These construction documents are for the Expand and Renovate Space for New MRI project at the Veterans Affairs Medical Center (VAMC) in Providence, Rhode Island. The architectural and engineering drawings detail a comprehensive renovation project involving demolition, site work, utility modifications, and new construction, with a focus on creating a new MRI space. The documents include detailed plans for demolition, existing conditions, erosion control, and site access management, showing extensive preparatory work required before the new MRI facility can be constructed.
The project scope encompasses multiple technical disciplines, including civil engineering, landscape architecture, mechanical/electrical/plumbing systems, structural engineering, and geotechnical engineering. Key elements include removing existing site infrastructure, managing utility relocations, installing erosion and sediment control measures, maintaining public and staff access during construction, and preparing the site for the new MRI facility. The project is fully sprinklered and managed by the U.S. Department of Veterans Affairs, with The Robinson Green Beretta Corporation serving as the architect and project manager.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING ABANDONED
ELECTRICAL DUCT BANK
X
X X X X X
XXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X
X
X
X X
X
X X
X
X X
X
X
X X
XX
X
XX
X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
XX
X
X
X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X
X X
XX
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXX
X X
X
X X X X X
X X
X X
X
X X X X X X X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
XX
X X
X X
X X
X
X X
X X
X X
X X
XXXXX X
X
X X
X X
X X
X X
X
XXXX
X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X X
X X
X
X X
XXXXXXXX
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X X
X
X X
X X
X X
X X
X
X
X X
X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXXXXXXXXXX
X X
X X
X
X X
X X
X
XXXXXXXXXXXXXXXXX X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXX
XXXXXXXXXX
X
X
XXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X X
X X
X
X X
XXXXXXXXXXXXXXXXXXXXXXX
X X X X X
X X
X
X X X X X X X X X X X X
XXXXX
X
X X
X
XX
X X
X X
X X X X X X X X XXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXX
X
X
XXXXXXXXX
XXXXXXXXXXXXXX
X X X X X X X X X X X X
X X X
X X X X X X X X X X
X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X
XX
XXXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
DN
UP
UP
UP
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SEDLOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SED
LOD / SED
LOD / SED
LOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
SED
SED
SED
SED
SED
SED
SED
SED
SED SED SED SED SED SED SED
SED SED SED SED SED SED SED SED
EX GRANITE CURB
EX GRANITE CURB
W (R) W (R) W (R) W (R)
W (R
W (R
W (R
W (R
W
VWV
W (R
W
(R
W (R
W
(R
W (R
W (R)
W (R)
W (R) W (R) W (R) W (R) W (R) W (R)
W (R
W (R
W (R
W (R
W (R) W (R)
SAN (R
)SAN (R
SAN (R
SAN (R
SAN (R
(E) (D)
(C) (B)(A)
(F)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
2-3" DUCTS (REC.)
1-4KV PRIMARY (REC.)
ALL ABANDONED
1-SPARE (REC.)
W (R
W (R
WV
SAN (R)
SAN (R)
SAN (R)
SAN (R)
SAN (R)
E
LE
C (R
E
LE
C
(R
E
LE
C (R
E
LE
C
(R
EL
EC
(R
S A
N (R
)SAN
(R
SD (R)
SAN (R)
SAN (R)
SD (R)
COVE
RED
W
ALK
W
AY
/ E
NTR
ANCE
EX. FIRE DEPT. SPRINKLER CONNECTION
W/ SPLASH BLOCK BELOW
EXTERNAL HOSE BIB FOR
CONTRACTOR WATER SUPPLY
EX BUILDING 1
E WING
EX BUILDING 1
B WING
LINE OF BRICK ABOVE
LINE OF BUILDING AT GRADE
SD (R) SD (R) SD (R) SD (R) SD (R) SD (R) SD (R) SD (R)
SD (R
SD (R)
SAN (R)
SAN (R)
SAN (R)
SAN (R) SAN (R) SAN (R) SAN (R) SAN (R) SAN (R) SAN (R) SAN (R) SAN (R) SAN (R)
S A
N (R
SAN (R
SAN (R
SAN (R
SAN (R)
SAN (R
SAN (R
SAN (R
SAN (R
SA
N (R
SA
N (R
SA
N (R
SAN (R
SAN (R
SAN (R
SAN (R
SAN (R
(H)(A) & (B)
SD (R
SD (R
SD (R)
SD (R)
SD (R)
SD (R)
GW (R)
GW (R)
G W
(R
GW (R)
GW (R)
G W
(R
GAS (S) GAS (S) GAS (S) GAS (S) GAS (S) GAS (S) GAS (S) GAS (S) GAS (S) GAS (S) GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
HVAC UNIT
HVAC U
NIT
HVAC U
NIT
E E
E E
E E
E E
E E
ELEC (R) ELEC (R)
ELEC (R) ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R)
ELE
C (R
ELE
C (R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R)
ELEC (R)
ELEC (R)
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
ELEC
(R
ELEC
(R
ELEC
(R
ELEC
(R
ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R)
ELEC (R)
ELEC (R) ELE
C (R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R) ELEC (R)
ELEC (R
ELEC (R)
ELEC. CONDUIT ON BUILDING
E
LE
C (R
ELEC (R)
ELEC (R)
ELEC (R) ELEC (R) ELEC (R) ELEC (R)
ELE
C (R
ELE
C (R
ELE
C (R
ELE
C (R
ELE
C (R
5'
5'
PIV
D E
E
E
S
E
S
S
S
S
D
D
U
1' CONCRETE RETAINING WALL
EX RETAINING WALL
CONCRETE WALK
C O
N C
R E
TE
W
A
LK
CONCRETE WALK
ARMED FORCES BLVD
BENCHMARK #2
NEI DISK - EL. 79.77
BENCHMARK #1
NEI DISK - EL. 80.20
EX FENCE
ENCLOSURE
EX FENCE
ENCLOSURE
MEDICAL GAS AREA
CONCRETE
P
AD
BOLLARDS
11.1'
FLARED END
SECTION & RIP-RAP
INV = 76.68
EU1
ELEC (R)
DOW
N
DOW
N
CONCRETE ENCASED
ELECTRICAL DUCK BANK,
TYPICAL.
EXISTING CONCRETE ENCASED
ELECTRICAL DUCT BANK
WV
FORMER LIGHT POLE BASE
(REMOVED)
EX CHILLER
W/ CONC. PAD
EX ELEC.
PANEL
EX ELECTRICAL UNIT
W/ CONC. PAD
D3
D2
EX. EXTERIOR ELECTRICAL OUTLET, CONTRACTOR TO SUPPLY AND CUT AND CAP SUPPLY
WIRES IN JUNCTION BOX, REMOVE EXTERIOR BOX AND PLUG HOLE PER MEP SPECS
EX. HOSE BIB. CONTRACTOR TO LOCATE SUPPLY AND CUT AND CAP PER MEP SPECS.
EX. EMERGENCY ROOF DRAIN OVERFLOW LOCATION
DEMO PAVEMENT
FOR NEW ELECTRICAL DUCT
DEMOLISH EXISTING MEDICAL GAS SYSTEM.
FROM EDGE OF ARMED FORCES BLVD
TO EDGE OF BUILDING 1.
CONTINUE TO ENSURE NO INTERRUPTION
IN SUPPLY, COORDINATE WITH VAMC AN
PROPOSED WORK.
ELEC (R) TO REMAIN
REMOVE EX CURB
SAWCUT AND BLEND
PR PAVEMENT GRADES
TO MATCH EX
PAVEMENT TO REMAIN
PAVEMENT TO BE REMOVED
PAVEMENT TO REMAIN PAVEMENT TO BE REMOVED
REMOVE PORTION
OF EX WALK
EX PIV
TO BE REPLACED
CURB TO BE
REMOVED
SAWCUT EX CONCRETE,
BLEND TO MATCH EX
RESTORATION OF EX (DEMO'D)
ELECTRIC SERVICES WITHIN MRI FOOTPRINT
COORDINATE WITH M.E.P & ARCHITECT
RESTORATION OF EXISTING (DEMOLISHED)
ELECTRIC SERVICES WITHIN MRI FOOTPRINT
COORDINATE WITH M.E.P & ARCHITECT
END WATER LINE
DEMO HERE
NO DEMOLITION WITHIN 5' OF EX STRUCTURE ( TYP.)
REMOVE EX CURB
REMOVE EX CURB
DEMOLISH EX WATERLINE. COORDINATE WORK WITH
CAMPUS WIDE WATERLINE REPLACEMENT PROJECT
REMOVE EX CURB
MAINTAIN A PROTECTED WALKWAY FROM EXIT DOORS IN
ACCORDANCE WITH ARCHITECTURAL CONSTRUCTION ACCESS
PLAN DURING CONSTRUCTION
DEMOLISH EX SIDEWALK. MAINTAIN A PROTECTED WALKWAY FROM
EXIT DOORS IN ACCORDANCE WITH ARCHITECTURAL
CONSTRUCTION ACCESS PLAN DURING CONSTRUCTION
DEMOLISH POTENTIALLY ABANDONED
ELECTRICAL CONDUIT. RELOCATE AS NEEDED
IF LIVE, COORDINATE WITH MEP DRAWINGS.
ELECTRICAL DUCT BANK TO REMAIN. CONTRACTOR TO VERIFY
LOCATION AND TOP ELEVATION. COORDINATE STRUCTURAL AND
UTILITIES WITH MEP AND ARCHITECTURAL DRAWINGS. EX HVAC UNITS
AND PORTION OF
FENCE TO REMAIN
REMOVE, RELOCATE AND REPLACE EX DUCT BANK,
COORDINATE TEMPORARY AND PERMANENT SERVICE
CONNECTIONS WITH MEP AND ARCHITECTURAL
DRAWINGS. COORDINATE CUSTOMER REQUIREMENTS
WITH MEP.
REMOVED
EX CURB
DEMOLISH EX SANITARY LINES 5' FROM BUILDING AND
PREPARE FOR TEMPORARY CONNECTIONS UNTIL FINAL
UTILITY CONSTRUCTION CAN TAKE PLACE. FLOWS MUST
CONTINUE WITHOUT INTERRUPTION.
DEMOLISH FENCE AND ELECTRICAL UNIT. COORDINATE
ALL WORK IN THIS AREA WITH MEP DRAWINGS.
DEMOLISH EX SANITARY LINES FROM BUILDING AND
PREPARE FOR TEMPORARY CONNECTIONS UNTIL FINAL
UTILITY CONSTRUCTION CAN TAKE PLACE. FLOWS MUST
CONTINUE WITHOUT INTERRUPTION.
DEMOLISH COVERED WALKWAY BUILDING COMPONENTS
AND ANYTHING ASSOCIATED, INCLUDING FOUNDATION.
PREPARE EX ROOF LEADERS FOR TEMPORARY
CONNECTIONS UNTIL FINAL UTILITY CONSTRUCTION CAN
TAKE PLACE. FLOWS MUST CONTINUE WITHOUT
INTERRUPTION.
REMOVE EX CURB
CURB TO REMAIN
REMOVE RETAINING WALL & FOOTING
REMOVE EX CURB
REMOVE EX
ROOF DRAIN & FES
AND RIP-RAP
SAWCUT AND BLEND
PR PAVEMENT GRADES
TO MATCH EX
REMOVE EX
STRUCTURES AND PIPING
SAN MH 4A - RIM EL. 79.43
D MH-9 - RIM EL. 77.40
E MH - RIM EL. 79.50
E MH - RIM EL. 76.63
EMPTY SITE LIGHTING
E MH - RIM EL. 77.26
ABANDONED 4KA POWER
CB-24 - RIM 77.48 (DAMAGED)
CB-25 - RIM EL. 76.71
INACCESSIBLE
CALC. INVERT
EL : 72.54
(B)
(A)
(I) (B)
(A)
(B)
(A)
(G)
(F)
(E)
(C) & (D)
CONCRETE ENCASED DUCT BANK,
WITH 30" MINIMUM COVER REPORTED.
(MEDICAL GAS)
REMOVE
PORTION OF FENCE
REMOVE
BOLLARDS(2)
CONCRETE ENCASED
ELECTRICAL DUCK BANK,
TYPICAL.
ELECTRIC ASSUMED ABANDONED.
CONTRACTOR TO VERIFY IN FIELD
SED
SED
SED
SED
SED
SED
SED
X X
REMOVE MH)
D4
DEMOLISH EX LANDING . MAINTAIN A PROTECTED WALKWAY FROM
EXIT DOORS IN ACCORDANCE WITH ARCHITECTURAL
CONSTRUCTION ACCESS PLAN DURING CONSTRUCTION
SIGN 4
SIGN:HOSPITAL STAFF ONLY
BEYOND THIS POINT
B09-2
B09-1
B09-3
PBA-2
SAN MH #3 - RIM EL: 72.58
SAN MH-30 - RIM EL. 77.09
CB - RIM EL. 78.2*
E MH - RIM EL. 78.1*
MH - RIM EL. 79.0*
DMH - RIM EL. 82.4*
DMH - RIM EL. 78.9*
CB - RIM EL. 8.7*
SAN MH 4 - RIM EL. 74.02
07-23-2021 EC TJI/LD
CD-1.0
RGB Project Number: 6515
109876541 2 3
109876541 2
F
E
D
C
B
A
F
E
D
C
B
FULLY SPRINKLERED
A
VA FORM 08 - 6231
Providence, Rhode Island
Date:Revisions:
Project Director
CONSULTANTS STAMPARCHITECT Phase
U.S. Department of Veterans Affairs
Management and Facilities Construction
Office of
Approved:
Drawing Title
DrawnCheckedIssue Date
Location
Project Title
Drawing Number
Building Number
Project Number
Kalin Associates, Inc.
1121 Washington Street, West Newton, MA 02465 T: 617-964-5477 Web: http://www.Kalinassociates.com
Nelco Worldwide 415 Spook Rock Road, Suffern, NY 10901 T: 845-777-2003 Web: https://www.nelcoworldwide.com
Cavanaugh Tocci Associates, Inc.
327F Boston Post Road, Sudbury, MA 01776 T: 978-443-7871 Web: http://www.cavtocci.com
50 Holden Street Providence, RI 02908
Architecture · Project Management · Interior Design
T: 401-272-1730 F: 401-273-7156 E-mail: rgbinfo@rgb.net
Building 1-B Gardner & Gerrish Landscape Architects, LLC.
151 Broadway, Providence, RI 02903 T: 401-263-3784 Web: https://www.gardner-gerrish.com
Construction Cost Engineering of Boston 156 Tilden Road Marshfield MA 02050 T: 781-837-3882 Web: http://c2eboston.com
Paul B. Aldinger & Associates, Inc.
860 A Waterman Avenue, East Providence, RI 02914 T: 401-435-5570 Web: https://www.pba-engr.com
Fitzemeyer & Tocci Associates, Inc.
300 Unicorn Park Dr. Woburn, MA 01801 T: 781-481-0210 Web: https://f-t.com
C.A. Pretzer Associates, Inc.
50 Freeway Drive, Cranston, RI 02920 T: 401-785-2690 Web: https://www.capretzer.com
Narragansett Engineering, Inc.
3102 E Main Rd, Portsmouth, RI 02871 T: 401-683-6630 Web: https://www.nei-cds.com
VAMC Providence Expand and Renovate Space for New MRI
650-345
The Robinson Green Beretta Corporation
ISSUED
FOR CONSTRUCTION
DEMOLITION PLAN
SOUTH
EXISTING UTILITIES
TO BE DEMOLISHED
CD-1.0 Scale:
DEMOLITION PLAN - SOUTH
GENERAL PLAN NOTES:
1. THESE ARE GENERAL PLAN NOTES AND SOME NOTES MAY NOT APPLY TO THIS
SHEET.
2. COORDINATE ALL NEW WORK W/ CIVIL, STRUCTURAL, PLUMBING, MECHANICAL,
ELECTRICAL, AND / OR OTHER DRAWINGS. NOTIFY NEI OF ANY DISCREPANCIES
BEFORE PROCEEDING WITH WORK.
3. EXISTING UTILITIES TO BE RELOCATED, TEMPORARY UTILITY CONNECTIONS AND
SERVICES TO BE SUPPLIED TO ENSURE UNINTERRUPTED SERVICES.
4. COORDINATE ALL UTILITY CUTOVERS FROM EXISTING TO TEMPORARY TO FINAL
CONNECTIONS WITH VAMC REPRESENTATIVE. ENSURE UNINTERRUPTED
SUPPLY OF UTILITIES.
5. CONTINUAL USAGE OF TEMPORARY CONNECTIONS, AND FINAL REPLACEMENT
LOCATION OF ALL WATER, SANITARY, STORMWATER, FIRE ALARM, ELECTRICAL,
COMMUNICATIONS AND ALL OTHER DEMOLISHED UTILITIES TO BE RESTORED IN
COORDINATION WITH MEP AND ARCHITECTURAL DRAWINGS.
DEMOLITION PLAN NOTES:
D1. CONTRACTOR TO PLACE CONSTRUCTION FENCE AROUND ISLAND DURING
INFILTRATION SYSTEM CONSTRUCTION. GATE(S) AS NECESSARY. PROVIDE
ANTI-TRACKING PAD DURING EQUIPMENT OPERATION PER DEM REQUIREMENTS AND
DETAILS.
D2. DEMOLISH ABANDONED 4KVA POWER MANHOLE AND DUCT BANK.
D3. DEMOLISH EMPTY SITE LIGHTING MANHOLE.
D4. PROTECT EXISTING GREASE TRAP WITH LOCATION AGREED UPON WITH VA
REPRESENTATIVE.
D5. WATER UTILITY TO BE RELOCATED. CONTRACTOR TO ENSURE CONTINUITY OF
POTABLE WATER AND FIRE SUPPLIES DURING THE WORK. CONTRACTOR TO FOLLOW
CLEANING AND TESTING REQUIREMENTS TO ENSURE A CONTINUOUS SUPPLY OF
POTABLE WATER.
D6. APPROXIMATE AREAS OF PAVEMENT MARKED FOR REMOVAL FOR TRENCH /
UTILITY WORK. CONTRACTOR TO DETERMINE ACTUAL LIMITS BASED ON REQUIRED
UTILITY TRENCH WIDTH, TRENCH BOX ETCETERA, SAWCUT PAVEMENT EDGES PRIOR
TO EXCAVATION. PAVEMENT EDGES TO BE RESAWCUT TO CLEAN / NON-CRACKED
PAVEMENT PRIOR TO TEMPORARY AND FINAL PAVEMENT PATCHWORK.
D7. CONTRACTOR TO DETERMINE APPROPRIATE SAFE EXCAVATION LIMITS FOR
STORMWATER INFILTRATION SYSTEM AND ASSOCIATED PIPING CONNECTIONS.
D8. CONTRACTOR TO REMOVE BIORETENTION SOILS AND DISPOSE OFFSITE.
EXCAVATE TO NATURAL SOIL LEVEL.
D9. CONTRACTOR TO USE TEMPORARY PLATES OR TEMPORARY PAVEMENT PATCHING
WHILE PERFORMING WORK IN ROADWAYS TO MAINTAIN PUBLIC ACCESS AT ALL
TIMES. WHEN ROADWAY IS RESTRICTED, CONTRACTOR TO USE LIVE TRAFFIC
CONTROL PERSONNEL.
D10. CONTRACTOR TO PHASE WATER LINE RELOCATION BY CONSTRUCTING NEW
RELATED LINE FIRST, DISINFECT, THEN CUT OVER TO NEW LINE WITH VA APPROVAL.
THEN CONTRACTOR TO DEMOLISH OLD WATER UTILITY LINE.
EXISTING CONCRETE,
CURB OR PAVEMENT
TO BE DEMOLISHED
HATCH LEGEND
S E
E M
A
TC
H
LI
N E
S H
E E
T C
D -1
.1
PROJECT
NORTH
NORTH
5030150 2010
C2
B-WING
C1
S-WING
A-WING
E-WING
BUILDING #1
not to scale
BUILDING #1 KEY PLAN PROJECT
NORTH
NORTH
X X X X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X XX
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LO
D
/ S E
D
LOD / SED
LOD / SED
LOD / SED
LO
D
/ S E
D
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
SD (S
SD (S
SD (S
SD (S
SD (S
SD (R
GAS (S)
GAS (S)
GAS (S)
GAS (S)ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC
(R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
EL
EC
(R
EL
EC
(R
EL
EC
(R
) ELEC
(R
ELEC
(R
ELEC
(R
E
E
CONCRETE WALKE MH - RIM EL. 65.0
DEMO HEADWALL
DEMO DRAINAGE LINE
CURB TO REMAIN
MAY HAVE BEEN REROUTED TO THIS E MH
ASSUMED REMOVED OR ABANDONED
X X X
X
X
XX
X
HEADWALL WITH
6" CONC PIPE OUTLET
INV = 55.28 (R)
EXISTING ABANDONED
ELECTRICAL DUCT BANK
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X
X X
X
X X
XX
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXX X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXX
XX
X X X X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X
X X
X X X
XXXXX
X
X X
X
XX
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXX
X X
X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXX
X X X X X X X X X X X X
X X
X X X
X
X
X X
X X X
X
XX
X
X X
X X
X X
X
X X X X
X X
X
X
XX
X X
X X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
XX
X
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LOD / SED
LOD / S
ED
LOD / S
ED
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S
ED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D / SED
LO
D / SED
LO
D / SED
LOD / SED
LO
D
/ SED
LO
D
/ SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SEDLOD / SED
LOD / SED
LOD / SED
LOD / SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SE
D
SE
D
SE
D
W (R
W (R
W (R
W (R)
W (R)
W (R)
W (R)
W V
W V
W (R
W (R
W (R
W (R
W (R
W (R
W (R)
W (R)
W (R) W (R)
W (R
W (R
W (R
W (R
W (R
W (R
EX PARKING GARAGE
SD (S
SD (S
SD (S
SD (R)
SD
(R
SD
(R
SD
(R
SD
(R
SD
(R
SD (R)
SD (R
SD (R
SD (R
SD (R
SAN (S)
SAN (S)
SAN (S)
SAN (R)
SAN (R)
SA
N
(R
SAN (R)
SAN (R)
SAN (R)
SAN (R)
SAN (R
SA
N (R
SA
N (R
SA
N (R
SA
N (R
SA
N (R
SA
N (R
SA
N (R
SA
N (R
SA
N (R
SA
N (R
SAN (R
(H)(A) & (B)
SD (R
SD (R
SD (R
SD (R
SD (R
SD (R)
GW (R)
G W
(R
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
GAS (S)
COMM (R)
COMM (R)
HVAC UNIT
HVAC U
NIT
HVAC U
NIT
E
LE
C (R
E
LE
C
(R
E
LE
C (R
ELEC (R)
ELEC (R)
ELEC (R)
ELEC
(R)
ELEC
(R)
E
LE
C (R
ELEC
(R)
ELEC
(R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
ELEC (R)
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
ELEC (R)
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
ELEC
(R
ELEC
(R
ELEC
(R
ELEC
(R
ELEC
(R
ELEC
(R
ELEC
(R
ELEC
(R
ELE
C (R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
EL
EC
(R
SI
G
N
EX
BE
N
CH
BE
N
CH
VA
S
IG
N
E
E
D
E
S
E
E
S
S
CONCRETE WALK
CONCRETE WALK
C O
N C
R
ETE W
ALK
CO
NC
RE
TE
W
AL
K
C O
N C
R
ET
E W
A
LK
AR
M
Y
RO
AD
EX FENCE
ENCLOSURE
CONCRETE
P
AD
BOLLARDS
X X
E MH - RIM EL. 78.34
(RAISED)
E MH - RIM EL. 65.0
E MH - RIM EL. 81.8*
(RAISED)
E MH - RIM EL. 80.19
EXISTING CONCRETE ENCASED
ELECTRICAL DUCT BANK
D3
D2
REMOVE EX
FLAGPOLE AND FOUNDATION
REMOVE WALL
REMOVE EX WALKWAY
ELEC. WIRES TO BE MAINTAINED BY CONTRACTOR
(POSSIBLE SITE LIGHTING)
D1
ELEC. AND CONTROL WIRES TO REMAIN
PA
VE
M
EN
T
TO
R
EM
AI
N
PAVE
MENT T
O B E R
EMOVE
D
PAVEMENT TO REMAIN
PAVEMENT TO BE REMOVED
REMOVE PORTION
OF EX WALK
CURB TO REMAIN
CURB TO REMAIN
END WATER LINE DEMO HERE
REMOVE EX CURB
REMOVE EX CURB
REMOVE EX CURB
EX HVAC UNITS
AND PORTION OF
FENCE TO REMAIN
REMOVE, RELOCATE AND REPLACE EX DUCT BANK,
COORDINATE TEMPORARY AND PERMANENT SERVICE
CONNECTIONS WITH MEP AND ARCHITECTURAL
DRAWINGS. COORDINATE CUSTOMER REQUIREMENTS
DEMOLISH EX SANITARY LINES 5' FROM BUILDING AND
PREPARE FOR TEMPORARY CONNECTIONS UNTIL FINAL
UTILITY CONSTRUCTION CAN TAKE PLACE. FLOWS MUST
CONTINUE WITHOUT INTERRUPTION.
REMOVE EX CURB
REMOVE EX CURB
SAWCUT AND BLEND
PR PAVEMENT GRADES
TO MATCH EX
SAWCUT AND BLEND
PR PAVEMENT GRADES
TO MATCH EX
E MH - RIM EL. 76.63
EMPTY SITE LIGHTING
(E)
(I)
(A)
(B)
(B)(A) (D)
(C)
(G)
(F)
(E)
(C) & (D)
DIRECT BURIAL SITE LIGHTING
TO SIGN UNKNOWN LOCATION
DIRECT BURIAL SITE LIGHTING
2' DEEP
REMOVE EX SIGNS (2)
STREET SIGN TO PROTECT AND REMAIN
VA SIGN TO BE RELOCATED. LOCATION SHOWN ON SHEET- CS 2.1
SED
SED
SED
SED
SED
X X
X X
X
XX
X X
REPLACE CB-23A
PBA-1
B-1
TP-1
CB 13B - RIM EL. 69.68
SAN MH 5
RIM EL. 74.76
CB-23A - RIM EL. 71.21
SAN MH 4 - RIM EL. 74.02
SAN MH 6 - RIM EL. 76.36
CB-13 - RIM EL.63.74
CB - RIM EL.62.58*
D MH - RIM EL.63.94*
CB - RIM EL.63.97*
DEMOLITION PLAN
NORTH
CD-1.1 Scale:
DEMOLITION PLAN - NORTH
GENERAL PLAN NOTES:
1. THESE ARE GENERAL PLAN NOTES AND SOME NOTES MAY NOT APPLY TO THIS
SHEET.
