About this file

This is a Payment Bond document for the Hillsborough County Board of County Commissioners, Florida, associated with Invitation for Bid (IFB) 26-00404 for the Kirby Street Pump Station #08 Rehabilitation project. The project involves construction of a new stormwater pump station on a county-owned parcel located north of the existing facility at 5201 E. Kirby Street, Tampa, Florida. The scope of work encompasses site preparation, clearing and grubbing, tree removal, earthwork, excavation, stormwater pond regrading, construction of the new pump station including wet well pumps, piping, mechanical and electrical systems, SCADA integration, installation of drainage infrastructure, utility coordination, temporary erosion and sediment control, dewatering, access improvements, fencing, sodding, and phased demolition of the existing pump station. The existing pump station shall remain operational throughout construction until the new facility is completed, tested, commissioned, and placed into service. The estimated total project cost is $1,473,476.90, and the project includes a 10% Small Business Enterprise (SBE) subcontractor participation goal.

The Payment Bond serves as a financial guarantee requiring the contractor and surety to ensure prompt payment to all claimants, including laborers, material suppliers, and suppliers providing resources directly or indirectly to the project. The bond protects the Owner against losses, damages, expenses, costs, and attorney's fees resulting from the contractor's default in payment obligations. Claimants seeking bond protection must comply with strict requirements set forth in Florida Statutes Section 255.05, and legal action against the Principal or Surety must be instituted within one year from the date of labor performance or material delivery completion. The bond remains in full force regardless of contract modifications, extensions of time, or other forbearance granted by either party, and notice to the Surety of such changes is waived.

View the file

Other files

File Type Posted
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
35-IFB-26-00404 Contract Terms and Conditions.pdf PDF
27-Attachment G - KIRBY STREET TESTHOLE DATA FORM.pdf PDF
34-Agreement - Construction - Stand Alone.pdf PDF
20-Attachment B - GeotchRpt.pdf PDF
36-Attachment G - SUE Rpt.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
4-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
19-IFB-26-00404 Supplemental Specifications.pdf PDF
21-Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
32-Plans - Kirby Street Combined 04 10 2026.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
16-Bid Bond.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
18-Performance Bond.pdf PDF
37-Plans - 46144401 Kirby SS Reconfiguration DrnPlan 2026-06-30.pdf PDF
8-Insurance Certificate.doc.doc DOC document
29-Plans - Kirby St DDM Non Roadway Ditch SS Approval.pdf PDF
15-SBE Goal Participation SBE-1 Form Tutorial.mp4 MP4 file
14-Subcontractor Letter of Intent .pdf PDF
7-Change Order Form.pdf.pdf PDF
28-Attachment H - Sluice-gates -installation-maintanance.pdf PDF
24-Attachment E - Drainage Report 2026-06-03.pdf PDF
31-Plans - Kirby Street Combined 03 05 2026.pdf PDF
26-Attachment G - Affected Utilities 2026-02-18.pdf PDF
22-Attachment C - SWFWMD ERP Permit.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
33-IFB-26-00404 Insurance Requirements.pdf PDF
25-Attachment F - TrafficControlOfficer.docx DOCX document
23-Attachment D - Project Map.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
3-Allowance Authorization Release Form.pdf.pdf PDF
30-Plans - 46144001 Kirby TopoSurvey.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Payment Bond PYB - 1

(REV. 07/02/25)

BOND NO._

PAYMENT BOND

Contractor Name

Contractor Principal Business Address

Contractor Telephone No. ( )

Surety Name

Surety Principal Business Address

Surety Telephone No. ( )

Owner of Property Being Improved:

Hillsborough County Board of County Commissioners Attn: Procurement Services Department P.O. Box 1110 Tampa, FL 33601

Telephone No. (813) 272 – 5790

Contracting Public Entity (if different from Owner) (N/A) Contract Number Assigned by Public Entity (BOCC No.)

(Bid No.) IFB-26-00404

Description of Project (including if applicable, a legal description and the street address of the property being improved and a general description of the improvement):

[ ] See Attachment ("Legal Description")

The scope of work project includes construction of a new stormwater pump station on a county-owned parcel located north of the existing facility. The new pump station is intended to improve the performance, reliability, capacity, and long-term maintainability of the County’s stormwater management system by replacing aging infrastructure nearing the end of its useful service life. The existing pump station shall remain fully operational throughout construction until the new facility has been completed, tested, commissioned, and placed into service. Following successful startup of the new pump station, the existing facility will be decommissioned and demolished in a phased manner. The scope of work includes, but is not limited to, site preparation; clearing and grubbing; tree removal; earthwork;

excavation; stormwater pond excavation and regrading; grading and slope reconstruction; construction of the new pump station, including the wet well pumps, associated piping, mechanical systems, electrical systems, control systems, SCADA integration, and sluice gate controls; installation of drainage infrastructure including storm piping, manholes, inlets, and outfall structures; utility coordination;

temporary erosion and sediment control; dewatering; access driveway; sidewalks; fencing and gates;

sodding; phased demolition of the existing pump station and associated infrastructure; restoration of disturbed areas; and final site cleanup. The Contractor shall also coordinate electrical service installation and utility connections required for the project.

Payment Bond PYB - 2

BOND NO. _____________________

PAYMENT BOND

I. BY THIS BOND, We, (hereinafter called the "Principal") and (Name of Surety) (hereinafter called the "Surety", located at (Business Address) a surety insurer chartered and existing under the laws of the State of and authorized to do business in the State of Florida, are held and firmly bound unto the BOARD OF COUNTY COMMISSIONERS OF HILLSBOROUGH COUNTY, FLORIDA (hereinafter called the "Owner") in the sum of ($ ) for payment of which we bind ourselves, our heirs, our personal representatives, our successors, and our assignees jointly and severally.

II. WHEREAS, the Principal and Owner have reached a mutual agreement (hereinafter referred to as the "Contract") as of (the bid award date for projects subject thereto) for the purpose of IFB-26-00404, Kirby Street Pump Station #08 Rehabilitation said Contract being made a part of this Bond by this reference.

III. A. NOW THEREFORE, THE CONDITION OF THIS BOND IS THAT IF THE PRINCIPAL:

1. Shall promptly make payments to all claimants as defined in section 255.05(1), Florida Statutes, supplying the Principal with labor, materials, or supplies, as used directly or indirectly by the Principal in the prosecution of the work provided for in the Contract; and

2. Shall pay the Owner for all losses, damages, expenses, costs, and attorney's fees, including those resulting from appellate proceedings, that the Owner sustains because of a default by the Principal in contravention to the Contract in regard to payment for such labor, materials, or supplies furnished to the Principal; then this Bond is void; otherwise, this Bond remains in full force and effect.

B. BE IT FURTHER KNOWN:

1. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the said Contract or alterations which may be made in the terms of the said Contract, or in the work to be done under it, or the giving by the Owner of any extension of time for the performance of the said Contract, or any other forbearance on the part of the Owner or Principal to the other, shall not in any way release the Principal and the Surety, or either or any of them, their heirs, their personal representatives, their successors or their assigns from liability hereunder, notice to the Surety of any such changes, alterations, extensions or forbearance being hereby waived.

2. Certain claimants seeking the protection of this Bond must timely comply with the strict requirements set forth in section 255.05, Florida Statutes, and as otherwise provided by law.

3. As concerns payment for labor, materials and supplies, as affects certain claimants, no legal action shall be instituted against the Principal or Surety on this Bond after one (1) year from the performance of labor or the completion of delivery of the materials or supplies as is specifically mandated pursuant to section 255.05, Florida Statutes.

Payment Bond PYB - 3

THIS BOND DATED THIS day of , 20 .

ATTEST: PRINCIPAL:

Printed Name

BY: (SEAL)

Witness Authorized Signature (Principal)

Witness Printed Name

Title of Person Signing Above

-OR-

Witness As Attorney in Fact (Attach Power)

Business Address

Business Telephone

STATE OF _______________________)

COUNTY OF ______________________)

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by ________________________________________ as (Name of person)

________________________________ for _______________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known ___ OR Produced Identification ___

Type of Identification Produced ______________________

Payment Bond PYB - 4

ATTEST SURETY:

Printed Name

Business Address

Witness Authorized Signature

-OR-

Witness As Attorney in Fact (Attach Power)

Agent's License No.

COUNTERSIGNED (if applicable) Agency Name

Signed Agency Mailing Address Agent's License No. Phone ( ) Agency Telephone Number

Agency Fax No.

STATE OF _______________________)

COUNTY OF ______________________)

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by ________________________________________ as (Name of person)

________________________________ for _______________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

Personally Known ___ OR Produced Identification ___ (Print, Type, or Stamp Name of Notary Public)

Type of Identification Produced ______________________