Attachment 05 - Volume 2 M-E-P-FP-S SPS Relocation - Composite set.pdf

PDF 26 MB Posted

Attached to
Y1DA--SPS Relocation and Renovation Minor #689-408 - West Haven
Solicitation number
36C77624R0041
Issued by

About this file

This document provides details for a federal contract solicitation. The solicitation number is 36C77624R0041 from the Department of Veterans Affairs Technology Acquisition Center Austin for the SPS Relocation and Renovation Minor project numbered 689-408 located in West Haven. The solicitation seeks proposals to relocate and renovate the SPS facility, with responses due on an unspecified date. Award of the contract is also not scheduled. No other salient details regarding products, services, pricing, or timelines are provided in this document.

View the file

Other files

File Type Posted
S06 - 36C77624R0041 0008.docx DOCX document
S06 - 36C77624R0041 0007.docx DOCX document
Attachment 29 - 2526-00 - Matot Cart Lift - 48W X 72D X 78H.pdf PDF
Attachment 31 - Connecticut Tax Language.docx DOCX document
Attachment 20 - RFI Response Sheet - West Haven - FINAL.pdf PDF
Attachment 24 - SB501.pdf PDF
Attachment 28 - 2526-00 - Otis Hydrofit 3500 HYD_3500_100_MRL.pdf PDF
Attachment 27 - 2526-00_22_1226 - LAA - Photo Book Composite(2).pdf PDF
Attachment 25 - Deducts_Performance Period.pdf PDF
Attachment 30 - 2526-00_24_0411 - A100 - Plans-1-AS112.pdf PDF
Attachment 36 - Existing Metal Panels.zip ZIP file
Attachment 22 - RWA WATER REPORT FOR VA FEB 2024.pdf PDF
Attachment 23 - West Haven VAMC SPS RBM Survey Report.pdf PDF
Attachment 32 - Hazardous Materials.pdf PDF
Attachment 34 - 02833313_West Haven VAMC - LB Paint.pdf PDF
Attachment 26 - 4276-001 Geotechnical Report.pdf PDF
Attachment 35 - 2526-00_23_0227 - 03. DVA - ILSM Post 4-6-2018.pdf PDF
Attachment 21 - VA As-Builts - SPS West Haven.zip ZIP file
Attachment 33 - 028211_West Haven VAMC - Asbestos.pdf PDF
S06 - 36C77624R0041 0006.docx DOCX document
S06 - 36C77624R0041 0005.docx DOCX document
S06 - 36C77624R0041 0004.docx DOCX document
Attachment 19 - AutoCad File of 1-AS141.zip ZIP file
Attachment 18 - 01 00 00 General Requirements_01Mar2024.pdf PDF
S06 - 36C77624R0041 0003.docx DOCX document
Attachment 17 - Narrative Arch SPS Bidding_Construction FINAL.pdf PDF
Attachment 12 - MEP Narrative_Including Geotechnical Report.pdf PDF
S06 - 36C77624R0041 0002.docx DOCX document
Attachment 16 - Site Visit Sign-in Sheet - West Haven - Part Two.pdf PDF
Attachment 13 - Structural Narrative.pdf PDF
Attachment 14 - Security Narrative.pdf PDF
Attachment 15 - Site Visit Sign-in Sheet - West Haven - Part One.pdf PDF
S06 - 36C77624R0041 0001.docx DOCX document
Attachment 01 - Construction SOW 689-408 SPS Relocation and Renovation.docx DOCX document
Attachment 08 - Anticipated Construction Schedule West Haven SPS.pdf PDF
Attachment 10 - Wage Determination - West Haven.docx DOCX document
Attachment 11 - Limitations on Subcontracting.docx DOCX document
S02 - 36C77624R0041.pdf PDF
Attachment 07 - Div 21-33 MEP sections SPECS.pdf PDF
Attachment 03 - Narrative Arch SPS CD FINAL. rev part 2.pdf PDF
Attachment 02 - Narrative Arch SPS CD FINAL. rev part 1.pdf PDF
Attachment 06 - Div 1-14 Architecutral and Structural SPECS.pdf PDF
Attachment 09 - General Construction Project Requirements.pdf PDF
Attachment 04 - Volume 1 A-C-S SPS Relocation - Composite set.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

E N

S

P

R

L

O C

A T

I O

N H

V A

C M

H d w g

L a y o u t

M

H

D a t e

W e d

J u n

M a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC: SYMBOLS,

ABBREVIATIONS & NOTES

GENERAL NOTES:

DUCTWORK SYMBOLS

GENERAL SYMBOLS

PIPING SYMBOLS

HVAC LINE TYPES

HVAC DEMOLITION NOTES:

VALVE SYMBOLS

SHUTDOWN / WORK LIMITS:

ENERGY CODE STATEMENT:

UNIFORM CODE STATEMENT:

ABBREVIATIONS

1-MH-001

DEDUCT ALTERNATES:

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

D

M

H

M

H

M

H M

H

M

H d a y o u t

M

D

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC GROUND FLOOR DEMOLITION PART PLAN

HVAC SUB-GROUND DEMOLITION PART PLAN

HVAC FIRST FLOOR DEMOLITION PART PLAN

HVAC SECOND FLOOR DEMOLITION PART PLAN

HVAC: SUB-GROUND, GROUND, FIRST &

SECOND FLOOR DEMOLITION PLANS

HVAC GROUND FLOOR DEMOLITION KEYED NOTES:

1-MD-101

Y

W

V

S

P

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

ZONE 3

ZONE 1

ZONE 2

ZONE 4

(O)

(O)

(O)

(O)

(O)

(O)

UP

UP

321.91000

B.7

2.5

E.1

E.2

ZONE 5

EXISTING (+)

EXISTING (+)

(O)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

D

M

H

M

H

M

H M

H

M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC GROUND FLOOR PART PLAN

HVAC SUB-GROUND PART PLAN

HVAC: SUB-GROUND & GROUND FLOOR

POSITIVE & NEGATIVE PRESSURES PLANS

LEGEND

1-MH-100

W

V

S

P

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

L

UP

B.7

2.5

E.1

E.2

1"ø 1 1/4"ø ø

1 1/4"ø

1 1/4"ø

1"ø ø

1"ø ø

1"ø ø

1 1/4"ø ø

1 1/4"ø

3/4"ø ø ø

3/4"ø ø ø ø

1"ø ø ø ø

1"ø

1"ø

1"ø

1"ø ø ø

1"ø

1"ø ø ø ø ø

3/4"ø ø

1"ø ø

1"ø

1"ø1"ø ø

1"ø ø

1"ø 1"ø ø

1"ø ø ø

1"ø 1"ø1"ø1"ø

1"ø ø

1"ø ø ø ø

1"ø ø ø

1"ø ø

1 1/4"ø

1"ø

1"ø

1"ø

1"ø

1 1/4"ø

1"ø ø

3/4"ø ø

1"ø ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

D

M

H

M

H

M

H M

H

M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC GROUND FLOOR DUCTWORK PART PLAN

HVAC SUB-GROUND DUCTWORK PART PLAN

HVAC: DUCTWORK SUB-GROUND &

GROUND FLOOR PLANS

GENERAL NOTES: GROUND FLOOR KEYED NOTES:

1-MH-101

Y

W

V

S

P

M

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

Y

W

V

S

Y

W

V

S

F

E

D

C.1 C

B

A 0A

5.154321.910

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

D

M

H

M

H

M

H M

H

M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC DUCTWORK DUCTWORK PENTHOUSE FLOOR PLAN

HVAC: DUCTWORK

PENTHOUSE FLOOR PLAN

HVAC DUCTWORK PENTHOUSE ROOF PLAN

AHU-1 SCHEMATIC DETAIL

AHU-2 SCHEMATIC DETAIL

AHU-3 SCHEMATIC DETAIL

AHU-5 SCHEMATIC DETAIL

AHU-4 SCHEMATIC DETAIL

KEYED NOTE:

1-MH-102

21.91000

2.5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

D

M

H

M

H

M

H M

H

M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC SUB-GROUND PIPING PART PLAN

HVAC: PIPING SUB-GROUND

FLOOR PLAN

1-MH-103

W

V

S

P

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

D

M

H

M

H

M

H M

H

M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC GROUND FLOOR PIPING PART PLAN

HVAC: PIPING GROUND

FLOOR PLAN

KEYED NOTE:

1-MH-103.1

Y

W

V

S

P

M

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

D

M

H

M

H

M

H M

H

M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC: PIPING PENTHOUSE

FLOOR PLAN

HVAC PIPNG PENTHOUSE FLOOR PLAN

GENERAL NOTE:

KEYED NOTE:

1-MH-104

CONTROLS SYMBOLS

T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT

TT TEMPERATURE TRANSMITTER

M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT

TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

FT FLOW TRANSMITTER

IT CURRENT TRANSMITTER

CT CONDUCTIVITY TRANSMITTER

SPS STATIC PRESSURE SENSOR

DS DUCT SMOKE DETECTOR

PDT PRESSURE DIFFERENTIAL TRANSMITTER

TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)

ZC VALVE OR DAMPER POSITION CONTROLLER

PDS PRESSURE DIFFERENTIAL SWITCH

LTCP LOCAL TEMPERATURE CONTROL PANEL

HVAC HVAC CONTROL PANEL

ECC

TC

VSMC VARIABLE SPEED MOTOR CONTROLLER

PC

SC

FC

PSH PRESSURE SWITCH HIGH

FSH

PSL PRESSURE SWITCH LOW

FSL

INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

TEMPERATURE CONTROLLER. SEE SEQUENCE OF

OPERATION

PRESSURE CONTROLLER. SEE SEQUENCE OF

OPERATION

SPEED CONTROLLER. SEE SEQUENCE OF

OPERATION

FLOW CONTROLLER. SEE SEQUENCE OF

OPERATION

FLOW SWITCH HIGH

FLOW SWITCH LOW

LENGTH IN DUCT WHEN SPACE PERMITS.)

A

TEMPERATURE SENSING ELEMENT FOR

TRANSMITTING TEMPERATURE TO EMCS

(PROVIDE 12 INCHES [200mm] MINIMUM

SENSOR WITH AVERAGING ELEMENT TO TRANSMIT

TEMPERATURE TO EMCS

M ELECTRIC OPERATED CONTROL DAMPER

DA DISCHARGE AIR

RA RETURN AIR

EA EXHAUST AIR

OA OUTSIDE AIR

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

INDICATES INTERLOCKED LINKS

INDICATES FUNCTIONAL RELATIONSHIPS

BETWEEN CONTROL COMPONENTS

M

SF

SUPPLY FAN

EXHAUST FAN

MOTORIZED DAMPER

ECC ENGINEERING CONTROL CENTER

DISCONNECT SWITCH

AIRFLOW MONITORING SWITCH

AFMD

EF

UC UNIT CONTROLLER

SPS

STATIC PRESSURE

SWITCH

HIGH LIMIT

SST START/STOP

HUMIDITY HIGH LIMIT

EXHAUST FAN VSMC ALARM

SUPPLY FAN VSMC ALARM

EXHAUST/RELIEF FAN STATUS

STATIC PRESSURE HIGH LIMIT

SUPPLY AIR FLOW (CFM)

EXHAUST LOW PRESSURE

DISCHARGE STATIC PRESSURE

DISCHARGE AIR HUMIDITY

DISCHARGE AIR TEMPERATURE

PRE-HEAT TEMPERATURE

REHEAT TEMPERATURE

COOLING COIL TEMPERATURE

SYSTEM COMPONENT:

EXHAUST AIR FLOW (CFM)

EXHAUST AIR TEMPERATURE

EXHAUST AIR HUMIDITY

SUPPLY FAN STATUS

MIXED AIR LOW LIMIT

EXHAUST FAN START/STOP

STEAM HUMIDIFIER

PRIMARY COOLING COILING VALVE V-2

PRE-HEAT VALVE V-1

EXHAUST AIR DAMPER

FACE AND PYPASS DAMPER

SUPPLY FAN VSMC

OUTSIDE AIR DAMPER

EXHAUST FAN VSMC

SUPPLY FAN START/STOP

OUTSIDE AIR TEMPERATURE

FILTER SENSOR (PRE & FINAL)

HT HUMIDITY TRANSMITTER

PRE-HEAT VALVE V-4

SECONDARY COOLING COILING VALVE V-3

ROOM DIFFERENTIAL / PRESSURE SENSOR

ALARM

PROCESSING

D

U

T

C

C

L

E

F

U

N

C

T

I

O

N

S

C

H

E

D

U

A

R

T

S

T

O

P

HUMIDITY HIGH LIMIT

EXHAUST FAN VSMC ALARM

SUPPLY FAN VSMC ALARM

EXHAUST/RELIEF FAN STATUS

STATIC PRESSURE HIGH LIMIT

SUPPLY AIR FLOW (CFM)

EXHAUST LOW PRESSURE

S

T

A

T

U

S

SYSTEM

A

L

A

R

M

P

R

I

O

R

I

T

Y

A

D

D

A

L

T

E

R

N

A

O

E

L

E

C

T

R

I

D

V

I

C

E

S

P

E

M

M

A

N

D

P

O

I

DISCHARGE STATIC PRESSURE

DISCHARGE AIR HUMIDITY

DISCHARGE AIR TEMPERATURE

PRE-HEAT TEMPERATURE

REHEAT TEMPERATURE

COOLING COIL TEMPERATURE

SYSTEM COMPONENT:

EXHAUST AIR FLOW (CFM)

EXHAUST AIR TEMPERATURE

O

P

E

N

C

L

O

S

E

S

T

A

R

T

S

T

O

P

V

A

L

V

S

I

T

I

O

N

D

A

M

P

S

I

T

I

O

N

JOB: 689-408

CV AIR HANDLER

VA POINTS LIST

SYSTEM:

BUILDING:

LEGEND

POINT

BINARY

T

E

M

P

E

R

A

T

U

I

L o c a l

A a r m n e l

M a s t e a n e l

A r e a n e l

H

I

G

H

A

T

E

S

S

U

R

E

H

I

U

M

I

D

I

T

Y

P

R

E

S

S

U

R

E

L

W

M

P

E

R

A

T

U

R

E

P

E

R

C

E

N

T

P

R

E

S

S

U

R

E

P

O

S

I

T

I

O

N

F

L

O

W

H

I

M

I

T

L

M

I

T

S

T

A

T

U

S

SYSTEM INPUTS

ANA-

BINARY ANALOG

S

P

A

M

N

T

R

O

L

S

T

A

T

E

S

S

U

S

E

T

D

E

M

A

M

I

T

I

N

G

T

E

M

P

E

R

A

T

U

S

E

T

T

E

M

P

E

R

A

T

U

V

E

R

R

I

D

E

E

N

T

H

A

L

O

N

O

M

I

Z

E

R

T

E

M

P

E

R

A

T

U

O

N

O

M

I

Z

E

R

F

A

I

L

U

D

E

REMARKS

F

U

M

M

U

N

I

C

A

T

I

O

N

SYSTEM SOFTWARE/CONTROL

APPLICATION/FUNCTION

PAGE:

EXHAUST AIR HUMIDITY

SUPPLY FAN STATUS

MIXED AIR LOW LIMIT

EXHAUST FAN START/STOP

STEAM HUMIDIFIER

PRIMARY COOLING COILING VALVE V-2

PRE-HEAT VALVE V-1

EXHAUST AIR DAMPER

FACE AND PYPASS DAMPER

SUPPLY FAN VSMC

OUTSIDE AIR DAMPER

EXHAUST FAN VSMC

S

T

A

T

E

S

S

U

R

E

C

A

R

B

N

O

X

I

D

E

H

U

M

I

D

I

T

Y

V

A

C

U

U

M

SUPPLY FAN START/STOP

AI-1

AI-2

AI-3

AI-4

AI-5

AI-6

AI-7

AI-8

AI-9

AI-10

T

R

E

N

D

I

N

G

OUTSIDE AIR TEMPERATURE AI-11

BI-1

BI-2

BI-3

BI-4

BI-5

BI-6

BI-7

BI-8

AO-1

AO-2

AO-3

AO-5

AO-7

AO-8

AO-9

AO-10

BO-1

BO-2

SEE GEN. NOTE 1 B

A

B

B

R

E

V

I

A

T

I

O

N

EAT

EAH

EAF

RTH

PHT

CCT

DAT

DASP

DAH

SAF

OAT

RLP

RF-STS

SF-STS

TSL-1

SPS-2

HHL

SF-ALA

RF-ALA

RF-SPD

SF-SPD

OAD

EAD

FBD

PHT-V1

CLG-V2

HUM

RF-SST

SF-SST

OUTPUTS

LOG

FILTER SENSOR (PRE & FINAL) B1-9 PDS

SEE GEN. NOTE 1 B

SEE GEN. NOTE & SEQ. OF OPS.

AO-11

PRE-HEAT VALVE V-4

PHT-V4

AO-12

CLG-V3SECONDARY COOLING COILING VALVE V-3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC: CONTROLS DIAGRAM &

POINTS LIST

P R

E

F

I L T

E R

100% OA

D-1

P R

E H

E A

T

C

O I L

C O

O L I N

G

C

O I L

LOCATE

SENSOR

OUTSIDE UNDER

SHIELD

S-15

V-1

(2-POSITION END

OF CYCLE VALVE)

V-3

CHR

(FACILITY)

CHS

SUPPLY FAN

A F

M D

SUPPLY AIR TO

TERMINAL UNITS

TT

FT

A F

T E

R

F I L T

E R

A F

M D

HS

CS

VSMC

STEAM

HEATING COIL

VARIABLE SPEED

MOTOR CONTROLLER

(AHU-1)

ZC

FT

PDS PDS

TT

T-6

SST

SPS

TSL

TSL-1

(3-WAY)

IT

1.

NOTES:

TT

EXHAUST AIR

M

CR-15

EXHAUST DUCT

D-2

M

STEAM

GENERATOR

HT

10" MIN.

[3000 MM]

HHL

REFER TO POINTS SCHEDULE & SEQUENCE OF

OPERATIONS

BDD

HT

H-1

A F

M D

FT

H-2

ZC

EXHAUST FAN

HS

IT

VSMC

SST

ECC

CURRENT

TRANSMITTER FOR

FAN STATUS (TYP)

ECC

FT

AFMD

FTAFMD

DS

TYPICAL CONSTANT AIR VOLUME AIR HANDLING UNIT (AHU-1) WITH 100% OUTSIDE AIR CONTROL DIAGRAM

TYPICAL SEQUENCE OF OPERATION OF AHU CONTROL SYSTEM

1. GENERAL:

A. UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS

"OFF" D-1, SHALL BE FULLY CLOSED. WHEN THE UNIT IS "ON" D-1 SHALL BE OPEN FULLY OPEN:

2. TEMERATURE CONTROL:

A. SUPPLY AIR TEMPERATURE, SENSED BY TT-6, SHALL BE MAINTAINED AT SETPOINT VIA DIGITAL CONTROL PANEL (DPC) BY MODULATING V-1, V-2, V-3, OR V-4 IN SEQUENCE.

B. WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-5, IS BETWEEN 50°F [10°C] AND THE SUPPLY AIR TEMPERATURE SENSED BY TT-6 THE DIGITAL CONTROL PANEL SHALL MODULATE V-1 TO CLOSE.

THE DIGITAL CONTROL PANEL SHALL MODULATE V-4 TO MAINTAIN THE SUPPLY AIR TEMPERATURE, SENSED BY TT-6.

C.

D.

WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-1, IS 50°F [10°C] HEATING VALVE V-1 SHALL MODULATE OPEN. FACE AND BYPASS DAMPERS SHALL MODULATE TO MAINTAIN DESIRED TEMPERATURE

SENSED BY TT-2.

3. AIR FLOW CONTROL

A. THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MODULATING THE SUPPLY FAN ADJUSTABLE SPEED MOTOR CONTROLLER TO MAINTAIN 1.0" [25MM] OF DUCT STATIC PRESSURE (FIELD

ADJUSTABLE), SENSED BY SPS-1. RESET STATIC PRESSURE BASED ON CLEAN OR DIRTY FILTER SIGNAL FROM THE PDS.

4. FREEZE PROTECTION:

A. IF THE AIR TEMPERATURE AS SENSED BY TT-2 FALLS BELOW 45°F [7°C], AN ALARM SIGNAL SHALL INDICATE AT THE DCP

AND ECC. IF THIS TEMPERATURE FALLS BELOW 40°F [4.4°C], AS SENSED BY THE TSL THE SUPPLY FAN SHALL SHUT DOWN. THE HEATING COIL END OF CYCLE VALVE V-1 SHALL CLOSE ALONG WITH THE FACE AND BYPASS DAMPERS.

TSL SHALL BE HARDWIRED TO THE SUPPLY FAN VFD AND UNIT SHALL BE SHUTDOWN IN HAND, AUTO OR BYPASS MODE. TSL WILL REQUIRE MANUAL RESET AT THE DEVICE.

6. EMERGENCY CONSTANT SPEED OPERATION

A. UPON FAILURE OF THE VFD, THE SUPPLY FAN SHALL BE STARTED/STOPPED MANUALLY AT THE DIGITAL CONTROL PANEL OR THE ECC THROUGH THE BY-PASS STARTER. FANS SHALL THEN BE OPERATED AT NORMAL CONSTANT SPEED.

7.

B. ALL CONTROL POINTS SHOWN ON THE POINTS UNIT SCHEDULE TO BE TIED INTO EXISTING JCI BMS.

C. UNLESS OTHERWISE NOTED, ALL POINTS SHALL BE ON THE GRAPHICS.

WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-1 IS ABOVE SUPPLY AIR TEMPERATURE SENSED BY TT-6 THE DIGITAL CONTROL PANEL SHALL MODULATE V-1 TO CLOSE. THE DPC SHALL MODULATE V-2 TO

MAINTAIN THE DESIRED TEMPERATIRED SENSED BY TT-3.

HUMIDITY CONTROL:

A. WHEN THE DIGITAL CONTROL PANEL IS NOT CALLING FOR HUMIDITY, SENSED BY RETURN AIR HUMIDITY H-1, THE STEAM GENERATOR SHALL REMAIN OFF. WHEN THE DIGITAL CONTROL PANEL IS CALLING FOR HUMIDITY, THE STEAM

GENERATOR SHALL ENERGIZE.

B. SUPPLY AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT OF 30%-60% RH (ADJ) VIA DIGITAL CONTROL PANEL BY MODULATING THE STEAM GENRERATOR TO MAINTAIN THE DESIRED HUMIDITY.

DCP SHALL DE-ENERGIZE THE STEAM GENERATOR WHENEVER THE SUPPLY FAN IS OFF OR WHEN HIGH HUMIDITY IS SENSED BY H-1 (HI LIMIT). THE STEAM GENERATOR SHALL BE INTERLOCKED WITH A

8. EXHAUST CONTROL:

A.

TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM TEMPERATURE.

DAMPER D-2 SHALL OPEN TO RELIEVE THE MAXIMUM O.A. CFM INDICATED.

9. WINTER COOLING:

A.

B. PROVIDE AN INTERFACE WITH THE ECC VIA OPEN BACNET PROTOCOL.

WHEN THE FACILITY CHILLED WATER IS SHUT DOWN, THE SECONDARY COOLING COIL V-3 SHALL MODULATE TO MAINTAIN COOLING SET POINT.

D. THE BMS SHALL BE BACNET PROTOCAL AS BUILDING STANDARD. VERIFY WITH HVAC SHOP AT THE FACILITY.

5. AUTOMATIC SHUTDOWN:

A. WHEN SMOKE IS DETECTED BY A DUCT SMOKE DETECTOR, DS, THE SUPPLY FANS SHALL SHUT OFF AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. DUCT SMOKE DETECTORS SHALL BE HARDWIRED

TO THE SUPPLY FAN VSMC.

EXHAUST FANS SERVING AREA OF THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY FANS SHALL REQUIRE MANUAL RESET AT THE UNIT.

IF THE SUPPLY FAN FAILS TO PROVE STATUS FOR 30 SECONDS (ADJ), THE FAN SHALL SHUT OFF, THE OUTSIDE AIR DAMPER SHALL CLOSE, ALL VALVES WILL CLOSE AND AN ALARM SHALL INDICATE AT THE ECC. A MANUAL RESET

SHALL BE REQUIRED TO RESTART THE FAN AT THE UNIT.

C O

O L I N

G

C

O I L

V-3

CHR

(NEW

CHILLER)

CHS

(3-WAY)

TT

EXHAUST AIR

FROM SPS

MECHANICAL ROOM (PENTHOUSE) CONTROL SCHEMATIC (TYPE-2)

SEQUENCE OF OPERATION:

VARIABLE VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM

PRIMARY SECONDARY

P R

E

F

I L T

E R

PDS

TT

R E

H E

I L

M

M

FACE &

BYPASS

DAMPER

(TYP. OF 2)

D-3

D-3

V-4

(4-WAY)

HWS HWR

TT

TYPICAL ROOM SENSOR

B. THE RELATIVE PRESSURE BALANCE BETWEEN EACH ROOM IS SHOWN ON 1/1-MH-401 WHERE THE PRESSURE FLOWS AS FOLLOWS, (++>+>->). A MINIMUM OF 0.02" W.C. PRESSURE DIFFERENTIAL SHALL BE SEEN ACROSS ANY TWO

ADJACENT ROOMS

TT

1-MH-501

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC: DETAILS

PLENUM COORDINATION DETAIL

ROOF MOUNTED GOOSENECK

CONCRETE DETAIL

METHOD OF HANGING DUCTWORK

SUPPLY DUCTWORK TAKE-OFFS

EXHAUST BRANCH DUCTWORK

TYPICAL DIFFUSER CONNECTION

EXTERIOR INSULATED DUCTWORK DETAIL

FOR LOW PRESSURE SYSTEM DETAIL

SHUTTER TYPE FIRE DAMPER

VANE ELBOWS

DUCTWORK SQUARE

DUCTWORK RADIUS ELBOWS

VOLUME DAMPER DETAIL

ACCESS PANEL & DOOR DETAIL

ROUND DUCT HANGERS

INSULATION SCHEDULE

NOTES:

