261116 - Secondary Unit Substations 1.pdf

PDF 105 KB Posted

Attached to
36C77625R0047 - Expand & Renovate New MRI - Providence, RI - Solicitation
Solicitation number
36C77625R0047
Issued by

About this file

This technical specification document (Section 26 11 16) details requirements for secondary unit substations for the VA Providence Medical Center's MRI expansion project. The specification covers furnishing, installation, connection, and testing of substations, which must be unitized integral assemblies with a continuous-duty, metal-clad, dead-front design incorporating a dry-type transformer.

Key technical requirements include a cast coil transformer with primary delta and secondary wye windings, copper windings, 95 kV BIL primary and 10 kV BIL secondary ratings, and four 2.5% full capacity taps. The substations must comply with IEEE, ANSI, NFPA, and UL standards, be seismically tested to International Building Code requirements, and include features like winding temperature indicators and provisions for future forced-air cooling. Submittal requirements are extensive, including detailed electrical ratings, wiring diagrams, dimensioned views, and manufacturer certifications. Installation specifications cover mounting on concrete slabs, grounding, and comprehensive acceptance testing procedures.

View the file

Other files

File Type Posted
36C77625R0047_r2.pdf PDF
36C77625R0047 0004.pdf PDF
E2-02.1-001 SECTION Reg Roll in 5113 Pkt Tile Support 1.pdf PDF
E2-01.1-003 SECTION Regular Roll with Fascia Wall Moun 1.pdf PDF
19026-VA Medical Center Geotech Rpt 1.pdf PDF
Magnetom Sola Tech Specs 1.pdf PDF
19.0158 - RGB - VAMC - MRI 3-24-23-SKC-1 1.pdf PDF
36C77625R0047 0003.pdf PDF
Technical Questions and Answers - Volume 1.docx DOCX document
E1-01.1-00220Regular20with20Wall 20 Mount.pdf PDF
190316.01 - VAMC Providence - MRI Expan-Add - 04.03.2023 1.pdf PDF
Technical Questions and Answers - Volume 2.docx DOCX document
Vida 1.PDF PDF
107316 - Canopies 1.pdf PDF
MagnetomVida Tech Specs 1.pdf PDF
36C77625R0047_r1.pdf PDF
00 Rescue SR frame 1.pdf PDF
Sola 1.PDF PDF
Vida XT Typical Final Drawings 1.PDF PDF
Sola XQ Typical Final Drawings 1.PDF PDF
S06 - 36C77625R0047 0002.pdf PDF
S06 - Attachment 02 - Site Visit Sign in Sheet - VA Reproduced.pdf PDF
S06 - Attachment 01 - Site Visit Sign in Sheet - Original.pdf PDF
S06 - Attachment 01 - Providence Campus Map.pdf PDF
S06 - 36C77625R0047 0001.pdf PDF
100 VAMC MRI - Full Set IFC 1 of 5.pdf PDF
100 VAMC MRI - Full Set IFC 2 of 5.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
S02 - Solicitation - 36C77625R0047.pdf PDF
100 VAMC MRI - Full Set IFC 4 of 5.pdf PDF
Wage Rates - Providence County.pdf PDF
650-345 Expand and Renovate MRI SOW Synopsis-FINAL.doc DOC document
Contractor Safety - Environmental Form.docx DOCX document
Specifications.pdf PDF
100 VAMC MRI - Full Set IFC 3 of 5.pdf PDF
100 VAMC MRI - Full Set IFC 5 of 5.pdf PDF
19026-VA Medical Center Geotech Rpt.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARCH 2023 VAMC PROVIDENCE

VA Project No. 650-345 EXPAND & RENOVATE SPACE FOR NEW MRI

RGB Project No. 6515 PROVIDENCE, RI

26 11 16 - 1

DSECTION 26 11 16

SECONDARY UNIT SUBSTATIONS

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the furnishing, installation, connection, and testing of the secondary unit substations, referred to as substation(s) in this section.

1.2 RELATED WORK

A. Section 03 30 00, CAST-IN-PLACE CONCRETE: Requirements for concrete equipment pads.

B. not used

C. not used

D. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS:

Requirements that apply to all sections of Division 26.

E. Section 26 05 13, MEDIUM-VOLTAGE CABLES: Medium-voltage cables.

F. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES:

Low-voltage conductors.

G. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS:

Requirements for personnel safety and to provide a low impedance path for possible ground fault currents.

H. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits.

I. Section 26 05 73, OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY:

Short circuit, coordination and arc-flash study, and requirements for a coordinated electrical system.

J. not used

K. Section 26 13 16, MEDIUM-VOLTAGE FUSIBLE INTERRUPTER SWITCHES: Medium-voltage fusible interrupter switches for use in secondary unit substations.

L. Section 26 23 00, LOW-VOLTAGE SWITCHGEAR: Switchgear for use in secondary unit substations.

M. Section 26 24 13, DISTRIBUTION SWITCHBOARDS: Distribution switchboards for use in secondary unit substations.

N. not used

1.3 QUALITY ASSURANCE

A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS

(PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS.

26 11 16 - 2

1.4 FACTORY TESTS

A. Factory Tests shall be required.

B. Factory Tests shall be in accordance with Paragraph, MANUFACTURED

PRODUCTS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS, and the following requirement:

1. Substations shall be thoroughly tested at the factory to assure that there are no electrical or mechanical defects. Tests shall be conducted per UL and ANSI Standards. Factory tests shall be certified. The following tests shall be performed:

a. Medium-Voltage Section: Refer to Section 26 13 16, MEDIUM-VOLTAGE

FUSIBLE INTERRUPTER SWITCHES.

b. Transformer Section:

1) Perform insulation-resistance tests winding-to-winding and each winding-to-ground.

2) Perform turns-ratio tests at all tap positions.

c. Low-Voltage Section: Refer to Section 26 24 13, DISTRIBUTION

SWITCHBOARDS.

1.5 SUBMITTALS

A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:

1. Shop Drawings:

a. Submit sufficient information to demonstrate compliance with drawings and specifications.

b. Prior to fabrication of substations, submit the following data for approval:

1) Complete electrical ratings, including primary and secondary voltage, decibel rating, temperature rise, nominal impedance, voltage regulation, and no load and full load losses.

2) Nameplate data.

3) Elementary and interconnection wiring diagrams.

4) Technical data for each component.

5) Dimensioned exterior views of the substations.

6) Dimensioned section views of the substations.

7) Floor plan of the substations.

8) Foundation plan for the substations.

26 11 16 - 3

9) Provisions and required locations for external conduit and wiring entrances.

10) Approximate design weights.

c. Certification from the manufacturer that the substations have been seismically tested to International Building Code requirements. Certification shall be based upon simulated seismic forces on a shake table or by analytical methods, but not by experience data or other methods.

2. Manuals:

a. Submit, simultaneously with the shop drawings, complete maintenance and operating manuals, including technical data sheets, wiring diagrams, and information for ordering replacement parts.

1) Include three-line diagrams showing device terminal numbers.

2) Include schematic signal and control diagrams, with all terminals identified, matching terminal identification in the substation.

3) Include information for testing, repair, troubleshooting, assembly, and disassembly.

b. If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection.

3. Test Reports:

a. Submit certified factory design and production test reports for approval.

b. Two weeks prior to the final inspection, submit certified field test reports.

4. Certifications: Two weeks prior to final inspection, submit the following:

a. Certification by the manufacturer that substations conform to the requirements of the drawings and specifications.

b. Certification by the Contractor that substations have been properly installed, adjusted, and tested.

1.6 APPLICABLE PUBLICATIONS

A. Publications listed below (including amendments, addenda, revisions, supplements, and errata), form a part of this specification to the

26 11 16 - 4 extent referenced. Publications are referenced in the text by basic designation only.

B. American Concrete Institute (ACI):

ACI 318-19..............Building Code Requirements for Structural

Concrete.

C. American Society for Testing and Materials (ASTM):

D 117-18................Standard Guide for Sampling, Test Methods, and

Specifications for Electrical Insulating

Liquids

D 3487-16...............Standard Specification for Mineral Insulating

Oil Used in Electrical Apparatus.

D. International Code Council (ICC):

IBC-21..................International Building Code

E. Institute of Electrical and Electronic Engineers (IEEE):

C37.121-20 .............Guide for Switchgear - Unit Substations —

Requirements

C57.12.00-21............General Requirements for Liquid-Immersed

Distribution, Power, and Regulating

Transformers

C57.12.01-20............General Requirements for Dry-Type Distribution and Power Transformers

C62.11-20...............Metal Oxide Surge Arresters for AC Power

Circuits (> 1kV)

C62.41-91(R1995)........Recommended Practice on Surge Voltage in Low

Voltage AC Power Circuits

F. National Electrical Manufacturers Association (NEMA):

TR 1-13(R2019)..........Transformers, Step Voltage Regulators and

Reactors

G. National Fire Protection Association (NFPA):

70-23...................National Electrical Code (NEC)

H. United States Department of Energy

10 CFR Part 431.........Energy Efficiency Program for Certain

Commercial and Industrial Equipment

26 11 16 - 5

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS

A. Unless otherwise specified, substations shall be in accordance with

ANSI, ASTM, IEEE, NFPA, UL, 10 CFR Part 431, and as shown on the drawings.

B. Substations shall be a unitized integral assemblies, complete, grounded, continuous-duty, metal-clad, dead-front, dead-rear, with dry-type transformer.

C. Substations shall be designed, manufactured, and rated for indoor installation and service, with ventilation openings. External doors shall have provisions for padlocking.

D. Substation ratings shall be not less than required by the NEC, and not less than shown on the drawings. Short circuit current ratings shall be not less than the available maximum short circuit currents as shown on the drawings.

E. Substations shall conform to the arrangements and details shown on the drawings, and to the space designated for installation.

F. Incorporate key-type mechanical interlock systems as required in

Section 26 13 16, MEDIUM-VOLTAGE FUSIBLE INTERRUPTER SWITCHES, Section

26 24 13, DISTRIBUTION SWITCHBOARDS, as shown on the drawings.

G. Substations shall be assembled and prewired by the manufacturer at the factory. Substations shall be sub-assembled and shipped in complete sections ready for connection at the site. Where practical, a substation shall be shipped as one unit.

H. Substations shall be thoroughly cleaned, phosphate treated, and painted at the factory with light gray rust-inhibiting paint or baked enamel.

2.2 MEDIUM-VOLTAGE SECTION

A. Medium-Voltage Fused Switch(es): Refer to Section 26 13 16, MEDIUM

VOLTAGE FUSIBLE INTERRUPTER SWITCHES.

B. not used

C. Interrupting ratings shall be not less than the maximum short circuit current available, as shown on the drawings.

2.3 NOT USED

2.4 DRY-TYPE TRANSFORMERS

A. Shall comply with IEEE C57.12.01, and IEEE C57.12.50 for dry-type transformers rated up to 500 kVA, and IEEE C57.12.51 for dry-type transformers rated 501 kVA and larger.

26 11 16 - 6

SPEC WRITER NOTE: Select either cast coil or vacuum pressure impregnated transformer.

B. Provide a cast coil type transformer with primary and secondary windings individually cast in epoxy. Transformer shall have an insulation system rated 185 degrees C, with an 80 degree C average winding temperature rise above a 40 degrees C maximum ambient.

C. not used

D. Transformer shall kVA rating as shown on the drawings, 95 kV BIL primary and 10 kV BIL secondary.

E. Primary and secondary windings:

1. Windings shall be copper.

2. Primary windings shall be delta-connected.

3. Secondary windings shall be wye-connected except where otherwise shown on the drawings.

4. Secondary windings shall have neutral bushings for transformers with wye-connected secondary windings.

5. Terminals shall be the most suitable clamp or blade type as required for the circuit connections.

F. Provide four 2-1/2 percent full capacity taps, two above and two below rated primary voltage. Locate tap adjustments on the face of the medium voltage coil. Adjustments shall be accessible by removing the front panel and shall be made when the transformer is de-energized.

G. Features and accessories shall include the following:

1. Winding temperature indicator.

2. Auxiliary cooling equipment and controls.

a. Transformer shall have provisions for future addition of automatically controlled fans for forced-air-cooling.

H. Transformer energy efficiency shall comply with the United States

Department of Energy’s 10 CFR Part 431.

2.5 LOW VOLTAGE SECTION

A. Refer to Section 26 24 13, DISTRIBUTION SWITCHBOARDS.

2.6 AUXILIARIES

A. Install additional components as shown on the drawings or otherwise required for the substations to ensure a complete and operational system.

26 11 16 - 7

PART 3 – EXECUTION

3.1 INSTALLATION

A. Install substations in accordance with the NEC, as shown on the drawings, and as recommended by the manufacturer.

B. Coordinate the components of the substations and their arrangements electrically and mechanically. Coordinate all circuit entrances into the substations, including methods of entrance and connections.

C. Anchor substations with rustproof bolts, nuts, and washers not less than 13 mm (1/2 inch) diameter, in accordance with manufacturer’s instructions, and as shown on the drawings.

D. In seismic areas, substations shall be adequately anchored and braced per details on structural contract drawings to withstand the seismic forces at the location where installed.

E. Exterior Location – N/A

F. Interior Location. Mount substations on concrete slab. Unless otherwise indicated, the slab shall be at least 100 mm (4 inches) thick. The top of the concrete slab shall be approximately 100 mm (4 inches) above finished floor. Edges above floor shall have 15 mm (1/2 inch) chamfer. The slab shall be of adequate size to project at least

100 mm (8 inches) beyond the equipment. Provide conduit turnups and cable entrance space required by the equipment to be mounted. Seal voids around conduit openings in slab with water- and oil-resistant caulking or sealant. Cut off and bush conduits 75 mm (3 inches) above slab surface. Concrete work shall be as specified in Section 03 30 00, CAST-IN-PLACE CONCRETE.

G. Substation Grounding:

1. Provide bare copper cable not smaller than No. 4/0 AWG, and not less than 610 mm (24 inches) below grade, interconnecting with the ground rods.

2. Surge arresters (if applicable) and neutral shall be bonded directly to the transformer enclosure, and then to the grounding electrode system with bare copper conductors, sized as shown on the drawings.

Lead lengths shall be kept as short as practical with no kinks or sharp bends.

3.2 ACCEPTANCE CHECKS AND TESTS

A. Perform tests in accordance with the manufacturer's recommendations.

In addition, include the following:

26 11 16 - 8

1. Medium-Voltage Section Tests:

a. Refer to Section 26 13 16, MEDIUM-VOLTAGE FUSIBLE INTERRUPTER

SWITCHES

2. Transformer Inspection and Tests:

a. Compare equipment nameplate data with specifications and approved shop drawings.

b. Inspect physical and mechanical condition. Check for damaged or cracked insulators.

c. Verify that cooling fans (if included) operate correctly and that fan motors have correct overcurrent protection.

d. Inspect all field-installed bolted electrical connections, verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method, or performing thermographic survey after energization under load.

e. not used

f. Perform specific inspections and mechanical tests as recommended by manufacturer.

g. Verify correct equipment grounding.

h. Verify that the tap-changer is set at specified ratio.

i. Verify proper secondary voltage phase-to-phase and phase-to-neutral after energization and prior to loading.

3. Low-Voltage Section Tests:

a. Refer to Section 26 24 13, DISTRIBUTION SWITCHBOARDS.

3.3 FOLLOW-UP VERIFICATION

A. Upon completion of acceptance checks, settings, and tests, the

Contractor shall demonstrate that the substations are in good operating condition and properly performing the intended function.

3.4 TEMPORARY HEATING

A. Apply temporary heat to substations, according to manufacturer's written instructions, throughout periods when the environment is not controlled for temperature and humidity within manufacturer's stipulated service conditions.

3.5 ONE LINE DIAGRAM AND SEQUENCE OF OPERATION

A. At final inspection, an as-built one line diagram shall be laminated or mounted under acrylic glass, and installed in a frame mounted in the substation room or in the outdoor substation enclosure.

26 11 16 - 9

B. Furnish a written sequence of operation for the substation and connected line side/load side electrical distribution equipment. The sequence of operation shall be laminated or mounted under acrylic glass, and installed in a frame mounted in the substation room or in the outdoor substation enclosure.

C. Deliver an additional four copies of the as-built one line diagram and sequence of operation to the COR.

3.6 INSTRUCTION

A. Furnish the services of a factory-trained technician for one 4-hour training period for instructing personnel in the maintenance and operation of the substations, on the dates requested by the COR.

---END---