This is a pre-solicitation notice for a multiple award task order contract for construction services. The Department of Veterans Affairs Veterans Integrated Services Network 23 intends to issue a request for proposal to make multiple indefinite-delivery, indefinite-quantity contract awards for maintenance, repair, alteration, and new construction projects ranging from $2,000 to $10 million. The construction MATOC will cover facilities in the Minneapolis and St. Cloud VA health care systems and their associated clinics in Minnesota. A minimum of eight awards are anticipated under North American Industry Classification System code 236220 for commercial and institutional building construction, with a $36.5 million small business size standard. This acquisition is set aside solely for service-disabled veteran-owned small businesses. Offerors must represent their status as such and be registered in the required systems. Interested parties should monitor the federal business opportunities website for solicitation details.
36C26318R0688 0001 ATTACHMENT 11j--Record Drawings 656-16-277 Relocate Rehab Functions (11 pages).pdf
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FB1
SP
SB
FP
FW1
LD
The first digit refers to the level on which the room occurs in a multi-level building. In a one-level building, this digit may be omitted.
The second digit refers to the area of that particular level where the room occurs when the campus is divided into different areas or buildings. If only one area or building exist, this digit may be omitted.
The last two or three digits identify the room.
Vis: 2R17 or 2R174
Rooms are numbered in the following manner:
ROOM AND DOOR NUMBERS
Grid lines are traces of imaginary vertical planes, identified by number and/or letter, used to facilitate the location of materials. Where no dimensions are shown and the materials are shown to occur with some definite relationship to the grid lines, then these materials shall be installed in this relationship.
GRID LINES
4C
Indicates demolition note described elsewhere on documents
Indicates note described elsewhere on documents
Indicates door number; see door schedule.
Indicates wall type. The wall type number is described in the wall type legend found on all floor plan sheets a/1 Indicates revision's to issued documents
Indicates equipment item; see equipment schedule202
1A101
W1 Indicates window number; see window types XXX.XX
XXX.XX
Note, Description
(XXX.XX)
Drapery
Cubicle Curtain Track
(Existing Spot Elevation)
Corner Guard
Elevation of Building Component(s) Relative to the Base Elevation
New Spot Elevation
Accordian Door
ARCHITECTURAL SYMBOLS
Existing Walls to Remain (shown shaded)
Walls to be Removed (shown dotted)
WALL GRAPHICS
New Walls (shown solid)
TAGS
CW1 Indicates curtain wall frame number; see curtain wall frame types
S1 Indicates storefront frame number; see storefront frame types
SYMBOLS
A501
Indicates building exterior elevation detail number sheet number
A401 Indicates building interior elevation detail number sheet number
FIRE BARRIER (1 HR, 2HR RATED
x INDICATES HOUR RATING)
SMOKE PARTITION
SMOKE BARRIER
WALL RATING LINES
x
FIRE PARTITION (1 HR RATED)
FIRE WALL (1 HR, 2HR RATED x
INDICATES HOUR RATING)
x
LEAD LINED WALL
L1 Indicates louver frame number; see louver types
F1 Indicates interior window number; see window types
A601
Indicates detail referenced Indicates building & wall section cut location
...and shall be referred to in correspondence as elevation 12/ 6-2.
Indicates detail number on that sheet Indicates number of sheet where section, elevation, or detail appears
Vis:
Where double numbers appear in a circle on scale drawings or elevations, the upper number is the number of the section or elevation on the sheet so numbered... the lower number indicates the sheet on which a section or elevation of the part in question may be found;
DETAIL AND SECTION REFERENCING
EXPLANATION OF DOCUMENT NOMENCLATURE
Information shown on plans will not be repeated on elevations and sections and vice versa. Where notes are indefinite, reference must be made to the specifications. When practical, notes upon the plans are eliminated, and information is condensed in the form of schedules which appear in the Project Manual.
Combinations of abbreviations consistent with the following abbreviations list may occur. When any feature of the building occurs more than once, it is drawn in full only once, and repetitions of the same feature are indicated in outline; it is the intention that all of such features indicated in outline shall be complete in every detail as shown in the typical instance. Features which are shown in detail at a larger scale will be indicated in outline only on the smaller scale drawings. Where plans or elevations are symmetrical, one-half will be drawn in full, and the other indicated in outline only;
and when any feature is continuous, a portion only will be shown in full and the remainder in outline.
In order to avoid an unnecessary amount of lettering and a confusing number of lines on the Contract Documents, the Architect/Engineer has used certain devices, abbreviations, conventions, symbols, diagrams and schedules, the meaning and use of which are herein illustrated and explained.
The Contract Documents cannot be fully and correctly interpreted without reference to these explanatory sheets and to the specifications contained in the Project Manual.
A701
A701
Indicates detail section cut location
A701 view direction view direction view direction
A701
Indicates a plan details and enlarged plans
A
@ At A Amp A Compressed Air A/C Air Conditioning ACC Accessory/Accessories ACT Acoustical Ceiling Tile ADA Americans with Disabilities Act ADD Addendum ADJ Adjustable ADO Automatic Door Operator AF Access Flooring AFF Above Finish Floor AFG Above Finish Grade AHU Air Handling Unit AIC Ampere Interrupting Capacity ALT Alternate ALUM Aluminum ANN Annunciator ARCH Architectural ASI Architect’s Supplemental Instructions AT Acoustical Ceiling Tile AT(SP) Acoustical Ceiling (with Sprayed Plastic Finish) ATS Automatic Transfer Switch A/V Audio Visual AWC Acoustical Wall Covering
B
B Blinds - Horizontal BATH Bathroom BCS Baby Changing Station BD Board BEJ Brick Expansion Joint BFE Bottom of Footing Elevation BITUM Bituminous BKSPL Backsplash BLDG Building BLK Block BLKG Blocking BM Beam BM Benchmark BOT Bottom BR Bedroom BRG Bearing BSMT Basement BSP Bedspread BTU British Thermal Units BV Blinds - Vertical
C
C Conduit C Concrete C/L Center Line CA Carpet CAB Cabinet CAM Camera CATV Cable Television CB Catch Basin CB Circuit Breaker CBB Concrete Backer Board CCT Circuit CFM Cubic Feet per Minute CFT Ceramic Floor Tile CG Corner Guard CJ Control Joint CJ CMU Control Joint CLG Ceiling CLR Clear CM Cultured Marble CM Crown Molding CO Cleanout CO Company COL Column CONC Concrete CONF Conference CONT Continuous CORR Corridor CP Cultured Polymer CPT Carpet Tile CR Chair Rail CSR Central Sterile Room CT Ceramic Tile CT Current Transformer CT Computer Aided Tomography CTP Countertop CU Clean Utility CUH Cabinet Unit Heater CWT Ceramic Wall Tile
D
D Drapery DBL Double DC Direct Current DET Detail DF Drinking Fountain DIA Diameter DIFF Diffuser DIM Dimension DISC Disconnect DIST Distance DISTR Distributor DR Dust Room DR Door DRP Door Protection DRWG Drawing DS Down Spout DT Dust Tight
E
E East E Existing EA Each EC Electrical Contractor EIFS Exterior Insulation & Finish System EJ Expansion Joint ELEC Electrical ELEV Elevator ELEV Elevation EMT Electric Metallic Tubing EOL End of Line EP Electrical Panel EPF Epoxy Flooring EQ Equal EQUIP Equipment ER Emergency ES Engineered Interior Surface ES Each Side EWC Electrical Water Cooler EXIST Existing EXP Expansion EXT Exterior
F
F Fahrenheit F Flush FAAP Fire Alarm Annunciator Panel FACP Fire Alarm Control Panel FB Face Brick FBO Furnished By Others FCIC Furnished by Contractor Installed by Contractor FCU Fan Coil Unit FD Floor Drain FDMPR Fire Damper FDN Foundation FDR Feeder FE Fire Extinguisher FFE Finished Floor Elevation FGP Fiberglass Panel FIN FLR Finished Floor FLA Full Load Amps FLUORO Fluoroscopy or Fluoroscopic FMA Flexible Metal Conduit FOIC Furnished by Owner Installed by Contractor FOIO Furnished by Owner Installed by Owner FP Fireproof or Fireproofing FP Folding Partition FR Fire Retardant FRS Flushing Rim Sink FS Firestopping FS Floor Sink FS Flow Switch FS Finish Sheet FURN Furniture FV Field Verify