2. COORDINATE ALL NEW WORK W/ CIVIL, STRUCTURAL, PLUMBING, MECHANICAL,
ELECTRICAL, AND / OR OTHER DRAWINGS. NOTIFY NEI OF ANY DISCREPANCIES
BEFORE PROCEEDING WITH WORK.
3. EXISTING UTILITIES TO BE RELOCATED, TEMPORARY UTILITY CONNECTIONS AND
SERVICES TO BE SUPPLIED TO ENSURE UNINTERRUPTED SERVICES.
4. COORDINATE ALL UTILITY CUTOVERS FROM EXISTING TO TEMPORARY TO FINAL
CONNECTIONS WITH VAMC REPRESENTATIVE. ENSURE UNINTERRUPTED
SUPPLY OF UTILITIES.
5. CONTINUAL USAGE OF TEMPORARY CONNECTIONS, AND FINAL REPLACEMENT
LOCATION OF ALL WATER, SANITARY, STORMWATER, FIRE ALARM, ELECTRICAL,
COMMUNICATIONS AND ALL OTHER DEMOLISHED UTILITIES TO BE RESTORED IN
COORDINATION WITH MEP AND ARCHITECTURAL DRAWINGS.
DEMOLITION PLAN NOTES:
D1. CONTRACTOR TO PLACE CONSTRUCTION FENCE AROUND ISLAND DURING
INFILTRATION SYSTEM CONSTRUCTION. GATE(S) AS NECESSARY. PROVIDE
ANTI-TRACKING PAD DURING EQUIPMENT OPERATION PER DEM REQUIREMENTS AND
DETAILS.
D2. DEMOLISH ABANDONED 4KVA POWER MANHOLE AND DUCT BANK.
D3. DEMOLISH EMPTY SITE LIGHTING MANHOLE.
D4. PROTECT EXISTING GREASE TRAP WITH LOCATION AGREED UPON WITH VA
REPRESENTATIVE.
D5. WATER UTILITY TO BE RELOCATED. CONTRACTOR TO ENSURE CONTINUITY OF
POTABLE WATER AND FIRE SUPPLIES DURING THE WORK. CONTRACTOR TO FOLLOW
CLEANING AND TESTING REQUIREMENTS TO ENSURE A CONTINUOUS SUPPLY OF
POTABLE WATER.
D6. APPROXIMATE AREAS OF PAVEMENT MARKED FOR REMOVAL FOR TRENCH /
UTILITY WORK. CONTRACTOR TO DETERMINE ACTUAL LIMITS BASED ON REQUIRED
UTILITY TRENCH WIDTH, TRENCH BOX ETCETERA, SAWCUT PAVEMENT EDGES PRIOR
TO EXCAVATION. PAVEMENT EDGES TO BE RESAWCUT TO CLEAN / NON-CRACKED
PAVEMENT PRIOR TO TEMPORARY AND FINAL PAVEMENT PATCHWORK.
D7. CONTRACTOR TO DETERMINE APPROPRIATE SAFE EXCAVATION LIMITS FOR
STORMWATER INFILTRATION SYSTEM AND ASSOCIATED PIPING CONNECTIONS.
D8. CONTRACTOR TO REMOVE BIORETENTION SOILS AND DISPOSE OFFSITE.
EXCAVATE TO NATURAL SOIL LEVEL.
D9. CONTRACTOR TO USE TEMPORARY PLATES OR TEMPORARY PAVEMENT PATCHING
WHILE PERFORMING WORK IN ROADWAYS TO MAINTAIN PUBLIC ACCESS AT ALL
TIMES. WHEN ROADWAY IS RESTRICTED, CONTRACTOR TO USE LIVE TRAFFIC
CONTROL PERSONNEL.
D10. CONTRACTOR TO PHASE WATER LINE RELOCATION BY CONSTRUCTING NEW
RELATED LINE FIRST, DISINFECT, THEN CUT OVER TO NEW LINE WITH VA APPROVAL.
THEN CONTRACTOR TO DEMOLISH OLD WATER UTILITY LINE.
S E
E M
A
TC
H
LI
N E
S H
E E
T C
D -1
.0
SEE MATCHLINE THIS SHEET, 1/CD-1.1
SEE MATCHLINE THIS SHEET, 1/CD-1.1
PROJECT
NORTH
NORTH
5030150 2010
C2
B-WING
C1
S-WING
A-WING
E-WING
BUILDING #1
not to scale
BUILDING #1 KEY PLAN PROJECT
NORTH
NORTH
07-23-2021 EC TJI/LD
CD-1.1
RGB Project Number: 6515
109876541 2 3
109876541 2
F
E
D
C
B
A
F
E
D
C
B
FULLY SPRINKLERED
A
VA FORM 08 - 6231
Providence, Rhode Island
Date:Revisions:
Project Director
CONSULTANTS STAMPARCHITECT Phase
U.S. Department of Veterans Affairs
Management and Facilities Construction
Office of
Approved:
Drawing Title
DrawnCheckedIssue Date
Location
Project Title
Drawing Number
Building Number
Project Number
Kalin Associates, Inc.
1121 Washington Street, West Newton, MA 02465 T: 617-964-5477 Web: http://www.Kalinassociates.com
Nelco Worldwide 415 Spook Rock Road, Suffern, NY 10901 T: 845-777-2003 Web: https://www.nelcoworldwide.com
Cavanaugh Tocci Associates, Inc.
327F Boston Post Road, Sudbury, MA 01776 T: 978-443-7871 Web: http://www.cavtocci.com
50 Holden Street Providence, RI 02908
Architecture · Project Management · Interior Design
T: 401-272-1730 F: 401-273-7156 E-mail: rgbinfo@rgb.net
Building 1-B Gardner & Gerrish Landscape Architects, LLC.
151 Broadway, Providence, RI 02903 T: 401-263-3784 Web: https://www.gardner-gerrish.com
Construction Cost Engineering of Boston 156 Tilden Road Marshfield MA 02050 T: 781-837-3882 Web: http://c2eboston.com
Paul B. Aldinger & Associates, Inc.
860 A Waterman Avenue, East Providence, RI 02914 T: 401-435-5570 Web: https://www.pba-engr.com
Fitzemeyer & Tocci Associates, Inc.
300 Unicorn Park Dr. Woburn, MA 01801 T: 781-481-0210 Web: https://f-t.com
C.A. Pretzer Associates, Inc.
50 Freeway Drive, Cranston, RI 02920 T: 401-785-2690 Web: https://www.capretzer.com
Narragansett Engineering, Inc.
3102 E Main Rd, Portsmouth, RI 02871 T: 401-683-6630 Web: https://www.nei-cds.com
VAMC Providence Expand and Renovate Space for New MRI
650-345
The Robinson Green Beretta Corporation
ISSUED
FOR CONSTRUCTION
CD-1.1 Scale:
DEMOLITION PLAN - NORTHEAST
PROJECT
NORTH
NORTH
5030150 2010
EXISTING UTILITIES
TO BE DEMOLISHED
EXISTING CONCRETE,
CURB OR PAVEMENT
TO BE DEMOLISHED
HATCH LEGEND
X X X X
DN
UP
UP
UP
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SED
LOD / SED
LOD / SED
LOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SEDLOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S E
D
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
SED
SED
SED
SED SED SED SED SED SED SED
SED SED SED SED SED SED SED SED
EC7
EC6
EC4
EC4
EC1
EC2
EC3
EX GRANITE CURB
EX GRANITE CURB
TEMPORARY WALKWAY
TEMPORARY WALKWAY
TEMPORARY WALKWAY
TEMPORARY WALKWAY
PORTABLE / TEMPORARY TRAFFIC BARRIER
COVE
RED
W
ALK
W
AY
/ E
NTR
ANCE
EX. FIRE DEPT. SPRINKLER CONNECTION
W/ SPLASH BLOCK BELOW
EXTERNAL HOSE BIB FOR
CONTRACTOR WATER SUPPLY
EX BUILDING 1
E WING
EX BUILDING 1
B WING
LINE OF BRICK ABOVE
LINE OF BUILDING AT GRADE
PROTECT CATCH BASIN WITH
INTERNAL INLET FILTER AND FILTER SOCK
GW (R)
GW (R)
G W
(R
GW (R)
GW (R)
G W
(R
HVAC UNIT
HVAC U
NIT
PIV
D E
E
E
S
E
S
S
S
S
D
D
U
1' CONCRETE RETAINING WALL
EX RETAINING WALL
CONCRETE WALK
C O
N C
R E
TE
W
A
LK
CONCRETE WALK
ARMED FORCES BLVD
BENCHMARK #2
NEI DISK - EL. 79.77
BENCHMARK #1
NEI DISK - EL. 80.20
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
EX FENCE
ENCLOSURE
MEDICAL GAS AREA
CONSTRUCTION FENCING
CONSTRUCTION GATES
AS REQUIRED
1'-6"MIN.
ANTI-TRAFFICKING PAD
AT ALL VEHICLE
ACCESS GATES
CONSTRUCTION ENTRANCE PER
RIDOT STD. 9.9.0
CONCRETE
P
AD
11.1'
FLARED END
SECTION & RIP-RAP
INV = 76.68
PROTECT CATCH BASIN WITH
FILTER SOCK UNTIL REMOVED
EU1
DOW
N
DOW
N
LIMIT OF DISTURBANCE
IF WATERLINE REPLACEMENT
IS INCLUDED IN THIS PROJECT
SED
SED
SED
SED
SED
SED
TEMP GRAVEL PAD FOR EXISTING GREASE TRAP
PORTABLE / TEMPORARY TRAFFIC BARRIER
PORTABLE / TEMPORARY TRAFFIC BARRIER
MAINTAIN ONE WAY,SINGLE LANE OF TRAFFIC AT ALL TIMES
(14' WIDE MINIMUM)
SIGN 4
SIGN:HOSPITAL STAFF ONLY
BEYOND THIS POINT
B09-2
B09-1
B09-3
PBA-2
07-23-2021 EC TJI/LD
CS-1.0
RGB Project Number: 6515
109876541 2 3
109876541 2
F
E
D
C
B
A
F
E
D
C
B
FULLY SPRINKLERED
A
VA FORM 08 - 6231
Providence, Rhode Island
Date:Revisions:
Project Director
CONSULTANTS STAMPARCHITECT Phase
U.S. Department of Veterans Affairs
Management and Facilities Construction
Office of
Approved:
Drawing Title
DrawnCheckedIssue Date
Location
Project Title
Drawing Number
Building Number
Project Number
Kalin Associates, Inc.
1121 Washington Street, West Newton, MA 02465 T: 617-964-5477 Web: http://www.Kalinassociates.com
Nelco Worldwide 415 Spook Rock Road, Suffern, NY 10901 T: 845-777-2003 Web: https://www.nelcoworldwide.com
Cavanaugh Tocci Associates, Inc.
327F Boston Post Road, Sudbury, MA 01776 T: 978-443-7871 Web: http://www.cavtocci.com
50 Holden Street Providence, RI 02908
Architecture · Project Management · Interior Design
T: 401-272-1730 F: 401-273-7156 E-mail: rgbinfo@rgb.net
Building 1-B Gardner & Gerrish Landscape Architects, LLC.
151 Broadway, Providence, RI 02903 T: 401-263-3784 Web: https://www.gardner-gerrish.com
Construction Cost Engineering of Boston 156 Tilden Road Marshfield MA 02050 T: 781-837-3882 Web: http://c2eboston.com
Paul B. Aldinger & Associates, Inc.
860 A Waterman Avenue, East Providence, RI 02914 T: 401-435-5570 Web: https://www.pba-engr.com
Fitzemeyer & Tocci Associates, Inc.
300 Unicorn Park Dr. Woburn, MA 01801 T: 781-481-0210 Web: https://f-t.com
C.A. Pretzer Associates, Inc.
50 Freeway Drive, Cranston, RI 02920 T: 401-785-2690 Web: https://www.capretzer.com
Narragansett Engineering, Inc.
3102 E Main Rd, Portsmouth, RI 02871 T: 401-683-6630 Web: https://www.nei-cds.com
VAMC Providence Expand and Renovate Space for New MRI
650-345
The Robinson Green Beretta Corporation
ISSUED
FOR CONSTRUCTION
EROSION CONTROL & PUBLIC
ACCESS CONTROL PLAN - SOUTH
CS-1.0 Scale:
EROSION CONTROL & PUBLIC ACCESS CONTROL PLAN - SOUTH
GENERAL PLAN NOTES:
1. THESE ARE GENERAL PLAN NOTES AND SOME NOTES MAY NOT APPLY TO THIS SHEET.
2. COORDINATE ALL NEW WORK W/ CIVIL, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND / OR OTHER
DRAWINGS. NOTIFY NEI OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK.
EROSION CONTROL PLAN NOTES:
EC1. PROVIDE SCAFFOLDING FOR OVERHEAD PROTECTION AND HORIZONTAL
PERSONNEL CONTROL TO (3) THREE ENTRANCES FOR VA STAFF, PROVIDE
TEMPORARY PAVED ACCESS (NON-ADA).
EC2. PROVIDE SCAFFOLDING FOR OVERHEAD PROTECTION AND HORIZONTAL
PERSONAL CONTROL PATH FOR VA MAINTENANCE PERSONNEL ACCESS TO E-WING (NON-ADA).
EC3. CONTRACTOR TO BARRICADE DOOR, COVER EXIT SIGN, AND PROVIDE SIGNAGE TO
CLOSEST EXIT.
EC4. SWAP PUBLIC WALKWAY FROM EITHER SIDE OF ROADWAY AS NEEDED. PROVIDE PAVED
WALKWAY SURFACE (NON-ADA), AND TRAFFIC BARRIERS TO CONTROL TRAFFIC AND
PEDESTRIANS.
EC5. COORDINATE TEMPORARY SED CONTROLS AND FENCE / TRAFFIC BARRIER. LOCATIONS TO
CHANGE AS PROJECT PROGRESSES. COORDINATE FENCE LOCATIONS, TEMPORARY WALKWAYS,
ACCESS GATES WITH VAMC PROJECT MANAGER. TEMPORALLY FENCE TRAFFIC ISLAND WHILE
STORMWATER INFILTRATION WORK IS IN PROGRESS. PROTECT PUBLIC WALKWAY AS REQUIRED.
PROVIDE ANTI-TRACKING PAD DURING ISLAND CONSTRUCTION.
EC6. INSTALL TEMPORARY SED AROUND ALL UTILITY WORK AS NEEDED IN STREETS, REMOVE
FROM ROADWAY WHEN EXISTING SURFACE IS STABILIZED WITH CRUSHED STONE OR
TEMPORARY PAVEMENT.
EC7. FOR TEMPORARY WALKWAYS AT TURFED AREAS, A TEMPORARY ASPHALT WALK SHALL BE PROVIDED.
TEMPORARY WALKWAY NEEDS TO BE REMOVED AND TURF RE-ESTABLISHED AFTER THE WALKWAY IS NO LONGER
NEEDED.
EC8. SEE CS-1.2 FOR SOIL STOCKPILE, EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
EC9. PROTECT ALL CATCH BASINS WITHIN THE LIMIT OF DISTURBANCE WITH INTERNAL INLET
FILTER AND FILTER SOCK.
EC10. PROTECTION DEVICES SHALL REMAIN UNTIL CATCH BASIN IS REMOVED (IF APPLICABLE) OR
FOR THE DURATION OF THE CONSTRUCTION PROJECT.
EC11. COORDINATE PUBLIC ACCESS ALONG COAST GUARD LANE AT ALL TIMES WITH VA PROJECT REPRESENTATIVE. MAINTAIN A MINIMUM OF ONE WAY TRAFFIC DURING THE WORK, INSTALL PLATES FOR ACCESS
AFTER HOURS.
EC12. PROTECT ALL CATCH BASINS WITHIN THE LIMIT OF DISTURBANCE WITH INTERNAL INLET FILTER AND
COMPOST FILTER SOCK.
EC13. PROTECTION DEVICES SHALL REMAIN UNTIL FINAL SITE STABILIZATION OCCURS OR FOR THE DURATION OF
THE CONSTRUCTION PROJECT.
EC14. PROVIDE FOR PERSONNEL PASSAGE THROUGH WORK AREA AT ALL TIMES BY STAGING WORK, FENCING
AND PAVED OR TEMPORARY PAVED PATHWAY FOR PUBLIC ACCESS.
EC15. CONTRACTOR SHALL INSTALL AND MAINTAIN CONSTRUCTION ENTRANCE AT ALL POINTS OF EGRESS FROM THE SITE THROUGHOUT CONSTRUCTION. ALL ENTRANCES TO HAVE LOCKABLE GATES AND STABILIZED STONE
PAD PER RIDOT STD. 9.9.0.
EC16. SNOW DISPOSAL TO UTILIZE OFF-SITE STOCKPILES
EXISTING UTILITIES PLAN NOTES:
EU1. EXISTING MEDICAL GAS TANK AREA WILL BE SUBJECT TO PERIODIC DELIVERIES FROM SUPPLIERS.
CONTRACTOR TO PROVIDE ACCESS AT ALL TIMES UNLESS ACCESS OUTAGES ARE COORDINATED WITH VAMC
PROJECT MANAGER
HATCH LEGEND
CONSTRUCTION ENTRANCE
(RIDOT STD. 9.9.0)
PROTECTED TEMPORARY
WALKWAY (SEE NOTES)
S E
E M
A
TC
H
LI
N E
S H
E E
T C
S -1
.1
TEMPORARY
WALKWAY
PORTABLE / TEMPORARY
TRAFFIC BARRIER
PROJECT
NORTH
NORTH
5030150 2010
C2
B-WING
C1
S-WING
A-WING
E-WING
BUILDING #1
not to scale
BUILDING #1 KEY PLAN PROJECT
NORTH
NORTH
TEMP.TRAFFIC BARRIER
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LO
D
/ S E
D
LOD / SED
LOD / SED
LOD / SED
LO
D
/ S E
D
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
SD (S
SD (S
SD (S
SD (S
SD (S
E
E
CONCRETE WALKE MH - RIM EL. 65.0
HEADWALL WITH
6" CONC PIPE OUTLET
INV = 55.28 (R)
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LOD / SED
LOD / S
ED
LOD / S
ED
LO
D
/ S E
D
LO
D / S
E D
LO
D
/ S
ED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D
/ SED
LO
D / SED
LO
D / SED
LO
D / SED
LOD / SED
LO
D
/ SED
LO
D
/ SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SED
LOD / SEDLOD / SED
LOD / SED
LOD / SED
LOD / SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SED
SE
D
SE
D
SE
D
EC7
EC6
EC6
EC5
EC1
M
AIN
TA
IN
O
NE
W
AY,
SI
NGLE
LA
NE
OF
TR
AFF
IC
A T
ALL
T
IM
ES
(1 4'
W
ID
E M
IN
IM
UM
EX PARKING GARAGE
SD (S
SD (S
SD (S
SAN (S)
SAN (S)
SAN (S)
PROTECT CATCH BASIN WITH
INTERNAL INLET FILTER AND FILTER SOCK
GW (R)
G W
(R
HVAC UNIT
HVAC U
NIT
HVAC U
NIT SI
G N
EX
BE
N
CH
BE
N
CH
VA
S
IG
N
E
E
D
E
S
E
E
S
S
CONCRETE WALK
CONCRETE WALK
C O
N C
R
ETE W
ALK
CO
NC
RE
TE
W
AL
K
C O
N C
R
ET
E W
A
LK
AR
M
Y
RO
AD
LIMIT OF DISTURBANCE
IF WATERLINE REPLACEMENT
IS INCLUDED IN THIS PROJECT
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
EX FENCE
ENCLOSURE
TEMPORARY CONSTRUCTION FENCE
CONCRETE
P
AD
BOLLARDS
E MH - RIM EL. 76.63
EMPTY SITE LIGHTING
PROTECT CATCH BASIN WITH
INTERNAL INLET FILTER AND FILTER SOCK
TEMPORARY WALKWAY
PORTABLE / TEMPORARY TRAFFIC BARRIER
TEMPORARY WALKWAY
SED
SED
SED
SED
SED
TEMP GRAVEL PAD FOR EXISTING GREASE TRAP
PORTABLE / TEMPORARY TRAFFIC BARRIER
PO
RTA
BLE
TE
M
PO
RAR
Y
TR
AF
FI
C B
AR
RIE
R
PO
RTA
BLE
TE
M
PO
RAR
Y
TR
AF
FI
C B
AR
RIE
R
PROTECT CATCH BASIN WITH
INTERNAL INLET FILTER AND FILTER SOCK
PAINT TEMP CROSSWALK
PBA-1
B-1
TP-1
07-23-2021 EC TJI/LD
CS-1.1
RGB Project Number: 6515
109876541 2 3
109876541 2
F
E
D
C
B
A
F
E
D
C
B
FULLY SPRINKLERED
A
VA FORM 08 - 6231
Providence, Rhode Island
Date:Revisions:
Project Director
CONSULTANTS STAMPARCHITECT Phase
U.S. Department of Veterans Affairs
Management and Facilities Construction
Office of
Approved:
Drawing Title
DrawnCheckedIssue Date
Location
Project Title
Drawing Number
Building Number
Project Number
Kalin Associates, Inc.
1121 Washington Street, West Newton, MA 02465 T: 617-964-5477 Web: http://www.Kalinassociates.com
Nelco Worldwide 415 Spook Rock Road, Suffern, NY 10901 T: 845-777-2003 Web: https://www.nelcoworldwide.com
Cavanaugh Tocci Associates, Inc.
327F Boston Post Road, Sudbury, MA 01776 T: 978-443-7871 Web: http://www.cavtocci.com
50 Holden Street Providence, RI 02908
Architecture · Project Management · Interior Design
T: 401-272-1730 F: 401-273-7156 E-mail: rgbinfo@rgb.net
Building 1-B Gardner & Gerrish Landscape Architects, LLC.
151 Broadway, Providence, RI 02903 T: 401-263-3784 Web: https://www.gardner-gerrish.com
Construction Cost Engineering of Boston 156 Tilden Road Marshfield MA 02050 T: 781-837-3882 Web: http://c2eboston.com
Paul B. Aldinger & Associates, Inc.
860 A Waterman Avenue, East Providence, RI 02914 T: 401-435-5570 Web: https://www.pba-engr.com
Fitzemeyer & Tocci Associates, Inc.
300 Unicorn Park Dr. Woburn, MA 01801 T: 781-481-0210 Web: https://f-t.com
C.A. Pretzer Associates, Inc.
50 Freeway Drive, Cranston, RI 02920 T: 401-785-2690 Web: https://www.capretzer.com
Narragansett Engineering, Inc.
3102 E Main Rd, Portsmouth, RI 02871 T: 401-683-6630 Web: https://www.nei-cds.com
VAMC Providence Expand and Renovate Space for New MRI
650-345
The Robinson Green Beretta Corporation
ISSUED
FOR CONSTRUCTION
CS-1.1 Scale:
EROSION CONTROL & PUBLIC ACCESS CONTROL PLAN - NORTH
GENERAL PLAN NOTES:
1. THESE ARE GENERAL PLAN NOTES AND SOME NOTES MAY NOT APPLY TO THIS SHEET.
2. COORDINATE ALL NEW WORK W/ CIVIL, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND / OR OTHER
DRAWINGS. NOTIFY NEI OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK.
EROSION CONTROL PLAN NOTES:
EC1. PROVIDE SCAFFOLDING FOR OVERHEAD PROTECTION AND HORIZONTAL
PERSONNEL CONTROL TO (3) THREE ENTRANCES FOR VA STAFF, PROVIDE
TEMPORARY PAVED ACCESS (NON-ADA).
EC2. PROVIDE SCAFFOLDING FOR OVERHEAD PROTECTION AND HORIZONTAL
PERSONAL CONTROL PATH FOR VA MAINTENANCE PERSONNEL ACCESS TO E-WING (NON-ADA).
EC3. CONTRACTOR TO BARRICADE DOOR, COVER EXIT SIGN, AND PROVIDE SIGNAGE TO
CLOSEST EXIT.
EC4. SWAP PUBLIC WALKWAY FROM EITHER SIDE OF ROADWAY AS NEEDED. PROVIDE PAVED
WALKWAY SURFACE (NON-ADA), AND TRAFFIC BARRIERS TO CONTROL TRAFFIC AND
PEDESTRIANS.
EC5. COORDINATE TEMPORARY SED CONTROLS AND FENCE / TRAFFIC BARRIER. LOCATIONS TO
CHANGE AS PROJECT PROGRESSES. COORDINATE FENCE LOCATIONS, TEMPORARY WALKWAYS,
ACCESS GATES WITH VAMC PROJECT MANAGER. TEMPORALLY FENCE TRAFFIC ISLAND WHILE
STORMWATER INFILTRATION WORK IS IN PROGRESS. PROTECT PUBLIC WALKWAY AS REQUIRED.
PROVIDE ANTI-TRACKING PAD DURING ISLAND CONSTRUCTION.
EC6. INSTALL TEMPORARY SED AROUND ALL UTILITY WORK AS NEEDED IN STREETS, REMOVE
FROM ROADWAY WHEN EXISTING SURFACE IS STABILIZED WITH CRUSHED STONE OR
TEMPORARY PAVEMENT.
EC7. FOR TEMPORARY WALKWAYS AT TURFED AREAS, A TEMPORARY ASPHALT WALK SHALL BE PROVIDED.
TEMPORARY WALKWAY NEEDS TO BE REMOVED AND TURF RE-ESTABLISHED AFTER THE WALKWAY IS NO LONGER
NEEDED.
EC8. SEE CS-1.2 FOR SOIL STOCKPILE, EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
EC9. PROTECT ALL CATCH BASINS WITHIN THE LIMIT OF DISTURBANCE WITH INTERNAL INLET
FILTER AND FILTER SOCK.
EC10. PROTECTION DEVICES SHALL REMAIN UNTIL CATCH BASIN IS REMOVED (IF APPLICABLE) OR
FOR THE DURATION OF THE CONSTRUCTION PROJECT.
EC11. COORDINATE PUBLIC ACCESS ALONG COAST GUARD LANE AT ALL TIMES WITH VA PROJECT REPRESENTATIVE. MAINTAIN A MINIMUM OF ONE WAY TRAFFIC DURING THE WORK, INSTALL PLATES FOR ACCESS
AFTER HOURS.
EC12. PROTECT ALL CATCH BASINS WITHIN THE LIMIT OF DISTURBANCE WITH INTERNAL INLET FILTER AND
COMPOST FILTER SOCK.
EC13. PROTECTION DEVICES SHALL REMAIN UNTIL FINAL SITE STABILIZATION OCCURS OR FOR THE DURATION OF
THE CONSTRUCTION PROJECT.
EC14. PROVIDE FOR PERSONNEL PASSAGE THROUGH WORK AREA AT ALL TIMES BY STAGING WORK, FENCING
AND PAVED OR TEMPORARY PAVED PATHWAY FOR PUBLIC ACCESS.
EC15. CONTRACTOR SHALL INSTALL AND MAINTAIN CONSTRUCTION ENTRANCE AT ALL POINTS OF EGRESS FROM THE SITE THROUGHOUT CONSTRUCTION. ALL ENTRANCES TO HAVE LOCKABLE GATES AND STABILIZED STONE
PAD PER RIDOT STD. 9.9.0.
EC16. SNOW DISPOSAL TO UTILIZE OFF-SITE STOCKPILES
EXISTING UTILITIES PLAN NOTES:
EU1. EXISTING MEDICAL GAS TANK AREA WILL BE SUBJECT TO PERIODIC DELIVERIES FROM SUPPLIERS.
CONTRACTOR TO PROVIDE ACCESS AT ALL TIMES UNLESS ACCESS OUTAGES ARE COORDINATED WITH VAMC
PROJECT MANAGER
S E
E M
A
TC
H
LI
N E
S H
E E
T C
S -1
.0
SEE MATCHLINE THIS SHEET, 2/CS-1.1
SEE MATCHLINE THIS SHEET, 1/CS-1.1
EROSION CONTROL & PUBLIC
ACCESS CONTROL PLAN - NORTH
HATCH LEGEND
CONSTRUCTION ENTRANCE
(RIDOT STD. 9.9.0)
PROTECTED TEMPORARY
WALKWAY (SEE NOTES)
TEMPORARY
WALKWAY
PORTABLE / TEMPORARY
TRAFFIC BARRIER
PROJECT
NORTH
NORTH
5030150 2010
C2
B-WING
C1
S-WING
A-WING
E-WING
BUILDING #1
not to scale
BUILDING #1 KEY PLAN PROJECT
NORTH
NORTH
CS-1.1 Scale:
EROSION CONTROL PLAN - NORTHEAST
PROJECT
NORTH
NORTH
5030150 2010
TEMP.TRAFFIC BARRIER
07-23-2021 EC TJI/LD
CS-1.2
RGB Project Number: 6515
109876541 2 3
109876541 2
F
E
D
C
B
A
F
E
D
C
B
FULLY SPRINKLERED
A
VA FORM 08 - 6231
Providence, Rhode Island
Date:Revisions:
Project Director
CONSULTANTS STAMPARCHITECT Phase
U.S. Department of Veterans Affairs
Management and Facilities Construction
Office of
Approved:
Drawing Title
DrawnCheckedIssue Date
Location
Project Title
Drawing Number
Building Number
Project Number
Kalin Associates, Inc.
1121 Washington Street, West Newton, MA 02465 T: 617-964-5477 Web: http://www.Kalinassociates.com
Nelco Worldwide 415 Spook Rock Road, Suffern, NY 10901 T: 845-777-2003 Web: https://www.nelcoworldwide.com
Cavanaugh Tocci Associates, Inc.
327F Boston Post Road, Sudbury, MA 01776 T: 978-443-7871 Web: http://www.cavtocci.com
50 Holden Street Providence, RI 02908
Architecture · Project Management · Interior Design
T: 401-272-1730 F: 401-273-7156 E-mail: rgbinfo@rgb.net
Building 1-B Gardner & Gerrish Landscape Architects, LLC.
151 Broadway, Providence, RI 02903 T: 401-263-3784 Web: https://www.gardner-gerrish.com
Construction Cost Engineering of Boston 156 Tilden Road Marshfield MA 02050 T: 781-837-3882 Web: http://c2eboston.com
Paul B. Aldinger & Associates, Inc.
860 A Waterman Avenue, East Providence, RI 02914 T: 401-435-5570 Web: https://www.pba-engr.com
Fitzemeyer & Tocci Associates, Inc.
300 Unicorn Park Dr. Woburn, MA 01801 T: 781-481-0210 Web: https://f-t.com
C.A. Pretzer Associates, Inc.
50 Freeway Drive, Cranston, RI 02920 T: 401-785-2690 Web: https://www.capretzer.com
Narragansett Engineering, Inc.
3102 E Main Rd, Portsmouth, RI 02871 T: 401-683-6630 Web: https://www.nei-cds.com
VAMC Providence Expand and Renovate Space for New MRI
650-345
The Robinson Green Beretta Corporation
ISSUED
FOR CONSTRUCTION
EROSION CONTROL DETAILS
EROSION AND SEDIMENT CONTROL NOTES:
1. ALL EROSION CONTROL SHALL BE IN ACCORDANCE WITH RHODE ISLAND
SOIL EROSION AND SEDIMENT CONTROL HANDBOOK, LATEST REVISION.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF ALL SEDIMENT AND EROSION CONTROL MEASURES AS
NECESSARY DURING THE ENTIRE CONSTRUCTION PERIOD.
3. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AND
MAINTAINED ON A WEEKLY BASIS OR AFTER EACH RAINFALL EVENT
GREATER THAN 0.25 INCHES OR GREATER DURING CONSTRUCTION TO
INSURE THAT CHANNELS, DITCHES AND PIPES ARE CLEAR OF DEBRIS AND
THAT THE EROSION CONTROL BARRIERS ARE INTACT. IDENTIFIED
DEFICIENCIES AND SHALL BE CORRECTED IMMEDIATELY.
4. SEDIMENT BUILD UP GREATER THAN ONE-HALF THE BARRIER HEIGHT
SHALL BE REMOVED AND DISPOSED OF PROPERLY AS REQUIRED. ANY
SEDIMENT BUILD UP OUTSIDE OF THE SEDIMENT BARRIER SHALL BE
REMOVED IMMEDIATELY.
5. CONTRACTOR SHALL MAINTAIN A SUFFICIENT RESERVE OF VARIOUS
EROSION CONTROL MATERIALS ON SITE AT ALL TIMES FOR EMERGENCY
USE OR ROUTINE MAINTENANCE.
6. THE CONTROLS SHOWN ON THESE PLANS ARE INTENDED AS MINIMUM
MEASURES. ADDITIONAL MEASURES MAY BE REQUIRED AND SHALL BE
IMPLEMENTED BY THE CONTRACTOR IF WARRANTED OR REQUESTED BY
THE OWNER, OWNERS REPRESENTATIVE, ENGINEER, OR ANY APPLICABLE
REGULATING AGENCY.
7. DUST SHALL BE CONTROLLED BY WATERING OR OTHER APPROVED
METHODS AS NECESSARY OR DIRECTED BY THE GOVERNMENT OR
GOVERNMENTS REPRESENTATIVE.
8. PRIOR TO THE START OF ANY LAND CLEARING / GRUBING OR OTHER
CONSTRUCTION ACTIVITY THE PERIMETER CONTROLS SHALL BE PLACED,
PROPERLY CONSTRUCTED AND CLEARLY VISIBLE. THESE CONTROLS
SHALL REPRESENT THE LIMITS OF WORK AND WORKERS SHALL BE
NOTIFIED THAT NO CONSTRUCTION ACTIVITY IS ALLOWED BEYOND THESE
CONTROLS.
9. IF OR AS POSSIBLE CONSTRUCTION SHALL BE PHASED TO LIMIT TO THE
MAXIMUM EXTENT PRACTICABLE THE AMOUNT OF EXPOSED SOILS. ALL
DISTURBED AREAS SHALL BE TEMPORARILY OR PERMANENTLY
STABILIZED WITHIN 14 DAYS OF COMPLETION OF GRADING ACTIVITIES.
10. THE CONTRACTOR SHALL SCHEDULE WORK IN A WAY TO ALLOW POSITIVE
DRAINAGE OF SUBGRADE THROUGHOUT CONSTRUCTION.
11. CONSTRUCTION ENTRANCES PER RIDOT STANDARD DETAIL 9.9.0 SHALL BE
EMPLOYED AT ALL POINTS OF INGRESS AND EGRESS FROM THE SITE.
12. TEMPORARY DIVERSIONS, SEDIMENT BASINS, AND TEMPORARY SWALES
MAY BE USED AND SHALL BE SIZED ACCORDING TO THE RHODE ISLAND
SOIL EROSION AND SEDIMENT CONTROL HANDBOOK.
13. CATCH BASINS AND STORM DRAINS SHALL BE PROTECTED PER RIDOT
STANDARD DETAIL 9.8.0 IN GRASSED AREAS OR SEDIMENT BAGS IN PAVED
AREAS.
14. DEWATERING FROM EXCAVATIONS WILL BE CONVEYED BY HOSE TO AN
UPLAND AREAS AND DISCHARGED INTO A DEWATERING BASIN PER RIDOT
STANDARD 9.7.0, HAYBALE CORRALS, OR SEDIMENTATION BAGS. THE
CONTRACTOR SHALL ENSURE THAT NO CONTAMINATE IS PRESENT IN
ANY WATERS PRIOR TO DISCHARGE FROM SITE AND IS RESPONSIBLE FOR
ALL ENGINEERING, EQUIPMENT, MATERIAL AND LABOR REQUIRED FOR
THE SITE WATER REMOVAL DURING CONSTRUCTION.
15. CONSTRUCTION WASTE MATERIALS SHALL BE KEPT ON-SITE AND
DISPOSED OF IN AN APPROVED AND APPROPRIATE MANNER IN
ACCORDANCE WITH ALL APPLICABLE REGULATORY AGENCIES.
16. RIPRAP SHALL BE USED WHERE NECESSARY TO CONTROL EXIT VELOCITIES.
17. NEWLY VEGETATED AREAS SHALL BE REGULARLY INSPECTED AND
MAINTAINED TO ENSURE ESTABLISHMENT OF APPROPRIATE VEGETATION.
18. THE CONTRACTOR SHALL NOT REMOVE ANY EROSION AND
SEDIMENTATION CONTROL MEASURES UNTIL FINAL ACCEPTANCE OF THE
SITE HAS OCCURRED.
19. ALL DRAINAGE STRUCTURES IMPACTED BY CONSTRUCTION SHALL BE
CLEARED OF ACCUMULATED SEDIMENT PRIOR TO THE FINAL SITE
ACCEPTANCE.
20. AFTER UTILITY WORK INVOLVING EXCAVATION IN THE ADJACENT DRIVE
AREAS (ARMY ROAD AND ARMED FORCES BLVD), CONTRACTOR TO PLACE
CRUSHED STONE GRAVEL BASE ON ANY DISTURBED SURFACE SO AS NOT
TO HAVE AN ERODABLE SURFACE EXPOSED AFTER BACKFILLING AND
PRIOR TO ALLOWING TRAFFIC TO RETURN TO THE ROADWAY.
A. INSTALLATION. COMPOST FILTER SOCKS SHALL BE CONSTRUCTED AT THE LOCATIONS, AND IN ACCORDANCE WITH THE DETAILS INDICATED ON THE PLANS, OR AS DIRECTED BY THE ENGINEER. THE FOLLOWING STIPULATIONS ALSO APPLY:
1. COMPOST FILTER SOCKS MAY BE EITHER FABRICATED ON SITE OR DELIVERED TO THE SITE.
2. COMPOST MEDIA SHALL CONFORM TO AASHTO MP 9-06 AND RIDOT SECTION 206.
3. TRENCHING IS NOT REQUIRED. COMPOST FILTER SOCKS SHALL BE PLACED OVER THE TOP OF GROUND, WOODEN STAKES SHALL
BE DRIVEN THROUGH THE CENTER OF THE FILTER SOCKS TO ANCHOR THEM TO THE GROUND. TO ENSURE OPTIMUM PERFORMANCE, HEAVY VEGETATION SHALL BE CUT DOWN OR REMOVED, AND EXTREMELY UNEVEN SURFACES SHALL BE GRADED
TO ENSURE THAT THE COMPOST FILTER SOCK UNIFORMLY CONTACTS THE GROUND SURFACE.
4. FILTER SOCKS SHALL BE PLACED IN A CONTINUOUS LINE. WHERE ENDS INTERSECT THEY SHALL BE SLEEVED TO CREATE AN INTERLOCK WITH A TWO (2) FOOT OVERLAP. AFTER ONE SECTION IS FILLED AND THE ENDS TIED OFF, THE NEXT SECTION SHALL BE PULLED OVER THE TIED OFF END OF THE PREVIOUS SECTION, TO CREATE A 2 FOOT OVERLAP. THE OVERLAP SHALL BE STAKED.
THE INTERSECTING OVERLAPS SHALL BE CONSTRUCTED TO ENSURE THAT STORMWATER DOES NOT BREAK THROUGH AT THESE
INTERSECTION POINTS.
B. REMOVAL. THIS WORK, SHALL INCLUDE THE REMOVAL OF THE COMPOST FILTER SOCK AND STAKES, ALL SILT, MUD AND DEBRIS ENTRAPPED OUTSIDE OF THE COMPOST FILTER SOCK SHALL BE REMOVED AND THE AREA CLEANED UP IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF SECTION 212 OF RIDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
3" MIN
1' MIN
CONSTRUCTION AREA
UNDISTURBED AREA
12" COMPOST FILTER SOCK,
STAKED WITH 1"x1" STAKES AT
10' OC. (MAX.)
FLOW
COMPOST FILTER SOCK
15' MAX.
10' MAX.
60' MAX
VARIES
MAX 1
FLOW
12" COMPOST FILTER SOCK,
STAKED WITH 1"x1" STAKES
1' MIN
3" MIN
PR/EX. CATCH BASIN
PR/EX. CATCH BASIN
12" COMPOST FILTER SOCK,
12" COMPOST FILTER SOCK (TYP.)
12"
TEMPORARY STOCKPILE NOTES:
1. TEMPORARY SEDIMENT STOCKPILES SHALL BE KEPT MOIST AND COVERED AT ALL TIMES.
2. STOCKPILE LOCATIONS TO BE APPROVED BY VA PROJECT MANAGER.
3. STOCKPILES SHALL NOT BE LOCATED WITHIN 100 FEET OF ANY AIR HANDLER.
4. ANY AIR HANDLER, CHILLER OR SIMILAR SYSTEM FOULED, DAMAGED OR IMPAIRED BY DUST DURING ANY WORK
TO BE RESTORED BY CONTRACTOR OR AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE VA
PROJECT MANAGER.
5. STOCKPILES TO BE COVERED BY 10 MIL REINFORCED POLY, MINIMUM.
6. STOCKPILE COVERS TO BE SECURED AS TO PREVENT COVER REMOVAL BY WIND OR OTHER FORCES.
7. VA PROJECT MANAGER MAY REQUIRE CONTRACTOR TO MOVE ANY STOCKPILE AT ANY TIME AT NO ADDITIONAL
GOVERNMENT EXPENSE.
8. STOCKPILES MAY NEED TO BE LOCATED OFF-SITE AT NO ADDITIONAL COST TO OWNER.
CS-1.2 SCALE:
TEMPORARY SEDIMENT STOCKPILE1
N.T.S
CS-1.2 SCALE:
CB / COMPOST FILTER SOCK DETAIL2
N.T.S
CS-1.2 SCALE:
SEDIMENT BARRIER COMPOST FILTER SOCK DETAIL4
N.T.S
CS-1.2 SCALE:
CATCH BASIN INLET PROTECTION3
N.T.S
SECTION
GRATE
CATCH BASIN
FILTER BAG
DUMP LOOPS
INSTALLATION
OUTLET
HOOD
GRATE
EXPANSION
RESTRAINT
1" REBAR FOR BAG
REMOVAL FROM INLET
DEFLECTOR
NOTES
1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK.
2. FILTER TYPES SHALL BE APPROVED BY THE INSPECTOR PRIOR TO INSTALLATION.
3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER.
4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE.
5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY
TIME).
6. FILTER BAGS SHALL NOT BE ALLOWED IN EXISTING TOWN OR RIDOT ROADS.
CS-1.2 SCALE:
SILT FENCE DETAIL5
N.T.S CS-1.2 SCALE:
CONSTRUCTION ACCESS6
N.T.S CS-1.2 SCALE:
DEWATERING BASIN7
N.T.SNOTE: SILT FENCE IS OPTION IN REPLACEMENT OF FILTER
SOCK. FILTER SOCK IS PREFERRED INSTALLATION