This document is a Geotechnical Engineering Report prepared by Paul B. Aldinger & Associates, Inc. for the proposed VA Medical Center MRI Imaging Center Addition located in Providence, Rhode Island. The report details subsurface exploration and analysis conducted in November 2020, including test borings at multiple locations on the project site. Key findings include that the site's subsurface geology consists of non-engineered granular fill overlying glacial outwash, with soil conditions characterized as fine to coarse sand with varying amounts of gravel and silt. Laboratory sieve analyses of soil samples revealed the site soils contain approximately 41-45% sand, 10-13% silt and clay, and 12-30% gravel.

The report provides detailed geotechnical recommendations for foundation design, including spreading footing or mat foundation support on compacted structural fill placed over the natural glacial outwash layer. Specific recommendations include removing non-engineered fill to a depth of approximately 8 feet, using a minimum of 12 inches of compacted structural fill beneath footings and slabs, and monitoring soil compaction during construction. The engineers also noted the site is not susceptible to earthquake liquefaction and recommended a Site Class D classification. The investigation was performed to support the VA's planned three-story MRI Imaging Center Addition with approximately 17,100 square feet of new construction and 1,400 square feet of renovation.

View the file

Other files

File Type Posted
36C77625R0047_r2.pdf PDF
36C77625R0047 0004.pdf PDF
00 Rescue SR frame 1.pdf PDF
MagnetomVida Tech Specs 1.pdf PDF
Technical Questions and Answers - Volume 2.docx DOCX document
E1-01.1-00220Regular20with20Wall 20 Mount.pdf PDF
E2-01.1-003 SECTION Regular Roll with Fascia Wall Moun 1.pdf PDF
190316.01 - VAMC Providence - MRI Expan-Add - 04.03.2023 1.pdf PDF
Vida 1.PDF PDF
107316 - Canopies 1.pdf PDF
19.0158 - RGB - VAMC - MRI 3-24-23-SKC-1 1.pdf PDF
Magnetom Sola Tech Specs 1.pdf PDF
E2-02.1-001 SECTION Reg Roll in 5113 Pkt Tile Support 1.pdf PDF
261116 - Secondary Unit Substations 1.pdf PDF
Technical Questions and Answers - Volume 1.docx DOCX document
36C77625R0047 0003.pdf PDF
Vida XT Typical Final Drawings 1.PDF PDF
Sola XQ Typical Final Drawings 1.PDF PDF
Sola 1.PDF PDF
36C77625R0047_r1.pdf PDF
S06 - Attachment 02 - Site Visit Sign in Sheet - VA Reproduced.pdf PDF
S06 - 36C77625R0047 0002.pdf PDF
S06 - Attachment 01 - Site Visit Sign in Sheet - Original.pdf PDF
S06 - Attachment 01 - Providence Campus Map.pdf PDF
S06 - 36C77625R0047 0001.pdf PDF
100 VAMC MRI - Full Set IFC 1 of 5.pdf PDF
Wage Rates - Providence County.pdf PDF
650-345 Expand and Renovate MRI SOW Synopsis-FINAL.doc DOC document
S02 - Solicitation - 36C77625R0047.pdf PDF
Contractor Safety - Environmental Form.docx DOCX document
100 VAMC MRI - Full Set IFC 2 of 5.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
100 VAMC MRI - Full Set IFC 4 of 5.pdf PDF
100 VAMC MRI - Full Set IFC 5 of 5.pdf PDF
100 VAMC MRI - Full Set IFC 3 of 5.pdf PDF
Specifications.pdf PDF
19026-VA Medical Center Geotech Rpt.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .