Attachment 13 - Structural Narrative.pdf

PDF 93 KB Posted

Attached to
Y1DA--SPS Relocation and Renovation Minor #689-408 - West Haven
Solicitation number
36C77624R0041
Issued by

About this file

This document is a narrative describing structural changes made to the 100% construction document plans for the Relocation & Renovation of SPS West Haven project. The key details are:

The largest change was the addition of a new retaining wall to replace the existing retaining wall holding back soils, vehicle traffic, and utilities where the existing cardiology wing is located. The 65% plans included a 10-inch thick structural slab foundation supported by concrete grade beams and piers, but this was changed to mitigate the significant grade change on the site. The steel framing was further developed, particularly at the stair tower, and a 2-hour fire separation and expansion joint were added between the existing building and the addition. A 5-inch slab-on-deck was added to the roof to maintain the 2-hour separation. The path of the existing underground electrical duct bank was further defined and the foundation plan was designed to maintain it.

View the file

Other files

File Type Posted
S06 - 36C77624R0041 0008.docx DOCX document
S06 - 36C77624R0041 0007.docx DOCX document
Attachment 29 - 2526-00 - Matot Cart Lift - 48W X 72D X 78H.pdf PDF
Attachment 31 - Connecticut Tax Language.docx DOCX document
Attachment 20 - RFI Response Sheet - West Haven - FINAL.pdf PDF
Attachment 24 - SB501.pdf PDF
Attachment 28 - 2526-00 - Otis Hydrofit 3500 HYD_3500_100_MRL.pdf PDF
Attachment 27 - 2526-00_22_1226 - LAA - Photo Book Composite(2).pdf PDF
Attachment 25 - Deducts_Performance Period.pdf PDF
Attachment 30 - 2526-00_24_0411 - A100 - Plans-1-AS112.pdf PDF
Attachment 36 - Existing Metal Panels.zip ZIP file
Attachment 22 - RWA WATER REPORT FOR VA FEB 2024.pdf PDF
Attachment 23 - West Haven VAMC SPS RBM Survey Report.pdf PDF
Attachment 32 - Hazardous Materials.pdf PDF
Attachment 34 - 02833313_West Haven VAMC - LB Paint.pdf PDF
Attachment 26 - 4276-001 Geotechnical Report.pdf PDF
Attachment 35 - 2526-00_23_0227 - 03. DVA - ILSM Post 4-6-2018.pdf PDF
Attachment 21 - VA As-Builts - SPS West Haven.zip ZIP file
Attachment 33 - 028211_West Haven VAMC - Asbestos.pdf PDF
S06 - 36C77624R0041 0006.docx DOCX document
S06 - 36C77624R0041 0005.docx DOCX document
S06 - 36C77624R0041 0004.docx DOCX document
Attachment 19 - AutoCad File of 1-AS141.zip ZIP file
Attachment 18 - 01 00 00 General Requirements_01Mar2024.pdf PDF
S06 - 36C77624R0041 0003.docx DOCX document
Attachment 17 - Narrative Arch SPS Bidding_Construction FINAL.pdf PDF
Attachment 12 - MEP Narrative_Including Geotechnical Report.pdf PDF
S06 - 36C77624R0041 0002.docx DOCX document
Attachment 16 - Site Visit Sign-in Sheet - West Haven - Part Two.pdf PDF
Attachment 14 - Security Narrative.pdf PDF
Attachment 15 - Site Visit Sign-in Sheet - West Haven - Part One.pdf PDF
S06 - 36C77624R0041 0001.docx DOCX document
Attachment 05 - Volume 2 M-E-P-FP-S SPS Relocation - Composite set.pdf PDF
Attachment 01 - Construction SOW 689-408 SPS Relocation and Renovation.docx DOCX document
Attachment 08 - Anticipated Construction Schedule West Haven SPS.pdf PDF
Attachment 10 - Wage Determination - West Haven.docx DOCX document
Attachment 11 - Limitations on Subcontracting.docx DOCX document
S02 - 36C77624R0041.pdf PDF
Attachment 07 - Div 21-33 MEP sections SPECS.pdf PDF
Attachment 03 - Narrative Arch SPS CD FINAL. rev part 2.pdf PDF
Attachment 02 - Narrative Arch SPS CD FINAL. rev part 1.pdf PDF
Attachment 06 - Div 1-14 Architecutral and Structural SPECS.pdf PDF
Attachment 09 - General Construction Project Requirements.pdf PDF
Attachment 04 - Volume 1 A-C-S SPS Relocation - Composite set.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Narrative - 100% CDs SMRT Architects and Engineers 877.700.7678 smrtinc.com

To Peter Sandor Date 06/21/23

From Brian Steele, PE Project No. 689-408

Subject Structural changes Project Name Relocation & Renovation of SPS West Haven

Structural Drawings – Narrative Description of Changes

1. The largest change from 65% to 100% was the was the addition of a new retaining wall to replace the existing retaining wall holding back the soils, vehicle traffic and utilities where the existing cardiology wing is located. The construction of the existing retaining wall is unknown so the structural integrity of the wall cannot be calculated.

2. The 65% foundation plan included a 10” thick structural slab for most of the area, with a slab on grade in the remaining areas. The structural slab was supported by concrete grade beams supported by concrete piers and spread footings. The footings were located low enough to not overstress the existing retaining wall and retaining wall footing (both unknown). This mimics the foundation layout of the existing cardiology wing.

3. One of the big issues with the grade beams and structural slab plan was the grade change is significant enough on the building site to require a much larger than needed grade beam to maintain frost protection.

4. The steel framing of the building addition did not change significantly from 65% to 100% but was developed further. Architectural wall sections were further developed at the stair tower location which required a complicated framing plan.

5. The need to maintain a 2 hour fire separation between the existing building and the addition, combined with the need for an expansion joint between the existing and the additions, was further developed after the 65% submission and added cost to the project.

6. The 65% only had a regular 1 ½ roof deck but for 100% a 5” slab on deck was added to the project to create a 2 hour separation from the existing building.

7. The path of the existing under ground electrical duct bank was further defined by the site investigations that came with the geotechnical report, which came after the 65% set. The 95% foundation is designed to maintain that duct bank without moving or creating any new forces on the encasement.