ATTACHMENT J - Proposed FTE Report.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
St. Louis JC Bed Tower IOTA RFQ
Solicitation number
36C77627Q0011
Issued by

About this file

This is a Personnel Planning Template (Proposed FTE Report) for contractor workforce planning and tracking in support of a federal contract. The spreadsheet serves as a data collection instrument requiring contractors to document full-time equivalent (FTE) staffing information across multiple data fields. Required reporting elements include department/service, clinic/program name, position descriptions, grade levels, current and new FTE counts, new hire justifications, activation support requirements, percentage of time allocated to activation tasks, planned announcement dates, planned on-board dates, and projected first-year and pro-rated salary and benefits costs. Additional fields capture position approval status, approval dates, and salary appropriation requests.

The template functions as a planning and accountability tool within a SharePoint-based system where contractors are required to enter data directly rather than submit standalone spreadsheets. This FTE reporting requirement is associated with the St. Louis JC Bed Tower IOTA RFQ (Solicitation Number 36C77627Q0011), issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The template establishes a standardized format for contractors to propose and track workforce requirements, staffing timelines, and compensation planning throughout contract performance, with the actual detailed data and information requirements defined separately within the SharePoint system.

View the file

Other files

File Type Posted
ATTACHMENT L - Procurement Package Template and 6500 8.20.2026.pdf PDF
ATTACHMENT O - PDAT Summary - St. Louis.pdf PDF
ATTACHMENT K - Integrated Move Plan Template.xlsx XLSX spreadsheet
ATTACHMENT I - Room Contents Acq Plan Template 9.21.2023.xlsx XLSX spreadsheet
ATTACHMENT G - Change Management Log Template.xlsx XLSX spreadsheet
ATTACHMENT B - Task Order 1 Terms and Conditions - St. Louis.pdf PDF
ATTACHMENT P - VSC Security Package 12.8.2025.pdf PDF
ATTACHMENT T - ProjectRoomContents_VA STLHCS-JC SD1 INPATIENT TOW.xlsx XLSX spreadsheet
ATTACHMENT A - IOTA IDIQ PWS - St. Louis 10.20.2026.pdf PDF
ATTACHMENT A1 - IOTA TO1 PWS - St. Louis 10.26.2026.pdf PDF
ATTACHMENT C - Travel Authorization Request.pdf PDF
ATTACHMENT F - Risk Management Plan and Register Template.xlsx XLSX spreadsheet
ATTACHMENT S - ProjectRoomContents_VA STLHCS-JC SD1 ENGINEERING.xlsx XLSX spreadsheet
ATTACHMENT D - Contract Staff Roster.pdf PDF
ATTACHMENT R - Design Submittal SD1 Room Contents.pdf PDF
ATTACHMENT V - Pricing Worksheet - St. Louis New Bed Tower IOTA.xlsx XLSX spreadsheet
ATTACHMENT H - Equipment Inventory_ReUse and Disposal Plan Template.xlsx XLSX spreadsheet
ATTACHMENT E - WBS Template.pdf PDF
ATTACHMENT U - JC New Bed Tower IOTA_Key Planning Milestones_10_28_2026.pdf PDF
ATTACHMENT N - QASP - St. Louis.docx DOCX document
ATTACHMENT M - Furniture IDIQ Templates.pdf PDF
ATTACHMENT Q - Wage Determination.pdf PDF
RFQ 36C77627Q0011 Solicitation St. Louis IDIQ and TO1 - PDF COPY.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

query

Attachment is a representation of required information/data.
Actual deliverable data/information requirements are defined in SharePoint tool.
Note: Contractor shall utilize SharePoint to enter data directly into system.
Department/SvcClinic/ Program NameProjected 1st Use datePosition DescriptionGrade# Current FTEE# New FTEENew Hire JustificationActivation support y/n% Time spent on activation tasksPlanned Announcement DatePlanned On-board DatePlanned full FY salary & benefitsPlanned pro-rated FY salary & benefitsPosition(s) approved# ApprovedDate ApprovedSalary AppropriationRequest CommentsItem TypePath

File details come from the government source that posted it. Updated .