This is a Statement of Work (SOW) or technical specification document for the Q702 New Albany, Indiana Community Based Outpatient Clinic (CBOC) Initial Outfitting, Transitioning & Activation Services (IOT&A) project under solicitation number 36C77626Q0146, issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

The document outlines requirements for comprehensive initial outfitting, transitioning, and activation services for a new VA community-based outpatient clinic location in New Albany, Indiana. The services encompass facility preparation, equipment procurement and installation, information technology infrastructure setup, staff training and readiness activities, and operational transition support to ensure the clinic becomes fully functional and operational. The scope includes coordination with VA stakeholders, installation of medical equipment and furnishings, network and telecommunications infrastructure configuration, electronic health record system implementation and testing, staff orientation and competency verification, and establishment of clinic operational procedures and workflows. The contractor is responsible for managing the overall transition timeline, coordinating multiple concurrent workstreams, documenting all activities and configurations, and ensuring compliance with VA standards and federal healthcare regulations. Success is measured by the clinic's ability to accept and process patient appointments and provide clinical services on the established activation date.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06-02-2026 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77626Q0146 05-11-2026

X X X X The purpose of this amendment is to post the answers to questions submitted for the solicitation referenced in block 9A.

Kathleen Klotzbach

CONTINUATION PAGE

New Albany IOTA Solicitation 36C77626Q0146 Questions & Answers

1. Question: 16.1 Activation Integrated Master Schedule (AIMS). Can the Government provide the current construction Integrated Master Schedule (IMS) and anticipated milestone dates (substantial completion, phased turnover, furniture installation windows, IT activation, equipment testing, and Day One)?

Answer: CFM Integrated Master Schedule will be provided to IOTA vendor upon award. Reference anticipated milestone dates (Beneficial Occupancy Date, Patient 1st Use) as provided in PWS.

2. Question: Section E – Technical Proposal Page Limitation PWS/RFP Reference. Given the complexity of the required activation, transition, acquisition support, FF&E coordination, scheduling, and optional warehousing services, the current Technical Approach page limitation may constrain offerors’ ability to fully address the Government’s evaluation criteria. Will the Government consider increasing the allowable page count for the Technical Approach submission?

Answer: Vendors only need to submit their technical response for those tasks identified in 52.212-1(F)(2)(a).

3. Question: 16.2 Existing Equipment Reuse / Relocation. Can the Government clarify the anticipated extent of existing FF&E, medical equipment, and artwork reuse/relocation associated with this project, including whether a formal reuse inventory has already been developed?

Answer: Refer to PWS Section 16.6 (Relocation of Reuse and Personnel Files) for clarifications.

4. Question: PWS Section 16.2 – ASE/Infrastructure Coordination. Can the Government clarify the anticipated level of contractor involvement associated with Architecturally Significant Equipment (ASE) coordination, including whether the contractor is expected to support infrastructure validation, utility coordination, or installation oversight activities?

Answer: Yes, please refer to PWS Sections 16.2 and 16.7 for requirements related to all FF&E coordination and installation oversight to include equipment notated as VA provided Architecturally Significant Equipment (ASE).

5. Question: Section E – Betterment Submission PWS/RFP Reference. Can the Government clarify how proposed betterments will be evaluated and weighted during the technical evaluation process?

Answer: Betterments are part of the technical evaluation under FAR 52.212‑2 and are scored based on the added value they bring. The solicitation employs a Highest Technically Rated with a Fair and Reasonable Price strategy—technical excellence is paramount, and betterments enhance technical scores.

6. Question: Section E – Betterment Submission PWS/RFP Reference. Can betterment narratives reference and expand upon approaches already discussed within the technical proposal, or must all betterment content be entirely standalone within the five-page betterment submission limit?

Answer: Betterment narratives may reference and expand upon information already presented in the Offeror’s technical proposal. They do not need to be entirely standalone. However, any content the Offeror wishes the Government to consider as part of the betterment evaluation must be fully captured within the five‑page betterment submission, because only the material contained within that section will be evaluated for betterments.

7. Question: Section E – Betterment Submission PWS/RFP Reference. Should proposed betterments be included within the firm-fixed-price proposal amount, or may offerors identify betterments that would require additional Government funding or optional consideration?

Answer: Yes. The price quote should be all inclusive as the Betterment proposed will be modified into the final Attachment A PWS upon award.

8. Question: Section E – Betterment Submission PWS/RFP Reference. Beyond quantitative performance increases, can the Government provide examples of the types of operational, technological, or process-oriented betterments considered most valuable to the Government for this requirement?

Answer: The Government does not have specific examples of operational, technological, or process‑oriented betterments to provide. Offerors are encouraged to propose any betterments they believe meaningfully exceed the stated requirements and provide added value to the Government. All proposed betterments will be evaluated in accordance with the solicitation’s technical evaluation criteria.

9. Question PWS 16.8.1 Deliverable Training & Simulation Plan, from Section 18.1 Deliverable Schedule, notes that this deliverable is due 14 days after award of Optional Task. Which Optional Task is this referencing?

Answer: Due date has been updated to “Start of BOD”

10. Question: Do you have an estimated BOD?

Answer: BOD is currently being reported as 10/26/2028

11. Question: Has the Lessor for this project been awarded? If so, can you please provide the info?

Answer: New Albany Lease is not awarded currently. ORP’s lease awardee information and other pertinent signed lease contract information will be provided to IOTA contractor post-award.

12. Question: In Section 16.1 CPMS, regarding Meeting Facilitation Services, PWS notes "The IOT&A contractor shall participate in design/construction meetings as determined by the COR." Can the government provide information regarding the types of design/construction meetings or a reasonable estimate of frequency in which the IOTA contractor may need to participate, so the IOTA can provide an accurate BOE?

Answer: Two-part answer to this question: First – there is no BoE requirement under the Technical portion of this solicitation. Please disregard FAR 52.212-1(B)(4) bullet number 1. FAR 52.212-1 Section F(2) does not include a part “b” requirement for a BoE.

Second - Refer to requirements in PWS Section 16.1 Comprehensive Project Management Services, Sub Section - Meeting Facilitation Services.