Attachment 05 - Volume 2 M-E-P-FP-S SPS Relocation - Composite set.pdf
PDF 26 MB Posted
- Solicitation number
- 36C77624R0041
About this file
This document provides details for a federal contract solicitation. The solicitation number is 36C77624R0041 from the Department of Veterans Affairs Technology Acquisition Center Austin for the SPS Relocation and Renovation Minor project numbered 689-408 located in West Haven. The solicitation seeks proposals to relocate and renovate the SPS facility, with responses due on an unspecified date. Award of the contract is also not scheduled. No other salient details regarding products, services, pricing, or timelines are provided in this document.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
E N
S
P
R
L
O C
A T
I O
N H
V A
C M
H d w g
L a y o u t
M
H
D a t e
W e d
J u n
M a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC: SYMBOLS,
ABBREVIATIONS & NOTES
GENERAL NOTES:
DUCTWORK SYMBOLS
GENERAL SYMBOLS
PIPING SYMBOLS
HVAC LINE TYPES
HVAC DEMOLITION NOTES:
VALVE SYMBOLS
SHUTDOWN / WORK LIMITS:
ENERGY CODE STATEMENT:
UNIFORM CODE STATEMENT:
ABBREVIATIONS
1-MH-001
DEDUCT ALTERNATES:
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
D
M
H
M
H
M
H M
H
M
H d a y o u t
M
D
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC GROUND FLOOR DEMOLITION PART PLAN
HVAC SUB-GROUND DEMOLITION PART PLAN
HVAC FIRST FLOOR DEMOLITION PART PLAN
HVAC SECOND FLOOR DEMOLITION PART PLAN
HVAC: SUB-GROUND, GROUND, FIRST &
SECOND FLOOR DEMOLITION PLANS
HVAC GROUND FLOOR DEMOLITION KEYED NOTES:
1-MD-101
Y
W
V
S
P
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
ZONE 3
ZONE 1
ZONE 2
ZONE 4
(O)
(O)
(O)
(O)
(O)
(O)
UP
UP
321.91000
B.7
2.5
E.1
E.2
ZONE 5
EXISTING (+)
EXISTING (+)
(O)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
D
M
H
M
H
M
H M
H
M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC GROUND FLOOR PART PLAN
HVAC SUB-GROUND PART PLAN
HVAC: SUB-GROUND & GROUND FLOOR
POSITIVE & NEGATIVE PRESSURES PLANS
LEGEND
1-MH-100
W
V
S
P
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
L
UP
B.7
2.5
E.1
E.2
1"ø 1 1/4"ø ø
1 1/4"ø
1 1/4"ø
1"ø ø
1"ø ø
1"ø ø
1 1/4"ø ø
1 1/4"ø
3/4"ø ø ø
3/4"ø ø ø ø
1"ø ø ø ø
1"ø
1"ø
1"ø
1"ø ø ø
1"ø
1"ø ø ø ø ø
3/4"ø ø
1"ø ø
1"ø
1"ø1"ø ø
1"ø ø
1"ø 1"ø ø
1"ø ø ø
1"ø 1"ø1"ø1"ø
1"ø ø
1"ø ø ø ø
1"ø ø ø
1"ø ø
1 1/4"ø
1"ø
1"ø
1"ø
1"ø
1 1/4"ø
1"ø ø
3/4"ø ø
1"ø ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
D
M
H
M
H
M
H M
H
M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC GROUND FLOOR DUCTWORK PART PLAN
HVAC SUB-GROUND DUCTWORK PART PLAN
HVAC: DUCTWORK SUB-GROUND &
GROUND FLOOR PLANS
GENERAL NOTES: GROUND FLOOR KEYED NOTES:
1-MH-101
Y
W
V
S
P
M
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
Y
W
V
S
Y
W
V
S
F
E
D
C.1 C
B
A 0A
5.154321.910
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
D
M
H
M
H
M
H M
H
M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC DUCTWORK DUCTWORK PENTHOUSE FLOOR PLAN
HVAC: DUCTWORK
PENTHOUSE FLOOR PLAN
HVAC DUCTWORK PENTHOUSE ROOF PLAN
AHU-1 SCHEMATIC DETAIL
AHU-2 SCHEMATIC DETAIL
AHU-3 SCHEMATIC DETAIL
AHU-5 SCHEMATIC DETAIL
AHU-4 SCHEMATIC DETAIL
KEYED NOTE:
1-MH-102
21.91000
2.5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
D
M
H
M
H
M
H M
H
M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC SUB-GROUND PIPING PART PLAN
HVAC: PIPING SUB-GROUND
FLOOR PLAN
1-MH-103
W
V
S
P
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
D
M
H
M
H
M
H M
H
M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC GROUND FLOOR PIPING PART PLAN
HVAC: PIPING GROUND
FLOOR PLAN
KEYED NOTE:
1-MH-103.1
Y
W
V
S
P
M
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
D
M
H
M
H
M
H M
H
M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC: PIPING PENTHOUSE
FLOOR PLAN
HVAC PIPNG PENTHOUSE FLOOR PLAN
GENERAL NOTE:
KEYED NOTE:
1-MH-104
CONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
CT CONDUCTIVITY TRANSMITTER
SPS STATIC PRESSURE SENSOR
DS DUCT SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)
ZC VALVE OR DAMPER POSITION CONTROLLER
PDS PRESSURE DIFFERENTIAL SWITCH
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC
TC
VSMC VARIABLE SPEED MOTOR CONTROLLER
PC
SC
FC
PSH PRESSURE SWITCH HIGH
FSH
PSL PRESSURE SWITCH LOW
FSL
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TEMPERATURE CONTROLLER. SEE SEQUENCE OF
OPERATION
PRESSURE CONTROLLER. SEE SEQUENCE OF
OPERATION
SPEED CONTROLLER. SEE SEQUENCE OF
OPERATION
FLOW CONTROLLER. SEE SEQUENCE OF
OPERATION
FLOW SWITCH HIGH
FLOW SWITCH LOW
LENGTH IN DUCT WHEN SPACE PERMITS.)