1-MH-701

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC: DETAILS

EXPOSED PIPE HEAT TRACE DETAIL

SIDEBEAM HANGER DETAIL

HANGER DETAIL -

CONCRETE DECK

BEAM CLAMP

HANGER DETAIL

PIPE HANGER DETAIL

TYPICAL PIPE HANGERS

INDIVIDUAL PIPE HANGER ROD & SPACING SCHEDULE

TYPICAL TRAPEZE HANGER SUPPORT DETAIL

PIPE SUPPORT AT WALL

STEAM AND CONDENSATE GUIDE DETAIL

PIPING SUPPORT ON ROOF

HYDRONIC PIPING METAL ENCLOSURE DETAIL RATED WALL PENETRATION DETAIL

DETAIL OF INSULATED PIPE THRU ROOF

TYPICAL CONCRETE WALL

PENETRATION DETAIL

5. STEAM STRAINERS SHALL BE ORIENTED TO PREVENT CONDENSATE FROM COLLECTING IN THE STRAINER.

COORDINATE WITH COR.

DOUBLE VALVE (1/3 AND 2/3)

STEAM PRESSURE REDUCING STATION

1-MH-702

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC: DETAILS

CONNECTIONS WITH FLEXIBLE CONNECTORS

SINGLE SUCTION FLOOR-MOUNTED PUMPS -

KEYED NOTES:

GENERAL NOTES:

CHILLER PIPING SCHEMATIC

INTEGRAL FACE AND BY-PASS VERT.

PREHEAT COIL STEAM PIPING

PIPING CONNECTIONS DETAIL

FLOOR MOUNTED EXPANSION TANK -

CHILLED WATER COOLING COIL CONNECTION DETAIL

CONCRETE EQUIPMENT BASES

UNIT HEATER DETAIL

AIR HANDLING UNIT (AHU)

HEATING COIL PIPING SCHEMATIC

TYPICAL AHU DRAIN TRAP

VAV TERMINAL NOTES:

SINGLE DUCT VAV TERMINAL WITH HEATING COIL

HEAT EXCHANGER - STEAM TO HOT WATER

STEAM HUMIDIFIER PIPING DETAIL

ELECTRIC

STEAM

HUMIDIFIER

1-MH-703

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC SCHEDULES

UNIT HEATER SCHEDULE

1-MH-801

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N H

V A

C M

H d a y o u t

M

H

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

HVAC SCHEDULES

1-MH-802

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

GENERAL SYMBOLS

POWER SYMBOLS

ELECTRICAL LINE TYPES

GENERAL NOTES:

ABBREVIATIONS

ELECTRICAL SYMBOLS,

ABBREVIATION & NOTES

BASE OF DESIGN LEGEND AND SCHEDULE OF LIGHTING EQUIPMENT

COMMUNICATION SYMBOLS

SYMBOL

LEGEND AND SCHEDULE OF LIGHTING CONTROL EQUIPMENT

NOTE:

1-EP-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

D

E

P d a y o u t

E

D

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL GROUND FLOOR DEMOLITION POWER PART PLAN

ELECTRICAL SUB-GROUND, GROUND, FIRST &

SECOND FLOOR DEMOLITION POWER PLANS

ELECTRICAL SUB-GROUND DEMOLITION POWER PART PLAN

ELECTRICAL DEMOLITION GENERAL NOTES:

ELECTRICAL 1ST FLOOR DEMOLITION POWER PART PLAN

ELECTRICAL 2ND FLOOR DEMOLITION POWER PART PLAN

ELECTRICAL DEMOLITION KEYED NOTES:

1-ED-101

UP

L

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

D

E

P d a y o u t

E

D

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL DEMOLITION NOTES:

ELECTRICAL GROUND FLOOR DEMOLITION LIGHTING PART PLAN

ELECTRICAL SUB-GROUND DEMOLITION LIGHTING PART PLAN

ELECTRICAL FIRST FLOOR DEMOLITION LIGHTING PART PLAN

ELECTRICAL SECOND FLOOR DEMOLITION LIGHTING PART PLAN

ELECTRICAL SUB-GROUND, GROUND, FIRST &

SECOND FLOOR DEMOLITION LIGHTING PLANS

1-ED-201

321.91000

2.5

P

M

L

J

G

H

Y

W

V

S

P

M

L

J

G

H

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

D

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL GROUND FLOOR POWER PART PLAN

ELECTRICAL SUB-GROUND POWER PART PLAN

ELECTRICAL SUB-GROUND &

GROUND FLOOR POWER PLANS

NEW CONSTRUCTION KEYED NOTES:NEW CONSTRUCTION GENERAL NOTE:

1-EP-101

Y

W

V

S

P

M

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

DN

RA

MP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

D

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL FIRST FLOOR POWER PART PLAN

ELECTRICAL FIRST FLOOR

POWER PART PLANS

NEW CONSTRUCTION KEYED NOTES:

ELECTRICAL ROOF POWER PART PLAN

NEW CONSTRUCTION KEYED NOTES:

ELECTRICAL GENERATOR BUILDING 39 PART PLAN

ELECTRICAL NORMAL ELECTRICAL ROOM SG110 PART PLAN

1-EP-102

W

V

S

P

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

UP

UP

UP

L

UP

321.91000

B.7

2.5

E.1

E.2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

D

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL GROUND FLOOR LIGHTING PART PLAN

