This document is an attachment that details construction estimate deducts for the SPS Relocation and Renovation Minor #689-408 - West Haven federal contract opportunity. The attachment lists 8 deduct items that would reduce the scope of work, including removing elevators, exterior facade changes, relocating HVAC equipment, and eliminating certain program areas such as the decontamination and administrative spaces. The performance period for the project is 560 calendar days. The solicitation number for this federal contract opportunity is 36C77624R0041, issued by the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Estimate
Deduct No.
Deduct Description Quantity
1 Remove one Elevator - 2-Stop: Future construction. Provide shafts only with all services available. Remove oil-minder sump pump, power to elevator, power to elevator cab, shunt trip breaker, elevator pit serivce light and power, etc
2 Remove second Elevator - 2-Stop: Future construction. Provide shafts only with all services available. Remove oil-minder sump pump, power to elevator, power to elevator cab, shunt trip breaker, elevator pit serivce light and power, etc
3 New Metal Panels at Existing Façade (net savings EIFS vs Metal Panel) See elevations.
1470 s.f.
4 Relocate condensing unit from Roof to on site (net savings) R/R disconnect, refigerant lines, controls
5 Prefab Canopies 2 6 Remove installation of equipment (but not services to): 1-3-sink unit in Decon, 1
Washer in Decon, 1 Sterilizer and 1 Medivator from scopes. If services are remaining there is no MEP/FP/Civil Deductions
7 Remove Admin. area from program [Area A]. Relocate showers, locker rooms and toilets [Area B] to Area A. Eliminate renovation at south portion of site from existing exterior wall [Areas B & C]. No demo of existing exterior wall. Eliminate AHU-1/EF- 1; Remove VAV-1 through 7 and associated coils, piping and controls, Reduce Heat Skid size 15%, Reduce chiller capacity 15%, Reduce Pump size 15%, Relocate AHU- 4/EF-4 and VAV's 20 through 25 to new area; Delete Lighting, Power, Data, FA devices in Area A, Relocate Lighting, Power, Data, FA devices from Area B to area A. Delete MEP/FP demolition of area B.
8 Remove Scopes Decon from program. [Area D] and relocate HVAC Penthouse [Area E] equipment to this area. Elimnate AHU-2/EF-2 and VAV's 8 through 11 and associated coils, piping and controls. Relocate AHU-4 from penthoust to main floor, reduce chiller size by 10%, reduce heat skid by 10%, reduce hot and chilled water pumps by 10%, Eliminate UH-4, Eliminate MEP/FP services to this area. Penthouse reduced approx. 825 sf.
560 Calendar Days
SPS West Haven Deduct Summary & Performance Period