A
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
M ELECTRIC OPERATED CONTROL DAMPER
DA DISCHARGE AIR
RA RETURN AIR
EA EXHAUST AIR
OA OUTSIDE AIR
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
INDICATES INTERLOCKED LINKS
INDICATES FUNCTIONAL RELATIONSHIPS
BETWEEN CONTROL COMPONENTS
M
SF
SUPPLY FAN
EXHAUST FAN
MOTORIZED DAMPER
ECC ENGINEERING CONTROL CENTER
DISCONNECT SWITCH
AIRFLOW MONITORING SWITCH
AFMD
EF
UC UNIT CONTROLLER
SPS
STATIC PRESSURE
SWITCH
HIGH LIMIT
SST START/STOP
HUMIDITY HIGH LIMIT
EXHAUST FAN VSMC ALARM
SUPPLY FAN VSMC ALARM
EXHAUST/RELIEF FAN STATUS
STATIC PRESSURE HIGH LIMIT
SUPPLY AIR FLOW (CFM)
EXHAUST LOW PRESSURE
DISCHARGE STATIC PRESSURE
DISCHARGE AIR HUMIDITY
DISCHARGE AIR TEMPERATURE
PRE-HEAT TEMPERATURE
REHEAT TEMPERATURE
COOLING COIL TEMPERATURE
SYSTEM COMPONENT:
EXHAUST AIR FLOW (CFM)
EXHAUST AIR TEMPERATURE
EXHAUST AIR HUMIDITY
SUPPLY FAN STATUS
MIXED AIR LOW LIMIT
EXHAUST FAN START/STOP
STEAM HUMIDIFIER
PRIMARY COOLING COILING VALVE V-2
PRE-HEAT VALVE V-1
EXHAUST AIR DAMPER
FACE AND PYPASS DAMPER
SUPPLY FAN VSMC
OUTSIDE AIR DAMPER
EXHAUST FAN VSMC
SUPPLY FAN START/STOP
OUTSIDE AIR TEMPERATURE
FILTER SENSOR (PRE & FINAL)
HT HUMIDITY TRANSMITTER
PRE-HEAT VALVE V-4
SECONDARY COOLING COILING VALVE V-3
ROOM DIFFERENTIAL / PRESSURE SENSOR
ALARM
PROCESSING
D
U
T
C
C
L
E
F
U
N
C
T
I
O
N
S
C
H
E
D
U
A
R
T
S
T
O
P
HUMIDITY HIGH LIMIT
EXHAUST FAN VSMC ALARM
SUPPLY FAN VSMC ALARM
EXHAUST/RELIEF FAN STATUS
STATIC PRESSURE HIGH LIMIT
SUPPLY AIR FLOW (CFM)
EXHAUST LOW PRESSURE
S
T
A
T
U
S
SYSTEM
A
L
A
R
M
P
R
I
O
R
I
T
Y
A
D
D
A
L
T
E
R
N
A
O
E
L
E
C
T
R
I
D
V
I
C
E
S
P
E
M
M
A
N
D
P
O
I
DISCHARGE STATIC PRESSURE
DISCHARGE AIR HUMIDITY
DISCHARGE AIR TEMPERATURE
PRE-HEAT TEMPERATURE
REHEAT TEMPERATURE
COOLING COIL TEMPERATURE
SYSTEM COMPONENT:
EXHAUST AIR FLOW (CFM)
EXHAUST AIR TEMPERATURE
O
P
E
N
C
L
O
S
E
S
T
A
R
T
S
T
O
P
V
A
L
V
S
I
T
I
O
N
D
A
M
P
S
I
T
I
O
N
JOB: 689-408
CV AIR HANDLER
VA POINTS LIST
SYSTEM:
BUILDING:
LEGEND
POINT
BINARY
T
E
M
P
E
R
A
T
U
I
L o c a l
A a r m n e l
M a s t e a n e l
A r e a n e l
H
I
G
H
A
T
E
S
S
U
R
E
H
I
U
M
I
D
I
T
Y
P
R
E
S
S
U
R
E
L
W
M
P
E
R
A
T
U
R
E
P
E
R
C
E
N
T
P
R
E
S
S
U
R
E
P
O
S
I
T
I
O
N
F
L
O
W
H
I
M
I
T
L
M
I
T
S
T
A
T
U
S
SYSTEM INPUTS
ANA-
BINARY ANALOG
S
P
A
M
N
T
R
O
L
S
T
A
T
E
S
S
U
S
E
T
D
E
M
A
M
I
T
I
N
G
T
E
M
P
E
R
A
T
U
S
E
T
T
E
M
P
E
R
A
T
U
V
E
R
R
I
D
E
E
N
T
H
A
L
O
N
O
M
I
Z
E
R
T
E
M
P
E
R
A
T
U
O
N
O
M
I
Z
E
R
F
A
I
L
U
D
E
REMARKS
F
U
M
M
U
N
I
C
A
T
I
O
N
SYSTEM SOFTWARE/CONTROL
APPLICATION/FUNCTION
PAGE:
EXHAUST AIR HUMIDITY
SUPPLY FAN STATUS
MIXED AIR LOW LIMIT
EXHAUST FAN START/STOP
STEAM HUMIDIFIER
PRIMARY COOLING COILING VALVE V-2
PRE-HEAT VALVE V-1
EXHAUST AIR DAMPER
FACE AND PYPASS DAMPER
SUPPLY FAN VSMC
OUTSIDE AIR DAMPER
EXHAUST FAN VSMC
S
T
A
T
E
S
S
U
R
E
C
A
R
B
N
O
X
I
D
E
H
U
M
I
D
I
T
Y
V
A
C
U
U
M
SUPPLY FAN START/STOP
AI-1
AI-2
AI-3
AI-4
AI-5
AI-6
AI-7
AI-8
AI-9
AI-10
T
R
E
N
D
I
N
G
OUTSIDE AIR TEMPERATURE AI-11
BI-1
BI-2
BI-3
BI-4
BI-5
BI-6
BI-7
BI-8
AO-1
AO-2
AO-3
AO-5
AO-7
AO-8
AO-9
AO-10
BO-1
BO-2
SEE GEN. NOTE 1 B
A
B
B
R
E
V
I
A
T
I
O
N
EAT
EAH
EAF
RTH
PHT
CCT
DAT
DASP
DAH
SAF
OAT
RLP
RF-STS
SF-STS
TSL-1
SPS-2
HHL
SF-ALA
RF-ALA
RF-SPD
SF-SPD
OAD
EAD
FBD
PHT-V1
CLG-V2
HUM
RF-SST
SF-SST
OUTPUTS
LOG
FILTER SENSOR (PRE & FINAL) B1-9 PDS
SEE GEN. NOTE 1 B
SEE GEN. NOTE & SEQ. OF OPS.
AO-11
PRE-HEAT VALVE V-4
PHT-V4
AO-12
CLG-V3SECONDARY COOLING COILING VALVE V-3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC: CONTROLS DIAGRAM &
POINTS LIST
P R
E
F
I L T
E R
100% OA
D-1
P R
E H
E A
T
C
O I L
C O
O L I N
G
C
O I L
LOCATE
SENSOR
OUTSIDE UNDER
SHIELD
S-15
V-1
(2-POSITION END
OF CYCLE VALVE)
V-3
CHR
(FACILITY)
CHS
SUPPLY FAN
A F
M D
SUPPLY AIR TO
TERMINAL UNITS
TT
FT
A F
T E
R
F I L T
E R
A F
M D
HS
CS
VSMC
STEAM
HEATING COIL
VARIABLE SPEED
MOTOR CONTROLLER
(AHU-1)
ZC
FT
PDS PDS
TT
T-6
SST
SPS
TSL
TSL-1
(3-WAY)
IT
1.
NOTES:
TT
EXHAUST AIR
M
CR-15
EXHAUST DUCT
D-2
M
STEAM
GENERATOR
HT
10" MIN.
[3000 MM]
HHL
REFER TO POINTS SCHEDULE & SEQUENCE OF
OPERATIONS
BDD
HT
H-1
A F
M D
FT
H-2
ZC
EXHAUST FAN
HS
IT
VSMC
SST
ECC
CURRENT
TRANSMITTER FOR
FAN STATUS (TYP)
ECC
FT
AFMD
FTAFMD
DS
TYPICAL CONSTANT AIR VOLUME AIR HANDLING UNIT (AHU-1) WITH 100% OUTSIDE AIR CONTROL DIAGRAM
TYPICAL SEQUENCE OF OPERATION OF AHU CONTROL SYSTEM
1. GENERAL:
A. UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS
"OFF" D-1, SHALL BE FULLY CLOSED. WHEN THE UNIT IS "ON" D-1 SHALL BE OPEN FULLY OPEN:
2. TEMERATURE CONTROL:
A. SUPPLY AIR TEMPERATURE, SENSED BY TT-6, SHALL BE MAINTAINED AT SETPOINT VIA DIGITAL CONTROL PANEL (DPC) BY MODULATING V-1, V-2, V-3, OR V-4 IN SEQUENCE.
B. WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-5, IS BETWEEN 50°F [10°C] AND THE SUPPLY AIR TEMPERATURE SENSED BY TT-6 THE DIGITAL CONTROL PANEL SHALL MODULATE V-1 TO CLOSE.
THE DIGITAL CONTROL PANEL SHALL MODULATE V-4 TO MAINTAIN THE SUPPLY AIR TEMPERATURE, SENSED BY TT-6.
C.
D.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-1, IS 50°F [10°C] HEATING VALVE V-1 SHALL MODULATE OPEN. FACE AND BYPASS DAMPERS SHALL MODULATE TO MAINTAIN DESIRED TEMPERATURE
SENSED BY TT-2.
3. AIR FLOW CONTROL
A. THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MODULATING THE SUPPLY FAN ADJUSTABLE SPEED MOTOR CONTROLLER TO MAINTAIN 1.0" [25MM] OF DUCT STATIC PRESSURE (FIELD
ADJUSTABLE), SENSED BY SPS-1. RESET STATIC PRESSURE BASED ON CLEAN OR DIRTY FILTER SIGNAL FROM THE PDS.
4. FREEZE PROTECTION:
A. IF THE AIR TEMPERATURE AS SENSED BY TT-2 FALLS BELOW 45°F [7°C], AN ALARM SIGNAL SHALL INDICATE AT THE DCP
AND ECC. IF THIS TEMPERATURE FALLS BELOW 40°F [4.4°C], AS SENSED BY THE TSL THE SUPPLY FAN SHALL SHUT DOWN. THE HEATING COIL END OF CYCLE VALVE V-1 SHALL CLOSE ALONG WITH THE FACE AND BYPASS DAMPERS.
TSL SHALL BE HARDWIRED TO THE SUPPLY FAN VFD AND UNIT SHALL BE SHUTDOWN IN HAND, AUTO OR BYPASS MODE. TSL WILL REQUIRE MANUAL RESET AT THE DEVICE.
6. EMERGENCY CONSTANT SPEED OPERATION
A. UPON FAILURE OF THE VFD, THE SUPPLY FAN SHALL BE STARTED/STOPPED MANUALLY AT THE DIGITAL CONTROL PANEL OR THE ECC THROUGH THE BY-PASS STARTER. FANS SHALL THEN BE OPERATED AT NORMAL CONSTANT SPEED.
7.
B. ALL CONTROL POINTS SHOWN ON THE POINTS UNIT SCHEDULE TO BE TIED INTO EXISTING JCI BMS.
C. UNLESS OTHERWISE NOTED, ALL POINTS SHALL BE ON THE GRAPHICS.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-1 IS ABOVE SUPPLY AIR TEMPERATURE SENSED BY TT-6 THE DIGITAL CONTROL PANEL SHALL MODULATE V-1 TO CLOSE. THE DPC SHALL MODULATE V-2 TO
MAINTAIN THE DESIRED TEMPERATIRED SENSED BY TT-3.
HUMIDITY CONTROL:
A. WHEN THE DIGITAL CONTROL PANEL IS NOT CALLING FOR HUMIDITY, SENSED BY RETURN AIR HUMIDITY H-1, THE STEAM GENERATOR SHALL REMAIN OFF. WHEN THE DIGITAL CONTROL PANEL IS CALLING FOR HUMIDITY, THE STEAM
GENERATOR SHALL ENERGIZE.
B. SUPPLY AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT OF 30%-60% RH (ADJ) VIA DIGITAL CONTROL PANEL BY MODULATING THE STEAM GENRERATOR TO MAINTAIN THE DESIRED HUMIDITY.
DCP SHALL DE-ENERGIZE THE STEAM GENERATOR WHENEVER THE SUPPLY FAN IS OFF OR WHEN HIGH HUMIDITY IS SENSED BY H-1 (HI LIMIT). THE STEAM GENERATOR SHALL BE INTERLOCKED WITH A
8. EXHAUST CONTROL:
A.
TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM TEMPERATURE.
DAMPER D-2 SHALL OPEN TO RELIEVE THE MAXIMUM O.A. CFM INDICATED.
