This document package includes construction documents and specifications for a rehabilitation center project at the St. Cloud VA Medical Center in Minnesota, as well as a notice for a Multiple Award Task Order Contract (MATOC) construction services opportunity within Veterans Integrated Service Network 23 (VISN 23).
The construction documents detail architectural, mechanical, electrical, fire protection, and structural plans and specifications for interior buildout and exterior site work at an existing rehabilitation center. The scope includes infill of shell space, addition of an exterior walking path, and site preparation for a 40' x 70' construction staging area.
The MATOC notice is a pre-solicitation for an indefinite-delivery, indefinite-quantity construction services contract within the Minnesota region of VISN 23, including the Minneapolis and St. Cloud VA medical centers and associated clinics. The 100% service-disabled veteran-owned small business set-aside contract would have a maximum value of $70 million over five years of ordering. Task orders are anticipated to range from $2,000 to $10 million for maintenance, repair, alteration, and new construction projects.
36C26318R0688 ATTACHMENT 11a--Drawings Original Revised 656-16-277 Relocate Rehab Functions (6 pages).pdf
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
CONSTRUCTION AREA
TO 8TH ST WEST ONLY
93 49 29
95 3
37 6
SAUK RIVER
TO 8TH ST EAST & WEST
T100
1A
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
Main Campus, St. Cloud, Minnesota
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
TITLE SHEET
01/03/2013
S1430
G001
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
Sheet Schedule
Mechanical M001 MECHANICAL SYMBOLS AND ABBREVIATIONS
M101 MECHANICAL HYDRONIC PIPING - LOWER LEVEL
M102 MECHANICAL HYDRONIC PIPING - FIRST FLOOR
M201 MECHANICAL VENTILATION - LOWER LEVEL
M202 MECHANICAL VENTILATION - FIRST FLOOR
M203 MECHANICAL ROOF PLAN
M301 MECHANICAL DETAILS
M302 MECHANICAL DETAILS
M303 MECHANICAL DETAILS
M304 MECHANICAL DETAILS
M305 MECHANICAL CONTROL DETAILS
M306 MECHANICAL DETAILS
M307 MECHANICAL SCHEDULES
Electrical E001 ELECTRICAL SYMBOLS & ABBREVIATIONS
E100 POWER & SIGNAL BASEMENT
E101 POWER & SIGNAL FIRST FLOOR
E200 LIGHTING BASEMENT
E201 LIGHTING FIRST FLOOR
E300 ONE-LINE DIAGRAM
E301 PANELBOARD SCHEDULE
E400 ELECTRICAL SCHEDULES
EC101 ELECTRICAL SITE PLAN
Fire Protection FP100 FIRE PROTECTION SYSTEM LOWER LEVEL
FP101 FIRE PROTECTION SYSTEM MAIN FLOOR
Sheet Schedule
Architectural Demolition AD101 DEMOLITION PLANS AND SECTION
Architectural A001 SYMBOLS & ABBREVIATIONS & WALL TYPES
A100 LOWER LEVEL PLAN
A101 FIRST FLOOR PLAN
A102 PARTIAL PLANS, ELEVATIONS & SCHEDULES
A108 ROOF PLAN
A200 REFLECTED CEILING PLAN- LOWER LEVEL
A201 REFLECTED CEILING PLAN - FIRST FLOOR
A301 INTERIOR ELEVATIONS
A401 INTERIOR DETAILS
A402 STAIR SECTIONS AND DETAILS
A403 INTERIOR DETAILS - MODULAR CASEWORK
A501 EXTERIOR ELEVATIONS
A601 BUILDING & WALL SECTIONS
A602 WALL SECTIONS
A603 WALL SECTIONS AND DETAILS
A701 EXTERIOR DETAILS
A702 EXTERIOR DETAILS
A801 DOOR TYPES, WINDOW TYPES & FRAME DETAILS
A802 DOOR SCHEDULE
Interiors I101 FINISH PLAN
I201 ROOM FINISH SCHEDULE
Plumbing P101 PLUMBING LOWER LEVEL
P201 PLUMBING FIRST FLOOR
P301 WASTE AND VENT RISERS
P302 DOMESTIC WATER RISERS
P303 PLUMBING DETAILS
P304 PLUMBING DETAILS
Sheet Schedule
General G001 TITLE SHEET
G201 CODE PLAN
Civil C1 CIVIL DEMOLITION PLAN
C2 GRADING PLAN
C3 STORM WATER POLLUTION PREVENTION PLAN
C4 STORM WATER POLLUTION PREVENTION PLAN
C5 UTILITY PLAN
C6 SIGNAGE, PAVEMENT MARKINGS AND
PAVEMENT PLAN
C7 UNDERGROUND STORM INFILTRATION SYSTEM
DETAILS
V1 SITE SURVEY- FOR REFERENCE
Landscape L100 LANDSCAPE PLAN
L101 IRRIGATION ZONE PLAN
L200 LANDSCAPE DETAILS
L300 LANDSCAPE DETAILS
Structural S001 GENERAL STRUCTURAL NOTES
S101 LOWER LEVEL AND TRASH ENCLOSURE
FOUNDATION PLANS
S201 MAIN LEVEL FRAMING PLAN AND GENERATOR
BUILDING PLANS
S301 ROOF FRAMING PLAN
S401 SECTIONS AND DETAILS
S402 SECTIONS AND DETAILS
S403 SECTIONS AND DETAILS
fence. Coordinate construction materials and location of fence with COTR.
staff and visitors from entering construction site. This fence may be a plastic snow
Contractor is responsible for erecting a barrier around work site to prevent patients, for watering new sod until project acceptance by the COTR.
Sod to be thoroughly saturated with water upon placement. The contractor is responsible rolls of sod. Top soil to be tilled and graded to a smooth matching grade of undamaged lawn.
their business. All damaged lawn will be overcut by 6" or more to accomodate full width will be performed by a landscape contractor that regularly does sodding as part of
Contractor is responsible for repairing and replacing any damaged lawn. The restoration
Access to all buildings and parking areas must be maintained throughout the project.
GENERAL CONDITIONS
All dimensions on drawings are approximate; Drawings are not to be scaled. It is the responsibility of the contractor to verify all field conditions and physical dimensions that influence the construction area.
It is recommended that contractors visit the proposed construction site prior to submitting their bids and they are encouraged to do so.
Contractor shall adhere strictly to State and Federal Occupational Safety and Health
Administration ( OSHA ) Standards.
Contractor shall park only in the designated parking areas and are not to park on the lawn areas; the only exception is to load or unload supplies or equipment.
Contractor is responsible for the safeguarding of their tools and equipment. All tools and equipment are not to be left unattended and are to be secured at all times when the contractor is not present, or the construction site is not supervised by the contractor.
All VA property is to be safeguarded from damage. Any damaged VA property is to be restored to original condition prior to damage or replaced completely. This includes installation, labor, and procurement expenses.
All demolished material becomes the property and the responsibility of the contractor with the exception of specified items designated either in the plans or verbally requested by the COTR to be retained by the VA.
Offsite disposal of the demolished items is the responsibility of the contractor.
If scaffolding is used, it must be used in accordance with (OSHA) regulations and is to be enclosed for the first eight feet above ground at end of each working day, until dismantled. Ladders must be removed and locked up at the end of each working day to prevent unauthorized persons from having access.
Clean all debris from construction site to the satisfaction of the COTR.
Contractors are to coordinate all work with the Contracting Officers Technical Representative.
(C.O.T.R.)
debris, wet down sufficiently to prevent dust spreading.
will insure negative air pressure is maintained in encapsulated work area. When transporting a dust barrier and ventilation with hepa filters. If venting to outside, the contractor
Contractor must control demolition and construction dust from facility by erecting
CONSTRUCTION DOCUMENTS
ORIGINAL DESIGN
DRAWINGS
REHAB BUILDING 116
40'x70' CONSTRUCTION STAGING
AREA. PROVIDE IN-GROUND POST
MOUNTED (NOT SURFACE
MOUNTED) FENCING PER GENERAL
REQUIREMENTS SECTION
010000-1.6-l
CONTRACTOR SHALL COMPLETELY PREPARE SITE FOR BUILDING OPERATIONS,
AND FURNISH LABOR AND MATERIALS AND PERFORM ALL WORK FOR
CONSTRUCTION OF INFILL OF SHELL SPACE, AND EXTERIOR WALKING PATH AT
THE EXISTING REHABILITATION CENTER, AS REQUIRED BY DRAWINGS AND
SPECIFICATIONS.
