

However, the CONTRACTOR is responsible for constructing the project in accordance with the contract documents and ensuring compliance with the specifications. Therefore, the CONTRACTOR is responsible for scheduling and performing testing as required to ensure CONTRACT compliance. All testing performed by the CONTRACTOR must be performed by a FDOT qualified testing laboratory approved by the COUNTY. The COUNTY will perform Quality Assurance testing to ensure CONTRACTOR compliance with the CONTRACT documents. This testing is solely for the COUNTY’s benefit. The COUNTY’s testing is not intended to relieve the CONTRACTOR of performing testing and they are not permitted to rely on this testing to ensure their CONTRACT compliance. Quality Assurance testing by the COUNTY in no way relieves the CONTRACTOR or their Subcontractors of their responsibility to provide quality materials and workmanship on the project. No act or omission on the part of the COUNTY, Professional, any inspector(s), or representative of the COUNTY shall be construed as relieving CONTRACTOR of this responsibility.

E. If the CONTRACTOR desires to utilize materials, means, or methods which in accordance with the FDOT specifications requires Quality Control testing and approval by the Engineer, the testing shall be performed at the expense of the CONTRACTOR, and reviewed for acceptance by the COUNTY. The COUNTY also reserves the right to require testing above and beyond the FDOT specified LOT testing in situations when the testing of LOT quantities will not provide a reasonable assurance of the quality of the WORK. This additional testing by the CONTRACTOR will be at no additional cost to the COUNTY.

F. At the CONTRACTOR’s option he may submit a Value Engineering Change Proposal, also know as a Cost Savings Initiative Proposal (CSIP), or hereinafter referred to as a VECP or CSIP in accordance with FDOT Standard Specifications for Road and Bridge Construction, Section 4-3.9, Value Engineering Incentive, or Cost Savings Initiative Proposal. The COUNTY reserves the right to reject at its discretion any VECP or CSIP submittal and the CONTRACTOR shall remain obligated to perform the WORK in accordance with the terms of the existing CONTRACT.

G. Paragraph Not Applicable.

H. The use of the term “Department” in the FDOT Specifications is replaced by COUNTY except in those instances where the FDOT is the controlling organization.

I. The terms Engineer, PROJECT MANAGER and Project Representative are interchangeable between the various CONTRACT Documents.

J. Control of Materials: The COUNTY will accept approved FDOT Quality Product List

(QPL) products and materials unless stated to the contrary herein.

1.02R Project Sign – Attachment A

Two (2) mobile project identification signs shall be provided, placed, and removed by the CONTRACTOR. The sign(s) shall be maintained in good working condition and shall be replaced by the CONTRACTOR when damaged. The cost to provide the project identification signs shall be included in the Maintenance of Traffic pay item(s). At the commencement of construction, the CONTRACTOR shall display the signs and relocate the signs as required by the COUNTY PROJECT REPRESENTATIVE. The CONTRACTOR is responsible for the care and custody of the project identification signs. Damage to, or theft of, the project identification signs shall be reported to the COUNTY PROJECT REPRESENTATIVE by the CONTRACTOR within 24 hours. The Cost of relocating and maintaining the signs shall be considered incidental to the project. The signs will be fabricated per the specifications provided as Attachment A.

1.03R Schedule The CONTRACTOR’s project schedule shall encompass the project’s entire construction duration specified in the CONTRACT and may not indicate a shorter duration. Additionally, the schedule shall reflect the construction phasing specified in the CONTRACT and shall include all WORK, including WORK to be performed by others such as coordination, material acquisition, utility relocation, COUNTY submittal reviews, permit reviews and approvals, etc.

Bar Chart: The bar chart schedule as described in Section 01310 of the Standard Specifications shall be required under this CONTRACT for each specific/individual project when assigned.

CPM: The CPM schedule as described in Section 01311 of the Standard Specifications shall be required under this CONTRACT.

Provide schedule in the format as requested by County PROJECT MANAGER.

1.04R Special Working Hours

The Standard work site operation hours within Hillsborough County to be considered by Bidders in preparing their bids shall be as follows:

8:00AM to 5:00PM - Low volume roadways such as subdivisions or any similar locations.

9:00AM to 4:00PM - High volume roadways (collector and arterial roadways) congested areas, and any similar locations.

9:00PM to 6:00AM - High volume roadways (level “F” roadways) congested areas, and any similar locations.

Monday through Friday, excluding County-observed holidays and weekends. No WORK shall proceed outside these hours without 72 hours prior notice (minimum) and written authorization by the County PROJECT MANAGER. However, the COUNTY reserves the right to establish WORK hours based on traffic volumes, congestion, or other situations that will interfere with the normal flow of traffic.

Temporary Traffic Control Permits will be issued by the COUNTY, as described later in these Supplemental Specifications. The TTC Permits indicate the allowable hours for operation within the actual roadway limits for each road or portion thereof in each project’s work order(s). The CONTRACTOR may request alternative work hours, based on the allowable hours established by the TTC Permit(s). The approval of alternate work hours for each project is subject to the same authorization described above and will be based on a standard 8-hour shift as provided by the normal work hours. These provisions allow daytime and nighttime shifts, based on the allowable hours indicated by the TTC Permit. Further changes to the approved work hours require a formal request by the CONTRACTOR for the TTC Permit to be amended by the COUNTY and the aforementioned written authorization by the County’s PROJECT MANAGER. If approved, an amended TTC Permit will be issued to the CONTRACTOR.

As long as the work is on schedule, the PROJECT MANAGER is not obliged to consider a shift longer than 8 hours or additional workdays beyond those described above. However, if the WORK is deemed to be behind schedule, the PROJECT MANAGER may approve longer shifts and/or additional shifts based on the approval of a recovery schedule submitted by the CONTRACTOR. At the discretion of the PROJECT MANAGER, additional costs incurred by the COUNTY for overtime wages and/or employing additional staff are subject to reimbursement by the CONTRACTOR to the COUNTY.

Overtime Work:

The Work Order will establish the milestone dates for the Work Order completion. The CONTRACTOR is responsible to complete the WORK within the required milestone dates, using overtime work, if necessary, at no additional cost to the COUNTY.

Emergency Work/Urgent Work:

In the event of an emergency or urgent WORK, as identified by the PROJECT MANAGER or his designee, the CONTRACTOR will be required to respond to the request of the PROJECT MANAGER or his designated representative and mobilize within twenty-four (24) hours of verbal notification, including weekends. The CONTRACTOR must mobilize and begin work within twenty-four (24) hours of verbal notification, including weekends in order to be compensated for associated "URGENT" line items, such as Mobilization and M.O.T. Failure to meet this CONTRACT requirement may result in the work's being assigned to another firm;

and/or no further Work Orders being issued to the CONTRACTOR; and/or termination of this CONTRACT; and/or the filing of a claim by the COUNTY against the performance bond. In the event of an emergency condition, certain purchase restrictions may be waived by the

COUNTY.

Routine Work:

In the event of routine WORK, as identified by the PROJECT MANAGER or designated representative, the CONTRACTOR will be required to respond to the request of the PROJECT MANAGER or designated representative, and commence WORK as indicated in the PROJECT MANAGER. Failure to meet this CONTRACT requirement may result in the work's being assigned to another firm; and/or no further Work Orders being issued to the CONTRACTOR; and/or termination of this CONTRACT; and/or the filing of a claim by the COUNTY against the performance bond. When needed, and approved by the County’s PROJECT MANAGER, the use of an off-duty law enforcement officer will be paid by the hour.

The total hours actually worked at the site by each individual officer will be entered for payment daily. Travel time to and from the site are not included in the daily payment. A line item is added to the bid pages to address the support of an off-duty law enforcement officer.

1.05 Clearing & Grubbing

Clearing & Grubbing shall be performed in accordance with FDOT Specification Section 110.

Additionally, specified plowing of the surface shall include the removal of the top layer of organic material beginning from the original ground line and if applicable stockpiling of the material for future use on the project. No additional compensation shall be provided for this WORK or associated WORK within the designed limits of construction with the exception of tree removal that is greater than 6” DBH. DBH is defined as Diameter at Breast Height, which is

4.5 feet above the ground on the uphill side of the tree. Tree removal greater than 6” in DBH should utilize “tree removal” bid items for payment.

1.06 Pedestrian Facilities

A. All pedestrian facilities shall be constructed in accordance with the Americans with Disabilities Act (ADA) and the Department of Transportation Regulation 49 CFR, Part 37.

B. Sidewalks and curb ramps shall be constructed in accordance with the FDOT Design

Standards FY2022-23 (or the latest edition at time of bid opening) Standard Plan 522-001 and 522-002. Residential sidewalks adjacent to driveways shall be six (6) inches depth up to the first construction joint, which shall be a distance of five (5) feet measured from the edge of the driveway. Sidewalks/Ramps adjacent to roadways shall be six (6) inches in depth up to the first construction joint which shall be a minimum distance of six (6) feet measured from the edge of pavement, or back of curb. The construction joint may not transect the detectable warning surface.

C. Detectable warning surfaces, as defined by the latest edition of FDOT Standard

Specifications for Road and Bridge Construction - Specification 527, will be utilized in lieu of tactile surfaces. Detectable warning surfaces must be capable of supporting vehicular traffic and no waivers to the warranty are acceptable. All references to tactile surfaces in the Hillsborough County Standard Specifications for construction shall be interpreted as referring to detectable warning surfaces. In order to meet ADA visual contrast requirements, the standard color for application on Hillsborough County maintained roads is red, unless otherwise directed by the County PROJECT MANAGER. If field conditions exist in which red would not create sufficient contrast, the County PROJECT MANAGER should be notified in order to determine if another color should be utilized. On FDOT maintained roads, the color requirements may vary and should be confirmed with FDOT prior to placement.

Acceptable Materials for Detectable Warning Surfaces:

1. Top Guard Detectable Warning by Roadway Concepts

2. Proprietary epoxy-based system supplied and installed by Vanguard of Florida.

3. Alternate materials and methods which fully meet CONTRACT specifications, and which have been approved for the FDOT Qualified Products List, may be used if approved by the County PROJECT MANAGER. Only those materials and methods which are compatible with traffic loads (including warranty) will be considered.

D. Typical Layout of Ramp Pay Item is below:

- End of Section -

Section 2 – Project Specific

2.01R Office Facilities:

A Field Office will not be required as part of this project.

2.02R Superpave Asphalt Unit of Measure:

For this CONTRACT the unit of measure for Pay item 334-1 Superpave asphaltic concrete shall be Tons (TN).

2.03R Environmental Project Signs - If required per Spec Section 01560-1.08.

CONTRACTOR shall provide Three (3) project signs for the COUNTY. Project sign(s) shall be fabricated, painted, and lettered in accordance with the Special Conditions if the project is financed entirely by the COUNTY, or in accordance with the EPA Supplementary General Conditions if partially financed by an EPA grant. Each sign shall be erected in a location as directed by the County PROJECT MANAGER. Each sign shall be braced to keep it in a plumb position for the construction duration. CONTRACTOR shall remove and dispose of the sign(s) when directed by the County PROJECT MANAGER.

2.04R Construction Phasing & Nearby School Traffic:

Construction phasing is provided for informational purposes only as depicted on the Temporary Traffic Control Plans. The CONTRACTOR is responsible for developing the project Construction Phasing Plan/Maintenance of Traffic Plan and associated coordination with school board, utilities, agencies, neighborhoods, affected landowners, etc. The CONTRACTOR shall be particularly mindful of school-generated peaking traffic patterns, bus stops, parent/student drop-off/pick-up areas, etc. in the vicinity of the project, and the CONTRACTOR shall ensure a safe project environment for these conditions. The CONTRACTOR shall maintain traffic in each direction unless otherwise shown on plans or approved by the county PROJECT MANAGER.

Additionally, the CONTRACTOR shall maintain all existing auxiliary turn lanes throughout the duration of the project, even during temporary traffic shifts, unless otherwise shown on plans or approved by the COUNTY Project Manager. Phasing only may be adjusted as approved by the COUNTY Project Manager or their designated representative.

2.05R Residential & Business Owner Coordination:

CONTRACTOR is responsible for coordinating all WORK with residences, homeowner associations, and business owners when performing WORK adjacent to their properties. This may include shifting of traffic, entrances, landscaping, hardscaping, irrigation, electrical, use of acquired property & easements, etc. The CONTRACTOR shall give 3 weeks’ notice prior to any related modifications and ensure that the property owner is satisfied with the proposed plan & timing. Any discrepancies or disputes over the plan will be coordinated with county PROJECT

MANAGER.

2.06R Project Locations: Attachment D

Work will be performed at a county owned parcel location at 5201 E. Kirby Street, Tampa Florida. (Kirby Street Pump Station #08 (CIP 46144.001):

2.07R Utility Coordination – N/A (HCWRD Conflict to be addressed and protected as part of the project design) Any conflicts between the WORK that the CONTRACTOR shall perform, and the utility owner’s facilities shall be resolved by the CONTRACTOR and the utility owner with the COUNTY’S concurrence. Utility Relocation Schedules and timelines included in the

CONTRACT Documents are intended to demonstrate the relationship between the utility relocation phasing plans and the construction phasing plans developed during the design of the project.

The CONTRACTOR shall coordinate its WORK with that of the utility companies. The CONTRACTOR shall protect from any damage to all existing structures, underground piping, benchmarks, trees, and other facilities. The CONTRACTOR will be held responsible for damage to such existing facilities. In the event of interruption of water, wastewater or other utility services as a result of accidental breakage, exposure, or lack of support, the CONTRACTOR shall promptly notify the proper authority and cooperate with the authority in the prompt restoration of service. If water or wastewater service is interrupted and the CONTRACTOR is performing or assisting the repair work, the CONTRACTOR shall work continuously until the service is restored. Do not begin WORK around fire hydrants until the local fire authority has approved provisions for continued service.

2.08R Permits – Attachment C

A. Pursuant to the General Conditions, the COUNTY has obtained the following permits:

1. ERP Individual Construction Major Modification File #861283 / 43045273.001 (CIP46144001 – Kirby St #08) Expires May 31st, 2028.

B. Pursuant to section 218.80, Florida Statutes, Hillsborough County discloses that the permits and fees listed below are the responsibility of the CONTRACTOR.

PERMIT COST

Hillsborough County Right of Way Use Permit $ 00.00 NPDES Notice of Intent Note: Less than 1 acre not required 1-5 acres $250.00 Over 5 acres $400.00 Hillsborough County Temporary Traffic Control Permit $ 00.00

An Allowance of $250.00 has been included in the bid proposal section to reimburse the CONTRACTOR for the cost of permits, in accordance with Items Section 5.4.6 (Permits) and Section 5.19 (Allowance) of the General Terms and Conditions. Any unused allowance remaining at the end of the CONTRACT will be credited back to the COUNTY by Change Order.

2.09R Incidental Items:

Miscellaneous or incidental items such as bypass pumping, coffer dams, dewatering, cutting, patching, grading, saw-cutting, concrete pipe collars, electrical hardware, bolts, nuts, fittings, etc., or other ancillary items may be required to complete the construction as indicated on the plans or in the scope of work. If no specific bid item is shown, such miscellaneous or incidental items are to be included in the unit price (s) for the item (s) with which they are associated. SEPARATE

PAYMENT FOR MISCELLANEOUS INCIDENTAL ITEMS SHALL NOT BE MADE BY

THE COUNTY. All components shown and described on the bid documents are to be included in the bid items shown on the bid form.

Means and Methods:

Additional compensation for items considered as means and methods will not be compensated for by the COUNTY. Specifically, but not limited to; the use of water trucks (for lining, structure sealing etc.) divers, vibration monitoring, cofferdams, dewatering systems, access mats, and concrete pumps.

2.10R Restoration of Site:

Upon completion of any WORK, the CONTRACTOR shall be responsible for cleaning and restoring the site. This includes removing all unused materials and excess soil. All disturbed areas, including areas outside the construction limits, shall be returned to their pre-construction conditions at the CONTRACTOR’s expense.

2.11R Storage of Construction Materials and Equipment:

Supplemental to the provisions in the CONTRACT Terms and Conditions, if the CONTRACTOR intends to store or stage materials, equipment, construction debris, etc. on private or public property outside of the right of way, the CONTRACTOR shall obtain permission via a written agreement. The CONTRACTOR shall provide the COUNTY with a copy of the written agreement prior to any utilization of the property. The written agreement shall specify the terms, identify the parties involved, and be signed by authorized individuals representing the property owner and the CONTRACTOR. If the property is a County facility, the COUNTY REPRESENTATIVE will assist with obtaining written permission to the extent possible. Areas utilized by the CONTRACTOR for storing or staging materials, equipment, and other items will be fully restored to their original condition at the expense of the CONTRACTOR. Restoration will occur immediately after the CONTRACTOR’s last use of the area.

2.12R Traffic Control Officer Requirement: Attachment F When needed, and approved by the County PROJECT MANAGER, the use of an off-duty law enforcement officer will be paid by the hour. The total hours actually worked at the site by each individual officer will be entered for payment daily. Travel time to and from the site are not included in the daily payment. A line item is added to the bid pages to address the support of an off-duty law enforcement officer. An example of the form to be used to document the number of daily hours worked for each officer is attached to these Special Conditions as Attachment F.

2.13R Residential Irrigation (Sprinkler) System Repair:

The construction activities associated with road reconstruction and resurfacing could impact existing irrigation systems that are within or near the County’s right-of-way. The CONTRACTOR is responsible at his own expense for immediate repairs to these systems which result from construction activity in their vicinity. Generally, these repairs are anticipated to be PVC pipeline break repairs (typically ½” to 2” diameter pipe) and damaged sprinkler head repair and/or replacement. The repair WORK will be coordinated with the affected residents or entities responsible for the irrigation system and accomplished to their satisfaction.

2.14R Maintenance of Traffic:

The CONTRACTOR shall furnish all necessary traffic control, barricades, signs, and flagmen, to ensure the safety of the traveling public and to all working personnel. The CONTRACTOR shall submit a Maintenance of Traffic (MOT) plan indicating all facets of traffic control for the project area. The MOT plan must be approved in writing by the County prior to commencing any WORK. All traffic control shall be in accordance with the FDOT Design Standards and FDOT Standard Specifications for Road and Bridge Construction Section 102, most current editions.

MOT and associated devices shall be checked daily and periodically throughout the project for compliance; and where adjustments or corrections are needed, prompt revisions shall be made.

Daytime and overnight lane closures shall be in accordance with all applicable permits, policies and Section 1 of these Supplemental Specifications, Article 1.04 Work Hours. Lane closures on roadways under FDOT’s jurisdiction shall be coordinated with FDOT by the CONTRACTOR.

Similarly, lane closures involving other authorities and municipalities, where the County’s roads intersect or are continuous with roads under their jurisdiction, will be coordinated with that entity by the CONTRACTOR. This may include expressway authorities, cities, and adjacent counties.

All associated costs for coordination, plans and/or permit(s) preparation, submittal and securing approval, are to be included in this Pay Item.

Payment for this item shall include: all necessary traffic control, barricades, signs and flagmen, to ensure the safety of the traveling public and to all working personnel, all Painted Pavement Markings including Interim and Final surfaces, Final Paint, Interim phase pavement markings, all Temporary Pavement Markings and Removal of all conflicting existing pavement markings. Other means of removal or obliteration of conflicting or obsolete pavement markings may be employed if approved by the PROJECT MANAGER. It shall also include material (asphalt, concrete, millings, crushed concrete, etc.) required to maintain driveways during construction, and their removal and disposal if required.

2.15R Close-out Documentation:

The CONTRACTOR shall provide all close-out documents such as the following in a timely manner:

• Signed and sealed, digital as-builts plan set

• Test reports

• Test logs

• Memorandum on company letterhead showing final DM/DWBE participation percentage and dollar amount

• Operational manual (if applicable)

• Permits closeout (if applicable)

• Beneficial occupancy (if applicable)

• Substantial certification

• Final certification

• Warranty assurances

Should the CONTRACTOR fail to comply with their responsibilities to provide all close-out documentation as prescribed in the CONTRACT within the allocated time frame, deemed by the County, the County shall not release the full construction fee. In such case, the County will continue to withhold a Close-out amount not to exceed $40,000.00 until CONTRACTOR has satisfactory fulfilled the CONTRACT requirements.

2.16R Measurement & Payment:

This Section modifies or clarifies items in the FDOT Standard Specifications for Road and Bridge Construction 2023-2024 and the Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition.

Standard Specifications for Road & Bridge Construction 2023-2024, Section 660, Loop Detector Assembly: Article 660-6 Method of Measurement and Article 660-7 Basis of Payment:

The method of measurement for traffic loop assemblies is per 660-8.2 Furnish and Install. Many traffic loop assemblies in Hillsborough County’s traffic systems may only require connection of the new loop lead into the first pull box. However, there are traffic signals on County roads that http://www.fdot.gov/programmanagement/Implemented/SpecBooks/July2018/JULY2018BK.shtm http://www.fdot.gov/programmanagement/Implemented/SpecBooks/July2018/JULY2018BK.shtm http://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2017/oct-2017-hc-public-works-specs.pdf?la=en http://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2017/oct-2017-hc-public-works-specs.pdf?la=en are operated and maintained by other municipalities. The CONTRACTOR is cautioned about predicating their price on a limited scope of work. Some traffic loop assemblies may require significantly more WORK to satisfy the Specifications, such as installing additional signal cables in conduits, cutting and epoxy sealing signal cables in asphalt, loop lead-in installation, and any other WORK required to produce a complete and accepted installation by the jurisdictional owner and operator of the traffic signals. Payment will be per traffic loop assembly type (AS).

All other provisions of Section 660 apply.

Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition, Section 101 – 1.02 Payment for Mobilization: Section 101-2.01 Basis of Payment:

Payment for Mobilization shall be based on lump sum as shown in the CONTRACT bid pages.

All other provisions of Section 101 apply.

Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition, Maintenance of Traffic Section 102-5.01 Basis of Payment:

Payment for Maintenance of Traffic shall be based on lump sum as shown in the CONTRACT bid pages. All other provisions of Section 102 apply.

2.17R Millings:

The CONTRACTOR is responsible for delivery of millings to the nearest County maintenance yard. All associated costs are to be included in the milling bid items in the BP sheets. If no County entity is willing to accept the millings, the CONTRACTOR will take possession of them and immediately remove the millings from the project site at no cost to the County.

2.18R Excavation for Structures and Pipe

Excavation for Structures and Pipe shall be performed in accordance with FDOT Specification Section 125. No additional compensation shall be provided for this WORK or associated WORK. Payment for this WORK under this Section shall be strictly adhered to in this CONTRACT and no other listed bid items shall be utilized unless prior approval from Project Manager has been permitted and work order has been issued.

2.19R Pipe Culverts and Storm Sewer Pipe material shall be specified on the construction plans or in some cases directed by the PROJECT MANAGER. CONTRACTOR’s unit prices for optional material shall take into consideration for the use of various piping material as directed by the COUNTY’s PROJECT MANAGER for project specific reasons.

2.20R Record Drawings In addition to the requirements stated in the Specifications, each sheet of the record drawings drawings shall be signed and sealed by the CONTRACTOR’s Project Superintendent and the Registered Surveyor in a Timely Manner. Final payment shall be dependent on the COUNTY’s acceptance and approval of these record drawings.

2.22R Audiovisual Survey A pay item for “Audio Video Survey” has been included in the bid proposal. The CONTRACTOR shall perform both the pre-construction and post-construction audio video survey as one (1) unit in each work order unless otherwise directed by the COUNTY. The audio video surveys are to be provided to the COUNTY in DVD format and must meet all the requirements stated in Section 01385.

Basis of payment for the pre-construction and post-construction audio video surveys shall be http://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2017/oct-2017-hc-public-works-specs.pdf?la=en http://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2017/oct-2017-hc-public-works-specs.pdf?la=en http://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2017/oct-2017-hc-public-works-specs.pdf?la=en http://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2017/oct-2017-hc-public-works-specs.pdf?la=en considered as one (1) unit per work order. The project’s pre-construction audio video survey DVD(s) and accompanying report(s) shall be submitted for review and approval to the COUNTY by the CONTRACTOR at least two weeks prior to CONTRACTOR’s mobilization date.

Also, final payment approval and final certification of project completion shall be contingent on the CONTRACTOR’s timely submission of the project’s post-construction audio video survey DVD(s) and accompanying report(s) for review and approval.

2.23R Electrical Work:

Provide a complete electrical service in accordance with the FDOT Supplemental Specifications, including all underground conduits, conductors, grounding, service entrance equipment, metering, and feeder wiring required for a fully operational power connection. Coordinate with TECO for the service point, inspections, meter installation, and final energization.

TECO will furnish and install the overhead (OH) primary service, three-phase transformer bank, and OH-to-underground (UG) secondary service under a separate agreement and outside this contract.

The Contractor shall furnish and install all electrical work from the TECO transformer to the pump station, including grounding, the meter/main service disconnect, feeder conductors, and the pump station local main disconnect.

2.24R Geotechnical Information – Attachment B A. Geotechnical information has been provided for the project as part of these Contract

Documents. This information is being provided for the Bidder’s information only and is not intended to be a complete description of the subsurface conditions. The Bidder or the CONTRACTOR is not relieved of any duty as otherwise required in these Contract Documents to examine the site of the proposed work or to make any investigations or inquiries, including, but not limited to additional subsurface testing, because the COUNTY has provided this information. Any such examinations, investigations, inquiries or testing performed by the Bidder or CONTRACTOR shall be done at such Bidder's or CONTRACTOR’s own expense.

B. Any reports provided are for the CONTRACTOR’s general information. The COUNTY disclaims all responsibility for the findings and interpretations expressed in the reports by the testing laboratories. The CONTRACTOR shall make whatever subsurface and geotechnical investigations it deems necessary as to actual field conditions and to comply with the requirements of the Contract Documents.

2.25R Drainage Report: Attachment E

2.26R Subsurface Utility Engineering (SUE) Report: Attachment G

2.27R Sluice Gates: Attachment H - Specifications are included in the contract documents.

- End of Section -

2.18R Excavation for Structures and Pipe
2.19R Pipe Culverts and Storm Sewer
2.20R Record Drawings
2.22R Audiovisual Survey

File details come from the government source that posted it. Updated .