9. WINTER COOLING:
A.
B. PROVIDE AN INTERFACE WITH THE ECC VIA OPEN BACNET PROTOCOL.
WHEN THE FACILITY CHILLED WATER IS SHUT DOWN, THE SECONDARY COOLING COIL V-3 SHALL MODULATE TO MAINTAIN COOLING SET POINT.
D. THE BMS SHALL BE BACNET PROTOCAL AS BUILDING STANDARD. VERIFY WITH HVAC SHOP AT THE FACILITY.
5. AUTOMATIC SHUTDOWN:
A. WHEN SMOKE IS DETECTED BY A DUCT SMOKE DETECTOR, DS, THE SUPPLY FANS SHALL SHUT OFF AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. DUCT SMOKE DETECTORS SHALL BE HARDWIRED
TO THE SUPPLY FAN VSMC.
EXHAUST FANS SERVING AREA OF THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY FANS SHALL REQUIRE MANUAL RESET AT THE UNIT.
IF THE SUPPLY FAN FAILS TO PROVE STATUS FOR 30 SECONDS (ADJ), THE FAN SHALL SHUT OFF, THE OUTSIDE AIR DAMPER SHALL CLOSE, ALL VALVES WILL CLOSE AND AN ALARM SHALL INDICATE AT THE ECC. A MANUAL RESET
SHALL BE REQUIRED TO RESTART THE FAN AT THE UNIT.
C O
O L I N
G
C
O I L
V-3
CHR
(NEW
CHILLER)
CHS
(3-WAY)
TT
EXHAUST AIR
FROM SPS
MECHANICAL ROOM (PENTHOUSE) CONTROL SCHEMATIC (TYPE-2)
SEQUENCE OF OPERATION:
VARIABLE VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM
PRIMARY SECONDARY
P R
E
F
I L T
E R
PDS
TT
R E
H E
I L
M
M
FACE &
BYPASS
DAMPER
(TYP. OF 2)
D-3
D-3
V-4
(4-WAY)
HWS HWR
TT
TYPICAL ROOM SENSOR
B. THE RELATIVE PRESSURE BALANCE BETWEEN EACH ROOM IS SHOWN ON 1/1-MH-401 WHERE THE PRESSURE FLOWS AS FOLLOWS, (++>+>->). A MINIMUM OF 0.02" W.C. PRESSURE DIFFERENTIAL SHALL BE SEEN ACROSS ANY TWO
ADJACENT ROOMS
TT
1-MH-501
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC: DETAILS
PLENUM COORDINATION DETAIL
ROOF MOUNTED GOOSENECK
CONCRETE DETAIL
METHOD OF HANGING DUCTWORK
SUPPLY DUCTWORK TAKE-OFFS
EXHAUST BRANCH DUCTWORK
TYPICAL DIFFUSER CONNECTION
EXTERIOR INSULATED DUCTWORK DETAIL
FOR LOW PRESSURE SYSTEM DETAIL
SHUTTER TYPE FIRE DAMPER
VANE ELBOWS
DUCTWORK SQUARE
DUCTWORK RADIUS ELBOWS
VOLUME DAMPER DETAIL
ACCESS PANEL & DOOR DETAIL
ROUND DUCT HANGERS
INSULATION SCHEDULE
NOTES:
1-MH-701
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC: DETAILS
EXPOSED PIPE HEAT TRACE DETAIL
SIDEBEAM HANGER DETAIL
HANGER DETAIL -
CONCRETE DECK
BEAM CLAMP
HANGER DETAIL
PIPE HANGER DETAIL
TYPICAL PIPE HANGERS
INDIVIDUAL PIPE HANGER ROD & SPACING SCHEDULE
TYPICAL TRAPEZE HANGER SUPPORT DETAIL
PIPE SUPPORT AT WALL
STEAM AND CONDENSATE GUIDE DETAIL
PIPING SUPPORT ON ROOF
HYDRONIC PIPING METAL ENCLOSURE DETAIL RATED WALL PENETRATION DETAIL
DETAIL OF INSULATED PIPE THRU ROOF
TYPICAL CONCRETE WALL
PENETRATION DETAIL
5. STEAM STRAINERS SHALL BE ORIENTED TO PREVENT CONDENSATE FROM COLLECTING IN THE STRAINER.
COORDINATE WITH COR.
DOUBLE VALVE (1/3 AND 2/3)
STEAM PRESSURE REDUCING STATION
1-MH-702
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC: DETAILS
CONNECTIONS WITH FLEXIBLE CONNECTORS
SINGLE SUCTION FLOOR-MOUNTED PUMPS -
KEYED NOTES:
GENERAL NOTES:
CHILLER PIPING SCHEMATIC
INTEGRAL FACE AND BY-PASS VERT.
PREHEAT COIL STEAM PIPING
PIPING CONNECTIONS DETAIL
FLOOR MOUNTED EXPANSION TANK -
CHILLED WATER COOLING COIL CONNECTION DETAIL
CONCRETE EQUIPMENT BASES
UNIT HEATER DETAIL
AIR HANDLING UNIT (AHU)
HEATING COIL PIPING SCHEMATIC
TYPICAL AHU DRAIN TRAP
VAV TERMINAL NOTES:
SINGLE DUCT VAV TERMINAL WITH HEATING COIL
HEAT EXCHANGER - STEAM TO HOT WATER
STEAM HUMIDIFIER PIPING DETAIL
ELECTRIC
STEAM
HUMIDIFIER
1-MH-703
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC SCHEDULES
UNIT HEATER SCHEDULE
1-MH-801
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N H
V A
C M
H d a y o u t
M
H
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
HVAC SCHEDULES
1-MH-802
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
GENERAL SYMBOLS
POWER SYMBOLS
ELECTRICAL LINE TYPES
GENERAL NOTES:
ABBREVIATIONS
ELECTRICAL SYMBOLS,
ABBREVIATION & NOTES
BASE OF DESIGN LEGEND AND SCHEDULE OF LIGHTING EQUIPMENT
COMMUNICATION SYMBOLS
SYMBOL
LEGEND AND SCHEDULE OF LIGHTING CONTROL EQUIPMENT
NOTE:
1-EP-001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
D
E
P d a y o u t
E
D
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL GROUND FLOOR DEMOLITION POWER PART PLAN
ELECTRICAL SUB-GROUND, GROUND, FIRST &
SECOND FLOOR DEMOLITION POWER PLANS
ELECTRICAL SUB-GROUND DEMOLITION POWER PART PLAN
ELECTRICAL DEMOLITION GENERAL NOTES:
ELECTRICAL 1ST FLOOR DEMOLITION POWER PART PLAN
ELECTRICAL 2ND FLOOR DEMOLITION POWER PART PLAN
ELECTRICAL DEMOLITION KEYED NOTES:
1-ED-101
UP
L
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
D
E
P d a y o u t
E
D
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL DEMOLITION NOTES:
ELECTRICAL GROUND FLOOR DEMOLITION LIGHTING PART PLAN
ELECTRICAL SUB-GROUND DEMOLITION LIGHTING PART PLAN
ELECTRICAL FIRST FLOOR DEMOLITION LIGHTING PART PLAN
ELECTRICAL SECOND FLOOR DEMOLITION LIGHTING PART PLAN
ELECTRICAL SUB-GROUND, GROUND, FIRST &
SECOND FLOOR DEMOLITION LIGHTING PLANS
1-ED-201
321.91000
2.5
P
M
L
J
G
H
Y
W
V
S
P
M
L
J
G
H
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
D
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL GROUND FLOOR POWER PART PLAN
ELECTRICAL SUB-GROUND POWER PART PLAN
ELECTRICAL SUB-GROUND &
GROUND FLOOR POWER PLANS
NEW CONSTRUCTION KEYED NOTES:NEW CONSTRUCTION GENERAL NOTE:
1-EP-101
Y
W
V
S
P
M
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
DN
RA
MP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
D
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL FIRST FLOOR POWER PART PLAN
ELECTRICAL FIRST FLOOR
POWER PART PLANS
NEW CONSTRUCTION KEYED NOTES:
ELECTRICAL ROOF POWER PART PLAN
NEW CONSTRUCTION KEYED NOTES:
ELECTRICAL GENERATOR BUILDING 39 PART PLAN
ELECTRICAL NORMAL ELECTRICAL ROOM SG110 PART PLAN
1-EP-102
W
V
S
P
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
UP
UP
UP
L
UP
321.91000
B.7
2.5
E.1
E.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
D
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL GROUND FLOOR LIGHTING PART PLAN
ELECTRICAL SUB-GROUND LIGHTING PART PLAN
ELECTRICAL SUB-GROUND &
GROUND FLOOR LIGHTING PLANS
KEYED NOTES:GENERAL NOTES:
1-EP-201
V
S
Y
W
V
S
F
E
D
C.1 C
B
A 0A
5.154321.91000
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
D
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL FIRST FLOOR
LIGHTING PART PLANS
ELECTRICAL FIRST FLOOR LIGHTING PART PLAN
KEYED NOTE:
ELECTRICAL ROOF LIGHTING PART PLAN
GENERAL NOTE:
1-EP-202
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL ONE-LINE
DIAGRAMS
ELECTRICAL PARTIAL ONE-LINE-DEMOLITION
ELECTRICAL PARTIAL ONE-LINE-NEW
WIRE AND CONDUIT SCHEDULE
TAG FEEDER SIZE WIRING AND CONDUIT
ELECTRICAL ONE-LINE - LIFE SAFETY
ELECTRICAL ONE-LINE - CRITICAL
ELECTRICAL ONE-LINE - NORMAL
ELECTRICAL ONE-LINE - EQUIPMENT
1-EP-601
TYPICAL SINGLE ZONE SWITCHING ROOM CONTROLLER
GENERAL NOTES:
VACANCY SENSOR SWITCH DETAIL
TYPICAL WALL MOUNT
SINGLE WAY WIRING:
THREE WAY WIRING:
MOUNTING HEIGHTS OF ELECTRICAL DEVICES
CONDUIT PENETRATION IN FIRE
RATED GWB OR PLASTER PARTITION
DATA DROP
CONDUIT PENETRATION
IN FIRE RATED CONCRETE FLOOR
IN FIRE RATED MASONRY PARTITION
CONDUIT PENETRATION
LAY-IN LIGHT FIXTURE SUPPORT DETAIL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL DETAILS
SITE LIGHTING POLE AND FIXTURES
TYPICAL COMMON TRENCH CONFIGURATION
GROUND ROD DETAIL
1-EP-701
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL DETAILS
1-EP-702
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
P
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL SCHEDULES
1-EP-801
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N E
L E
C T
R I C
A L
E
P
E
P d a y o u t
E
P
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
ELECTRICAL SCHEDULES
1-EP-802
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
L d a y o u t
P
L
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
GENERAL SYMBOLS
GENERAL PLUMBING NOTES:GENERAL NOTES:
PLUMBING LINE TYPES
PIPING SYMBOLS VALVE SYMBOLS ABBREVIATIONS
PLUMBING SYMBOLS,
ABBREVIATION & NOTES
1-PL-001
L
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
D
S
A N
I T
A R
Y d a y o u t
P
D
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING DEMOLITION NOTES:
PLUMBING SUB-GROUND, GROUND, FIRST & SECOND
FLOOR DEMOLITION SANITARY PIPING PLANS
PLUMBING GROUND FLOOR DEMOLITION SANITARY PIPING PART PLAN
PLUMBING SUB-GROUND DEMOLITION SANITARY PIPING PART PLAN
PLUMBING FIRST FLOOR DEMOLITION SANITARY PIPING PART PLAN
PLUMBING SECOND FLOOR DEMOLITION SANITARY PIPING PART PLAN
DEMOLITION KEYED NOTE:
1-PD-101
L
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
D
D
O M
E S
T I C d a y o u t
P
D
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING DEMOLITION NOTES:
PLUMBING GROUND FLOOR DEMOLITION DOMESTIC PIPING PART PLAN
PLUMBING SUB-GROUND DEMOLITION DOMESTIC PIPING PART PLAN
PLUMBING FIRST FLOOR DEMOLITION DOMESTIC PIPING PART PLAN
PLUMBING SECOND FLOOR DEMOLITION DOMESTIC PIPING PART PLAN
PLUMBING SUB-GROUND, GROUND, FIRST & SECOND
FLOOR DEMOLITION DOMESTIC PIPING PLANS
DEMOLITION KEYED NOTE:
1-PD-201
W
V
S
P
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
UP
UP
UP
L
UP
5.154321.91000
B.7
2.5
E.1
E.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
D
S
A N
I T
A R
Y d a y o u t
P
L
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING GROUND FLOOR SANITARY PIPING PART PLAN
PLUMBING SUB-GROUND SANITARY PIPING PART PLAN
PLUMBING SUB-GROUND & GROUND
FLOOR SANITARY PIPING PLANS
1-PL-101
Y
W
V
S
P
M
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
P
M
Y
W
V
S
P
M
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
D
S
A N
I T
A R
Y d a y o u t
P
L
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING FIRST FLOOR SANITARY & STORM WATER PIPING PARTIAL PLAN
PLUMBING FIRST FLOOR SANITARY &
STORM WATER PIPING PLANS
PLUMBING ROOF SANITARY & STROM WATER PIPING PARTIAL PLAN
1-PL-102
W
V
S
P
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
UP
L
UP
321.91000
B.7
2.5
E.1
E.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
D
D
O M
E S
T I C d a y o u t
P
L
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING GROUND FLOOR DOMESTIC & TREATED WATER PIPING PART PLAN
PLUMBING SUB-GROUND DOMESTIC PIPING PART PLAN
PLUMBING SUB-GROUND & GROUND
FLOOR DOMESTIC PIPING PLANS
KEYED NOTES:
1-PL-201
Y
W
V
S
P
M
Y
W
V
S
G
F
E
D
C.1 C
B
A 0A
5.154321.91000
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
D
D
O M
E S
T I C d a y o u t
P
L
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING FIRST FLOOR
DOMESTIC PIPING PLAN
PLUMBING FIRST FLOOR DOMESTIC AND TREATEDWATER PIPING PARTIAL PLAN
1-PL-202
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
L d a y o u t
P
L
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING DETAILS
SINGLE FIXED CARRIER
WATER CLOSET CARRIER DETAIL
LAVATORY WALL CARRIER DETAIL
EMERGENCY SHOWER/EYEWASH STATION DETAIL
SINK DRAINAGE / VENT DETAIL
WALL MOUNTED FLUSH VALVE DETAIL
NOTE:
TYPICAL STORM LEADER DETAIL
TYPICAL STORM OVERFLOW LEADER DETAIL
ROOF DRAIN & OVERFLOW DETAIL
PENETRATION DETAIL
EXTERIOR WALL
RATED WALL PENETRATION DETAIL
TYPICAL PIPING CONCRETE PENETRATION DETAIL
HANGER DETAIL
CONCRETE DECK BEAM CLAMP
HANGER DETAIL
TYPICAL PIPE HANGER DETAILS
HANGER DETAIL
SIDEBEAM
PIPE SUPPORT AT WALL
SANITARY VENT TERMINATION
TRAP DETAIL
FLOOR DRAIN DETAIL
THERMOSTATIC MIXING VALVE DETAIL
1-PL-701
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
L d a y o u t
P
L
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING DETAILS
REVERSE OSMOSIS SYSTEM LAYOUT - ENLARGED PLAN
REVERSE OSMOSIS PACKAGE - SCHEMATIC DIAGRAM DETAIL.
NOTES:NOTE:
KEY NOTES:
HYDRAULIC ELEVATOR SUMP PUMP DETAIL
SEWAGE EJECTOR DETAIL
TYPICAL TRAPEZE HANGER SUPPORT DETAIL
PIPE SUPPORT AT WALL
EQUIPMENT HANGING DETAIL
1-PL-702
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N P
L U
M B
I N
G P
L d a y o u t
P
L
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
PLUMBING DETAILS
ATTACHMENT METHOD FOR PIPE SYSTEMS
WATER HEATER PIPING SCHEMATIC
GENERAL NOTES
COMPRESSED AIR DROP DETAIL
WATER PUMP DETAIL IN-LINE CIRCULATOR
CONCRETE PAD DETAIL
EMERGENCY SHOWER/EYEWASH STATION DETAIL
1-PL-703
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
689-408
950 Campbell Ave.
West Haven, CT 06516
RELOCATION &
RENOVATION OF SPS
WEST HAVEN
Office of construction and Facilities Management Approved:Project Director
Approved:Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
16 JUNE 2023
100% CONTRACT
DOCUMENTS
- - of 130
F i l e
N a m e
F
V
A
W
E S
T
H
A V
L
O C
A T
I O
N F
I R
E
A
L A
R M
F
A d a y o u t
F
A
D a t e
W e d
J u n a m e a h
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE: 19-199
FIRE ALARM SYMBOLS,
ABBREVIATIONS, NOTES, & DETAILS
FIRE ALARM SEQUENCING MATRIX
HEAT DETECTOR DETAIL
TYPICAL SMOKE /
& SPEAKER/STROBE DETAIL
TYPICAL PULL STATION
MOUNTING HEIGHTS OF FIRE ALARM DEVICES
EXIT SIGN MOUNTING - GYPBOARD CEILING
EXIT SIGN MOUNTING - LAY-IN CEILING
FIRE ALARM RISER
FIRE PROTECTION DESIGN MANUAL June 1, 2021
Table 7.3 Fire Alarm System Input Output Matrix
*While NFPA 101 does not require some detectors to notify building occupants, VA requires all smoke detectors, other than duct smoke detectors, to notify building occupants. Only install smoke detectors when required by NFPA 101 or its references.
** Those doors that are required to be tied to the fire alarm system such as delayed egress electrical locking systems and sensor release electrical locking systems.
*** This applies to Ambulatory Health Care Occupancies that require smoke barriers per NFPA 101 or are designed with multiple smoke zones.
OUTPUT →
INPUT DEVICE
Duct Smoke Detector*
Area Smoke Detector*
Door Release Smoke Detector*
Elevator Smoke Detector*
Manual Pull Station
Elevator Machine Room Heat Detector
Sprinkler Waterflow / Pressure Switch
Water Control Valve Tamper
High/Low Pressure Dry-Pipe Sprinkler System
Dry-Pipe Valve Room Temperature Alarm b
A – Do not provide duct detectors in dedicated (100%) exhaust fans, they should continue to run.
B – The facility is permitted to sound the general alarm or notify necessary staff in lieu of initiating a supervisory signal to be consistent with the operation of existing systems.
S o u n d g e n e r a l b u i l d i n g a l a f o r
O t h e r a n d
N o n
H i g h
R i s e n o n H e a l t h
C a r e
S e e
S e c t i o n
N o t i f y n e c e s s a r y s t a f f f o r r e s p o n s e f o r
H e a l t h
This is the start of the file's text. The full file is on GovTribe.