25.- Exhibit M15_ Above Ground Fuel Storage Tank Inspection Requirement.pdf

PDF 114 KB Posted

Attached to
Laredo Texas Full Maintenance; Operations and Maintenance; Custodial, Grounds, and Related Services
Solicitation number
47PH0225R0006
Issued by

About this file

This document is an M15 Attachment specifying Above Ground Storage Tank Inspection Criteria. The attachment outlines two primary inspection requirements: monthly visual inspections and tri-annual integrity testing. Monthly in-house visual inspections must be conducted and documented, focusing on detecting signs of leaks, stress fractures, stressed vegetation, and visible water in the secondary containment area, including a routine walk-around of the container's supports and foundations.

Tri-annually, a qualified third-party licensed inspection company must conduct integrity testing on above ground fuel storage tanks with a capacity of 55 gallons or more. The submittal must include a copy of the integrity test inspection and a report showing pass/fail status, along with a detailed write-up of any concerns or weaknesses. All findings are to be logged in the FST Management Plan and uploaded into NCMMS (presumably a management system) for record-keeping and tracking.

View the file

Other files

File Type Posted
47PH0225R0006 Amendment 0005 SF30.pdf PDF
CBA IUOE 351 2025 06 01-2028 05 31 Final .pdf PDF
47PH0225R0006 Amendment 0004.pdf PDF
47PH0225R0006 Amendment 0003 SF30 0 OF 12.pdf PDF
47PH0225R0006 Amendment 0003 PDF Form SF1449-21 Solicitation for Commercial Products 3 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-1 Fire Extinguisher Report 9 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 Excel Doc Figure L-1 Combined Management Plan 7 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-3 Experience Worksheet 6 of 12.docx DOCX document
47PH0225R0006 Amendment 0003 Attendees to the Pre-Proposal Walk Thru Laredo Texas Full Maintenance 2 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Laredo Texas Full Maintenance Questions and Answers 11 of 12.pdf PDF
47PH0225R0006 Amendment 0003 - Notes by Gemini Pre-Proposal Meeting Laredo - 10 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Specification Laredo Texas Full Maintenance Operations and Maintenance1 of 12.pdf PDF
47PH0225R0006 Amendment 0002 SF30 PDF Form 12 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-2 Past Performance Questionnaire 5 of 12.docx DOCX document
47PH0225R0006 Amendment 003 Preventive Maintenance Guide 2022 4 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-2 Inventory to Include Fire Alarm Devices 8 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Pre-Proposal Walk Thru Schedule Laredo Texas Full Maintenance 6 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Conference Presentation Laredo Texas Full Maintenance 4 of 7.pdf PDF
47PH0225R0006 Attachment 2_ Wage Determination Laredo Texas 3 of 7.pdf PDF
47PH0225R0006 Amendment 0002 SF30 1 OF 7.pdf PDF
47PH0225R0006 Questions and Answers Laredo Texas Full Maintenance 7 of 7.pdf PDF
47PH0225R0006 Amendment 0002 Specification Laredo Texas Full Maintenance Operations and Maintenance 2 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Conference Notes Laredo Full Maintenance - 2025_10_14 08_25 CDT 5 of 7.pdf PDF
19.- Exhibit M9 2022 GSA PBS PM Guide.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report (1).pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy.pdf PDF
14.- Exhibit M4 B Operating Plan Template.pdf PDF
13.- Exhibit M3_ Sustainable Products and GSA Attribute Preferences (1).pdf PDF
47PH0225R0006 Amendment 0001 Specification Laredo Texas Full Maintenance Operations and Maintenance.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry (1).pdf PDF
11.- Exhibit M1 - O_M QASP Template (2).pdf PDF
47PH0225R0006 Amendment 0001 SF30 1 of 4.pdf PDF
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry (1).pdf PDF
15.- Exhibit M5 - Smart Bldgs.pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan (1).pdf PDF
1.- Exhibit C1- Custodial R7 Recycling & Solid Waste Trash Report - APR24.pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1) (1).pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry (1).pdf PDF
4.- Exhibit C4 - Solid Waste Audit Reports (1).pdf PDF
17.- Exhibit M7 - Electrical Testing Technicians Requisites.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse (1).pdf PDF
16.- Exhibit M6 - Water Treatment Instructions (1).pdf PDF
9. Exhibit C5 - Building Information Sheet - Border Patrol Sector Headquarters (1).pdf PDF
47PH0225R0006 Amendment 0001 Questions and Answers 4 of 4.pdf PDF
47PH0225R0006 Amendment 0001 FIGURE L-3 Experience Worksheet 3 of 4.pdf PDF
8.- Exhibit C5 - Building Information World Trade Land Port of Entry.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse.pdf PDF
31.- BL5 Roof Information - List of Assets.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M15 ATTACHMENT: ABOVE GROUND STORAGE TANK INSPECTION CRITERIA

Monthly - Visual inspection log (if AST PM is not monthly and visual inspection is not specified in the job plan). In-house visual inspections are required to be conducted and documented on a monthly basis. The inspection should look for signs of leaks, stress fractures, stressed vegetation, and visible water in the secondary containment area. This visual inspection is intended to be a routine walk-around and include the container’s supports and foundations.

Tri-annually – (Third Party Licensed Inspection Company) Conduct integrity testing on above ground fuel storage tanks with a capacity of 55 gallons or more by a qualified third party. Submittal should include a copy of the integrity test inspection and a report showing pass/fail with a write up of any concerns or weaknesses.

Log all findings in the FST Management Plan.

Upload into NCMMS

File details come from the government source that posted it. Updated .