37.- Figure L-1 Combined Management Plan 7.18.24.xlsx

XLSX spreadsheet 88 KB Posted

Attached to
Laredo Texas Full Maintenance; Operations and Maintenance; Custodial, Grounds, and Related Services
Solicitation number
47PH0225R0006
Issued by

About this file

The file is a Management Plan Baseline (Figure L-1) for a full maintenance contract in Laredo, Texas, solicitation number 47PH0225R0006. The document provides a government baseline for manpower requirements, showing annual productive hours, vacation, holidays, and sick time totaling 2,080 hours, though the specific personnel details are not filled in. This is part of a General Services Administration (GSA) Public Buildings Service procurement for Operations and Maintenance, Custodial, and related services covering six federal buildings totaling approximately 13,050,108 square feet.

The procurement is set aside exclusively for 8(a) firms under NAICS code 561210 with a small business size standard of $47M, and joint ventures are permitted if one member is an 8(a) firm. The contract will be a Firm Fixed Price with monthly payments, featuring a 12-month base period and four one-year option periods, anticipated to begin around 06/01/2026. The solicitation will be electronically posted on SAM.gov, with potential offerors responsible for downloading documents and monitoring for amendments. The contract will be awarded using FAR Part 15 procedures, with competition limited to eligible 8(a) firms.

View the file

Other files

File Type Posted
47PH0225R0006 Amendment 0003 SF30 0 OF 12.pdf PDF
47PH0225R0006 Amendment 0003 Specification Laredo Texas Full Maintenance Operations and Maintenance1 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-1 Fire Extinguisher Report 9 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 - Notes by Gemini Pre-Proposal Meeting Laredo - 10 of 12.pdf PDF
47PH0225R0006 Amendment 0002 SF30 PDF Form 12 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Attendees to the Pre-Proposal Walk Thru Laredo Texas Full Maintenance 2 of 12.pdf PDF
47PH0225R0006 Amendment 0003 PDF Form SF1449-21 Solicitation for Commercial Products 3 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Excel Doc Figure L-1 Combined Management Plan 7 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Attachment 2_ Wage Determination Laredo Texas 3 of 7.pdf PDF
47PH0225R0006 Amendment 0001 SF30 1 of 4.pdf PDF
4.- Exhibit C4 - Solid Waste Audit Reports (1).pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry (1).pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry (1).pdf PDF
11.- Exhibit M1 - O_M QASP Template (2).pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy.pdf PDF
1.- Exhibit C1- Custodial R7 Recycling & Solid Waste Trash Report - APR24.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan (1).pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1) (1).pdf PDF
17.- Exhibit M7 - Electrical Testing Technicians Requisites.pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022.pdf PDF
47PH0225R0006 Amendment 0001 FIGURE L-3 Experience Worksheet 3 of 4.pdf PDF
47PH0225R0006 Amendment 0001 Questions and Answers 4 of 4.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report (1).pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report.pdf PDF
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry.pdf PDF
11.- Exhibit M1 - O_M QASP Template (1).pdf PDF
19.- Exhibit M9 2022 GSA PBS PM Guide (1).pdf PDF
28.- BL1_ Extinguisher Report - List of Assets.pdf PDF
32.- BL6 Work Order History - List of Work Orders.pdf PDF
33.- BL7 Energy_&_Water_Monthly_Report_template.docx.pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry.pdf PDF
9. Exhibit C5 - Building Information Sheet - Border Patrol Sector Headquarters.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse.pdf PDF
14.- Exhibit M4 Building Operating Plan Template.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
22.- Exhibit M12_ Flushing Stagnant Plumbing.pdf PDF
23.- Exhibit M13 Sample Fuel Storage Tank Management Plan.pdf PDF
29.- BL2 Inventory to Include Fire Alarm Devices - List of Assets.pdf PDF
36.- Figure B-3 FM 5 Year Contract 10.30.24 .xlsx XLSX spreadsheet
38.- Figure L-2 Past Performance Reference Questionnaire.pdf PDF
Solicitation 47PH0225R0006 Laredo Texas Full Maintenance Operations and Maintenance Custodial Grounds and Related Services.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan.pdf PDF
Building Information World Trade Land Port of Entry.pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1).pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022 (1).pdf PDF
24.- Exhibit M14_ Underground Fuel Storage Tank Inspection Requirements .pdf PDF
25.- Exhibit M15_ Above Ground Fuel Storage Tank Inspection Requirement.pdf PDF
31.- BL5 Roof Information - List of Assets.pdf PDF
34.- FIGURE B-1 for Union and Non Union FM Contracts.xlsx XLSX spreadsheet
39.- FIGURE L-3 Experience Worksheet.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Management Plan Baseline

FIGURE L-1

MANAGEMENT PLAN

Solicitation Number: 47PH0225R0006
Full Maintenance, Laredo, Texas
The Management Plan Baseline represents the government's projection of the manpower requirement to meet the requirements in the specification. The baseline is not intended to dictate an offeror's proposed manpower. It is a benchmark to evaluate the offerors understanding of the requirement in the solicitation. Refer to Section L of the solicitation for further guidance.
Government's Baseline
Personnel185618568088562080
LOCATIONPOSITION TITLEAnnual ProductiveAnnual VacationAnnual HolidayAnnual SickAnnual TotalTotal FTE
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
TOTALS00.000.000.000.000.00

Contractor's L1 Management Plan

MANAGEMENT185618568088562080
LOCATIONPOSITION TITLEAnnual ProductiveAnnual VacationAnnual HolidayAnnual SickAnnual TotalTotal FTEAnticipated Work Schedule
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
TOTALS00.000.000.000.000.00
EMPLOYEES185618568088562080
LOCATIONPOSITION TITLEAnnual ProductiveAnnual VacationAnnual HolidayAnnual SickAnnual TotalTotal FTEAnticipated Work Schedule
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
TOTALS0.00.000.000.000.000.00

image1.jpeg

File details come from the government source that posted it. Updated .