12/03/2018
RELOCATE REHAB
SERVICES 656-16-277
RELOCATE REHAB FUNCTIONS
PROJECT #656-16-277
ORIGINAL DESIGN DRAWINGS
DN
DN
DN
FDFD
FD
FD
FD
FD
FD
FD
DN
S B
SB
S B
S B
S B
S B
S B
S B
S B
S B
S B
S B
S B
SB
SB
S B
SB
SB
S B
S B
S B
S B
S B
S B
SB
SBSB SB SB SB SB
S B
SBSB SB
S B
SBSB SB SB
FB1FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 F
B
F B
F
B
F B
FB1 F
B
F
B
F B
FB1FB1FB1FB1FB1FB1FB1FB1FB1FB1
FB1FB1 FB1 FB1 FB1 FB1 FB1
F B
F
B
F B
1F B
F
B
F B
F B
FB1
FB1FB1 FB1
F B
F
B
F B
FB1FB1FB1F
B
F
B
F B
FB1FB1 FB1
F B
F
B
F B
F
B
F B
FB1FB1 FB1 F
B
F
B
F B
F
B
F B
F
B
FB1FB1FB1F
B
FB1FB1FB1FB1FB1
F B
F
B
F B
F
B
F B
FB1FB1 FB1
FB1FB1FB1FB1
F B
F
B
F B
FB1FB1 FB1 FB1
F B
FB1FB1 FB1
FB1FB1 FB1 FB1 FB1
F B
F B
SP S
P
S P
S P
S P
SPSP SP SP SP SP
S P
S P
S P
S P
S P
S P
S P
S P
S P
S P
S P
SP
SP
S P
SP SP
S P
S P
S P
S P
S P
SP S
PSPSP SP SP
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
FB1
SP
SB
FP
FW1
LD
UP
DN
FB1FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1
FB1FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
F
B
F B
NEW BUILDING
OCCUPANCY GROUP I-2, TYPE 1B
EXIST BUILDING #51
GROUP I-2
PEDESTRIAN WALKWAY
(IBC 2006 SECTION 3104)
HORIZONTAL EXIT
EXIT DISCHARGEEXIT DISCHARGE
EXIT DISCHARGE
EXIT DISCHARGE
EXIT DISCHARGE
EXIT DISCHARGE
118 SF
PSYCHOLOGIST
CONSULTATION
SMOKE BARRIER DEFINES
SMOKE COMPARTMENT
181 SF
SOUTH
VESTIBULE
190 SF
STAFF
800 SF
OP GYM 139 SF
T-4
55 SF
FEMALE
TOILET
ROOM
114 SF
SCHEDULING
90 SF
WORK
117 SF
LPN
126 SF
RECEPTION
1593 SF
PT GYM
552 SF
PT
CHARTING
79 SF
EQUIP
STORAGE
140 SF
T-1
200 SF
T-5
64 SF
PATIENT
TOILET
138 SF
T-3
136 SF
T-6
139 SF
T-9
139 SF
EQ
STORAGE
1064 SF
MECHANICAL
187 SF
MUSIC130 SF
NORTH
VESTIBULE
329 SF
PROS
STORAGE
1387 SF
CORRIDOR
147 SF
WAITING
147 SF
LOW
VISION
CLINIC
29 SF
JAN
279 SF
GROUP
MEETING
ROOM
123 SF
SOCIAL
WORKER
CONSULTATION
11 SF
SOILED
LINEN
187 SF
PASS
THROUGH
596 SF
LINK TO
BUILDING
323 SF
SPEECH
LAB
61 SF
IT
138 SF
T-8
142 SF
ADL BED
122 SF
ADL BATH
197 SF
ADL
KITCHEN
426 SF
CORRIDOR
117 SF
ASSESSMENT/
CONSULTATION
55 SF
MALE
TOILET
55 SF
MALE
TOILET
ROOM
149 SF
SPEECH
THERAPY
140 SF
T-2
176 SF
PROCEDURE
ROOM EMG
56 SF
CLEAN
UTILITY
1018 SF
CORRIDOR
441 SF
HALLWAY
18 SF
SOILED
21 SF
CL LINEN
15 SF
CLEAN
LINEN
123 SF
ELECTRICAL
124 SF
ELECTRICAL
285 SF
OT
CHARTING
933 SF
OT CLINIC
65 SF
PATIENT
TOILET
88 SF
LOW
VOLTAGE
148 SF
WAITING
112 SF
COORDINATOR
56 SF
FEMALE
TOILET
22 SF
WC STOR.
119 SF
PROVIDER
OFFICE
200 SF
T-7
7 SF
RECYCLING
527 SF
HALLWAY
DN
FIRE BARRIER (1 HR, 2HR RATED
x INDICATES HOUR RATING)
SMOKE PARTITION
SMOKE BARRIER
WALL RATING LEGEND
SMOKE BARRIER PARTITIONS TO BE
CONTINUOUS FROM FLOOR TO
STRUCTURE ABOVE. REFER TO PLANS
FOR LOCATIONS AND EXTENTS.
PASSAGE OF PIPES, CONDUITS, DUCTS,
CABLES AND SIMILAR EQUIPMENT
SHALL BE SEALED WITH A MATERIAL
CAPABLE OF MAINTAINING FIRE AND
SMOKE RESISTANCE - REFER TO SEC
07240 x
FIRE PARTITION (1 HR RATED)
FIRE WALL (1 HR, 2HR RATED x
INDICATES HOUR RATING)
x
LEAD LINED WALL
Trash, Soiled Linen, Storage & Mechanical Rooms
Code References
Partitions
Door Openings
Fire Protection
Allowable AreaFloor Area IBC Occupancy TypeIBC Building Type
Area of New Construction (Building)
New Fire Sprinkler Throughout New Areas
2006 International Building Code
2007 Minnesota State Building Code
2009 Minnesota State Plumbing Code
2008 National Electrical Code
NFPA 101 2000, Life Safety Code
NFPA 99 2005, Health Care Facilities
Americans with Disabilities Act with VA Supplement
Guidelines for Construction and Equipment of Hospitals and Medical Facilities - American Institute of Architects Committee on Architecture for Health Care 2010
UNLIMITED AREA
Total Area [with Pedestrian Walkway (IBC 3104)]
17,292 SF
19,047 SF
Structural Frame
Nonbearing exterior walls
Roof construction
Floor construction
Reinforced concrete columns & beams
6" CMU w/face brick
8" P/C plank
8" P/C plank w/ 2" topping
Description UL Reference
2 hour
Fire Resistance Rating
1 hour
2 hour
Building Element
Stair
Horizontal exit
1 hour
Area A
Area B
Smoke Compartments
12,125 sf
5,167 sf
Number of Stories One
1 hour
1 hour
1 hourFire Barriers
Smoke Barriers 1 hour
Smoke Partition
Trash, Soiled Linen, Storage & Mechanical Rooms
Stair
Horizontal exit
60 minute
Fire Barriers (1 hour) (2 hour)
Smoke Barriers
Smoke Partition
60 Minute
60 Minute
60 Minute 90 Minute
20 Minute
Non Rated - Smoke Limiting
2006 International Fire Code
2006 International Mechancial Code w/ MN Amendments
2009 Minnesota State Energy Code
UL-U465Metal framing w/ gypsum board
Metal framing w/ gypsum board
Metal framing w/ gypsum board
Metal framing w/ gypsum board
Metal framing w/ gypsum board
Metal framing w/ gypsum board
LSC Occupancy TypeLSC Building Type
Non Rated - Smoke Limiting
1 hour
REGULATORY INFORMATION
I-21B
[222] [Healthcare Occupancy]
ASHRAE 90.1 2006
MN SHPO
Architectural Barriers Act Accessibility Standards including Barrier Free Design Guide
Steel beam & columns (South Vestibule) 1 hour
UL-U465
UL-U465
UL-U465
UL-U465
Uniform Federal Accessibility Standards
OSHA
VA HVAC DESIGN GUIDE
2009 INTERNATIONAL PLUMBING CODE
2246 SF
MECH ROOM
14119 SF
CRAWL
SPACE
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Sara Malin License No. 40063
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
CODE PLAN
01/03/2013
S1430
G201
1/16" = 1'-0"G201
1 CODE PLAN - FIRST FLOOR
NORTH
1/16" = 1'-0"G201
2 CODE PLAN - LOWER LEVEL PLAN
NORTH
AREA OF WORK
RELOCATE REHAB
SERVICES 656-16-277
12/03/2018
NOTE: ALL LANDSCAPE MULCH
CHANGED TO 1-1/2" BRYANT
RED ROCK.
AREA OF WORK.
KEEP SIDEWALKS OPEN AT
ALL TIMES.
INSTALL CHAIN LINK
CONSTRUCTION FENCE
PER SPECIFICATIONS.
NEW BENCH
LOCATION
AREA OF GEOTHERMAL WELL VALVES,
ADJUST HEIGHT AS REQUIRED TO MAKE
FLUSH WITH CONCRETE.
EXISTING MANHOLE. CURVE
AND SHIFT PATH TO THE
EAST AS NECESSARY TO
AVOID THIS CONFLICT.
EXISTING
TRANSFORMER
LOCATION
LIMESTONE PATH NOT TO BE INSTALLED. REARRANGE
PLANTINGS TAKEN FROM THE TRANSFORMER AREA.
FIELD COORDINATE FINAL LAYOUT WITH COR.
WOOD BRIDGE: PROVIDE 4X4 TREATED LUMBER
(MAX 16" SPACING) ATTACHED TO A 4" CONCRETE
SLAB. PROVIDE COMPOSITE DECKING (TREX OR
EQUIVALENT) WITH HIDDEN FASTENERS. INSTALL
SUCH THAT THERE IS AN EVEN TRASITION TO THE
CONCRETE WALK AREAS ON EITHER SIDE OF THE
BRIDGE. FIELD COORDINATE FINAL DETAILS WITH
COR AND PROVIDE A DETAILED SHOP DRAWING FOR
REVIEW AND APPROVAL.
N.I.C.
N.I.C.
N.I.C.
FENCE NOT REQUIRED
ALONG BUILDING.
RELOCATE REHAB
AREA OF WORK
AREA OF WORK
AREA OF WORK
RELOCATE REHAB
RELOCATE REHAB
VERIFY BENCH
TYPE WITH COR
RELOCATE REHAB
File details come from the government source that posted it. Updated .