36C77626R0022 0001.pdf

PDF 127 KB Posted

Attached to
Y1DA--596-334 Construct Replacement CLC Complex Care - Lexington Federal contract opportunity
Solicitation number
36C77626R0022
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is an Amendment of Solicitation/Modification of Contract issued by the Department of Veterans Affairs, Program Contracting Activity Central, located in Independence, Ohio. The amendment, numbered 0001 and dated March 10, 2026, amends Solicitation 36C77626R0022 for Project 596-334, a construction project for a replacement Complex Care facility (Construct Replacement CLC - Complex Care). The amendment is issued by Kara Evert and signed by Contracting Officer Richelle N. Gray under RPOC VA-VHA-RPOC-2025-0062.

The amendment serves two purposes: first, it adds FAR clause 52.211-12, Liquidated Damages—Construction (September 2000), which establishes that contractors failing to complete work within the specified contract timeframe must pay liquidated damages to the Government at the rate of $718.07 per calendar day of delay until work completion or acceptance. Liquidated damages continue to accrue if the Government terminates the contractor's right to proceed and are in addition to excess repurchase costs. Second, the amendment provides a copy of the sign-in sheet from the mandatory site visit conducted on March 18, 2026. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation through completion of required forms, acknowledgment on submitted offers, or separate written communication referencing the solicitation and amendment numbers, or risk rejection of their offer.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--596-334 Construct Replacement CLC Complex Care - Lexington, newest first.
File Type Posted
36C77626R0022 0006.pdf PDF
0005 - Responses to Tech Questions - 4-23-26.pdf PDF
0005 - Revised C200.pdf PDF
0005 - Revised C600.pdf PDF
36C77626R0022 0005.pdf PDF
0004 - Responses to Tech Questions - 4-20-26.pdf PDF
36C77626R0022 0004.pdf PDF
0003 - Revised A102.pdf PDF
36C77626R0022 0003.pdf PDF
0003 - Responses to Tech Questions - 4-15-26.pdf PDF
36C77626R0022 0002.pdf PDF
0002 - Responses to Tech Questions - 4-8-26.pdf PDF
0002 - Addendum 01.pdf PDF
0002 - Contractor Laydown.pdf PDF
0002 - Phase II As-Builts.pdf PDF
0002 - Existing Generator.pdf PDF
0001 - 596-334 Construct Replacement CLC - Complex Care - Sign-in Sheet.pdf PDF
Attachment 03 - Brand Name Justification.pdf PDF
Attachment 09 - Project Information Sheet for Contractors.docx DOCX document
RFP 36C77626R0022 - 3-10-26.pdf PDF
Attachment 01 - Specifications.pdf PDF
Attachment 02 - Drawings.pdf PDF
Attachment 06 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 05 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 07 - Site Visit Instructions.pdf PDF
Attachment 08 - Site Visit Map.pdf PDF
Attachment 10 - PPQ.docx DOCX document
Attachment 04 - DBA Wages - Fayette County - 01-30-2026.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0001 03-20-2026

596-334

36C776

Kara Evert Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

36C776

Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

To all Offerors/Bidders

36C77626R0022

03-10-2026

X

X X

X ONE

The purpose of this amendment is to:

1) Add an applicable clause. FAR clause 52.211-12, Liquidated Damages-Construction, (provided on page 2) is now included in this solicitation and will also be included in the final contract.

2) Provide a copy of the sign-in sheet from the site visit on 3/18/26. See attached.

Richelle N. Gray Contracting Officer

VA-VHA-RPOC-2025-0062

52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $718.07 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of Clause)

See attached document: 0001 - 596-334 Construct Replacement CLC - Complex Care - Sign-in Sheet.

End of Document

52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

File details come from the government source that posted it. Updated .