This is an Asbestos Inspection and Lead Paint Chip Sampling Report prepared for the Syracuse VA Medical Center EHRM Upgrades project at two locations: 800 Irving Avenue in Syracuse, New York and 125 Brookley Road in Rome, New York. The report was prepared by Performance Environmental Services, Inc. in coordination with subcontractor Lozier Environmental Consulting, Inc. and was submitted to Spees Design Build, the project manager, dated October 5, 2023. The inspection was conducted on August 15 and October 4, 2023 at the Syracuse location and August 18, 2023 at the Rome location by certified and accredited asbestos inspector Frank Golojich.
At 800 Irving Avenue, inspections identified 22 types of materials suspected of containing asbestos. Laboratory analysis confirmed asbestos in two homogeneous areas: carpet glue, floor tile, and mastic in location C106 (330 sf) containing 4.6% to 5.8% Chrysotile, and wall and ceiling seam caulk in location S196 (20 sf) assumed to contain asbestos due to inaccessibility. Eight of nineteen paint chip samples tested positive for lead, with results ranging from 0.0082% to 0.21% lead content across locations C507, C607, C907, C703, C303, C273, AL08, and BT03. At 125 Brookley Road, one asbestos-containing material was identified: firestop caulk in location G120 (1 sf) containing 5.5-6.9% Chrysotile. One paint chip sample from location G120 tested positive for lead at 0.033%. The report includes recommendations for abatement, Operations and Maintenance Program preparation, and compliance with EPA NESHAPS and New York State Department of Labor regulations based on project classification and material quantities.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
28054 Center Oaks Court, Suite B ▪ Wixom, Michigan 48393 ▪ Voice: 248.926.3800 ▪ Fax: 248.926.3838 105 Bradford Road, Suite 320 ▪ Wexford, PA 15090 ▪ Voice: 412.463.6576
October 5, 2023
Mr. Kris Good, RCDD Project Manager Spees Design Build 23830 Pacifica Highway S, Suite 203 Kent, WA 98032
RE: ASBESTOS INSPECTION AND LEAD PAINT CHIP SAMPLING REPORT
US DEPARTMENT OF VETERANS AFFAIRS
SYRACUSE VA MEDICAL CENTER – EHRM UPGRADES
800 IRVING AVENUE – SYRACUSE, NEW YORK 13201
125 BROOKLEY ROAD – ROME, NEW YORK 13441
PERFORMANCE PROJECT # 2320288
Dear Mr. Good:
In accordance with your request, Performance Environmental Services, Inc. (Performance) was contracted by Spees Design Build to conduct asbestos inspections and lead paint chip sampling at specific renovation areas within the buildings located at 800 Irving Avenue in Syracuse, New York and 125 Brookley Road in Rome, New York. Performance subcontracted with Lozier Environmental Consulting, Inc. to conduct the asbestos inspection and paint chip sampling activities at the above referenced locations. The inspection included an on-site investigation and collection of samples suspected of containing asbestos and paint coatings which may contain lead in accessible areas within the study area. The purpose of these inspections was to locate and identify building materials suspected of containing asbestos and lead.
A. 800 Irving Avenue, Syracuse, New York:
As a result of our asbestos inspection and subsequent laboratory analysis, the following asbestos-containing materials were identified:
HA
# Material Description Asbestos-Containing
Material Location ~ Quantity
05 Carpet glue (tan) over 12” x 12” floor tile (white) and black mastic
Carpet glue, floor tile and mastic
C106 330 ft2
09* Wall and ceiling seam caulk (pink) Caulk S196 20 ft2
* Material assumed to contain asbestos due to material being inaccessible for sampling.
The red firestop caulk (HA#04) contained a trace amount of Chrysotile which is BELOW the regulatory threshold of >1% asbestos for the material to be considered an asbestos-containing material. For these situations, OSHA regulations require wet methods, prompt clean-up and disposal of wastes in leak-tight containers, no high-speed abrasive disc saws that are not equipped with point-of-cut ventilator or enclosures with HEPA filtered exhaust air, no compressed air used to remove asbestos, and no employee rotation as a means of reducing employee exposure to asbestos. Further information can be obtained from the OSHA Interpretive letter entitled “Compliance requirements for renovation work involving material containing 1% or less” dated 11/24/03.
Asbestos Inspection and Lead Paint Chip Sampling Report US Department of Veterans Affairs Syracuse VA Medical Center – EHRM Upgrades 800 Irving Avenue – Syracuse, New York 13201 125 Brookley Road – Rome, New York 13441 October 5, 2023
As a result of our inspection and laboratory analysis, the following paint coatings were identified as lead-containing as per OSHA regulations:
Sample # Description Location % Lead Content 72531-31 White paint chip C507 0.0082% 72531-33 White paint chip C607 0.11% 72531-40 White paint chip C907 0.025% 72531-44 White paint chip C703 0.061% 72531-56 White paint chip C303 0.077% 72531-66 White paint chip C273 0.044% 72531-82 White paint chip AL08 0.21% 72531-88 White paint chip BT03 0.058%
B. 125 Brookley Road, Rome, New York:
As a result of our asbestos inspection and subsequent laboratory analysis, the following asbestos-containing material was identified:
HA
# Material Description Asbestos-Containing
Material Location ~ Quantity
04 Firestop caulk (gray) Caulk G120 1 ft2
As a result of our inspection and laboratory analysis, the following paint coatings were identified as lead-containing as per OSHA regulations:
1 White paint chip G120 0.033%
Attached, please find the Asbestos Inspection and Lead Paint Chip Sampling Reports, which includes the complete laboratory data, the chain of custody records and the Bulk Sample Location Maps. If there are any questions or comments concerning this report or our recommendations, please do not hesitate to contact us.
Respectfully, PERFORMANCE ENVIRONMENTAL SERVICES, INC.
Curtis V. Wagner William C. Wessner III Senior Project Manager Senior Project Manager
CVW/WCW:mr
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 SCOPE OF WORK
3.0 INSPECTION OVERVIEW AND FINDINGS – 800 IRVING AVENUE, SYRACUSE, NY
4.0 INSPECTION OVERVIEW AND FINDINGS – 125 BROOKLEY ROAD, ROME, NY
5.0 DISCUSSION
6.0 SUMMARY AND RECOMMENDATIONS
APPENDICES
APPENDIX 1 ................................................................................ ASBESTOS INSPECTION DOCUMENTATION
APPENDIX 2 ...................................................................... LEAD PAINT CHIP SAMPLING DOCUMENTATION
APPENDIX 3 ................................................................................................. BULK SAMPLE LOCATION MAPS
SPEES DESIGN BUILD, LLC ASBESTOS INSPECTION AND LEAD PAINT CHIP SAMPLING REPORT
800 IRVING AVENUE, SYRACUSE, NY POLARIZED LIGHT MICROSCOPY/ATOMIC ABSORPTION ANALYSIS
125 BROOKLEY RD., ROME, NY OCTOBER 2023
PERFORMANCE ENVIRONMENTAL SERVICES, INC. PAGE 1
105 BRADFORD ROAD, SUITE 320
WEXFORD, PENNSYLVANIA
1.0 INTRODUCTION
Spees Design Build (Spees) contracted Performance Environmental Services, Inc. (Performance) to conduct asbestos inspections and lead paint chip sampling at specific renovation areas within the buildings located at 800 Irving Avenue in Syracuse, New York and 125 Brookley Road in Rome, New York.
Performance subcontracted with Lozier Environmental Consulting, Inc. to conduct the asbestos inspection and paint chip sampling activities at the above referenced locations. On August 15 and October 4, 2023, Lozier representative, Mr. Frank Golojich (NY DOL Certificate #16-13382, DMV# 588807812) conducted the on-site investigation and sample collection activities at 800 Irving Avenue in Syracuse, New York.
Subsequently, Mr. Golojich conducted the on-site investigation at 125 Brookley Road in Rome, New York on August 18, 2023.
2.0 SCOPE OF WORK
Spees provided locations for the scope of work and the subsequent inspection areas. An EPA certified and State of New York Accredited Asbestos Inspector performed the inspection activities to locate and sample materials suspected of containing asbestos. Additionally, Performance/Lozier categorized painted surfaces according to color and collected representative samples of paint chips suspected of being lead-containing. Performance also provided project review, report preparation and consultation services during this project.
As part of this study, Performance completed the following:
1) Conducted an inspection of accessible areas in designated areas to be renovated to locate materials suspected of containing asbestos;
2) Categorized painted surfaces according to color;
3) Collected bulk material samples for subsequent analysis by Polarized Light Microscopy (PLM) or
Atomic Absorption (AA);
4) Submitted bulk samples collected during this asbestos inspection to a National Voluntary
Laboratory Accreditation Program (NVLAP) accredited laboratory for PLM analysis; and
5) Submitted bulk samples collected during the paint chip sampling to a National Lead Laboratory
Accreditation Program (NLLAP) for AA analysis.
Performance assembled the information collected during the study in this report, which details the laboratory results and locations of sampled materials.
3.0 INSPECTION OVERVIEW AND FINDINGS – 800 IRVING AVENUE, SYRACUSE, NY
As a result of our inspection, Performance/Lozier observed twenty-two (22) types of material suspected of containing asbestos. The suspect materials were classified into homogeneous areas. A homogeneous area (HA) is a building material that appears similar in terms of color, texture, and apparent date of application. The materials were assigned HA numbers 1 through 22 and were compiled as follows:
PERFORMANCE ENVIRONMENTAL SERVICES, INC. PAGE 2
HA #
Material Description
Friable (F) or Nonfriable
(Cat I/II NF*) 01 Drywall and joint compound (white) F 02 Covebase mastic (beige) Cat II NF 03 Duct caulk (gray) Cat II NF 04 Firestop caulk (red) Cat II NF 05 12” x 12” Floor tile (white) and beige mastic Cat I NF 06 Wall and ceiling seam caulk (gray/beige) Cat II NF 07 Floor mastic (beige) Cat I NF 08 Tar (black) on pipe under floor Cat II NF 09 Wall and ceiling seam caulk (pink) Cat II NF 10 Carpet glue (tan) over 12” x 12” floor tile (white) and black mastic Cat I NF 11 Wall tar (black) Cat II NF 12 Wall plaster (white/gray) Cat II NF 13 Wall seam caulk (red) Cat II NF 14 Duct wrap (white) F 15 Wall mastic (tan) Cat II NF 16 2’ x 4’ Lay-in ceiling tile (white) F 17 Covebase mastic (brown) Cat II NF 18 12” x 12” Floor tile (white/blue/pink) and yellow mastic Cat I NF 19 Wall tile grout (white) and mortar bed (gray) Cat II NF 20 12” x 12” Floor tile (white/gray) and yellow or black mastic Cat I NF 21 Fiberboard (white) on wall F 22 Covebase mastic (tan) Cat II NF
*Cat I NF = Category I NF = Asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products, Cat II NF = All other nonfriable materials excluding Cat I NF.
3.1 IDENTIFIED ASBESTOS-CONTAINING MATERIALS – 800 IRVING AVENUE, SYRACUSE, NY
Performance/Lozier collected one hundred one (101) bulk samples of the identified homogenous areas and submitted them to an NVLAP-accredited laboratory for PLM analysis. As per New York requirements, TEM analysis was performed on fifty-nine (59) samples. As the laboratory results indicate, asbestos was detected in the following HA numbers:
HA # Material Description Asbestos- Containing
Material
Asbestos Content
05 Carpet glue (tan) over 12” x 12” floor tile (white) and black mastic
Carpet glue, floor tile and mastic
4.6% Chrysotile/ 3-5.8% Chrysotile/ 2.5-3% Chrysotile
09 Wall and ceiling seam caulk (pink) Caulk Assumed*
* Material assumed to contain asbestos due to material being inaccessible for sampling.
Refer to the attached Appendices for the complete laboratory data, the Chain of Custody records, and the Bulk Sample Location Maps.
PERFORMANCE ENVIRONMENTAL SERVICES, INC. PAGE 3
3.2 SUSPECTED/IDENTIFIED LEAD-CONTAINING PAINT – 800 IRVING AVENUE, SYRACUSE, NY
Performance/Lozier collected nineteen (19) paint chip samples for Atomic Absorption (AA) services to analyze suspect lead-containing paint to determine if lead was present. AA Analysis revealed detectable levels of lead in eight (8) of the samples collected as detailed below:
72532-6 White paint chip SG95 <0.0060
72532-12 Yellow/white paint chip SL06 <0.0055
72532-17 White paint chip S196 <0.0076
72532-22 White paint chip C106 <0.0059
72532-26 White paint chip C203 <0.0044
72532-31 White/beige paint chip C507 0.0082
72532-33 White paint chip C607 0.11
72532-37 White/beige paint chip C808A <0.0088
72532-40 Gray/white paint chip C907 0.025
72532-44 Beige/white paint chip C703 0.061
72532-51 White paint chip S406 <0.0040
72532-56 White/green/black paint chip C303 0.077
72532-66 White/beige paint chip C273 0.044
72532-71 White paint chip S272 <0.0049
72532-77 White paint chip CG06 <0.0071
72532-82 White/gray/red paint chip AL08 0.21
72532-86 White/beige paint chip C403 <0.0042
72532-88 Green/gray paint chip BT03 0.058
72532-93 White/gray paint chip 16-12 <0.0067 “<” = below laboratory Limit of Detection (LOD)
OSHA lead regulations mandate proper Personal Protective Equipment (PPE), engineering controls and various other requirements for certain construction and/or demolition activities as detailed in 29 CFR
1926.62 for building components containing detectable levels of lead. Since there are detectible levels of lead present, OSHA regulations do apply.
4.0 INSPECTION OVERVIEW AND FINDINGS – 125 BROOKLEY ROAD, ROME, NY
As a result of our inspection, Performance/Lozier observed four (4) types of material suspected of containing asbestos. The suspect materials were classified into homogeneous areas. A homogeneous area (HA) is a building material that appears similar in terms of color, texture, and apparent date of application. The materials were assigned HA numbers 1 through 4 and were compiled as follows:
PERFORMANCE ENVIRONMENTAL SERVICES, INC. PAGE 4
HA #
Material Description
Friable (F) or Nonfriable
(Cat I/II NF*) 01 Ceiling plaster (white/gray) F
02 Firestop caulk (red) Cat II NF
03 12” x 12” Floor tile (white) and yellow mastic Cat I NF
04 Firestop caulk (gray) Cat II NF
4.1 IDENTIFIED ASBESTOS-CONTAINING MATERIALS – 125 BROOKLEY ROAD, ROME, NY
Performance/Lozier collected fourteen (14) bulk samples of the identified homogenous areas and submitted them to an NVLAP-accredited laboratory for PLM analysis. As per New York requirements, TEM analysis was performed on six (6) samples. As the laboratory results indicate, asbestos was detected in the following HA numbers:
HA # Material Description Asbestos- Containing
Material
Asbestos Content
04 Firestop caulk (gray) Caulk 5.5-6.9% Chrysotile
Refer to the attached Appendices for the complete laboratory data, the Chain of Custody records, and the Bulk Sample Location Map.
4.2 SUSPECTED/IDENTIFIED LEAD-BASED PAINT – 125 BROOKLEY ROAD, ROME, NY
Performance/Lozier collected one (1) paint chip sample for Atomic Absorption (AA) services to analyze suspect lead-containing paint to determine if lead was present. AA Analysis revealed a detectable level of lead in the sample collected as detailed below:
72531-10 White paint chip G120 0.033
“<” = below laboratory Limit of Detection (LOD)
OSHA lead regulations mandate proper Personal Protective Equipment (PPE), engineering controls and various other requirements for certain construction and/or demolition activities as detailed in 29 CFR
1926.62 for building components containing detectable levels of lead. Since there are detectible levels of lead present, OSHA regulations do apply.
5.0 DISCUSSION
5.1 Asbestos Control and Management
Renovation and demolition activities, as well as some maintenance activities have the potential to disturb materials and release asbestos fibers into the environment; therefore, government agencies have created regulations to protect the health of workers potentially exposed as well as the environment.
PERFORMANCE ENVIRONMENTAL SERVICES, INC. PAGE 5
WEXFORD, PENNSYLVANIA
EPA:
The Environmental Protection Agency (EPA), under the National Emission Standards for Hazardous Air Pollutants (NESHAPS), requires notification and procedures for emissions control depending on whether the asbestos material in question falls into the definition of “Regulated Asbestos-Containing Material” (RACM). NESHAPS defines RACM as:
(a) Friable asbestos material,
(b) Category I nonfriable ACM that has become friable,
(c) Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or
(d) Category II nonfriable ACM that has a high probability of becoming or having become crumbled, pulverized, or reduced to powder by the forces expected to act on the material during demolition or renovation operations.
The proceeding items summarize basic requirements for demolition and renovation projects according to
NESHAPS:
If the facility is being renovated, notification requirements and procedures for asbestos emission control apply if the combined amount of RACM to be stripped, removed, dislodged, cut, drilled, or similarly disturbed is (i) at least 260 linear feet on pipes, or (ii) at least 160 square feet on other facility components, or (iii) at least 35 cubic feet off facility components where the length or area could not be measured previously.
NEW YORK STATE DEPARTMENT OF LABOR:
The New York State Department of Labor (NYDOL), under Part 56 of Title 12 of the Official Compilation of Codes, Rules and Regulations of the State of New York, requires specific notification and removal procedures to be completed for all asbestos-containing materials (ACM) and presumed asbestos-containing materials (PACM) according to the amounts that are to be disturbed or removed regardless of EPA classification:
(a) Large asbestos project: An asbestos project involving the removal, disturbance, enclosure, encapsulation, repair or handling of 160 square feet or more of ACM, PACM or asbestos material; or 260 linear feet or more of ACM, PACM, or asbestos material.
(b) Small asbestos project: An asbestos project involving the removal, enclosure, repair, disturbance, or any handling of more than 10 and less than 160 square feet of ACM, PACM or asbestos material; or more than 25 and less than 260 linear feet of ACM, PACM, or asbestos material.
(c) Minor asbestos project: An asbestos project involving the removal, encapsulation, enclosure, repair, disturbance, or any handling of 10 square feet or less of ACM, PACM or asbestos material; or 25 linear feet or less of ACM, PACM or asbestos material.
PERFORMANCE ENVIRONMENTAL SERVICES, INC. PAGE 6
WEXFORD, PENNSYLVANIA
5.2 Inspection Limitations and Miscellaneous Field Notes:
The Performance inspection activities were limited to the rooms within the buildings identified in the Bulk Sample Location Maps as provided in Appendix 3. No other areas were assessed during the inspections.
Performance did not complete destructive bulk sampling in areas such as behind finished surfaces (e.g.
plaster or drywall walls, hard ceilings), inside mechanical pipe chases, behind mirrored walls or behind chalkboards; therefore, the inspection was limited to areas that were accessible and/or easily exposed.
Performance did not sample any system that presented a health and safety hazard to the inspector such as energized electrical systems, elevator components, active mechanical systems, or within confined spaces.
Remodeling and renovations within buildings often result in asbestos-containing flooring products (flooring and mastics) being covered with non-asbestos flooring products. Although every attempt is made to delineate flooring types during inspection activities, due to the limited destructive nature of sampling Performance assumes asbestos-containing materials may be present below sampled flooring in areas not inspected. It is imperative that if flooring finishes in an area differ from areas where samples were collected; additional samples are collected and analyzed of the newly uncovered material before disturbance occurs.
If there are any friable asbestos-containing materials present and there is either limited or no visibility above a ceiling area, then Performance assumes that there may be suspect asbestos-containing debris above the ceiling areas. Performance recommends abating the assumed debris if located later prior to any work that might disturb this material.
Throughout this document, when the term “inaccessible” is used, it is defined as areas of the building that were locked or where admittance was not permitted. If any inaccessible areas inside the study area are noted, then Performance assumes there may be suspect asbestos-containing materials inside. If renovation, demolition, or maintenance activities have the potential to disturb inaccessible materials and release asbestos fibers into the environment, then Performance recommends sampling the materials before disturbance. If the test results verify the materials are asbestos-containing materials (greater than 1% asbestos), then Performance recommends abatement before disturbance. If abatement is not performed and the materials are not disturbed, then Performance recommends that an Operations and Maintenance Program be prepared to facilitate the in-place management of these asbestos-containing materials. Federal, state, and local laws regulate removal, transportation, and disposal of asbestos materials.
Performance has prepared this report for the express use of its clients and their approved agents.
Although some information included in this report or in portions of this report may be required to be included in notifications to various parties, this report is not intended to be used as an asbestos specification or work plan.
This report is based upon conditions observed at the property at the time of the inspection. This report does not intend to identify all hazards or to indicate that other hazards do not exist at the project site.
Environmental conditions and regulations are subject to constant change and reinterpretation.
PERFORMANCE ENVIRONMENTAL SERVICES, INC. PAGE 7
WEXFORD, PENNSYLVANIA
6.0 SUMMARY AND RECOMMENDATIONS
ASBESTOS
Friable Materials:
Performance did not identify any friable materials within the inspected areas at either physical building address.
Category I Nonfriable Materials:
Referring to the definition of RACM in section 3.3.1, EPA NESHAPS requires removal of Category I nonfriable ACM prior to a renovation or demolition if they have become friable or if they will be or have been subjected to sanding, grinding, cutting, or abrading. Performance recommends abating the flooring material (HA#05) at the 800 Irving Avenue, Syracuse, NY address if renovation or demolition work would disturb these materials. If the identified materials are not removed or disturbed and remain in place, then Performance recommends that an Operations and Maintenance Program be prepared to facilitate the in-place management of these asbestos-containing materials.
Category II Nonfriable Materials:
Referring to the definition of RACM in section 3.3.1, EPA NESHAPS requires removal prior to a renovation or demolition of all Category II nonfriable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material during demolition or renovation operations. Due to this requirement and regulatory enforcement, Performance recommends abating the firestop caulk (HA#04) at the 125 Brookley Road, Rome, NY address if it has the potential to be disturbed. If the identified material is not removed or disturbed, then Performance recommends that an Operations and Maintenance Program be prepared to facilitate the in-place management of this asbestos-containing material.
Assumed Materials:
The pink wall and ceiling seam caulk (HA#09) at the 800 Irving Avenue, Syracuse, NY address is assumed to contain a Category II nonfriable ACM and it has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material during demolition or renovation operations. If the material becomes accessible for sampling at a future date, and prior to disturbance, Performance recommends sampling the material by an EPA certified and NY DOL accredited and licensed asbestos inspector to confirm the asbestos content.
Performance recommends removing the caulk if it has the potential to be disturbed. If the identified material is not removed or disturbed, then Performance recommends that an Operations and Maintenance Program be prepared to facilitate the in-place management of this asbestos-containing material.
PERFORMANCE ENVIRONMENTAL SERVICES, INC. PAGE 8
WEXFORD, PENNSYLVANIA
LEAD
Visual observation revealed that paint was noted throughout the work area. Laboratory results verified the presence of lead greater than the laboratory limit of detection (LOD) in paint coatings at both locations.
Since the facility is not regulated under the EPA or HUD as “target housing” or a “child-occupied facility” or regulated under any federal or state housing assistance, no further action for these regulatory agencies is required.
If the lead-containing paint identified in this inspection has the potential to become disturbed such as through demolition or renovation, then OSHA requirements would apply. The OSHA Lead in Construction Standard (29 CFR 1926.62) defines work as:
• Demolition or salvage of structures where lead or materials containing lead are present;
• Removal or encapsulation of materials containing lead;
• New construction, alteration, repair, or renovation of structures, substrates that contain lead, or materials containing lead;
• Installation of products containing lead; or,
• Lead contamination/emergency cleanup.
OSHA lead regulations mandate proper Personal Protective Equipment (PPE), engineering controls and various other requirements for certain construction and/or demolition activities as detailed in 29 CFR
1926.62 for building components containing detectable levels of lead. Since there were detectible levels of lead present, OSHA regulations do apply.
APPENDIX 1
ASBESTOS INSPECTION
DOCUMENTATION
CONTENTS
CERTIFICATES OF
LABORATORY ANALYSIS
CHAIN OF CUSTODY RECORDS
APPENDIX 2
LEAD PAINT CHIP SAMPLING
DOCUMENTATION
CONTENTS
CERTIFICATES OF
LABORATORY ANALYSIS
CHAIN OF CUSTODY RECORD
APPENDIX 3
BULK SAMPLE LOCATION MAPS
4a
J
5-6
H
ENTRY POINT
A
B B
558 SF
TELECOM
AL08
157 SF
OI&T
AL12
4489 SF
MEDICAL SUPPLY
& STORAGE
BL05
864 SF
CORRIDOR
4a
5-6
H
157 SF
OI&T
AL12
81A,B
80A,B
J
H
ENTRY POINT
A
B B
558 SF
TELECOM
AL08
157 SF
OI&T
AL12
4489 SF
MEDICAL SUPPLY
& STORAGE
BL05
864 SF
CORRIDOR
4a
5-6
157 SF
OI&T
AL12
81A,B
80A,B
Syracuse VA Medical Center EHRM Upgrades
800 Irving Avenue - Syracuse, NY Bldg 1 Level 00B
Bulk Sample Location Map
None1 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
Wexford, PA 15090
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1
N
F'
E.8
E' D.7
10.
11.
ENTRY POINT 2
B
B
A
386 SF
OI&T
SL06
145 SF
WOMENS
SL08
2409 SF
MECHANICAL
ROOM
SL64A
78 SF
ELECT CLOSET
SL04
1842 SF
ELEVATOR
LOBBY
10.
11.
12 13
9A
F'
E.8
E' D.7
10.
11.
ENTRY POINT 2
B
B
A
386 SF
OI&T
SL06
145 SF
WOMENS
SL08
2409 SF
MECHANICAL
ROOM
SL64A
78 SF
ELECT CLOSET
SL04
1842 SF
ELEVATOR
LOBBY
12 13
9A
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 00B
Bulk Sample Location Map
None2 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
Wexford, PA 15090
11.
10.
F' E.8
B
B
A
80 SF
OI&T
SG95
80 SF
SPD SOLUTION
SG82
78 SF
ELECT.
SG91
219 SF
SHAFT 6
SG82A
2059 SF
ELEVATOR
LOBBY
5A,B
1A,B
11.
10.
F' E.8
B
B
A
80 SF
OI&T
SG95
80 SF
SPD SOLUTION
SG82
78 SF
ELECT.