G
G Ground GA Gauge GB Gypsum Board GC General Contractor GEN General GFCI Ground Fault Circuit Interrupter GND Ground GPH Gallons Per Hour GPM Gallons Per Minute GRB Grab Bar GWB Gypsum Wallboard Systems GYP BD Gypsum Board
H
HD Heavy Duty HDB Hardboard HDWE Hardware HK Hook HM Hollow Metal HP Horsepower HR Handrail HS Hand Sanitizer HSKP Housekeeping HT Height HTR Heater HUMD Humidifier HV High Voltage HVAC Heating Ventilating Air Conditioning HW Hot Water HW HR Hot Water Heating Return HW HS Hot Water Heating Supply HWH Hot Water Heater HWR Hot Water Return HWS Hot Water Supply HZ Hertz
I
ICB Integrally Coved Base ICU Intensive Care Unit IE Invert Elevation IG Isolated Ground IMC Intermediate Metal Conduit INFO Information INSUL Insulation INT Interior INV Invert
J
JAN Janitor JB Junction Box JT Joint
K
KIT Kitchen KO Knock Out KCMIL Thousand Circular Miles KP Kickplate KV Kilovolts KVA Kilovolt Amperes KW Kilowatt KWH Kilowatt Hour L
L Lintel LAV Lavatory LDR Labor/Delivery/Recovery LDRP Labor/Delivery/Recovery/Post-Partum LN Linoleum LNDRY Laundry LS Light Switch LT Light LTG Lighting LV Low Voltage
M
M Mat (Floor) MAMMO Mammography MAS Masonry MATL Material MAX Maximum MB Marker Board MCB Main Circuit Branch MCC Motor Control Center MFR Manufacturer MH Manhole MIN Minimum MIR Mirror MISC Miscellaneous MLDG Molding MLO Main Lug Only MO Masonry Opening MOD Modular MOT Motor MSB Main Switch Board MTG Mounting MTS Manual Transfer Switch MTL Metal
N
N North NC Normally Closed NEC National Electric Code NIC Not In Contract NL Night Light NO Normally Open NOM Nominal NS Nurse Station NTS Not To Scale
O
O/C On Center O.C. On Center OB Obstetrics OD Outside Diameter OD Overflow Drain OR Operating Room OT Occupational Therapy OUT Outlet OUTPAT Outpatient
P
P Pole P Paint P/C Precast Concrete PAR Post-Anesthesia Recovery PAT RM Patient Room PB Pull Box PB Push Button PERP Perpendicular PF Power Factor PH Phase PHARM Pharmacy PLYWD Plywood PR Pair PR Proposal Request PRB Profile Base PRI Primary PREFIN Prefinished PRV Power Roof Ventilator PRV Pressure Reducing Valve PSI Pounds per Square Inch PT Paint PT Physical Therapy PTD Paper Towel Dispenser PWR Power PV Porcelain Paver PVC Polyvinyl Chloride
Q
QT Quarry Tile QTY Quantity
R
R Resistance R Radius R Rubber RA Return Air RB Resilient Base RAD Radiology REC Recessed RCP Reflected Ceiling Plan RD Roof Drain RECP Receptacle RECPN Reception REF Refrigerator RF Resilient Floor RF Rubber Flooring RFS Room Finish Schedule RJ Roof Jack RL Relocate RM Room RPM Revolutions Per Minute RPS Revolutions Per Second RPZ Reduced Pressure Zone Backflow Device RS Rubber Stair Tread RSF Resilient Sheet Flooring RT Rain Tight RT Rubber Tile RWL Rain Water Leader
S
S South S Solid Surface SAF Safety Floor SC High Build Glazed Coating (Special Coating) SCHED Schedule SD Soap Dispenser SEAL CONC Sealed Concrete SEC Secondary SHR Shower SP Solid Polymer SP Spare SPEC Specifications SQ Square SQ FT Square Foot SQ IN Square Inch SS Stainless Steel ST Stain STL Steel SU Soiled Utility SURG Surgery SUSP Suspended SW Switch SWBD Switchboard SYM Symmetrical
T
T Toilet T Thermostat TBD Tackboard TBE Top of Beam Elevation TC Telecommunications Cabinet TDE Top of Deck Elevation TER Terrazzo TERM Terminal TFE Top of Footing Elevation TP Tamper Resistant TPH Toilet Paper Holder TREAT Treatment TSE Top of Slab Elevation TWE Top of Wall Elevation TYP Typical
U
U Urinal UC Under Counter or Under Cabinet UG Underground UH Unit Heater UL Underwriters’ Laboratory UN Unless Noted UNO Unless Noted Otherwise UV Unit Ventilator
V
V Vinyl V Volt VA Volt-Amperes VAC Vacuum VB Vertical Blind VCT Vinyl Composite Tile VCW Vinyl Clad Wood VOL Volume VT Vapor Tight
W
W West W/O Without WAGD Waste Anesthetic Gas Disposal WC Water Closet WC Wallcovering WCH Wheelchair WD Wood WDW Window WF or W Wide Flange Steel Beam WG Wall Guard WP Wall Protection WR Water Resistant WS Weatherstripping WS Working Scupper WSCT Wainscot WSF Welded Seam Sheet Flooring WT Watertight WT Weight WTR Water WWF Welded Wire Fabric
X
XFMR Transformer XP Explosion Proof
Z
Z Impedance
ABBREVIATIONS
FB1
SP
SB
FP
FW1
LD
FW2
SP
FB1
FB2
FB1
FB1
STEEL
1. 7/8"
2. 1 5/8"
3. 2 1/2"
4. 3 5/8"
6. 6"
8. 8"
WOOD
2. 2X2 (1 1/2")
4. 2X4 (3 1/2")
6. 2X6 (5 1/2")
8. 2X8 (7 1/4")
10. 2X10 (9 1/4")
ONE LAYER 5/8" GYP BD
TWO LAYERS 5/8" GYP BD
STUD THICKNESS
ONE LAYER 5/8" GYP BD
AIR SPACE
3 5/8" STEEL STUD
3 5/8" STEEL STUD
ONE LAYER 5/8" GYP BD
ONE LAYER 5/8" GYP BD
S E
E P
LA
N
1 HR - UL U465 - STEEL
1 HR - UL U305 - WOOD
2 HR - UL U411 - STEEL
2 HR - UL U301 - WOOD
WALL RATING INDICATOR, SEE PLAN
WALL RATING INDICATOR, SEE PLAN
WALL RATING INDICATOR, SEE PLAN
A STL
C STL
B WD
D WD
E STL
F WD
J
4C
STUD SIZE AND
STANDARD WALL
ASSEMBLY
J SPECIAL WALL ASSEMBLY
WALL ASSEMBLY
K
S E
E P
LA
N
2 HR - UL U336 - FIRE SEPERATION
AIR SPACE
2X4 WOOD STUD
2X4 WOOD STUD
ONE LAYER 5/8" GYP BD
ONE LAYER 5/8" GYP BD
WALL RATING INDICATOR, SEE PLAN
TWO LAYERS 1" GYP BD
1 HR - UL U420 - PLUMBING WALL
FURRING OR STUD
NOTE: ALL INTERIOR WALLS TO BE TYPE
"4C" UNLESS NOTED OTHERWISE.
SOUND ATTENUATING INSULATION
1 HR - UL U465 - STEEL
1 HR - UL U305 - WOOD
WALL RATING INDICATOR, SEE PLAN
ONE LAYER 5/8" GYP BD
TWO LAYERS 5/8" GYP BD
SOUND ATTENUATING INSULATION
METAL STUD GUSSET AT THIRD POINTS,
EACH STUD
SOUND ATTENUATING INSULATION
TWO LAYERS 5/8" GYP BD
SOUND ATTENUATING INSULATION
ONE LAYER 5/8" GYP BD
G STL
H WD
FIRE BARRIER (1 HR, 2HR RATED
x INDICATES HOUR RATING)
SMOKE PARTITION
SMOKE BARRIER
WALL RATING LEGEND
SMOKE BARRIER PARTITIONS TO BE
CONTINUOUS FROM FLOOR TO
STRUCTURE ABOVE. REFER TO PLANS
FOR LOCATIONS AND EXTENTS.
PASSAGE OF PIPES, CONDUITS, DUCTS,
CABLES AND SIMILAR EQUIPMENT
SHALL BE SEALED WITH A MATERIAL
CAPABLE OF MAINTAINING FIRE AND
SMOKE RESISTANCE - REFER TO SEC
07240 x
FIRE PARTITION (1 HR RATED)
FIRE WALL (1 HR, 2HR RATED x
INDICATES HOUR RATING)
x
LEAD LINED WALL
ONE LAYER 5/8" GYP BD
1 HR - UL U465 - STEEL
WALL RATING INDICATOR, SEE PLAN
L
ONE LAYER 1" GYPSUM SHAFT WALL LINER
C-H METAL STUD3
1/ 8"
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Sara Malin License No. 40063
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
SYMBOLS &
ABBREVIATIONS &
WALL TYPES
11/13/2018
S1430
A001
1 9/30/16 RECORD SET
DN
DN
34" 34" 34" 34"
DN
REF.
32"32"
32" 32" 36"36"
24"24" 48"
30" 24" 24"
30"
32" 32"
30"
FDFD
FD
FD
FD
48"
FD
DN
48"
SBSB
SB
SB
SBSB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SP
SP
SPSP SP SP
FB1FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1
FB
FB
FB
FB
FB1
FB
FB
FB
FB1FB1FB1FB1FB1FB1FB1FB1FB1FB1
FB1FB1 FB1 FB1 FB1 FB1 FB1
FB
FB
FB
1FB
FB
FB
FB
FB1
FB1FB1 FB1
FB
FB
FB
FB1FB1FB1
FB
FB
FB
FB1FB1 FB1
FB
FB
FB
FB
FB
FB1FB1 FB1
FB
FB
FB
FB
FB
FB
FB1FB1FB1
FB
FB1FB1FB1FB1FB1
FB
FB
FB
FB
FB
FB1FB1 FB1
FB1FB1 FB1 FB1 FB1
FB
FB
SP
SPSP
SP
SP
SPSP SP SP SP SP
SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SPSP
SP
SP
SP
SP
SP
SPSP SP SP
FB
FB
FB
FB
FB
FB
FB
FB
FB
FB
FB
FB
FB
SPSP
SP
SP
SPSP SP SP SP
SPSP
SP
SP
SP
SP
SBSB SB
SBSB SB
SBSB
SB
SB
SBSB
SB
SB
SBSB
SB
SB
SPSP SP SP
SP
SPSPSP
A5012
A501
A501
A501
FUTURE LINK
1:33
DASHED LINE INDICATES
DROP-OFF CANOPY ABOVE
SNOW MELT SYSTEM - BOTH
SIDES
(ALTERNATE #14 ELIMINATE)
SNOW MELT SYSTEM
(ALTERNATE #14 ELIMINATE)
SIDE FOLDING
SECURITY GRILLE
'-4
27'-2" 19'-8" 47'-4" 19'-8" 27'-2"
103°
'-4
/2
1' -9
/4
4'
-4
4' -0
9'
-4
4'-2" 4'-0" 2'-8" 4'-0" 2'-8" 4'-0" 5'-8" 3'-4" 4'-0" 5'-0" 4'-0" 3'-4" 4'-0" 4'-0" 2'-8" 4'-0" 18'-0" 4'-0" 2'-8" 4'-0" 4'-0" 3'-4" 4'-0" 5'-0" 4'-0" 3'-4" 5'-0" 4'-0" 2'-8" 4'-0" 2'-8" 4'-0" 4'-10"3'-4" 35'-4" 3'-4" 10'-0" 3'-4" 10'-0" 3'-4" 12'-0"
3'-4" 6'-8"
3'-4" 6'-8"
3'-4" 6'-8"
3'-4"
19' - 5" +/-
E Q
. A
'-0
E Q
. A
1/
2" 6'
-4
1/
2"
AHU-1
RAMP DOWN
TO BUILDING 51
4'
-4
141'-0"
E-22
DF
A301 5D
FFE 97'-7"
EXISTING BLDG 51
A301 1F
A301
2B
2C
A301
3A
A301
3B
A301
2D
2E
A601
A601
DF
CUBICLE CURTAIN
TRACK ABOVE
(TYP.)
WC STOR.
A601
A602
5'-0" 35'-9" 10'-0"
AD101
MAX
R
AM
P 40'-0"
97' - 7"
98' - 11"
101A
101B
142B
142C
108 107
104B
142D
104A
137A
176A 174A
105 142A 160
176B
171170169
175A
A402
SOUTH
VESTIBULE
STAFF
OP GYM
T-4
FEMALE
TOILET ROOM
SCHEDULING
WORK
RECEPTION
PT GYM
PT CHARTING
EQUIP
STORAGE
T-1
T-5
PATIENT
TOILET
T-3
T-6
MECHANICAL
MUSIC
NORTH
VESTIBULE
PROS
STORAGE
CORRIDOR
WAITING
JAN
GROUP
MEETING
ROOM
SOCIAL
WORKER
CONSULTATION
PASS
THROUGH
LINK TO
BUILDING 51
ASSESSMENT/
CONSULTATION
MALE TOILET
MALE TOILET
ROOM
T-2
CORRIDOR
ELECTRICAL
WAITING
FEMALE
TOILET
T-7
100' - 0"
TV - FOIOTV - FOIO
FEC
E-25
PIANO
PIANO
CART
A301
1B
E-22
A301
1A
E-18 E-27
A301
5C
E-15
E-17
E-19
E-20
E-33
E-34
E-28
E-28
CEILING LIFT
E-32
E-35 E-37
E-21
E-29 E-30 E-31
E-14
E-16
05 E-23
E-26
E-24
FEC
A301
1C
FEC
126A
135 134
123B
126B
110A
114A
123A
110B
175B
A301 1D
A301
1E
A301 2A
CLEAN LINEN
SOILED LINEN
ELECTRICAL
LOW
VOLTAGE
114B
142E
RECYCLING
TALL STOR CABINETS
ELEC.
PANELS
SEE
ELEC.
DN
UP
IT
2F
CLEAN
UTILITY
A602
1:33
ALTERNATE #9
LINK TO
BUILDING 51
ALTERNATE #12 ELIMINATE
BUILDING CANOPY
HALLWAY
CLEAR
8' - 1"
6C
TRANSFORMER PAD
DOOR
OPENER ON
BOLLARD
DOOR OPENER
ON BOLLARD
SIDEWALK- TYP.
STOOP- SEE
STRUCT.
AREA WELL
4A
4A
2A 4A
2A
4A
STOOP- SEE
STRUCT.
STOOP- SEE STRUCT.
STOOP- SEE
STRUCT.
10' - 8"
110C
A102 3A
TRASH
ENCLOSURE
8' -0
1B
A702
AREA WELL
7' -3
" V
IF
3/
4" T
Y P
9 3/4" TYP.
3' -8
7'
-8
3' -8
/4
4'
-0
2' -8
4'
-0
9' -0
/4
4'
-0
2' -8
4'
-0
2' -1
1/
2"
2' -6
6'
-4
2' -8
6'
-4
2' -8
6'
-4
2' -6
7'
-4
4' -0
2'
-8
4' -0
'-6
'-8
7'
-6
BEJ
BEJ BEJ
BEJ BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJBEJ
BEJ
BEJBEJ
BEJ
BEJ
BEJ
BEJBEJ
BEJBEJ
EJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ BEJ
BEJ
BEJ BEJ
BEJ
BEJ
EJ
BEJ BEJ BEJBEJBEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ
BEJ BEJ BEJ
BEJ BEJBEJ BEJ
A702 4C10'-8"
3' - 4" 3' - 4"11' - 5"
A702 3C
INDUSTRIAL
OPEN-RISER
STAIR
(STAIR S-4)
STAIR
S1
STAIR
S2
TYP.
TYP.
E-36
A402
A402
1G
TYP.
BCS
BCS
BCS
BCS
1'-0"
EJ
EJ
C
LE
A R
8' -1
4'-11" 4'-0" 2'-8" 4'-0" 2'-8" 4'-0" 4'-11" 2'-4" 3'-4" 4'-10" 3'-4" 5'-10" 5'-10" 4'-6" 4'-0" 4'-4" 10'-0" 4'-4" 4'-0" 4'-6" 5'-10" 5'-8" 3'-4" 5'-0" 3'-4" 2'-4" 5'-0" 4'-0" 2'-8" 4'-0" 2'-8" 4'-0" 4'-10"
3' -8
4'
-0
2' -0
4'
-0
5' -4
4'
-0
2' -0
4'
-0
4' -8
4'
-0
2' -0
4'
-0
3' -0
2'
-6
6' -4
2'
-8
6' -4
2'
-8
6' -4
2'
-6
'-4
8'
-4
9' -5
/4
14'-5"
'-5
/4
'-4
/4
8' -5
'-1 1"
'-6
9'-2" 10'-8 3/4" 22'-3 1/2"
CLEAR
8'-1"
10'-1 3/4"
15'-7 1/4" 15'-11 1/2"
20'-3 1/2" 18'-4 1/2" 9'-7" 11'-10 1/4" 11'-10 1/2" 10'-0 1/4"
6' - 8" 4' - 10" 10' - 1" 7' - 0"
2' - 2"
4' - 10"
5'-8 1/2" 9'-11 1/4" 1'-4" 9'-11" 3' -7
/2
C
LE
A R
8' -1
3'
-8
2' -7
/2
'-1
/4
1' -2
7'
-2
/4
C
LE
A R
8' -1
8'
-1
J
8'-3 1/4"
CLEAR
8'-1" 20'-3 1/2"
4'-0"
13'-9 1/2"
8'-7" 4'-8 1/4" 8'-11"
'-7
/4
4'
-3
/2
5' -1
3/
4"
C
LE
A R
8' -1
/4
'-2
/4
8' -5
9'
-5
9' -6
/4
'-9
/2
9'
-8
1' -9
'-2
8'
-4
/4
2' -5
/4
'-6
/4
'-1
0"
J
J
2' -2
/2
1'-0"
5' -0
8' -8
/4
6' -1
1" 2'
-0
6' -1
1"
'-1
1/ 2"
'-2
10'-8 1/2" 18'-2 1/2"
A603 1C
A603 1D
J
4A
4A
ENTRANCE
GRILL
ENTRANCE GRILL
ENTRANCE
GRILL
A702 4B
6A4A
4A
6A
4A
TYP. @ LINK
4A TYP. @
LINK
6C
FEC
SYSTEMS
FURNITURE
BY DIV. 12
MAINTENANCE
PAD - SEE MECH.
6' -7
1'
-1
2A
4A
4A
4A
4A
4A
4A
4A
4A4A4A4A4A
4A
4A4A
4A
4A4A
4A
4A
4A
4A 1'-2 1/4"
3/
4"
4A 4A
4A
F1
CONTINIOUS
MAINTENANCE
STRIP
CONTINIOUS
MAINTENANCE
STRIP
8' -1
1"
2A
4A
4A
4A
2A
4A
4A2A
4A
2A
4A
2A
2A2A
4A 2A
2A
2A
2A
2A
4A
4A
1A
4A
4A
4A
4A
A601
F2
F2
C
LE
A R
2' -0
SF2 SF2
FE
FAAP
8' -0
2'
-0
8' -0
E
QE
Q
2' -5
137B
SF7
1A1A
OWNER TO PROVIDE SIGNAGE
STATING THAT NO STORAGE IS
PERMITTED IN CRAWL SPACE
DOOR OPENER
ON BOLLARD
3/4" TOPPING DEPRESSION
3/4" TOPPING
DEPRESSION
3/4" TOPPING
DEPRESSION
FLOOR HATCH BY
DIV. 08 31 13 -
90 MIN. RATING
100' - 0" 100' - 0"
A301
2G
2H A301
2G Sim
2H
S im
176C
174B
STOOP - SEE
STRUCTURAL
4'-6"
(EL. 1045.67)
(EL. 1043.25)
MAX
STOOP- SEE
STRUCTURAL.
E01
TEMPORARY
CONSTRUCTION
WALL. PATCH PAINT
WALLS, FLOORS,
AND CEILING AS
NECESSARY AFTER
REMOVAL.
STOOP, CONC STEPS AND
RETAINING WALL- SEE
STRUCT
10'-6 1/4" +/-
6'-0"
3D A603
A501
CUBICLE CURTAIN
TRACK ABOVE
3' -1
/2
"CONTINIOUS
MAINTENANCE
STRIP
ROOF
OVERHANG
ABOVE
3'-4" 8'-0"
6' -0
5'-0"
4E
4A
2' -6
4A
LOUVER ABOVE -
SEE MECH
LOUVER
ABOVE -
SEE MECH
CEILING MOUNTED
TRACK AND HARNESS
SYSTEM BY 11 73 01 -
ALTERNATE #2
A603
A702 2B
A702 2B
A702 2B A702
2B
M
IN
. 4 8"
C
LE
A R
FA
C
E O
F B
C S
T O
FR
O
N T
O F
TO
IL
E T. .
C O
N
FI
R M
C
LR
C O
N
FI
R M
C
LR
SHELL SPACE
4,550 SF
AREA OF
WORK
GENERAL NOTES:
FINISH FLOOR ELEV = 100'-0"
EXTERIOR DIMENSION TO EXTERIOR FACE OF WALL
SEE SPECIFICATION FOR TYPE AND LOCATION OF GYPSUM
BOARD; "X", "C", ETC.
INTERIOR CORRIDOR WALLS DIMENSIONED TO FINISH FACE
OF WALL, SPECIFIED CLEAR
INTERIOR WALLS DIMENSIONED TO CENTER OF WALL
ALL WALL TYPES TO BE 4C UNLESS NOTED OTHERWISE.
ALL COLUMNS TO BE FURRED OUT WITH 1A UNLESS NOTED
OTHERWISE.
PROVIDE MAINTENANCE STRIP AROUND ENTIRE PERIMETER
OF BUILDING AND LINK WHERE BUILDING COMES IN CONTACT
WITH TURF
SEE STRUCTURAL FOR CMU CONTROL JOINTS
ALL WALLS TO EXTEND TO STRUCTURE ABOVE, PROVIDE
DEFLECTION TRACK
NO BRICK CUTS ARE ACCEPTED AT THE OPENINGS FOR
WINDOWS, DOORS OR STOREFRONTS. 1/2 OR CUSTOM SIZE
BRICKS SHALL BE PROVIDED AS NECESSARY.
INDICATED EQUIPMENT, SEE EQUIPMENT SCHEDULEXX
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Sara Malin License No. 40063
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
FIRST FLOOR PLAN 11/13/2018
S1430
A101
1/8" = 1'-0"A101
1 FIRST FLOOR PLAN- AREA A
NORTH
1 9/30/14 Bathroom Dimension Changes
2 6/2/15 Code Review Changes
3 9/30/16 RECORD SET
A102 1D
A102
1A
A1021B
A102
1C
41'-0"
'-0
5' -0
'-0
5' -0
1.5 MW GENERATOR
ALTERNATE #7 -
SEE ELEC
GENERATOR
BUILDING
180A
A601
A701 4A
SIM.
A701 4B
SIM.
19'-4"
7' -6
7'
-1 1"
7' -1
1"
180B
DAY TANK - SEE
MECH.
DOCKING STATION
- SEE ELEC.
3'-4" 3'-4" 34'-4"
180C
8' -8
8'
-4
5' -0
2'
-0
8"
1' -4
HM DOOR
SPLASH BLOCK
3' -5
3' -8
12'-4" 16'-0" 12'-8"
SPLASH BLOCK
FUEL OIL PIPING
TRENCH. SEE
DETAIL 1E
A102
A601
A601
A601
2'x2'x2' CONC.
SUMP. COORD.
SIZE AND
LOCATION WITH
MECH. & ELECT.
2D
A102
ARCHITECTURAL
PRECAST BAND
PREFINISHED METAL
PARAPET CAP
BEJ
FACE BRICK W/ HEADER
BRICK AT EVERY 6TH
COURSE
BEJ
SCUPPER AND
DOWNSPOUT
8" SOLDIER COURSE
INTAKE LOUVER
FACE BRICK W/
HEADER BRICK AT
EVERY 6TH COURSE
PREFINISHED METAL
PARAPET CAP
BEJ
ARCHITECTURAL
PRE-CAST BAND
2' -0
HM DOOR AND
FRAME
SOLDIER COURSE
L7
NON-ILLUMINATED EXTERIOR SIGN
VA STANDARD SIGN EN-06.06,
MESSAGE LAYOUT A
EXTERIOR
LIGHT FIXTURE
(2 THUS)
BRICK SOLDIER
COURSE
BEJ
A601
PREFINISHED METAL
PARAPET CAP
A601
BEJ
ARCHITECTURAL
PRE-CAST BAND
FACE BRICK W/ HEADER
BRICK AT EVERY 6TH
COURSE
8" SOLDIER COURSE
SPLASH BLOCK SPLASH BLOCK
DS
DS
A601
L14
EXHAUST LOUVER
ARCHITECTURAL
PRE-CAST BAND
PREFINISHED METAL
PARAPET CAP
L15
BEJ
FACE BRICK W/
HEADER BRICK AT
EVERY 6TH COURSE
2' -0
8" BRICK SOLDIER COURSE
16' - 0"
7'
4"
S
LO
P E
1/ 4"
P E
R F
T.
A601
A102
3B
A102
3D
A102 3C
SIM.
TRASH
ENCLOSURE
BEJ BEJ
2'-0" 2'-0"
14'-0" A102 4A
RECESSED
STRIKE FOR
CANE BOLT -
BOTH SIDES
BOLLARDS
A601
FACE BRICK
PREFINISHED METAL
PARAPET CAP
7'
4"
BEJBEJ
FACE BRICK
PREFINISHED METAL
PARAPET CAP
7' -0
HEAVY DUTY STEEL
HINGE - (3) PER SIDE
TUBE STEEL HINGE PIPE
CANE BOLT - (2) THUS
HEAVY DUTY SLIDE BOLT
GATE LATCH MOUNTED
3'-6" ABOVE GRADE
TRASH ENCLOSURE GATE
BY DIV. 32 31 22
PERSONAL FALL ARREST
SYSTEM CONNECTOR
(2 THUS)
SLOPE
5.75"
1/ 4"
FT
S
LO
P E
GENERATOR BELOW
SLOPE
OPENING FOR EXHAUST
STACK - VERIFY
OPENING SIZE AND
LOCATION
CONCRETE FILLED
TUBE STEEL
8"
BRICK RETURN
3"
TOWEL BAR
SD
ADJ. SHELVING
SHOWER
CURTAIN ROD
GRID
SLOPE
1/8" / FT TYP. AT ALL
FLOOR DRAINS
R 4"
FOLD DOWN
GRAB BARS
A601
1'-0"
/8
1/4" STEEL PLATE
CONTINUOUS L2X2X1/4 FRAME
WITH 1/4" X 1/2" EDGE BAR
AND ANCHORS @ 24" O.C.
CONCRETE TRENCH
#4 @ 18"
#4 LONGIT.
2'-0"
VERIFY
1'-0"
SPLIT GRATING -
COORDINATE W/ MECH.
CONTINUOUS L2X2X1/4 FRAME
WITH 1/4" X 1/2" EDGE BAR
AND ANCHORS @ 24" O.C.
CONCRETE SUMP
#4 @ 18"
#4 LONGIT.
2' -0
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Sara Malin License No. 40063
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
PARTIAL PLANS,
ELEVATIONS &
SCHEDULES
11/13/2018
S1430
A102
1/8" = 1'-0"A102
2A GENERATOR BUILDING FLOOR PLAN
1/8" = 1'-0"A102
1A NORTH ELEVATION - GENERATOR BUILDING
1/8" = 1'-0"A102
1B EAST ELEVATION - GENERATOR BUILDING
1/8" = 1'-0"A102
1C SOUTH ELEVATION - GENERATOR BUILDING
1/8" = 1'-0"A102
1D WEST ELEVATION - GENERATOR BUILDING
EQUIPMENT LIST -
(EXISTING & NEW
1/8" = 1'-0"A102
3A TRASH ENCLOSURE PLAN
1/8" = 1'-0"A102
3B NORTH ELEVATION - TRASH ENCLOSURE
1/8" = 1'-0"A102
3C EAST/WEST ELEVATION - TRASH ENCLOSURE
NORTH
1/8" = 1'-0"A102
3D SOUTH ELEVATION - TRASH ENCLOSURE
1/8" = 1'-0"A102
2B GENERATOR ROOF PLAN
1 1/2" = 1'-0"A102
4A JAMB AT TRASH ENCLOSURE
1/4" = 1'-0"A102
4B ADL BATH
1/8" = 1'-0"A102
2C GENERATOR BUILDING RCP
1 1/2" = 1'-0"A102
1E PIPING TRENCH DETAIL
1" = 1'-0"A102
2D SUMP DETAIL AT DAY TANK
1 9/30/16 RECORD SET
NEW WORK
32" 32" 36"36"
48"
24"
32"
30"
48"
48"
WORK
RECEPTION
T-1
MUSIC
NORTH
VESTIBULE
PASS
THROUGH
LINK TO
BUILDING 51
T-2
C E
IL
IN
G L
IF
T
A601
WC STOR.
SCHEDULING
ASSESSMENT/
CONSULTATION
WAITING
A601
ANGLED SOFFIT
A602
AD101
EXPOSED
EXPOSED
EXPOSED
EXPOSED
A402
EXPOSED
SOUTH
VESTIBULE
STAFF
OP GYM
T-4
FEMALE
TOILET ROOM
PT GYM
PT CHARTING
EQUIP
STORAGE
T-5
PATIENT
TOILET
T-3
T-6
MECHANICAL
PROS
STORAGE
CORRIDOR
WAITING
JAN
GROUP
MEETING
ROOM
SOCIAL
WORKER
CONSULTATION
MALE TOILET
MALE TOILET
ROOM
CORRIDOR
ELECTRICAL
FEMALE
TOILET
T-7
A402
EXPOSED
SOILED LINEN
IT
CLEAN
UTILITY
CLEAN LINEN
ELECTRICAL
LOW
VOLTAGE
RECYCLING
HALLWAY
EXPOSED
A602
METAL PANEL CEILING SYSTEM-
AT-2
10' - 0" AFF
10' - 0" AFF
10' - 0" AFF
8' - 6"
CUBICAL CURTAIN TRACK-
TYP. ALL TREATMENT
ROOMS
9' - 6"
9' - 2"
8' - 0"
9' - 6"
8' - 0"
8' - 0"
8' - 0" 8' - 0"
8' - 0"
2'-10"
E Q
E Q
E Q
E Q
E Q
EQ TYP.EQ TYP.
EQ EQ EQ
ALIGN
TYP.
2'-4"
2' -2
E Q
E Q
E Q
E Q
E Q
EQ EQ
2' -2
2'-2"
2' -8
ALIGN
ALIGN
FLOOR HATCH BELOW
STEEL HOIST HOOK
TEMPORARY
PARTITION.
PATCH CEILING
AS REQUIRED TO
MATCH EXISTING.
1'-0"
2'-0"2' -0
AIR CURTAIN -SEE MECH
AIR CURTAIN - SEE MECH
1'- 0" 7' - 2"
CUH-SEE MECHANICAL
CUH - SEE MECHANICAL
1F
A401
PROVIDE SOUND
ATTENUATION
ABOVE CEILING
2' -2
" 7' - 2"
107' - 7"
107' - 9"
109' - 0"
107' - 11"
13' - 5"
3D A603
CUBICAL
CURTAIN TRACK
METAL PANEL
CEILING SYSTEM- AT-2
MECH LOUVER
MECH LOUVER
2' -8
2'
-8
8' - 4"
CUH-SEE MECHANICAL
CEILING MOUNTED
TRACK AND HARNESS
SYSTEM BY 11 73 01 -
ALTERNATE #2
7'-0"
A603
2' -0
FIELD VERIFY
CLEARANCE
REQUIRED WITH
MECHANICAL
1'-2"
8' - 0"
7' - 3"
7' - 6"
SHELL SPACE
4,550 SF
CANOPY NOT CONSTRUCTED
AREA OF
WORK
FINISHED GYP. BD.
ON SUSPENDED
METAL FRAMING
2 x 2 OR 2 x 4 ACT
ON SUSPENDED
METAL FRAMING
UN-FINISHED GYP. BD.
ATTACHED TO
UNDERSIDE OF
STRUCTURE, 1-HR
ROOF ASSEMBLY
FINISHED GYP. BD.
ATTACHED TO
UNDERSIDE OF
STRUCTURE, 1-HR
ROOF ASSEMBLY
VINYL FACED GYP. BD
LAY-IN
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Sara Malin License No. 40063
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
REFLECTED CEILING
PLAN - FIRST FLOOR
11/13/2018
S1430
A201
1/8" = 1'-0"A201
1 FIRST FLOOR REFLECTED CEILING PLAN
CEILING HATCH PATTENS
REFLECTED CEILING GENERAL NOTES:
1. CUBICLE TRACK BY GC, CURTAIN BY OWNER
2. CEILING HEIGHTS TO BE 9'-0" AFF U.N.O.
3. DEDUCT ALTERNATE 2 IS THE ELIMINATION OF
THE CEILING LIFTS AND THE OVERGROUND GAIT
AND BALANCE TRAINING SYSTEM.
NORTH
1 10/7/15 PR-37 Gait Track Mod
2 9/30/16 RECORD SET
SWING-DOWN
GRAB BARS
CONTINUE WAINSCOT
ON ALL WALLS
SEE GENERAL
NOTES FOR WSCT
INFORMATION
RANGE-FOIO
VERIFY REQ'D
CLEARANCE WITH
OWNER
RANGE HOOD (FOIO?).
1A
A401
1E
A401
2'-1"
VERIFY
PROVIDE
MATCHING
CLOSURE
PANEL
CORNER CABINET
W/ OPEN SHELVES
1B
A401
3' -0
1'
-5
/4
2' -6
1'-6" 2'-2" 1'-6"
SS-1B CTP
LP-1 LOWER
CABS
LP-1 UPPER CABS
OPEN
UC LIGHTS
SD - FOIO
PTD - FOIO
CORNER CABINET
W/ OPEN LP-1 SHELVES
1B
A401
1A
A401
FRIDGE FOIO
DISHWASHER FOIO
SS-1B CTP
LP-1 BASE CABS
LP-1 CABS
PROVIDE LP-1 END
PANEL FOR
DISHWASHER OPENING
PROVIDE LP-1 APRON TO
CONCEAL SINK FACE
VERIFY WITH OWNER
1'-6"
MICROWAVE - FOIO
VERIFY W/ OWNER
2' - 6"
2' -6
1'
-5
/4
3' -0
2'-6" 3'-0" 1'-6" 2'-6"
RB-1 BASE - ALL SIDES
1A
A401
SIM.
ADJUSTABLE
SHELVES
A401 4E
LP-1 CABS
4" RB-1 VINYL BASE
3'-0" 3'-0"
7' -0
FILLER STRIP
2' -6
2'
-0
2' -6
COPIER-
FOIO
1A
A401
1B
A401
LP-1 CABS
LP-2 CTP
LP-1 BASE CABS
4" RB-1
VINYL BASE
3'-0"
TALL LP-1 CABINETS
W/ ADJ. SHELVES -
LOCKABLE
HR-1
WB-1
4" RB-1 VINYL BASE
4E
A401
7' -1
/4
3/
4"
3'-0" 3'-0"
PTD - FOIO
SD - FOIO
(7) ADJUSTABLE
VERTICAL DIVIDERS
30" DEEP TALL LP-1
CABINET W/ ADJUSTABLE
SHELVES
(2 '-6
" M
IN
2' -7
/4
LOCKABLE
30" DEEP LP-1
BASE CABS
LP-1 CABS
30" DEEP
LP-2 CTP
4E
A401
2'-6"2'-6"2'-6"2'-6"
3' -0
1'
-6
1B
A401
1A
A401
VIEW
OBLIQUE
MODULAR RECEPTION DESK
BY SECTION 12 31 00
VIEW
OBLIQUE
UC
REF.
BY
FFE
UC LIGHTS
SD - FOIO
PTD - FOIO
TALL LP-1 CABINETS W/
ADJ. SHELVES - LOCKABLE
CLEAR
2'-4" LOCKABLE
LP-1 CABS
LP-2 CTP
LP-1 BASE CABS
4" RB-1 VINYL
BASE,
CONTINUE IN
RECESS
4E
A401
7' -0
1'-3"3'-0"2'-4"3'-3"3'-3"
3' -0
1'
-6
2' -6
FILLER STRIP
SD - FOIO
PTD - FOIO
HAND SANITIZER - FOIO
HAMPER - FOIO
CT-3 WAINSCOT
5'-0"4" RB-1 VINYL BASE
4C
COAT HOOK
SYSTEMS FURNITURE BY DIV. 12
V E
R
IF
Y D
IM
E
N S
IO
N
S W
IT
H
S Y
S
TE
M S
F U
R N
IT
U
R E
4'-0"
4" RB-1 BASE
6' -0
A603
UC LIGHTS -
SEE ELEC.
MODULAR RECEPTION
DESK BY SECTION 12 31 00
14" DEEP LP-1
ADJUSTABLE
SHELVES
COPIER-FOIO
3E
A401
1B
A401
LP-2 CTP
LP-1
BASE
CABS
4" RB-1 VINYL
BASE
2'-6"3' -0
14" DEEP LP-1
SHELVES
COPIER-FOIO
4" RB-1
VINYL
BASE
ONE-WAY GLAZING
4' -0
2'
-2
MODULAR DICTATION STATION BY
SECTION 12 31 00
4" RB-1 VINYL BASE
F2 F2
FAAP - SEE ELECT.4" RB-1 VINYL BASE
SF2 SF1
SS-1A SILL
1A
A401
1B
A401
1C
A401
PROVIDE
MATCHING
FILLER PANELS
LP-1 CABS
LP-2 CTP,
BACKSPLASH, &
SIDESPLASH
LP-1 BASE CABS
2' -6
1'
-5
/4
3' -0
1' -6
2'-0"2'-6"FSOFFIT
1A
A401
SIM.
UC LIGHT
MICROWAVE SHELF
1A
A401
1D
A401
1B
A401
1C
A401
LP-2 CTP
FRIDGE FOIO
LP-1 BASE CABS
VERIFY WITH OWNER
2'-10"
1A
A401
SIM.
2'-8" 2'-8" 2'-8"
3' -0
2'
-0
2' -6
1' -6
LP-1 CABS
1A
A401
1B
A401
1C
A401
ELECTRIC
WATER
COOLER
4'-0"
3' -0
1'
-6
2' -6
LP-1 UPPER
CABS
LP-2 CTP,
BACKSPLASH, &
SIDESPLASH
LP-1 LOWER
CABS
ONE-WAY GLAZING
A .F
.F
4' -0
2'
-2
F2 F2
4" RB-1 BASE
ADJUSTABLE
SHELVES
4E
A401
LP-1 CABS
3'-0" 3'-0"
7' -0
FILLER STRIP
SD -
FOIO
PTD -
FOIO
A401 4F
CONTINUE
WAINSCOT
ON ALL
WALLS
(1) 4 1/4" X 4 1/4" CT-3
BULLNOSE TRIM
(1) 2 1/8" X 8 1/2"
CT-4 ACCENT BAND
(10) 4 1/4" X 4 1/4"
CT-3 FIELD TILE
(1) 4 1/4" X 8 1/2"
CT-3 COVE BASE
6' -6
3' -0
2'-0"
UC LIGHTS
BLANKET WARMER
ON CART - FOIO
EMG UNIT ON CART - FOIO
1A
A401
SOFFIT
LP-1 CABS
LP-2 CTP
LP-1 DRAWER
EQ EQ EQ EQ EQ
2' -6
3/
4"
4" RB-1 BASE
SD - FOIO
PTD - FOIO
1'-6"
A401 1A
1B
A401
SOFFIT
LP-2 CTP
LP-1 BASE
CABS
LP-1 CABS
REFER TO ELEVATION
1G/A301 FOR WAINSCOT
INFORMATION
3/ 4"
2' -6
1'
-7
/4
3' -0
2'-0"
TALL LP-1 CABINETS W/
ADJ. SHELVES -
LOCKABLE
LP-1 CABS
4" RB-1 VINYL BASE
4E
A401
3'-0" 3'-0"
7' -2
FILLER STRIP
14" DEEP LP-1
SHELVES ON
STANDARDS
LP-2 CTP
LP-1 BASE CAB4" RB-1 VINYL BASE
EQ EQ EQ EQ
3' -0
1B
A401
6' -6
CONTINUE
WAINSCOT ON
ALL WALLS
SEE GENERAL
NOTES FOR WSCT
INFORMATION
LP-1 BASE CABS &
APRON AT SINK
A401 4B
UC LIGHTS
1A
A401
4'-0"
ADJUSTABLE LP-1
SHELVES AT UPPER
LP-1 CABINETS
ADJUSTABLE COUNTER-TOPS BY
12 31 00, MODULAR CASEWORK
2' -6
7' -2
3'-0" 3'-0" 3'-0" 3'-0"
2' -6
4" RB-1 VINYL BASE
LP-1 MAILBOX
SLOTS
9 1/2" CLEAR TYP.
5" C
LE
A
R T
Y P
. LP-2 CTP
LP-1 BASE
CABS
4" RB-1
VINYL BASE
3E
A401
3'-0"
SD - FOIO
PTD ON
ADJACENT WALL-
FOIO
HAND SANITIZER - FOIO
CT-3 WAINSCOT; CONTINUE
WSCT ON ALL 3 WALLS
SEE ELEVATION
FOR WAINSCOT
INFORMATION
A301 1G
Sim
1'-6"
SD - FOIO
PTD - FOIO
HAND
SANITIZER -
FOIO
(1) 4 1/4" X 8 1/2"
CT-3 COVE BASE
AWP-1; REFER TO FINISH
PLAN FOR PANEL LENGTH
3' -0
(8) 4 1/4" X 4 1/4"
CT-3 FIELD TILES
(1) 4 1/4" X 4 1/4"
BULLNOSE TRIM
SAME TILE WSCT
TYPICAL AT ALL
TREATMENT ROOM
SINK LOCATIONS
4" CARPET BASE 3'-8"
24"X36"
MIRROR - TYP
4' -0
LP-1 CABS
ADJUSTABLE
TILTED MIRROR;
FILLER PER SPECS
SD - FOIO
OPEN
PTD - FOIO
1' -6
4"
3' -0
2'
-0
SS-1A CTP WITH
INTEGRAL SINK
LP APRON,
RETURNED TO
WALL
CONTINUE
WAINSCOT ON
ALL WALLS
SEE GENERAL
NOTES FOR WSCT
INFORMATION
1'-1 3/4"
2' -1
0"
4'-2"
2'-0" 1'-0"
1' -6
4"
1' -0
2'
-0
CONTINUE
WAINSCOT
ON ALL
WALLS
(1) 4 1/4" X 4 1/4" CT-3
BULLNOSE TRIM
(1) 2 1/8" X 8 1/2"
CT-4 ACCENT BAND
(10) 4 1/4" X 4 1/4"
CT-3 FIELD TILE
(1) 4 1/4" X 8 1/2"
CT-3 COVE BASE
BCS
A401 4F
SD -
FOIO
PTD -
FOIO
CONTINUE
WAINSCOT
ON ALL
WALLS
A401 4F
CT-3 FIELD TILE; ALL
OTHER TILES AT TOP
ROW ARE CT-3
BULLNOSE TRIM
TILE DETAIL TYP. AT
ALL VERTICAL GRAB
BAR LOCATIONS
ALL TILES AT VERTICAL
GRAB BAR ARE CT-3
BULLNOSE TRIM
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Sara Malin License No. 40063
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
INTERIOR
ELEVATIONS
11/13/2018
S1430
A301
1/4" = 1'-0"A301
4C ADL BATH
1/4" = 1'-0"A301
4A ADL KITCHEN 1
1/4" = 1'-0"A301
4B ADL KITCHEN 2
1/4" = 1'-0"A301
1F MUSIC
1/4" = 1'-0"A301
5E OT CHARTING
1/4" = 1'-0"A301
4H OT CLINIC
1/4" = 1'-0"A301
5B OT CLINIC - SPLINT COUNTER
1/4" = 1'-0"A301
3A RECEPTION
1/4" = 1'-0"A301
4G SPEECH LAB
1/4" = 1'-0"A301
2B TYPICAL TREATMENT ROOM
1/4" = 1'-0"A301
2C TREATMENT RMS & SPEECH THERAPY - TYP.
1/4" = 1'-0"A301
3B RECEPTION 2
1/4" = 1'-0"A301
2D WORK 1
1/4" = 1'-0"A301
2E WORK 2
1/4" = 1'-0"A301
5F OT CHARTING 2
1/4" = 1'-0"A301
5D SOUTH VESTIBULE
1/4" = 1'-0"A301
1A GROUP MEETING ROOM 1/4" = 1'-0"A301
1B STAFF
1/4" = 1'-0"A301
1C OP GYM
1/4" = 1'-0"A301
1D PT GYM
1/4" = 1'-0"A301
1E PT GYM 2
1/4" = 1'-0"A301
2A TYPICAL TOILET
1/4" = 1'-0"A301
3C PROCEDURE ROOM EMG
1/4" = 1'-0"A301
3D PROCEDURE ROOM EMG 2
1/4" = 1'-0"A301
3E LOW VISION CLINIC
1/4" = 1'-0"A301
5C PT CHARTING
1/4" = 1'-0"A301
4D ADL BATH 2
1/4" = 1'-0"A301
3F LOW VISION CLINIC 2
1/4" = 1'-0"A301
2F WORK 3
1/4" = 1'-0"A301
5A OT CLINIC 2
1/4" = 1'-0"A301
1G MUSIC 2
GENERAL NOTES
1. REFER TO ELEVATION 1G/A301 FOR TREATMENT ROOM,
PROCEDURE ROOM, SPEECH THERAPY, & LPN TILE
WAINSCOT DETAILS
2. REFER TO ELEVATION 2A/A301 FOR TYPICAL TOILET
ROOM & ADL BATH TILE WAINSCOT DETAILS. TILE
WAINSCOT TO CONTINUE ALL WALLS, U.N.O.
3. PROVIDE LOCKS ON ALL SINK BASE CABINETS
4. REFER TO ELEVATION 2G/A301 FOR TYPICAL TILE DETAIL
AT VERTICAL GRAB BARS
1/4" = 1'-0"A301
4E ADL BATH 3
1/4" = 1'-0"A301
4F ADL BATH 4
SEE SHEET A403 FOR
MODULAR CASEWORK
DETAILS
SEE SHEET A403 FOR
MODULAR CASEWORK
DETAILS
SEE SHEET A403 FOR
MODULAR CASEWORK
DETAILS
1/4" = 1'-0"A301
2H FEMALE TOILET 170 (EAST)
1/4" = 1'-0"A301
2G FEMALE TOILET 170 (NORTH)
NOTE: SEE PLAN FOR
T-3 CUSTOM COUNTER
SHAPE & DIMENSIONS
1 9/25/14 ASI 5 TILE REVISIONS
2 9/30/16 RECORD SET
ROOM NOT CONSTRUCTED ROOM NOT CONSTRUCTED
ROOM NOT CONSTRUCTED
ROOM NOT CONSTRUCTED
ROOM NOT CONSTRUCTED
RECESSED CABINET
VERIFY WALL CONFIGURATION &
LOCATION W/ PLANS
MOUNT BOTTOM OF F.E.
CABINET @ 3'-0" A.F.F.
VERIFY RECESS REQ'MTS
W/ CABINET SUPPLIER
6" METAL STUDS
2"
2"
5/8" GYP BD ON STUD WALL
SURFACE MOUNTED
CORNER GUARD BY DIV 10
REFER TO PLAN
FOR WALL TYPES
FINISH PAINTING WALLS
PRIOR TO CORNER
GUARD INSTALLATION
5/8" GYP BD ON STUD WALL
FINISH PAINTING WALLS
PRIOR TO CORNER
GUARD INSTALLATION
SURFACE MOUNTED
CORNER GUARD BY DIV 10
2' -1
0" 3' -4
2' -5
TO
P
O F
C O
N
TR
O
LS
MIRROR BY DIV. 10
CENTER ON LAV.
M
IN
SOAP DISP
FOIO
PAPER TOWEL DISP
FOIO
SAN NAP DISP BY DIV 10
(SND)
FOIO
WALL HUNG VAN OR
CAB & SINK
NOTE:
PROVIDE BLOCKING AS REQ'D
(BY DIV. 10) FOR ALL WALL
MTD. ITEMS
1'-3"
REAR GRAB BAR IS 36"
UNLESS OTHERWISE
NOTED ON ELEVATIONS
MINIMUM OF 24"
NOTE:
PLUMBER TO INSTALL
W.C. BASE, SWING UP
GRAB BAR TO BE MTD.,
W.C. TANK TO BE
INSTALLED
2' -3
" T
O S
E A
T3' -0
6" 3'-0"
1'-0" 1'-0"
A
LL
W .C
.'S
TO
T
O P
SWING UP GRAB BAR
AT ADL BATHROOM
1'-0"3'-6"
3' -0
" T
O S
E A
T
8"
4"
TO
T
O P
TOILET PAPER HOLDER,
BY DIV 10 TPH
SAN NAP DISP,
BY DIV 10 SND
CLR MIN
4'-10 1/2"
3' -4
3'-4"
1' -6
3' -4
BCS (BABY
CHANGING STATION)
1" x 3" x 1/4" STL ANCHOR WELD
TO END OF HORIZ SECTION
1'-6" x 1'-4" x 1" SQUARE 11 GA STL TUBE w/ 6" x 6" x 3/16" STL GUSSET, WELD TO TUBE
3/16" x 2-1/2" TAPCON SCREWS
1"
3"
1/8" RAD
1' -4
CTP, REFER TO ELEVS & PLANS
PROVIDE BLOCKING AS REQUIRED
CLOSE ENDS & PAINT TO MATCH WALL
1'-0" @ CLOSETS
VARIES, REFER TO PLAN
FASTEN TO WALL W/ LP COVERED CLEATS &
SCREWS. PLASTIC CAPS TO MATCH LP
6"
1/
2"
5' -0
" A .F
.F
1" DIA. CHROME BAR W/ ESCUTCHEON
PLATES, REFER TO ELEVS
L.P. GUSSETS AT 36" O.C.
BLOCKING AS REQUIRED
COUNTERSINK & PLUG SCREWS,
LP ALL SURFACES
4"
R E
FE
R
T O
E
LE
V S
1/
4"
2'-0"
SCRIBE TO WALL
IF INDICATED ON ELEVS
SUPPORT
BRACKET,
SEE DETAIL
2D
A401
WD OR LP ALL EXPOSED
SURFACES,
REFER TO ELEVS
ADJ SHELF
GENERAL NOTES
12" OR 15", REFER TO CASEWORK
R E
FE
R
T O
E
LE
V S
UC LIGHT AS INDICATED
ON ELEVS, REFER TO ELEC
SHELF QUANTITY VARIES,
REFER TO CASEWORK
GENERAL NOTES
VALANCE AS INDICATED,
REFER TO ELEVS
3/ 4"
SEE ELEVATIONS/RCP FOR SOFFITS
SEE RCP
LP FACED FILLER BY DIV. 12
R E
FE
R
T O
E
LE
V S
4"
1/ 2"
SCRIBE TO WALL AS
INDICATED ON ELEVS
DRAWER
D O
O R
6"
21" ADJ.
SHELF
BASE, REFER TO RFS 3"
LP ALL
EXPOSED
SURFACES
NOTE: 30" DEEP AT
SPLINT COUNTER
R E
FE
R
T O
E
LE
V S
4"
1/ 2"
6"
SINK BY DIV 15
LP ALL EXPOSED
SURFACES
1/2"
D O
O R
3"
SCRIBE TO WALL AS
INDICATED ON ELEVS
BASE, REFER TO RFS
LP ALL
EXPOSED
SURFACES
1' -0
1'
-6
CUT OUT FOR
ELEC. OUTLET
MICROWAVE
BY OWNER
(VERIFY SIZE)
1'-3"
1'-8"
2' -6
R E
FE
R
T O
E
LE
V S
4"
3"
BASE, REFER TO RFS
REFER TO SPEC
FOR PULL STYLE
ADJUSTABLE SHELF
LP CABS BY SEC 12,
TYP
2'-0"
2' -6
4"
1/ 2"
DRAWER
DRAWER
DRAWER
E Q
E Q
E Q
LP ALL
EXPOSED
SURFACES
3"
SCRIBE TO WALL AS
INDICATED ON ELEVS
BASE, REFER TO RFS
2' -6
4"
/4
1/ 2"
FILE
DRAWER
DRAWER
PENCIL DRAWER4"
SCRIBE TO WALL,
IF INDICATED ON ELEVS
BASE, REFER TO RFS 3"
LP ALL
EXPOSED
SURFACES
3' -0
4"
BASE
21" ADJ.
SHELF
DRAWER
7' -2
1'-2"
3/4" LP VERTICAL
DIVIDERS SLOTTED
FOR REMOVEABLE
SHELVES
REMOVEABLE
1/4" PLEXIGLASS
DIVIDERS 3" O.C.
VERT
REMOVABLE 3/16" CLEAR
PLEXIGLASS SHELVES
R E
FE
R
T O
E
LE
V S
3/4" LP VERTICAL
DIVIDERS SLOTTED FOR
REMOVABLE SHELVES
1/
2"
1'-3"
LP ALL
EXPOSED
SURFACES
CONT SPACER
1/4" SCREWS
@ 16" O.C.
STEEL BLOCKING
WALL GUARD BY
DIV 10, SEE SPEC
HANDRAIL BY DIV 10,
SEE SPEC
CONT STEEL BLOCKING
REFER TO PLANS FOR
WALL TYPE
2' -1
0"
REFER TO RFS & PLAN
FOR LOCATIONS &
VARIATIONS
ANCHORAGE SHALL BE
LOCATED TO MISS STUDS
MFG'R. STD.
END CLOSURE
CORNER
GUARD
FINISHED WALL
RESILIENT CONTACT
SURFACE BUMPER
DOOR FRAME
RESILIENT CONTACT
SURFACE BUMPER
MFG'R. STD.
END CLOSURE7"
6"
7" MAX.MFG.R. REQ'D.7" MAX.6"
[1 m m
[1 m m
LE
N
G
TH
A S
R E
Q 'D
[152mm] [178mm] [178mm]
NEOPRENE CUSHION
AT EACH FASTENING
RESILIENT CONTACT
SURFACE BUMPER
ALUMINUM
ANCHOR
BRACKETS OR
CONT. RETAINER
TOGGLE BOLT
FINISHED WALL
BASE
FINISHED FLOOR
BACKING DETAIL
O5 50 00-02
1/2"
2 1/2" MAX.
8" [2 m m
C O
O R
D
IN
A
TE
W
IT
H U
S E
R S
8" M
A X
[2 m m
[13mm]
[64mm]
SEE RCP
SEE RCP
8" X 20 GA. METAL
STUDS @ 16" O.C.
SECURITY GRILL TRACK BY
DIVISI0N 8
8" X 20 GA. RUNNER
TOP AND BOTTOM.
ANCHOR TO P/C W/
POWER DRIVEN
FASTENERS @ EACH
SIDE OF EACH STUD.
ONE LAYER GYP BD
EACH SIDE OF STUD -
SHIM AS REQUIRED FOR
WIDTH.
SEE RCP
2"
CONTRACTOR SHALL
COORDINATE LOCATIONS OF
HORIZONTAL FASTENERS.
FASTEN AT BOTH
ENDS WITH MIN. 4
TAPPING SCREWS.
CUT
HORIZONTAL
FASTENER FROM
STUD
VERTICAL WALL
STUDS AT 16"
[406mm] OR 24" [610mm] O.C.
ISOMETRIC
WALL FINISH
PLAN
1.
GENERAL NOTES:
CERAMIC TILE, 1/4" HEIGHT
SOLID SURFACE THRESHOLD
SS-1A, 1/4" TO 1/8" SLOPE SET
FLUSH WITH CT, BY DIV 09
VCT, 1/8" HEIGHT
CARPET, 1/4" HEIGHT
VCT, 1/8" HEIGHT
CTA-47-H VINYL TRANSITION
STRIP, 2 1/2" WIDE
CARPET, 1/4" HEIGHT
RUBBER FLOORING, 3/8" HEIGHT
CTA-47-L VINYL TRANSITION
STRIP, 2 1/2" WIDE
SEAL SEAM BETWEEN MATERIALS
W/ CLEAR SILICONE CAULK
VCT, 1/8" HEIGHT
CTA-47-PL TRANSITION
STRIP, 4" WIDE
RUBBER FLOORING, 3/8" HEIGHT
CERAMIC TILE, 1/4" HEIGHT
SOLID SURFACE THRESHOLD, 1/4" TO
3/8" SLOPE SET FLUSH WITH CT,
BY DIV 09
RUBBER FLOORING, 3/8" HEIGHT
RUBBER FLOORING, 3/8" HEIGHT
VCT, 1/8" HEIGHT
SUBFLOOR LEVELER
LS-40, 12" WIDE
SEAL SEAM BETWEEN MATERIALS
W/ CLEAR SILICONE CAULK
ALL CASEWORK IS LAMINATE PLASTIC AS INDICATED ON
ELEVATIONS, UNLESS NOTED OTHERWISE.
ALL BASE CABINETS TO HAVE 1 ADJUSTABLE SHELF. ALL UPPER
CABINETS TO HAVE 2 ADJUSTABLE SHELVES, EXCEPT UPPER
CABINETS 24" OR LESS HIGH TO HAVE 1 ADJUSTABLE SHELF.
ALL UPPER CABINETS TO BE 15" DEEP UNLESS OTHERWISE NOTED
ON DRAWINGS. ALL BASE CABINETS TO BE 24" DEEP UNLESS
OTHERWISE NOTED ON DRAWINGS.
INSTALL FLOOR BASE TO ALL LAMINATE BASE CABINETS IN TOE
SPACE AS SCHEDULED IN ROOM FINISH SCHEDULE.
SEE SHEET A403 FOR MODULAR CASEWORK.
GENERAL NOTES AT CASEWORK:
REFER TO ELECTRICAL AND TELECOMMUNICATION
PLANS FOR POWER/DATA/VIDEO OUTLETS.
PROVIDE ADA COMPLIANT PROTECTIVE INSULATION
WRAP AT EXPOSED LAVATORY PLUMBING, TYPICAL.
VERIFY GROMMET LOCATIONS WITH OWNER.
PROVIDE BLOCKING IN WALLS AS REQUIRED.
ALL COUNTERTOPS TO HAVE 4" BACKSPLASH AND 4"
SIDESPLASH AT RETURN WALLS.
PROVIDE LOCKS ON ALL SINK BASE CABINETS.
2' -6
4"
1/ 2"
DRAWER
DRAWER
3/
4" 5"
5"
LP ALL
EXPOSED
SURFACES
3"
SCRIBE TO WALL AS
INDICATED ON ELEVS
BASE, REFER TO RFS
DRAWER
DRAWER
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Sara Malin License No. 40063
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
INTERIOR DETAILS 11/13/2018
S1430
A401
1 1/2" = 1'-0"A401
3A FIRE EXTINGUISHER CABINET - RECESSED
3" = 1'-0"A401
3C CORNER GUARD, SURFACE MOUNTED @ END OF WALL
3" = 1'-0"A401
3D CORNER GUARD, SURFACE MOUNTED @ CORNER OF WALL
1/2" = 1'-0"A401
4F TYP. TOILET ROOM FIXTURE DIMENSIONS
3/4" = 1'-0"A401
2D SUPPORT BRACKET
1 1/2" = 1'-0"A401
2E SHELF
3/4" = 1'-0"A401
2B 24"D COUNTER
3/4" = 1'-0"A401
1A TYP. WALL CABINET 3/4" = 1'-0"A401
1B 24"D BASE CAB - DOOR/DRAWER
3/4" = 1'-0"A401
1C 24"D SINK BASE
3/4" = 1'-0"A401
1D MICROWAVE CAB
1" = 1'-0"A401
4E 24"D STORAGE CABINET
3/4" = 1'-0"A401
1E 24" BASE CAB./3 DRAWERS
3/4" = 1'-0"A401
2A 24"D BASE CAB - FILE/DRAWER/PENCIL
3/4" = 1'-0"A401
4D 24"D 36"H BASE CAB./MAIL SLOTS
3/4" = 1'-0"A401
3E 15"D FORM SLOTS
1 1/2" = 1'-0"A401 3B TYP HANDRAIL w/ BUMPER 3F WALL GUARD
2F WALL GUARD SECTION - NTS
NTS
1 1/2" = 1'-0"A401
1F SECURITY GRILL SUPPORT
4A
ANCHORAGE- GRAB BARS AND
CABINATES
3" = 1'-0"A401
5A CERAMIC TILE TO VCT
3" = 1'-0"A401
5C CARPET TO VCT
3" = 1'-0"A401
5E CARPET TO RUBBER FLOORING
3" = 1'-0"A401
5D RUBBER FLOORING TO VCT
3" = 1'-0"A401
5B CERAMIC TILE TO RUBBER FLOORING
3" = 1'-0"A401
5F SUBFLOOR LEVELER SYSTEM
6A VESTIBULE FLOOR GRILL
NTS
NTS
3/4" = 1'-0"A401
4B INT DTL - CASEWORK - BASE CAB, 4 DRAWERS
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Sara Malin License No. 40063
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
INTERIOR DETAILS -
MODULAR
CASEWORK
11/13/2018
S1430
A403
1/2" = 1'-0"A403
1 TREATMENT RM MODULAR CASEWORK
3/8" = 1'-0"A403
2 RECEPTION DESK MODULAR CASEWORK
3/8" = 1'-0"A403
3 OT CHARTING RM MODULAR CASEWORK
3/8" = 1'-0"A403
4 PT CHARTING RM MODULAR CASEWORK
PROVIDE SEPARATE CONDUITS
FOR NORMAL & EMERGENCY
POWER
1 9/30/16 RECORD SET
ROOM NOT CONSTRUCTED
LEVEL 0
100' - 0"
ROOF SLAB
115' - 9"
CRAWL SPACE
93' - 0"
MECH BASEMENT
88' - 0"
PROVIDE DEFLECTION TRACK
AT TOP OF WALL - TYP. A601
OPP.
LEVEL 0
100' - 0"
ROOF SLAB
115' - 9"
CRAWL SPACE
93' - 0"
MECH BASEMENT
88' - 0"
1' -0
8"
6' -0
2'
-8
8 1/2
SHEET
WATERPROOFING
2" RIGID FOUNDATION
INSULATION
CONC. FOUNDATION -
SEE STRUCT.
CONC. SLAB ON GRADE -
SEE STRUCT.
3" ROCK MULCH ON
LANDSCAPE FABRIC
PLASTIC EDGING
2'-8"
FACE BRICK
CONTINUOUS CAVITY DRAINAGE
MATERIAL
3" CAVITY WALL INSULATION
(R-15 MIN.)
AIR/VAPOR BARRIER
6" CMU
5/8" GYP BD ON METAL FURRING
AT 16" O.C. TOPPING ON PRECAST
PLANK - SEE STRUCTURAL
BRICK SOLDIER
COURSE
4 1/2" PRECAST
ARCHITECTURAL
CONCRETE
LIGHT GUAGE
TRUSSES BY
05 40 00
PRECAST BEAM -
SEE STRUCTURAL
PRECAST PLANK -
SEE STRUCTURAL
ACT - SEE RCP
COLUMN BEYOND
COLUMN AND
FURRING BEYOND
ASPHALT SHINGLE SYSTEM
METAL DECKING - SEE
STRUCTURAL
5/8" PLYWOOD SHEATHING
AIR/VAPOR BARRIER
PREFINISHED
FACIA
GRID
PRECAST SILL
A701 2A
A701 3A
A701 3B
GUTTER
DRIP EDGE
A701 2B
1/2" EXPANSION
JOINT MATERIAL
VAPOR BARRIER OVER
6" GRANULAR FILL
6" SCREEDED
ON-SITE SOIL
VAPOR BARRIER OVER
6" GRANULAR FILL
AT MECHANICAL BASEMENT
SEE CIVIL FOR GRADING
BLOWN IN INSULATION
FACE BRICK
CONT. CAVITY
DRAINAGE MATERIAL
3" RIGID INSULATION
AIR/VAPOR BARRIER
8" CMU
CONC. SLAB -
SEE STRUCT.
6" COMPACTED
GRANULAR FILL
1/2" EXPANSION
JOINT MATERIAL
FOUNDATION - SEE
STRUCT.
FULLY ADHERED EPDM
MEMBRANE ROOF OVER
ROOR INSULATION
OVER PRECAST PLANK
CONT. CLEAT
PREFINISHED METAL
CAP FLASHING
TREATED WD
BLOCKING
SLOPE
PLANK BEARING
SEE STRUCT.
T.O. CMU
16'-4"
SHEET
WATERPROOFING
2" RIGID FOUNDATION
INSULATION
AIR/VAPOR BARRIER, LAP OVER
THRU-WALL FLASHING
CONT MTL DRIP
EDGE
THRU WALL FLASHING CUT
FLUSH w/ FACE OF WALL LAP
& SEAL ALL JOINTS DAM ALL
END CONDITIONS
CONT CAVITY DRAINAGE MATERIAL
FULL THICKNESS OF CAVITY
GROUT SOLID
WEEP HOLE WICK
T.O. FOOTING
SEE STRUCT.
VAPOR BARRIER
1' -0
4 3/4"
'-8
PRECAST
ARCHITECTURAL
CONCRETE
(SEE
FOR PROFILE DIMS)
B.O. BAND
2'-0"
1 3/8"
1"MAX OVERHANG -
1"
3A
A701
LEVEL 0
100' - 0"
ROOF SLAB
115' - 9"
CRAWL SPACE
93' - 0"
GRID
A701 2A
A701 3A
A701 3B
SHEET
WATERPROOFING
2" RIGID FOUNDATION
INSULATION
CONC. FOUNDATION -
SEE STRUCT.
FACE BRICK
CONTINUOUS CAVITY
DRAINAGE MATERIAL
3" CAVITY WALL
INSULATION (R-15 MIN.)
AIR/VAPOR BARRIER
6" CMU
5/8" GYP BD ON METAL
FURRING AT 16" O.C.
(SEE PLAN FOR TYPE)
TOPPING ON PRECAST
PLANK - SEE STRUCTURAL
PRECAST SILL
SEE FOR MAINTENANCE
STRIP TYP. NOTES
A601
BRICK SOLDIER
COURSE
ACT - SEE RCP
2'-10"2'-3 3/8"
A702 2D
A702 1D
5' -8
9'
-4
2' -8
PRECAST BEAM -
SEE STRUCTURAL
PRECAST PLANK -
SEE STRUCTURAL
6" SCREEDED
ON-SITE SOIL
VAPOR BARRIER OVER
6" GRANULAR FILL
T.O. FOOTING
SEE STRUCT.
SIM.
SEE CIVIL FOR GRADING
CONT. CLEAT
PREFINISHED METAL
CAP FLASHING
TREA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .