23-Attachment D - Project Map.pdf

PDF 855 KB Posted

Attached to
Kirby Street Pump Station #08 Rehabilitation
Solicitation number
IFB-26-00404
Issued by
Hillsborough County, Florida

About this file

This is a project map and drainage assessment document prepared by Hillsborough County Engineering and Operations Department for the Kirby Street Pond Modification and Pump Station Design project (CIP 46144001). The project addresses chronic street flooding in the vicinity of the Kirby Street stormwater pond, specifically affecting Doreen Street and N. Whittier Street. The existing stormwater collection system discharges into the Kirby Street pond, which is currently controlled by a constant speed simplex pump system with a capacity of 700 gallons per minute. The project site is located at 5200 E. Kirby Street between N. 50th Street and N. 56th Street in the East Lake Orient Park community, Section 27 Township 28 Range 19, approximately 1,970 feet south of the Hillsborough River within the Hillsborough River Watershed. The proposed improvements must satisfy requirements established by the Southwest Florida Water Management District (SWFWMD) Environmental Resource Permit and Hillsborough County standards.

The contract opportunity associated with this project involves construction of a new stormwater pump station on a County-owned parcel located north of the existing facility at 5201 E. Kirby Street, Tampa, Florida 33617, with subsequent decommissioning and demolition of the existing pump station. The estimated total project cost is $1,473,476.90. A 10 percent Small Business Enterprise (SBE) participation goal has been established for subcontractor involvement. Questions and requests for interpretation must be submitted no later than 14 calendar days after the solicitation issuance date, site visit, or pre-bid conference, whichever occurs later, as specified in the Contract Terms and Conditions Document.

View the file

Other files

File Type Posted
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
35-IFB-26-00404 Contract Terms and Conditions.pdf PDF
27-Attachment G - KIRBY STREET TESTHOLE DATA FORM.pdf PDF
34-Agreement - Construction - Stand Alone.pdf PDF
20-Attachment B - GeotchRpt.pdf PDF
36-Attachment G - SUE Rpt.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
4-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
19-IFB-26-00404 Supplemental Specifications.pdf PDF
21-Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
32-Plans - Kirby Street Combined 04 10 2026.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
16-Bid Bond.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
18-Performance Bond.pdf PDF
37-Plans - 46144401 Kirby SS Reconfiguration DrnPlan 2026-06-30.pdf PDF
8-Insurance Certificate.doc.doc DOC document
29-Plans - Kirby St DDM Non Roadway Ditch SS Approval.pdf PDF
15-SBE Goal Participation SBE-1 Form Tutorial.mp4 MP4 file
14-Subcontractor Letter of Intent .pdf PDF
7-Change Order Form.pdf.pdf PDF
28-Attachment H - Sluice-gates -installation-maintanance.pdf PDF
24-Attachment E - Drainage Report 2026-06-03.pdf PDF
31-Plans - Kirby Street Combined 03 05 2026.pdf PDF
26-Attachment G - Affected Utilities 2026-02-18.pdf PDF
22-Attachment C - SWFWMD ERP Permit.pdf PDF
17-Payment Bond.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
33-IFB-26-00404 Insurance Requirements.pdf PDF
25-Attachment F - TrafficControlOfficer.docx DOCX document
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
3-Allowance Authorization Release Form.pdf.pdf PDF
30-Plans - 46144001 Kirby TopoSurvey.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KIRBY ST. POND MODIFICATION AND PUMP STATION DESIGN

Page | 1

Figure II.A – Location Map

I. PURPOSE

The intent of this report is to evaluate the Kirby Street Pond Modification and Pump Station Design

(Hillsborough County’s CIP 46144001). The purpose of this project is to improve local street flooding within the vicinity of the Kirby Street stormwater pond. Doreen Street and N. Whittier Street share a common stormwater collection system that discharges into the Kirby Street stormwater pond. The Kirby Street Pond stage is controlled by a constant speed simplex pump system that conveys 700 gpm to an existing outfall. Both streets are reportedly experiencing flooding during heavy storm events.

This drainage report provides an assessment of the proposed drainage improvements that satisfy the requirements established by the Southwest Florida Water Management District (SWFWMD) ERP and Hillsborough County.

II. SITE DESCRIPTION

A. Location:

The project is located off E Kirby Street at 5200 E. Kirby St. between N. 50th St. and N. 56th St. within the community of East Lake Orient Park in Section 27 Township 28 and Range 19. Kirby Street lies within the Hillsborough River Watershed. The project is located approximately 1,970 ft south of the Hillsborough River. See Figure 1 below.

PROJECT LOCATION

File details come from the government source that posted it. Updated .