SG91
219 SF
SHAFT 6
SG82A
2059 SF
ELEVATOR
LOBBY
5A,B
1A,B
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 00G
Bulk Sample Location Map
None3 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
J K.2 L
3' - 8"
A
B
B
A
52 SF
SHAFT
CG06A
171 SF
NIGHT NURSE
CLOSET
CG06
191 SF
VESTIBULE
CG19
1691 SF
CORRIDOR
G01
101 SF
OFFICE
CG08
710 SF
SERVICE
ELEVATOR
G02
RM CG06 & CG06A -DEMO FLOOR PLAN
PROJECT
NORTH
73A,B
75A,B
76A,B 74A,B
J K.2 L
3' - 8"
A
B
B
A
52 SF
SHAFT
CG06A
171 SF
NIGHT NURSE
CLOSET
CG06
191 SF
VESTIBULE
CG19
1691 SF
CORRIDOR
G01
101 SF
OFFICE
CG08
710 SF
SERVICE
ELEVATOR
G02
73A,B
75A,B
76A,B 74A,B
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 00G
Bulk Sample Location Map
None4 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
J.1
7'
1/
2"
DUCT TO EXTERIOR
A
B
B
A
297 SF
CASHIER
C106
136 SF
CHIEF
C108
94 SF
POLICE
A184
108 SF
OFFICE
A186
46 SF
ELECT. CLOSET
A179
20A,B,C
21A,B
F 2320288
33018
J.1
7'
1/
2"
DUCT TO EXTERIOR
A
B
B
A
297 SF
CASHIER
C106
136 SF
CHIEF
C108
94 SF
POLICE
A184
108 SF
OFFICE
A186
46 SF
ELECT. CLOSET
A179
20A,B,C
21A,B
F 2320288
33018
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 01
Bulk Sample Location Map
None5 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
F '
E.8
11.
10.
ENTRY POINT
A B
B
74 SF
IT
S196
115 SF
EXAM
S199
156 SF
CONFERENCE
S192
81 SF
ELEC.
S103A
14A,B
16A,B
M 2320288
F '
E.8
11.
10.
ENTRY POINT
A B
B
74 SF
IT
S196
115 SF
EXAM
S199
156 SF
CONFERENCE
S192
81 SF
ELEC.
S103A
14A,B
16A,B
M 2320288
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 01
Bulk Sample Location Map
None6 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
R.1 S.1 T.1
16-17
DUCT TO EXTERIOR
A
B
A
187 SF
NETCOM
C270
278 SF
SHAFT
C273A
182 SF
BREAKROOM
C272
914 SF
DATA CENTER
C273
171 SF
STAIRS
2S4
10 SF
CLOSET
C277
16 SF
CLOSET
C275
58A,B 67596160
64A,B
65, 94
R.1 S.1 T.1
16-17
DUCT TO EXTERIOR
A
B
A
187 SF
NETCOM
C270
278 SF
SHAFT
C273A
182 SF
BREAKROOM
C272
914 SF
DATA CENTER
C273
171 SF
STAIRS
2S4
10 SF
CLOSET
C277
16 SF
CLOSET
C275
58A,B 67596160
64A,B
65, 94
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 02
Bulk Sample Location Map
None7 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
K.2
ENTRY POINT
A
B
S
F
PI
PE
S H
A
FT
C
3a
86 SF
OFFICES
B266
26 SF
HKA
B264
23 SF
HKA
C201
113 SF
REFRIDG.
C202
57 SF
C203
24A,B
25A,B
K.2
ENTRY POINT
A
B
S
F
PI
PE
S H
A
FT
C
3a
86 SF
OFFICES
B266
26 SF
HKA
B264
23 SF
HKA
C201
113 SF
REFRIDG.
C202
57 SF
C203
24A,B
25A,B
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 02
Bulk Sample Location Map
None8 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
/4
3' - 8 5/8"
NEW LINE OF WALL
E.8
11.
10.
A
A
ENTRY POINT
B
B
270 SF
ELEV. LOBBY
S201
83 SF
ELECT. CLOSET
S271
228 SF
SHAFT 6
S265C
95 SF
SOILED LINEN
S265B
78 SF
TELECOM
S272
148 SF
SOILED UTILITY
S265A
71 69
/4
3' - 8 5/8"
NEW LINE OF WALL
E.8
11.
10.
A
A
ENTRY POINT
B
B
270 SF
ELEV. LOBBY
S201
83 SF
ELECT. CLOSET
S271
228 SF
SHAFT 6
S265C
95 SF
SOILED LINEN
S265B
78 SF
TELECOM
S272
148 SF
SOILED UTILITY
S265A
71 69
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 02.5
Bulk Sample Location Map
None9 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
2 4
ENTRY POINT
B A
B
63 SF
C303
S
F
PI
PE
S H
A
FT
C
3a
267 SF
CONFERENCE
C305
64 SF
Room C301C
711 SF
LAB
C301
52A,B
53, 54, 55
J K.2 L
2 4
ENTRY POINT
B A
B
63 SF
C303
S
F
PI
PE
S H
A
FT
C
3a
267 SF
CONFERENCE
C305
64 SF
Room C301C
711 SF
LAB
C301
52A,B
53, 54, 55
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 03
Bulk Sample Location Map
None10 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
10.
F'
ENTRY POINT
A
B
80 SF
OI&T
S406
475 SF
W/C STORAGE
S405
77 SF
ELECT. CLOSET
S404
4647A,B48
10.
F'
ENTRY POINT
A
B
80 SF
OI&T
S406
475 SF
W/C STORAGE
S405
77 SF
ELECT. CLOSET
S404
4647A,B48
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 04
Bulk Sample Location Map
None11 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
ENTRY POINTA B
B
78 SF
CYSTO ROOM
C403A
37 SF
SHAFT
179 SF
SCI
C413
53 SF
CLEAN UTILITY
C403B
168 SF
PASSAGE
C403
85A,B 86
J K.2 L
ENTRY POINTA B
B
78 SF
CYSTO ROOM
C403A
37 SF
SHAFT
179 SF
SCI
C413
53 SF
CLEAN UTILITY
C403B
168 SF
PASSAGE
C403
PROJECT
85A,B 86
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 04
Bulk Sample Location Map
None12 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
A
B B
ENTRY POINT
71 SF
SHAFT
C507
S
F
PI
PE
S H
A
FT
C
7a
135 SF
CHIROPRACTOR
C509
256 SF
PROSTHETICS
C505
3130A,B
J K.2 L
A
B B
ENTRY POINT
71 SF
SHAFT
C507
S
F
PI
PE
S H
A
FT
C
7a
135 SF
CHIROPRACTOR
C509
256 SF
PROSTHETICS
C505
3130A,B
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 05
Bulk Sample Location Map
None13 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
2338 SF
ROOF
5-434
16-17
2338 SF
ROOF
5-434
Notes:
Note 1: Callout tags showing the location of asbestos-containing materials may only be used to locate which room or corridor contains the material. The tags do not indicate the location of the material within the room or corridor.
Note 2: All doors, door frames and firehatches may contain asbestos materials that should not be disturbed.
Performance recommends testing any doors, door frames, firehatches or firehoses for the presence of asbestos prior to any activities that may disturb them.
Note 3: Performance assumes concealed flooring materials beneath finish floor surfaces contain asbestos unless sampled. If demolition or renovation work uncovers previously inaccessible flooring materials, please review the associated survey report to ensure all layers of flooring have been sampled before disturbance.
LEGEND
Boundary of survey
Negative for asbestos Positive for asbestos1
Bulk Sample Locations:
Sample not analyzed1
Area inaccessible
Inaccessible above ceiling
Generalized material type
Material quantity
Material H.A. number
Thermal system insulationT = F = Flooring materials S = Surfacing materials
Generalized Material Letter Key:
8F
T
212282
KEY PLAN Locations of ACMs
Lead paint chip sample1 Syracuse VA Medical Center
EHRM Upgrades 800 Irving Avenue - Syracuse, NY
Bldg 1 Level 05
Bulk Sample Location Map
None14 of 2108/15/232320288 Page: Scale:Date:Project Number:
Prepared For:
Spees Design Build
23830 Pacifica Highway S, Suite 203 Kent, WA 98032
Prepared By:
Performance Environmental Services, Inc.
105 Bradford Road Suite 320
1 1
D C
D C
DC2A
D C
D C
D C
DC1A
5 450 SF
IMAGING
DC1
978 SF
DATA CENTER
DC2
202 SF
ENTRANCE
DC3134 SF
SECURE
STORAGE
DC4
117 SF
PACKING/UNPACKING
DC7
98 SF
DC5
5" IN-03.01-16
5" 5"
5"
5"
5"
IN-03.01-17
IN-03.01-18 IN-03.01-20
IN-03.01-22
IN-03.01-19
5 5
2440 SF
MECHANICAL
C521A
192 SF
STORAGE
DC8
86 SF
STAGING AREA
DC6
IN-03.01-24
5"
IN-03.01-23
5"
C521A
D C
01a
01a
01a
01a
01a 01a
01a
D C
L F.3 P.1
16-17
E.8
1 1
2 3
D C
D C
DC2A
D C
D C
D C
DC1A
5 450 SF
IMAGING
DC1
978 SF
DATA CENTER
DC2
202 SF
ENTRANCE
DC3134 SF
SECURE
STORAGE
DC4
117 SF
PACKING/UNPACKING
DC7
98 SF
DC5
5"
IN-03.01-15
5" IN-03.01-16
5" 5"
5"
5"
5"
5"
IN-03.01-17
IN-03.01-18 IN-03.01-20
IN-03.01-22
IN-03.01-21
IN-03.01-19
5 5
2440 SF
MECHANICAL
C5…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .