This document includes a pre-solicitation notice and opportunity for a multiple award task order contract for construction services. The Department of Veterans Affairs Veterans Integrated Services Network 23 Minnesota Region is seeking proposals from service-disabled veteran-owned small businesses for indefinite-delivery, indefinite-quantity construction contracts with a maximum value of $70 million over five years. Task orders will range from $2,000 to $10 million for maintenance, repair, alteration, and new construction projects at VA health care facilities in Minneapolis, St. Cloud, and other Minnesota clinics. The solicitation will be released on the Federal Business Opportunities website with responses due as specified. Interested parties must register through the website and systems for federal contracting and certifications. This is a total small business set-aside for service-disabled veteran-owned small businesses only.
36C26318R0688 0001 ATTACHMENT 11k--Record Drawings 656-16-277 Relocate Rehab Functions (2 pages).pdf
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
34" 34" 34" 34"
DN
32"32" 32" 32"
36"36"
24"24" 48"
30" 24" 24"
30"
32" 32"
30"
FDFD
FD
FD
FD
48"
FD
DN
48"
A601
SCHEDULING
WORK
RECEPTION
T-1
MUSIC
NORTH
VESTIBULE
PASS
THROUGH
LINK TO
BUILDING 51
ASSESSMENT/
CONSULTATION
WAITING
WC STOR.
GROUP
MEETING
ROOM
STAFF
PROS
STORAGE
EQUIP
STORAGE
PATIENT
TOILET
PT CHARTING
CORRIDOR
T-7
T-6
PT GYM
OP GYM
ELECTRICAL
ELECTRICAL
MECHANICAL
WAITING
SOUTH
VESTIBULE
CORRIDOR
SOCIAL
WORKER
CONSULTATION
FEMALE
TOILET
MALE TOILET
171JAN
LOW
VOLTAGE
T-4
T-3
FEMALE
TOILET ROOM
MALE TOILET
ROOM
T-5
T-2
SOILED LINEN
CLEAN LINEN
RECYCLING
HALLWAY
P-4P-4
LINK TO
BUILDING 51
P-6
IT
CLEAN
UTILITY
P-5
CPT-1
P-4 P-5
AWP-1
P-4P-5
P-6
P-6
P-5
P-6
P-6
2' -0
1'
-0
1' -0
2' -0
2'-0"
1'-0" 1'-0"
2'-0"
ALIGN INSET EDGE WITH
CENTER OF DOORWAY
2'-0"
1'-0" 1'-0"
1' -0
2' -0
1'
-0
1' -0
2' -0
1'-0"
2'-0"
1'-0"1'-0"
2'-0"
2'-0" 1'-0"
1'-0" 2'-0"
2' -0
1'
-0
1' -0
2' -0
1'-0"
ALIGN INSET
WITH WALL
I101
RT-1B
RT-1B
RT
-1
B
RT
-1
B
P-4
P-4
P-5
P-5
I101
RT-1A
RT-1A
2' -3
2'-3"
2' -3
2'-3"
2' -3
ALIGN RT-1
BORDERS
STAIR
S1
STAIR
S2
2' -0
9'-0" 4'-0"
FGVCT-1A
VCT-1AFG
RT-1A
RT
-1
A
AWP-1
AWP-1
7'-0"
2'-0" 1'
-0
2' -0
1' -0
1'
-0
2' -0
ALIGN CPT WITH WALL
EDGES; CARPET
DIMENSIONS SIM TO
WAITING 102
1' -0
ALIGN CPT WITH
WALL EDGES
2'-3"
FG
VC
T- 1A
CPT-1VCT-1A
VC
T-
1A
FG
A403
A403
A403
5A
A401
5A
A401
5A
A401
5A
A401
5A
A401
5B
A401
5C
A401
5C
A401
5C
A401
5C
A401
5C
A401
5C
A401
5C
A401
5C
A401
5C
A401
5D
A401
5D
A401
5F
A401
5E
A401
6A
A401
6A
A401
5C
A401
5C
A401
5D
A401
5D
A401
5E
A401
3D A603
PATCH PAINT
WALLS, FLOORS,
AND CEILING AS
NECESSARY AFTER
REMOVAL OF
TEMPORARY
CONSTRUCTION
PARTITION.
MECHANICAL PAD
2'-0"
9'-0"
ALIGN INSET
WITH WALL
EDGE
A603
SHELL SPACE
4,550 SF
AREA OF
WORK
1'-0"1'-0"2'-0" 2'-0" 2'
-0
1' -0
"1 '-0
2'
-0
VCT-1D
VCT-1E
VC
T-
1E
VC
T-
1D
1' -3
/2
2"
4"
2"
1/
2"
2"
4"
2"
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Certified Interior Designer under the laws of the State of Minnesota.
Diedre Frances Jones Certification No. C00914
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
FINISH PLAN 11/13/2018
S1430
I101
1/8" = 1'-0"I101
1 AREA A FS
1/4" = 1'-0"I101
2 CORRIDOR INTERSECTION DETAIL
CENTER INNER INSET WITHIN
CORRIDOR INTERSECTION
NORTH
3/8" = 1'-0"I101
3 BATHROOM INSETS, TYP ALL PUBLIC TOILETS
1" WIDE CT-2A
ACCENT BANDS
FINISH LEGEND
ACCENT VCT
VCT-1C
VCT-1D
VCT-1E
CORNER GUARD
STAINLESS STEEL
CORNER GUARD
HANDRAIL WITH WALL
BUMPER BELOW
FLOOR SLOPE TO
BEGIN 8" FROM
WALL EDGE, TYP.
1 9/30/16 RECORD SET
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Certified Interior Designer under the laws of the State of Minnesota.
Diedre Frances Jones Certification No. C00914
COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.
C
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DATE:
DATE: DRAWING NO.
DRAWN
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE
REHABILITATION CENTER
PROJECT #656-332
St. Cloud VA Health Care System
ROOM FINISH
SCHEDULE
11/13/2018
S1430
I201
RFS
Room Number Room Name
Finish CommentsFloor Base Wall Ceiling
001 MECH ROOM C* RB-1 EXPOSED EXPOSED *SEALED
003 BASEMENT LINK - - - - - - P/SC* *AT BEAMS
004 PROVIDER OFFICE CPT RB GWB, P AT
101 SOUTH VESTIBULE FG RB-1 GWB, P-1 GWB/P
102 WAITING CPT-1 CPT-1 GWB, P-1, P-4* AT-1 *P-4 ACCENT WALLS (SEE FINISH PLAN FOR LOCATION) 103 WAITING CPT-1 CPT-1 GWB, P-1, P-4* AT-1 *P-4 ACCENT WALLS (SEE FINISH PLAN FOR LOCATION)
104 CORRIDOR VCT-1A, VCT-1D,
VCT-1E*
RB-1 GWB, WB-1, HR-1, P-1** AT-1 *VCT-1D & VCT-1E INSETS (SEE FINISH PLAN FOR DETAILS), **SEE FINISH PLAN
FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WB-1 DETAILS
105 RECEPTION CPT-1 CPT-1 GWB, P-1, P-6* AT-1 *P-6 ACCENT WALL; INCLUDE P-6 AT ALL SOFFIT SURFACES (SEE FINISH PLAN
FOR LOCATION)
106 CLEAN UTILITY VCT-1A RB-1 GWB, P-1 AT-1
107 WORK CPT-1 CPT-1 GWB, P-1 AT-1
108 SCHEDULING CPT-1 CPT-1 GWB, P-1 AT-1
109 WC STOR. VCT-1A RB-1 GWB, WB-1, P-1* AT-1 *WB-1 AT ALL WALLS
110 MECHANICAL C* RB-1 GWB, P-1 EXP/P *SEALED
111 IT VCT-1A RB-1 GWB, P-1 EXP/P
112 LOW VOLTAGE C* RB-1 GWB, P-1 EXP/P *SEALED
113 ELECTRICAL C* RB-1 GWB, P-1 EXP/P *SEALED
114 ELECTRICAL C* RB-1 GWB, P-1 EXP/P *SEALED
115 RECYCLING VCT-1A RB-1 GWB, P-1 AT-1
116 HALLWAY VCT-1A, VCT-1C,
VCT-1D*
RB-1 GWB, WB-1, HR-1, P-1, P-5,
P-6**
AT-1 *VCT-1C & VCT-1D INSETS (SEE FINISH PLAN FOR LOCATIONS), **SEE FINISH
PLAN FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WB-1 DETAILS; P-5 &
P-6 ACCENTS (SEE FINISH PLAN FOR LOCATION)
120 SOILED LINEN RT-1A RB-1 GWB, P-1/SC AT-1
121 OP GYM RT-1A, RT-1B* RB-1 GWB, PT-5 AT-1/GWB** *SEE FINISH PLAN FOR INSET & BORDER LOCATIONS & DETAILS, **PT-1 AT GWB
SOFFITS
122 PT GYM RT-1A, RT-1B, CPT-1* RB-1 GWB, PT-5 AT-1/GWB** *RF-1B & CPT-1 INSETS (SEE FINISH PLAN FOR LOCATION), **PT-1 AT GWB
SOFFITS
123 PROS STORAGE VCT-1A RB-1 GWB, P-1 AT-1
124 EQUIP STORAGE VCT-1A RB-1 GWB, WB-1, P-1* AT-1 *SEE ELEVATIONS FOR WALL BUMPER DETAILS 125 PATIENT TOILET CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A
ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE
126 PT CHARTING CPT-1 CPT-1 GWB, P-1 AT-1
127 CLEAN LINEN VCT-1A RB-1 GWB, WB-1, P-1* AT-1 *SEE ELEVATIONS FOR WALL BUMPER DETAILS
128 ASSESSMENT/ CONSULTATION CPT-1 CPT-1 GWB, P-1 AT-1
129 T-1 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
130 T-2 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
131 T-3 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
132 T-4 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
133 T-5 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
134 T-6 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
135 T-7 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
136 STAFF VCT-1B RB-1 GWB, P-3, P-5* AT-1 *P-5 ACCENT WALL (SEE FINISH PLAN FOR LOCATION)
137 NORTH VESTIBULE FG RB-1 GWB, P-1 GWB/P
138 MUSIC CPT-1 CPT-1, CT-3* GWB, CT-3, P-1, P-6,
AWP-1**
AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS); P-1 AT WEST WALL (INCLUDE ALL JOGS),
P-6 AT REMAINING WALLS WITH AWP-1 PANELS AS SHOWN ON FINISH PLAN AND
ELEVATIONS
139 GROUP MEETING ROOM CPT-1 CPT-1 GWB, P-3, P-6* AT-1 *P-6 ACCENT WALL (SEE FINISH PLAN FOR LOCATIONS) 140 FEMALE TOILET ROOM CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A
ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE
141 MALE TOILET ROOM CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A
ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE
142 CORRIDOR VCT-1A, VCT-1D,
VCT-1E*
RB-1 GWB, WB-1, HR-1, P-1, P-4,
P-5, P-6**
AT-1 *VCT-1D & VCT-1E INSETS (SEE FINISH PLAN FOR LOCATIONS), **SEE FINISH
PLAN FOR HR-1 LOCATIONS; SEE ELEVATIONS FOR WALL BUMPER DETAILS; P-4,
P-5 & P-6 ACCENTS (SEE FINISH PLAN FOR LOCATIONS)
144 CORRIDOR VCT-1A, VCT-1C,
VCT-1E*
RB-1, CT-3** GWB, CT-3, WB-1, HR-1, P-1,
P-4, P-6***
AT-1 *VCT-1C & VCT-1E INSETS (SEE FINISH PLAN FOR LOCATIONS), **CT-3 BASE AT
CT-3 WSCT (SEE ELEVATION), ***CT-3 WSCT AT SINK (SEE ELEVATION); SEE
FINISH PLAN FOR HR-1 LOCATIONS; SEE ELEVATIONS FOR WALL BUMPER
DETAILS; P-4 & P-6 ACCENTS (SEE FINISH PLAN FOR LOCATION)
145 SPEECH LAB CPT-1 CPT-1 GWB, P-3, P-6* AT-1 *P-6 ACCENT WALL (SEE FINISH PLAN FOR LOCATIONS) 146 SPEECH THERAPY VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATION FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
147 T-8 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
148 EQ STORAGE VCT-1A RB-1 GWB, WB-1, P-1* AT-1 *SEE ELEVATIONS FOR WALL BUMPER DETAILS
149 SOILED VCT-1E RB-1 GWB(SC), P-1/SC AT-1
150 CL LINEN VCT-1E RB-1 GWB, P-1 AT-1
151 ADL BATH CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE FINISH PLAN FOR DETAILS), **CT-3 WSCT WITH CT-4A
ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE
152 T-9 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
153 ADL KITCHEN VCT-1B RB-1 GWB, P-3 AT-1
154 ADL BED CPT-1* CPT-1* GWB, P-3, P-5** AT-1* *CONTINUE FINISHES INTO CLOSET, **P-5 ACCENT WALL, INCLUDE ALL JOGS
(SEE FINISH PLAN FOR LOCATION); CONTINUE P-5 IN CLOSET
155 OT CHARTING CPT-1 CPT-1 GWB, P-1 AT-1
156 OT CLINIC VCT-1A, VCT-1E* RB-1 GWB, P-1, P-4** AT-1/GWB*** *VCT-1E BORDER (SEE FINISH PLAN FOR DETAILS), **P-4 ACCENTS (SEE FINISH
PLAN FOR LOCATIONS), ***PT-1 AT GWB SOFFITS
160 HALLWAY VCT-1A, VCT-1C,
VCT-1E*
RB-1 GWB, WB-1, HR-1, P-1, P-4,
P-6**
AT-1 *VCT-1C & VCT-1E INSETS (SEE FINISH PLAN FOR LOCATIONS), **SEE FINISH
PLAN FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WALL BUMPER
DETAILS; P-4 & P-6 ACCENTS (SEE FINISH PLAN FOR LOCATIONS)
161 PSYCHOLOGIST CONSULTATION CPT-1 CPT-1 GWB, P-1 AT-1
162 PROVIDER OFFICE CPT-1 CPT-1 GWB, P-1 AT-1
163 LPN CPT-1 CPT-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS)
164 COORDINATOR CPT-1 CPT-1 GWB, P-1 AT-1
165 LOW VISION CLINIC VCT-1A RB-1 GWB, P-1 AT-1
166 PROCEDURE ROOM EMG VCT-1A RB-1, CT-3* GWB(SC), CT-3, P-1/SC** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND
SINK (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE & AT REMAINING WALLS
167 PATIENT TOILET CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A
ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE
168 SOCIAL WORKER CONSULTATION CPT-1 CPT-1 GWB, P-1 AT-1
169 JAN CT-1 CT-3 GWB(SC), CT-3, P-1/SC* AT-1 *10 TILE HIGH CT-3 WSCT (ALL WALLS), P-1/SC ABOVE 170 FEMALE TOILET CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A
ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE
171 MALE TOILET CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A
ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE
174 LINK TO BUILDING 51 VCT-1A RB-1 GWB, WB-1, HR-1, P-1, P-5* AT-1 *SEE FINISH PLAN FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WALL
BUMPER DETAILS; P-5 ACCENT WALL (SEE FINISH PLAN FOR LOCATION)
175 PASS THROUGH FG, VCT-1A* RB-1 GWB, P-1, P-4** AT-1 *P-4 ACCENT WALLS (SEE FINISH PLAN FOR LOCATIONS) 176 LINK TO BUILDING 51 VCT-1A RB-1 GWB, WB-1, HR-1, P-1, P-5* AT-1 *SEE FINISH PLAN FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WALL
BUMPER DETAILS; P-5 ACCENT WALL (SEE FINISH PLAN FOR LOCATION)
S1 STAIR C, VCT-1A* RB-1** GWB, P-1 EXP/P *SEALED CONCRETE, VCT-1A AT LANDINGS, **RB-1 AT LANDINGS
S2 STAIR C* - GWB, P-1 EXP/P *SEALED CONCRETE, INCLUDING LANDINGS
1 8/16/13 ADDENDUM 1
2 9/25/14 ASI 5 TILE REVISIONS
3 10/30/14 ASI 7 Kickplate Revision
4 9/30/16 RECORD SET
File details come from the government source that posted it. Updated .