ATTACHMENT S - ProjectRoomContents_VA STLHCS-JC SD1 ENGINEERING.xlsx

XLSX spreadsheet 453 KB Posted

Attached to
St. Louis JC Bed Tower IOTA RFQ
Solicitation number
36C77627Q0011
Issued by

About this file

This is a Project Room Contents spreadsheet for the VA St. Louis John Cochran VAMC (Station ID 657) Bed Tower Engineering and Outbuilding Consolidation project, with a projected completion year of 2025 and report generated in August 2026. The document details comprehensive space planning and equipment requirements for consolidated administrative, operational, and support functions across ten departments including Engineering Service, Office of Information & Technology, Logistics Service, Learning and Organizational Development, Health Administration Service, Care in the Community Services, Employee and Whole Health, Biomedical and Technology & Innovation, Home Health—Home Based Primary Care, and Garage/Motor Pool operations. The spreadsheet catalogs over 400 individual line items specifying room types, quantities, areas in square feet, and detailed equipment specifications including government-furnished items such as telephones, desks, conference systems, lockers, mirrors, fixtures, and dispensers with associated unit costs and acquisition codes.

The project consolidates multiple outbuilding functions into a centralized bed tower location, with detailed notes indicating consolidation from various existing buildings (1T, 3, 4, 5T, 6, 6A, 7, 7A, 14, and 16). Key departmental consolidations include Learning and Organizational Development (simulation labs, education training), Health Administration Services (call center operations, mail services, telehealth), and Engineering Services (shops, maintenance facilities, emergency management). Equipment specifications include NSN codes, unit of issue designations, average pricing information, utility requirements (electrical, gas, water), and installation designations marking items as "Government Furnished & Installed," "Government Furnished/Contractor Installed," or "Contractor Furnished/Installed." The spreadsheet reflects multiple revisions through October 2024, indicating ongoing refinement of space requirements and equipment selections for this major facility consolidation project.

View the file

Other files

File Type Posted
ATTACHMENT L - Procurement Package Template and 6500 8.20.2026.pdf PDF
ATTACHMENT O - PDAT Summary - St. Louis.pdf PDF
ATTACHMENT K - Integrated Move Plan Template.xlsx XLSX spreadsheet
ATTACHMENT I - Room Contents Acq Plan Template 9.21.2023.xlsx XLSX spreadsheet
ATTACHMENT G - Change Management Log Template.xlsx XLSX spreadsheet
ATTACHMENT B - Task Order 1 Terms and Conditions - St. Louis.pdf PDF
ATTACHMENT P - VSC Security Package 12.8.2025.pdf PDF
ATTACHMENT T - ProjectRoomContents_VA STLHCS-JC SD1 INPATIENT TOW.xlsx XLSX spreadsheet
ATTACHMENT A - IOTA IDIQ PWS - St. Louis 10.20.2026.pdf PDF
ATTACHMENT A1 - IOTA TO1 PWS - St. Louis 10.26.2026.pdf PDF
ATTACHMENT C - Travel Authorization Request.pdf PDF
ATTACHMENT J - Proposed FTE Report.xlsx XLSX spreadsheet
ATTACHMENT F - Risk Management Plan and Register Template.xlsx XLSX spreadsheet
ATTACHMENT D - Contract Staff Roster.pdf PDF
ATTACHMENT R - Design Submittal SD1 Room Contents.pdf PDF
ATTACHMENT V - Pricing Worksheet - St. Louis New Bed Tower IOTA.xlsx XLSX spreadsheet
ATTACHMENT H - Equipment Inventory_ReUse and Disposal Plan Template.xlsx XLSX spreadsheet
ATTACHMENT E - WBS Template.pdf PDF
ATTACHMENT U - JC New Bed Tower IOTA_Key Planning Milestones_10_28_2026.pdf PDF
ATTACHMENT N - QASP - St. Louis.docx DOCX document
ATTACHMENT M - Furniture IDIQ Templates.pdf PDF
ATTACHMENT Q - Wage Determination.pdf PDF
RFQ 36C77627Q0011 Solicitation St. Louis IDIQ and TO1 - PDF COPY.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Info

Project Room Contents

VA STLHCS-JC SD1 ENGINEERING AND OUTBUILDINGS (RLF INNOVA), 2022

ENGINEERING AND OUTBUILDING CONSOLIDATION

ST. LOUIS, MO

Associated with the replacement inpatient bed tower for John Cochran VAMC

Projected Year: 2025 Midpoint Year: 2025

VISN: 15 State: MO Station ID: 657 Station: St Louis, John Cochran Divisio Installation: St Louis-John Cochran Division

Project Created: 28 Mar 2019 10:50AM ET by William Conley Space Plan Last Edited: 22 Oct 2024 12:07PM ET by Chris Phillips

Report Generated: 28 Aug 2026 12:35PM ET

Project Room Contents

DepartmentFunctional AreaRoom CodeRoom NameNumber Of RoomsRoom AreaBlueprint NumberJSNContent NameAcq CodeFund SrcQtyUnit CostTotal CostContent NotesDept NotesFA NotesRoom NotesEquip TypeNSNUnit Of IssueAverage PricePrice DatePosting DateWeightHeightWidthDepthUtil 1Util 2Util 3Util 4Util 5Util 6HertzBTU Per HourPhase 1Phase 2Volts 1Volts 2Amps 1Amps 2Watts 1Watts 2DescriptionLog Cat DescriptionLog Cat CommentAgency Code
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)3 - LOD SIMULATIONCLR04Inpatient Simulation1360A1011Telephone,Desk,1 LineVV100Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 1T. An outbuilding is not ideal for a simulation lab. Staff would be more likely to use it if in bed tower.PP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)3 - LOD SIMULATIONCRA01Conference Room1240A1011Telephone,Desk,1 LineVV100Used by LOD staff and also serves as a debrief area for simulationPP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREAOFA10Workstations, 4-person pod (Specialty Consult Groups)10160A1011Telephone,Desk,1 LineVV400Consolidating from outlying building 1T.Pods/clusters of 4 person community care work teams - specialty consults. Staffed with advanced MSAs and RNs.PP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREAOFA10Workstations, 3-person pod (Non-Skilled Home Care)1120A1011Telephone,Desk,1 LineVV300PP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREAOFA10Workstations, 3-person pod (Dental Consults Group)1120A1011Telephone,Desk,1 LineVV300PP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
9 - HOME HEALTH - HOME BASED PC1 - STAFF AND ADMINISTRATIVE AREASAWK1Workroom, Team (NP, 3 RNs)1180A1011Telephone,Desk,1 LineVV400Consolidating from outlying building 16Home-based primary care teamPP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
9 - HOME HEALTH - HOME BASED PC1 - STAFF AND ADMINISTRATIVE AREASAWK1Workroom, Team (PT, 2 RNs, PSA)1180A1011Telephone,Desk,1 LineVV400Home-based primary care teamPP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
9 - HOME HEALTH - HOME BASED PC1 - STAFF AND ADMINISTRATIVE AREASAWK1Workroom, Team (Transitional Care Nurses)1180A1011Telephone,Desk,1 LineVV400PP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)2 - LOD EDUCATION AND TRAININGSAWK1Workroom1160A1011Telephone,Desk,1 LineVV300Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 4PP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)4 - CENTRAL UTILITY / ENERGY PLANT (CUP/CEP)SAWK1CUP/CEP Control Room1180A1011Telephone,Desk,1 LineVV2002 CUP/CEP Operator workstations in Control Room (2 work per shift)PP5805EA004/11/201206/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREASL001Lounge, Staff1360A1012Telephone,Wall Mounted,1 LineVV100Reduced to fit.PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)1 - STAFF AND ADMIN - COMMON AREASALG1Breakroom1180A1012Telephone,Wall Mounted,1 LineVV100Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Supports training and simulation operations.Available for use by both staff and trainees/simulation participantsPP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)2 - EMPLOYEE HEALTHCLCEXExam Room2125A1012Telephone,Wall Mounted,1 LineVV100This is a clinical service that may be better located with Primary Care or other clinical function. Consolidating services from building 5T and building 16.PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)2 - EMPLOYEE HEALTHSALG2Breakroom1120A1012Telephone,Wall Mounted,1 LineVV100Includes nourishment centerPP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)3 - LOD SIMULATIONCLCEXSimulation Exam Room1125A1012Telephone,Wall Mounted,1 LineVV100Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 1T. An outbuilding is not ideal for a simulation lab. Staff would be more likely to use it if in bed tower.PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSCLR03Classroom, Computer Training1240A1012Telephone,Wall Mounted,1 LineVV100Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7AConsolidate call center staff from outlying building 7-7A and trainers from building 1T.PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)7 - STAFF SUPPORT AREASALG1Lounge, Staff1180A1012Telephone,Wall Mounted,1 LineVV100PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREASALG1Lounge / Breakroom1210A1012Telephone,Wall Mounted,1 LineVV100Consolidating from outlying building 1T.PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
2 - OFFICE OF INFORMATION & TECHNOLOGY (OIT) (232)3 - STAFF AND ADMINISTRATIVE AREASL001Lounge, Staff1210A1012Telephone,Wall Mounted,1 LineVV100OIT help desk from Bldg. 3. Server and switchgear infrastructure from Bldg. 3 is being replaced in the new bed tower space program (PFD).PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREASL001Lounge, Staff1420A1012Telephone,Wall Mounted,1 LineVV100PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAXACR1Critical Systems Control Room1240A1012Telephone,Wall Mounted,1 LineVV100Locate shop supervisors adjacent to the critical systems control room. Used for monitoring generators, electrical, med gas, and building alarms.PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
9 - HOME HEALTH - HOME BASED PC1 - STAFF AND ADMINISTRATIVE AREASALG1Lounge / Breakroom1120A1012Telephone,Wall Mounted,1 LineVV100Consolidating from outlying building 16PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)4 - CENTRAL UTILITY / ENERGY PLANT (CUP/CEP)SALG2Lounge, Staff1120A1012Telephone,Wall Mounted,1 LineVV100PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSSALG2Kitchen / Staff Breakroom1210A1012Telephone,Wall Mounted,1 LineVV100Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7AConsolidate call center staff from outlying building 7-7A and trainers from building 1T.PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)7 - STAFF SUPPORT AREASALG2Kitchen / Staff Breakroom1120A1012Telephone,Wall Mounted,1 LineVV100PP5805EA008/21/202403/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)2 - EMPLOYEE HEALTHLBPC1Laboratory, POCT160A1014Telephone,Wall Mounted,1 Line,With SpeakerVV100This is a clinical service that may be better located with Primary Care or other clinical function. Consolidating services from building 5T and building 16.Small point of care testing and specimen holding roomPP5805EA005/05/201112/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)4 - CENTRAL UTILITY / ENERGY PLANT (CUP/CEP)OFA01Office, CUP/CEP Supervisor1120A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)5 - SAFETY OFFICEOFA02Office, Shared - 2 Person, Safety1120A1015Telephone,Desk,Multiple LineVV200Consolidating from outlying building 7/7A.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)5 - SAFETY OFFICEOFA02Office, Shared, Industrial Hygienist1120A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)5 - SAFETY OFFICEOFA05Office, Shared (Asst. Chief and Fire Protection Engineer)1120A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)2 - LOD EDUCATION AND TRAININGOFA02Office, Shared - 2 Person, LOD5120A1015Telephone,Desk,Multiple LineVV200Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 4PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSOFA02Office, Shared, Call Center Leads1120A1015Telephone,Desk,Multiple LineVV200Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7AConsolidate call center staff from outlying building 7-7A and trainers from building 1T.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSOFA06Workstation, Call Center1348A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
2 - OFFICE OF INFORMATION & TECHNOLOGY (OIT) (232)3 - STAFF AND ADMINISTRATIVE AREAOFA09Office, OIT Lead (Section Supervisor)3100A1015Telephone,Desk,Multiple LineVV100OIT help desk from Bldg. 3. Server and switchgear infrastructure from Bldg. 3 is being replaced in the new bed tower space program (PFD).PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
2 - OFFICE OF INFORMATION & TECHNOLOGY (OIT) (232)3 - STAFF AND ADMINISTRATIVE AREAOFA09Office, OIT Chief1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
2 - OFFICE OF INFORMATION & TECHNOLOGY (OIT) (232)3 - STAFF AND ADMINISTRATIVE AREAOFA09Office, OIT AO1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
2 - OFFICE OF INFORMATION & TECHNOLOGY (OIT) (232)3 - STAFF AND ADMINISTRATIVE AREAOFA07Workstation, Computer Operator / Technician / Help Desk1556A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)2 - EMPLOYEE HEALTHOFA09Office, Employee Health6100A1015Telephone,Desk,Multiple LineVV100This is a clinical service that may be better located with Primary Care or other clinical function. Consolidating services from building 5T and building 16.Includes 3 NPs, 1 Physician, 1 Triage RN, and OH TechPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)4 - WHOLE HEALTHOFA09Office, Whole Health Coaches3100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)4 - WHOLE HEALTHOFA09Office, Whole Health Director1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)4 - WHOLE HEALTHOFA09Office, Whole Health Manager1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)1 - WAITING / RECEPTION AREARECP1Reception1120A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)3 - SOCIAL WORK SERVICESOFDC1Office, Social Worker3125A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
10 - GARAGE / MOTOR POOL (284)2 - WORK AREA / STORAGEOFA09Office, Support Services1100A1015Telephone,Desk,Multiple LineVV100Consolidates work area and storage from bldg. 14 and a small portion of bldg. 6 (VTS). Supports both Grounds/Transportation and the HAS Veteran's Transportation Service (16 vehicles).Consolidated from building 14Confirm number of personnel, space requirementPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)5 - AMERICAN FEDERATION OF GOVERNMENT EMPLOYEES (AFGE)OFA02Office, Shared - 3 Person, AFGE1180A1015Telephone,Desk,Multiple LineVV300Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7AConsolidate function from Bldg. 6APP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREAOFA07Workstation, Supply Tech Lead156A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREAOFA07Workstation, Inventory Supervisor256A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREAOFA07Workstation, Inventory Manager1056A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)2 - LOD EDUCATION AND TRAININGOFA07Workstation, LOD456A1015Telephone,Desk,Multiple LineVV100Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 4Currently in an open office conceptPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSOFA06Workstation, Telephone Operators748A1015Telephone,Desk,Multiple LineVV100Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7AConsolidate call center staff from outlying building 7-7A and trainers from building 1T.Currently have 11 Call Center staff on multiple shifts who are moving from bldg. 3 to bldg. 7. Department requests 6 workstations and a 7th workstation for codes. Also providing a Call Center Supervisor office.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSOFA06Workstation, Trainers348A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSOFA07Workstation, Nurse Triage356A1015Telephone,Desk,Multiple LineVV100Currently have 5 Nurse Triage staff, but some work remotelyPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)6 - HEALTH INFORMATION MANAGEMENT SECTION (HIMS)OFA07Workstation, ROI staff256A1015Telephone,Desk,Multiple LineVV100Inquire whether there is an area in Bldg. 1 for this HIMS outlying function in Bldg. 6ANeeds to be in an area providing privacyPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)2 - TRAVEL AND VTS SERVICESOFA07Workstation, Consult Schedulers556A1015Telephone,Desk,Multiple LineVV100Consolidate functions from outlying building 6AReferral coordination staff - also have consult schedulers in multiple locations (i.e., 5th floor of building 1 with surgery)PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)2 - TRAVEL AND VTS SERVICESOFA07Workstation, Beneficiary Travel356A1015Telephone,Desk,Multiple LineVV100Would prefer to find space for these personnel in Bldg. 1PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)2 - TRAVEL AND VTS SERVICESOFA07Workstation, Profile Management656A1015Telephone,Desk,Multiple LineVV100Could backfill in Bldg. 1PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)2 - TRAVEL AND VTS SERVICESOFA07Workstation, Travel Schedulers356A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)3 - MAILROOM / DOCKOFA07Workstation, Postal Clerk356A1015Telephone,Desk,Multiple LineVV100Consolidate from Bldg 6A. Handled over 490,000 pieces of mail last year.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)4 - TELEHEALTHOFA07Workstation, MSA Admin356A1015Telephone,Desk,Multiple LineVV100Consolidate from Bldg 6APP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)4 - TELEHEALTHOFA07Workstation, Telehealth Providers656A1015Telephone,Desk,Multiple LineVV100Specialty Providers - provide visual and acoustic privacyPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
4 - BIOMEDICAL AND TECHNOLOGY & INNOVATION (284)1 - BIOMEDICAL DEPARTMENTOFA07Office / Biomed Workstations556A1015Telephone,Desk,Multiple LineVV100Consolidating from 2nd floor of outlying building 3.Currently open concept - includes 2 workstations for internsPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
9 - HOME HEALTH - HOME BASED PC1 - STAFF AND ADMINISTRATIVE AREAOFA09Office, Home Based Primary Care Director1100A1015Telephone,Desk,Multiple LineVV100Consolidating from outlying building 16Home-based primary care teamPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
2 - OFFICE OF INFORMATION & TECHNOLOGY (OIT) (232)1 - RECEPTION AREARCP01Reception185A1015Telephone,Desk,Multiple LineVV100OIT help desk from Bldg. 3. Server and switchgear infrastructure from Bldg. 3 is being replaced in the new bed tower space program (PFD).OIT Help desk supports up to 5,000 computer users across STL VA HCSPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA02Office, Shared, Major Project Service2120A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREAOFA07Workstation, Secretary156A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA07Workstation, D&C Project Engineer / PMs856A1015Telephone,Desk,Multiple LineVV100Increasing from 6 to 8 in future (lots of project management expected)PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA07Workstation, Clerical656A1015Telephone,Desk,Multiple LineVV100M&O PSA, Eng PSA, Budget Tech, 2 Engineers, CompliancePP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAOFA09Office, Supervisor / AC1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAOFA09Office, Supervisor Carpentry1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAOFA09Office, Supervisor Electrical1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAOFA09Office, Supervisor Plumbing / Pipefitting1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Grounds Maintenance & Transportation Shop: Workbench / Worktable1520A1015Telephone,Desk,Multiple LineVV700Includes space for full time mechanic who maintains both the transportation fleet and grounds equipmentPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Locksmith Shop: Workbench and Worktable1120A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Carpentry / Masonry Shop: Floor Mounted Tools and Equipment1500A1015Telephone,Desk,Multiple LineVV400PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Carpentry / Masonry Shop: Workbench and Worktable1590A1015Telephone,Desk,Multiple LineVV1000PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Air Conditioning Shop: Floor Mounted Tools and Equipment1300A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Air Conditioning Shop: Workbench and Worktable1580A1015Telephone,Desk,Multiple LineVV900PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Plumbing / Pipefitting Shop: Floor Mounted Tools and Equipment1200A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Plumbing / Pipefitting Shop: Workbench and Worktable1580A1015Telephone,Desk,Multiple LineVV900PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Electrical Shop: Floor Mounted Tools and Equipment1150A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)3 - SHOP AREAPMCW1Electrical Shop: Workbench and Worktable1580A1015Telephone,Desk,Multiple LineVV900PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)4 - CENTRAL UTILITY / ENERGY PLANT (CUP/CEP)PMCW1Plant Maintenance, Mechanic1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)5 - SAFETY OFFICEOFA09Office, Safety Chief2100A1015Telephone,Desk,Multiple LineVV100Consolidating from outlying building 7/7A.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)5 - SAFETY OFFICEOFA09Office, Environmentalist1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)5 - SAFETY OFFICEOFA07Workstation, Safety Specialist / GEMS356A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)5 - SAFETY OFFICEOFA07Workstation, Safety Clerical / Intern156A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREAOFA09Office, Logistics Chief1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREAOFA09Office, Assistant Logistics Chief1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREAOFA09Office, Warehouse Lead1100A1015Telephone,Desk,Multiple LineVV100Receiving Office - suggest providing a view of the loading dockPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)6 - EMERGENCY MANAGEMENTOFA09Office, Private, Emergency Management1100A1015Telephone,Desk,Multiple LineVV100Consolidating from outlying building 7/7A.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)1 - RECEPTION AREARCP01Reception185A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAXXYYCHospital Plans and Drafting Room1400A1015Telephone,Desk,Multiple LineVV400Reduced per department directionPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAXXYYCInterior Design Workroom1160A1015Telephone,Desk,Multiple LineVV200Reduced per department directionPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, Major Project Service Chief1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, Engineering Chief1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, Engineering Assistant Chief1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, M&O Chief1100A1015Telephone,Desk,Multiple LineVV100M&O - Maintenance and OperationsPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, D&C Chief1100A1015Telephone,Desk,Multiple LineVV100D&C - Design and ConstructionPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, AO, Engineering Service1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, Major Projects - Interior Designer1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, Major Project Liaison2100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREAOFA09Office, Major Projects AO1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)2 - LOD EDUCATION AND TRAININGOFA09Office, Private, LOD2100A1015Telephone,Desk,Multiple LineVV100Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 4PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)2 - LOD EDUCATION AND TRAININGOFA09Office, LOD Supervisor1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)3 - LOD SIMULATIONOFA09Office, Simulation Lab Coordinator (Shared)1100A1015Telephone,Desk,Multiple LineVV200Consolidating from outlying building 1T. An outbuilding is not ideal for a simulation lab. Staff would be more likely to use it if in bed tower.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSOFA09Office, Training Supervisors2100A1015Telephone,Desk,Multiple LineVV100Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7AConsolidate call center staff from outlying building 7-7A and trainers from building 1T.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSOFA09Office, Supervisor, Telephone Operators1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)2 - TRAVEL AND VTS SERVICESOFA09Office, MVO Supervisor1100A1015Telephone,Desk,Multiple LineVV100Consolidate functions from outlying building 6APP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)3 - MAILROOM / DOCKOFA09Office, Postal / Mail Service Chief1100A1015Telephone,Desk,Multiple LineVV100Consolidate from Bldg 6A. Handled over 490,000 pieces of mail last year.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)4 - TELEHEALTHOFA09Office, Telehealth Manager1100A1015Telephone,Desk,Multiple LineVV100Consolidate from Bldg 6APP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)5 - AMERICAN FEDERATION OF GOVERNMENT EMPLOYEES (AFGE)OFA09Office, Private, AFGE2100A1015Telephone,Desk,Multiple LineVV100Consolidate function from Bldg. 6APP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
4 - BIOMEDICAL AND TECHNOLOGY & INNOVATION (284)1 - BIOMEDICAL DEPARTMENTOFA09Office, Biomed Chief1100A1015Telephone,Desk,Multiple LineVV100Consolidating from 2nd floor of outlying building 3.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
4 - BIOMEDICAL AND TECHNOLOGY & INNOVATION (284)1 - BIOMEDICAL DEPARTMENTOFA09Office, Biomed AO1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
4 - BIOMEDICAL AND TECHNOLOGY & INNOVATION (284)2 - TECHNOLOGY AND INNOVATIONOFA09Office, T&I Supervisor1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
4 - BIOMEDICAL AND TECHNOLOGY & INNOVATION (284)2 - TECHNOLOGY AND INNOVATIONOFA07Office / T&I Workstations756A1015Telephone,Desk,Multiple LineVV100Size and configuration to be determinedPP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREAOFA09Office, Private, Nurse / Program Manager1100A1015Telephone,Desk,Multiple LineVV100Consolidating from outlying building 1T.PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREAOFA09Office, MSA Supervisor1100A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREAOFA09Office, AO, Care in Community Services1100A1015Telephone,Desk,Multiple LineVV200PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREAOFA09Office, Assoc. Chief, Care in Community1100A1015Telephone,Desk,Multiple LineVV100PP5805EA005/05/201109/03/20010000.....T0000000000GOVT FURNISHED & INSTALLEDV
2 - OFFICE OF INFORMATION & TECHNOLOGY (OIT) (232)2 - COMPUTER SUPPORT AREAITWR1Workroom, Imaging / Repair1480A1016Telephone,Desk,With SpeakerVV400OIT help desk from Bldg. 3. Server and switchgear infrastructure from Bldg. 3 is being replaced in the new bed tower space program (PFD).Upgraded some space due to huge turnover and holding space required for pallets of monitors, desktops, laptops, and the configuration that goes with them. Breakdown and imaging spaces will be needed with MHS Genesis deployment and ongoing future projects.Increased from 340 to 480PP5805EA003/18/201103/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
10 - GARAGE / MOTOR POOL (284)2 - WORK AREA / STORAGEITWR1Work / Repair Area2200A1016Telephone,Desk,With SpeakerVV100Consolidates work area and storage from bldg. 14 and a small portion of bldg. 6 (VTS). Supports both Grounds/Transportation and the HAS Veteran's Transportation Service (16 vehicles).Consolidated from building 14Outdoor wash bay requestedPP5805EA003/18/201103/03/20030000.....T0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)7 - STAFF SUPPORT AREACFR01Conference Room, 6-8 people1240A1020Telephone,Conferencing SystemVV1580580Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7APPEA56804/26/201704/02/2019121214.A...T6000011000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)6 - EMERGENCY MANAGEMENTCFR02Emergency Operations Center1300A1020Telephone,Conferencing SystemVV1580580Consolidating from outlying building 7/7A.Incident Command Center with large monitors (TV) displays on wallsPPEA56804/26/201704/02/2019121214.A...T6000011000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREACFR02Conference Room1300A1020Telephone,Conferencing SystemVV1580580Recommend locating next to the 300 sf. lounge with retractable divider for a larger meeting and training space as needed.PPEA56804/26/201704/02/2019121214.A...T6000011000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREACFR01Training Room, Staff1240A1020Telephone,Conferencing SystemVV1580580Combined with Conf Room.PPEA56804/26/201704/02/2019121214.A...T6000011000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREALR002Changing Room260A1030Locker,2 Person,Over/UnderVV1281562Reduced to reflect single-occupant changing spacePP7125EA275.6704/24/201412/10/200263721218......0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREALR002Locker / Changing Room, Male1316A1030Locker,2 Person,Over/UnderVV202815620PP7125EA275.6704/24/201412/10/200263721218......0000000000GOVT FURNISHED & INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREALR002Locker / Changing Room, Female1316A1030Locker,2 Person,Over/UnderVV102812810PP7125EA275.6704/24/201412/10/200263721218......0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)1 - STAFF AND ADMIN - COMMON AREASALG1Breakroom1180A1030Locker,2 Person,Over/UnderVV102812810Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Supports training and simulation operations.Available for use by both staff and trainees/simulation participantsPP7125EA275.6704/24/201412/10/200263721218......0000000000GOVT FURNISHED & INSTALLEDV
9 - HOME HEALTH - HOME BASED PC1 - STAFF AND ADMINISTRATIVE AREASALG1Lounge / Breakroom1120A1030Locker,2 Person,Over/UnderVV52811405Consolidating from outlying building 16PP7125EA275.6704/24/201412/10/200263721218......0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)7 - STAFF SUPPORT AREASALG1Lounge, Staff1180A1030Locker,2 Person,Over/UnderVV102812810Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7APP7125EA275.6704/24/201412/10/200263721218......0000000000GOVT FURNISHED & INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREASALG1Lounge / Breakroom1210A1030Locker,2 Person,Over/UnderVV122813372Consolidating from outlying building 1T.PP7125EA275.6704/24/201412/10/200263721218......0000000000GOVT FURNISHED & INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)2 - TRAVEL AND VTS SERVICESOFA10Workroom, VTS Drivers136A1035Locker,Single TierVV3205615Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7AConsolidate functions from outlying building 6APP7125EA200.3304/24/201403/03/200368721218......0000000000GOVT FURNISHED & INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREALR001Locker Room, Staff1302A1035Locker,Single TierVV6020512300contains 60, 1' lockersPP7125EA200.3304/24/201403/03/200368721218......0000000000GOVT FURNISHED & INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)3 - LOD SIMULATIONCLCEXSimulation Exam Room1125A1066Mirror,Float Glass,With SS FrameCC18383Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 1T. An outbuilding is not ideal for a simulation lab. Staff would be more likely to use it if in bed tower.RPIE7105EA81.6710/12/201012/15/19982236181......0000000000CONTRACTOR FURNISHED/INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)2 - EMPLOYEE HEALTHCLCEXExam Room2125A1066Mirror,Float Glass,With SS FrameCC183166This is a clinical service that may be better located with Primary Care or other clinical function. Consolidating services from building 5T and building 16.RPIE7105EA81.6710/12/201012/15/19982236181......0000000000CONTRACTOR FURNISHED/INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)3 - LOD SIMULATIONCLR04Inpatient Simulation1360A1067Mirror,Float Glass,ADA AccessibleCC1291291Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 1T. An outbuilding is not ideal for a simulation lab. Staff would be more likely to use it if in bed tower.RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
5 - CARE IN THE COMMUNITY SERVICES (254)1 - STAFF AND ADMINISTRATIVE AREATNPG1Toilet, Staff460A1067Mirror,Float Glass,ADA AccessibleCC12911164Consolidating from outlying building 1T.RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)1 - STAFF AND ADMIN - COMMON AREATLTU1Toilet, Public360A1067Mirror,Float Glass,ADA AccessibleCC1291873Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Supports training and simulation operations.RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
3 - LOGISTICS SERVICE (284)4 - STAFF AND ADMINISTRATIVE AREATNPG1Toilet, Staff360A1067Mirror,Float Glass,ADA AccessibleCC1291873RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
7 - LEARNING AND ORGANIZATIONAL DEVELOPMENT (402)2 - LOD EDUCATION AND TRAININGTLTU1Staff Toilet160A1067Mirror,Float Glass,ADA AccessibleCC1291291Consolidates LOD functions from outlying building 4 and simulation from outlying building 1T. The library and medical media remain in building 2.Consolidating from outlying building 4RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
1 - ENGINEERING SERVICE (230)2 - ADMINISTRATIVE AND OPERATIONS AREATNPG1Toilet, Staff660A1067Mirror,Float Glass,ADA AccessibleCC12911746RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
1 - ENGINEERING SERVICE (230)4 - CENTRAL UTILITY / ENERGY PLANT (CUP/CEP)TLTU1Toilet, Staff160A1067Mirror,Float Glass,ADA AccessibleCC1291291RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)1 - CALL CENTER OPERATIONSTLTU1Toilet, Staff260A1067Mirror,Float Glass,ADA AccessibleCC1291582Consolidated HAS staff and functions from outbuildings 1T, 3, 6A, and 7/7AConsolidate call center staff from outlying building 7-7A and trainers from building 1T.RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)7 - STAFF SUPPORT AREATLTF2Toilet, Public, Female1200A1067Mirror,Float Glass,ADA AccessibleCC2291582RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
6 - HEALTH ADMINISTRATION SERVICE (246)7 - STAFF SUPPORT AREATLTM2Toilet, Public, Male1200A1067Mirror,Float Glass,ADA AccessibleCC2291582RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
1 - ENGINEERING SERVICE (230)1 - RECEPTION AREATNPG1Toilet, Public160A1067Mirror,Float Glass,ADA AccessibleCC1291291RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
8 - EMPLOYEE AND WHOLE HEALTH (282)1 - WAITING / RECEPTION AREATPSP1Toilet, Patient, Specimen160A1067Mirror,Float Glass,ADA AccessibleCC1291291This is a clinical service that may be better located with Primary Care or other clinical function. Consolidating services from building 5T and building 16.RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV
10 - GARAGE / MOTOR POOL (284)2 - WORK AREA / STORAGETNPG1Toilet160A1067Mirror,Float Glass,ADA AccessibleCC1291291Consolidates work area and storage from bldg. 14 and a small portion of bldg. 6 (VTS). Supports both Grounds/Transportation and the HAS Veteran's Transportation Service (16 vehicles).Consolidated from building 14RPIE7105EA28502/10/201403/15/20142037186......0000000000CONTRACTOR FURNISHED/INSTALLEDV

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .