36C26318R0688-074.pdf
PDF 86 KB Posted
- Solicitation number
- 36C26318R0688
About this file
This document contains a scope of work and related federal contract opportunity notice. The scope of work outlines rehabilitation functions to be relocated at a Veterans facility, including speech therapy, adult daily living, and occupational therapy clinic spaces. The federal contract opportunity is a pre-solicitation notice for an indefinite delivery indefinite quantity multiple award task order contract for construction services within Minnesota Veterans facilities. Awards will be made to at least eight small businesses, with a maximum contract value of $70 million over five years. The solicitation targets Service Disabled Veteran Owned Small Businesses, and responses are due at a later unspecified date to be posted on the federal business opportunities website.
36C26318R0688 ATTACHMENT 9--SOW 656-16-277 Relocate Rehab Functions (1page).pdf
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Indefinite Delivery Indefinite Quantity (IDIQ) Contracts Solicitation 36C26318R0688
ATTACHMENT 9
Scope of Work
Project Number: 656-16-277
Project Title: Relocate Rehab Functions
Description of Work: Work shall include, but shall not be limited to providing all labor, materials, equipment, etc. necessary to relocate rehabilitation functions and restore specific features that were deducted as deduct alternates in construction of the Rehabilitation Center minor project (Building 116). The design includes fully designed spaces for functions such as Speech Therapy, Adult Daily Living, Psychologist, Low Vision and other rehabilitation and clinical functions, and the Occupational Therapy clinic and charting areas, which were constructed as only shell space in the minor project. These areas are to be completed per the original design, from the existing shell space conditions, as part of this project. The design also includes other items deducted, including an outside walking area, which will need to be adjusted and differ in layout from the original design. This NRM moves those functions into the space identified for them in the minor project (approximately 4,500SF) and creates swing space in Building 51 basement (approximately 4,500SF).
Durations of Work: 200 calendar days