ELECTRICAL SUB-GROUND LIGHTING PART PLAN

ELECTRICAL SUB-GROUND &

GROUND FLOOR LIGHTING PLANS

KEYED NOTES:GENERAL NOTES:

1-EP-201

V

S

Y

W

V

S

F

E

D

C.1 C

B

A 0A

5.154321.91000

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

D

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL FIRST FLOOR

LIGHTING PART PLANS

ELECTRICAL FIRST FLOOR LIGHTING PART PLAN

KEYED NOTE:

ELECTRICAL ROOF LIGHTING PART PLAN

GENERAL NOTE:

1-EP-202

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL ONE-LINE

DIAGRAMS

ELECTRICAL PARTIAL ONE-LINE-DEMOLITION

ELECTRICAL PARTIAL ONE-LINE-NEW

WIRE AND CONDUIT SCHEDULE

TAG FEEDER SIZE WIRING AND CONDUIT

ELECTRICAL ONE-LINE - LIFE SAFETY

ELECTRICAL ONE-LINE - CRITICAL

ELECTRICAL ONE-LINE - NORMAL

ELECTRICAL ONE-LINE - EQUIPMENT

1-EP-601

TYPICAL SINGLE ZONE SWITCHING ROOM CONTROLLER

GENERAL NOTES:

VACANCY SENSOR SWITCH DETAIL

TYPICAL WALL MOUNT

SINGLE WAY WIRING:

THREE WAY WIRING:

MOUNTING HEIGHTS OF ELECTRICAL DEVICES

CONDUIT PENETRATION IN FIRE

RATED GWB OR PLASTER PARTITION

DATA DROP

CONDUIT PENETRATION

IN FIRE RATED CONCRETE FLOOR

IN FIRE RATED MASONRY PARTITION

CONDUIT PENETRATION

LAY-IN LIGHT FIXTURE SUPPORT DETAIL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL DETAILS

SITE LIGHTING POLE AND FIXTURES

TYPICAL COMMON TRENCH CONFIGURATION

GROUND ROD DETAIL

1-EP-701

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL DETAILS

1-EP-702

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

P

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL SCHEDULES

1-EP-801

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N E

L E

C T

R I C

A L

E

P

E

P d a y o u t

E

P

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

ELECTRICAL SCHEDULES

1-EP-802

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

L d a y o u t

P

L

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

GENERAL SYMBOLS

GENERAL PLUMBING NOTES:GENERAL NOTES:

PLUMBING LINE TYPES

PIPING SYMBOLS VALVE SYMBOLS ABBREVIATIONS

PLUMBING SYMBOLS,

ABBREVIATION & NOTES

1-PL-001

L

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

D

S

A N

I T

A R

Y d a y o u t

P

D

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING DEMOLITION NOTES:

PLUMBING SUB-GROUND, GROUND, FIRST & SECOND

FLOOR DEMOLITION SANITARY PIPING PLANS

PLUMBING GROUND FLOOR DEMOLITION SANITARY PIPING PART PLAN

PLUMBING SUB-GROUND DEMOLITION SANITARY PIPING PART PLAN

PLUMBING FIRST FLOOR DEMOLITION SANITARY PIPING PART PLAN

PLUMBING SECOND FLOOR DEMOLITION SANITARY PIPING PART PLAN

DEMOLITION KEYED NOTE:

1-PD-101

L

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

D

D

O M

E S

T I C d a y o u t

P

D

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING DEMOLITION NOTES:

PLUMBING GROUND FLOOR DEMOLITION DOMESTIC PIPING PART PLAN

PLUMBING SUB-GROUND DEMOLITION DOMESTIC PIPING PART PLAN

PLUMBING FIRST FLOOR DEMOLITION DOMESTIC PIPING PART PLAN

PLUMBING SECOND FLOOR DEMOLITION DOMESTIC PIPING PART PLAN

PLUMBING SUB-GROUND, GROUND, FIRST & SECOND

FLOOR DEMOLITION DOMESTIC PIPING PLANS

DEMOLITION KEYED NOTE:

1-PD-201

W

V

S

P

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

UP

UP

UP

L

UP

5.154321.91000

B.7

2.5

E.1

E.2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

D

S

A N

I T

A R

Y d a y o u t

P

L

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING GROUND FLOOR SANITARY PIPING PART PLAN

PLUMBING SUB-GROUND SANITARY PIPING PART PLAN

PLUMBING SUB-GROUND & GROUND

FLOOR SANITARY PIPING PLANS

1-PL-101

Y

W

V

S

P

M

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

P

M

Y

W

V

S

P

M

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

D

S

A N

I T

A R

Y d a y o u t

P

L

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING FIRST FLOOR SANITARY & STORM WATER PIPING PARTIAL PLAN

PLUMBING FIRST FLOOR SANITARY &

STORM WATER PIPING PLANS

PLUMBING ROOF SANITARY & STROM WATER PIPING PARTIAL PLAN

1-PL-102

W

V

S

P

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

UP

L

UP

321.91000

B.7

2.5

E.1

E.2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

D

D

O M

E S

T I C d a y o u t

P

L

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING GROUND FLOOR DOMESTIC & TREATED WATER PIPING PART PLAN

PLUMBING SUB-GROUND DOMESTIC PIPING PART PLAN

PLUMBING SUB-GROUND & GROUND

FLOOR DOMESTIC PIPING PLANS

KEYED NOTES:

1-PL-201

Y

W

V

S

P

M

Y

W

V

S

G

F

E

D

C.1 C

B

A 0A

5.154321.91000

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

D

D

O M

E S

T I C d a y o u t

P

L

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING FIRST FLOOR

DOMESTIC PIPING PLAN

PLUMBING FIRST FLOOR DOMESTIC AND TREATEDWATER PIPING PARTIAL PLAN

1-PL-202

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

L d a y o u t

P

L

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING DETAILS

SINGLE FIXED CARRIER

WATER CLOSET CARRIER DETAIL

LAVATORY WALL CARRIER DETAIL

EMERGENCY SHOWER/EYEWASH STATION DETAIL

SINK DRAINAGE / VENT DETAIL

WALL MOUNTED FLUSH VALVE DETAIL

NOTE:

TYPICAL STORM LEADER DETAIL

TYPICAL STORM OVERFLOW LEADER DETAIL

ROOF DRAIN & OVERFLOW DETAIL

PENETRATION DETAIL

EXTERIOR WALL

RATED WALL PENETRATION DETAIL

TYPICAL PIPING CONCRETE PENETRATION DETAIL

HANGER DETAIL

CONCRETE DECK BEAM CLAMP

HANGER DETAIL

TYPICAL PIPE HANGER DETAILS

HANGER DETAIL

SIDEBEAM

PIPE SUPPORT AT WALL

SANITARY VENT TERMINATION

TRAP DETAIL

FLOOR DRAIN DETAIL

THERMOSTATIC MIXING VALVE DETAIL

1-PL-701

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

L d a y o u t

P

L

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING DETAILS

REVERSE OSMOSIS SYSTEM LAYOUT - ENLARGED PLAN

REVERSE OSMOSIS PACKAGE - SCHEMATIC DIAGRAM DETAIL.

NOTES:NOTE:

KEY NOTES:

HYDRAULIC ELEVATOR SUMP PUMP DETAIL

SEWAGE EJECTOR DETAIL

TYPICAL TRAPEZE HANGER SUPPORT DETAIL

PIPE SUPPORT AT WALL

EQUIPMENT HANGING DETAIL

1-PL-702

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N P

L U

M B

I N

G P

L d a y o u t

P

L

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

PLUMBING DETAILS

ATTACHMENT METHOD FOR PIPE SYSTEMS

WATER HEATER PIPING SCHEMATIC

GENERAL NOTES

COMPRESSED AIR DROP DETAIL

WATER PUMP DETAIL IN-LINE CIRCULATOR

CONCRETE PAD DETAIL

EMERGENCY SHOWER/EYEWASH STATION DETAIL

1-PL-703

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

689-408

950 Campbell Ave.

West Haven, CT 06516

RELOCATION &

RENOVATION OF SPS

WEST HAVEN

Office of construction and Facilities Management Approved:Project Director

Approved:Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

16 JUNE 2023

100% CONTRACT

DOCUMENTS

- - of 130

F i l e

N a m e

F

V

A

W

E S

T

H

A V

L

O C

A T

I O

N F

I R

E

A

L A

R M

F

A d a y o u t

F

A

D a t e

W e d

J u n a m e a h

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE: 19-199

FIRE ALARM SYMBOLS,

ABBREVIATIONS, NOTES, & DETAILS

FIRE ALARM SEQUENCING MATRIX

HEAT DETECTOR DETAIL

TYPICAL SMOKE /

& SPEAKER/STROBE DETAIL

TYPICAL PULL STATION

MOUNTING HEIGHTS OF FIRE ALARM DEVICES

EXIT SIGN MOUNTING - GYPBOARD CEILING

EXIT SIGN MOUNTING - LAY-IN CEILING

FIRE ALARM RISER

FIRE PROTECTION DESIGN MANUAL June 1, 2021

Table 7.3 Fire Alarm System Input Output Matrix

*While NFPA 101 does not require some detectors to notify building occupants, VA requires all smoke detectors, other than duct smoke detectors, to notify building occupants. Only install smoke detectors when required by NFPA 101 or its references.

** Those doors that are required to be tied to the fire alarm system such as delayed egress electrical locking systems and sensor release electrical locking systems.

*** This applies to Ambulatory Health Care Occupancies that require smoke barriers per NFPA 101 or are designed with multiple smoke zones.

OUTPUT →

INPUT DEVICE

Duct Smoke Detector*

Area Smoke Detector*

Door Release Smoke Detector*

Elevator Smoke Detector*

Manual Pull Station

Elevator Machine Room Heat Detector

Sprinkler Waterflow / Pressure Switch

Water Control Valve Tamper

High/Low Pressure Dry-Pipe Sprinkler System

Dry-Pipe Valve Room Temperature Alarm b

A – Do not provide duct detectors in dedicated (100%) exhaust fans, they should continue to run.

B – The facility is permitted to sound the general alarm or notify necessary staff in lieu of initiating a supervisory signal to be consistent with the operation of existing systems.

S o u n d g e n e r a l b u i l d i n g a l a f o r

O t h e r a n d

N o n

H i g h

R i s e n o n H e a l t h

C a r e

S e e

S e c t i o n

N o t i f y n e c e s s a r y s t a f f f o r r e s p o n s e f o r

H e a l t h

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .