This document includes a pre-solicitation notice and opportunity for a multiple award task order contract for construction services. The Department of Veterans Affairs Veterans Integrated Services Network 23 Minnesota Region is seeking proposals from service-disabled veteran-owned small businesses for indefinite-delivery, indefinite-quantity construction contracts with a maximum value of $70 million over five years. Task orders will range from $2,000 to $10 million for maintenance, repair, alteration, and new construction projects at VA health care facilities in Minneapolis, St. Cloud, and other Minnesota clinics. The solicitation will be released on the Federal Business Opportunities website with responses due as specified. Interested parties must register through the website and systems for federal contracting and certifications. This is a total small business set-aside for service-disabled veteran-owned small businesses only.

36C26318R0688 0001 ATTACHMENT 11k--Record Drawings 656-16-277 Relocate Rehab Functions (2 pages).pdf

View the file

Other files

File Type Posted
36C26319D0094-000.docx DOCX document
36C26319D0093-000.docx DOCX document
36C26319D0092-000.docx DOCX document
36C26319D0091-000.docx DOCX document
36C26319D0090-000.docx DOCX document
36C26319D0089-002.docx DOCX document
36C26319D0088-001.docx DOCX document
36C26318R0688-0003000.docx DOCX document
36C26318R0688-0002002.pdf PDF
36C26318R0688-0002000.docx DOCX document
36C26318R0688-0002003.pdf PDF
36C26318R0688-0002001.pdf PDF
36C26318R0688-0001000.docx DOCX document
36C26318R0688-0001005.pdf PDF
36C26318R0688-0001004.pdf PDF
36C26318R0688-0001001.pdf PDF
36C26318R0688-0001002.pdf PDF
36C26318R0688-0001006.pdf PDF
36C26318R0688-0001007.pdf PDF
36C26318R0688-072.docx DOCX document
36C26318R0688-090.pdf PDF
36C26318R0688-088.pdf PDF
36C26318R0688-071.docx DOCX document
36C26318R0688-078.pdf PDF
36C26318R0688-077.pdf PDF
36C26318R0688-076.pdf PDF
36C26318R0688-075.pdf PDF
36C26318R0688-064.docx DOCX document
36C26318R0688-066.docx DOCX document
36C26318R0688-069.docx DOCX document
36C26318R0688-086.pdf PDF
36C26318R0688-087.pdf PDF
36C26318R0688-082.pdf PDF
36C26318R0688-084.pdf PDF
36C26318R0688-068.docx DOCX document
36C26318R0688-067.docx DOCX document
36C26318R0688-081.pdf PDF
36C26318R0688-079.pdf PDF
36C26318R0688-070.docx DOCX document
36C26318R0688-083.pdf PDF
36C26318R0688-085.pdf PDF
36C26318R0688-073.xls XLS spreadsheet
36C26318R0688-074.pdf PDF
36C26318R0688-065.docx DOCX document
36C26318R0688-089.pdf PDF
36C26318R0688-080.pdf PDF
36C26318R0688.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

34" 34" 34" 34"

DN

32"32" 32" 32"

36"36"

24"24" 48"

30" 24" 24"

30"

32" 32"

30"

FDFD

FD

FD

FD

48"

FD

DN

48"

A601

SCHEDULING

WORK

RECEPTION

T-1

MUSIC

NORTH

VESTIBULE

PASS

THROUGH

LINK TO

BUILDING 51

ASSESSMENT/

CONSULTATION

WAITING

WC STOR.

GROUP

MEETING

ROOM

STAFF

PROS

STORAGE

EQUIP

STORAGE

PATIENT

TOILET

PT CHARTING

CORRIDOR

T-7

T-6

PT GYM

OP GYM

ELECTRICAL

ELECTRICAL

MECHANICAL

WAITING

SOUTH

VESTIBULE

CORRIDOR

SOCIAL

WORKER

CONSULTATION

FEMALE

TOILET

MALE TOILET

171JAN

LOW

VOLTAGE

T-4

T-3

FEMALE

TOILET ROOM

MALE TOILET

ROOM

T-5

T-2

SOILED LINEN

CLEAN LINEN

RECYCLING

HALLWAY

P-4P-4

LINK TO

BUILDING 51

P-6

IT

CLEAN

UTILITY

P-5

CPT-1

P-4 P-5

AWP-1

P-4P-5

P-6

P-6

P-5

P-6

P-6

2' -0

1'

-0

1' -0

2' -0

2'-0"

1'-0" 1'-0"

2'-0"

ALIGN INSET EDGE WITH

CENTER OF DOORWAY

2'-0"

1'-0" 1'-0"

1' -0

2' -0

1'

-0

1' -0

2' -0

1'-0"

2'-0"

1'-0"1'-0"

2'-0"

2'-0" 1'-0"

1'-0" 2'-0"

2' -0

1'

-0

1' -0

2' -0

1'-0"

ALIGN INSET

WITH WALL

I101

RT-1B

RT-1B

RT

-1

B

RT

-1

B

P-4

P-4

P-5

P-5

I101

RT-1A

RT-1A

2' -3

2'-3"

2' -3

2'-3"

2' -3

ALIGN RT-1

BORDERS

STAIR

S1

STAIR

S2

2' -0

9'-0" 4'-0"

FGVCT-1A

VCT-1AFG

RT-1A

RT

-1

A

AWP-1

AWP-1

7'-0"

2'-0" 1'

-0

2' -0

1' -0

1'

-0

2' -0

ALIGN CPT WITH WALL

EDGES; CARPET

DIMENSIONS SIM TO

WAITING 102

1' -0

ALIGN CPT WITH

WALL EDGES

2'-3"

FG

VC

T- 1A

CPT-1VCT-1A

VC

T-

1A

FG

A403

A403

A403

5A

A401

5A

A401

5A

A401

5A

A401

5A

A401

5B

A401

5C

A401

5C

A401

5C

A401

5C

A401

5C

A401

5C

A401

5C

A401

5C

A401

5C

A401

5D

A401

5D

A401

5F

A401

5E

A401

6A

A401

6A

A401

5C

A401

5C

A401

5D

A401

5D

A401

5E

A401

3D A603

PATCH PAINT

WALLS, FLOORS,

AND CEILING AS

NECESSARY AFTER

REMOVAL OF

TEMPORARY

CONSTRUCTION

PARTITION.

MECHANICAL PAD

2'-0"

9'-0"

ALIGN INSET

WITH WALL

EDGE

A603

SHELL SPACE

4,550 SF

AREA OF

WORK

1'-0"1'-0"2'-0" 2'-0" 2'

-0

1' -0

"1 '-0

2'

-0

VCT-1D

VCT-1E

VC

T-

1E

VC

T-

1D

1' -3

/2

2"

4"

2"

1/

2"

2"

4"

2"

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Certified Interior Designer under the laws of the State of Minnesota.

Diedre Frances Jones Certification No. C00914

COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.

C

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DATE:

DATE: DRAWING NO.

DRAWN

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE

REHABILITATION CENTER

PROJECT #656-332

St. Cloud VA Health Care System

FINISH PLAN 11/13/2018

S1430

I101

1/8" = 1'-0"I101

1 AREA A FS

1/4" = 1'-0"I101

2 CORRIDOR INTERSECTION DETAIL

CENTER INNER INSET WITHIN

CORRIDOR INTERSECTION

NORTH

3/8" = 1'-0"I101

3 BATHROOM INSETS, TYP ALL PUBLIC TOILETS

1" WIDE CT-2A

ACCENT BANDS

FINISH LEGEND

ACCENT VCT

VCT-1C

VCT-1D

VCT-1E

CORNER GUARD

STAINLESS STEEL

CORNER GUARD

HANDRAIL WITH WALL

BUMPER BELOW

FLOOR SLOPE TO

BEGIN 8" FROM

WALL EDGE, TYP.

1 9/30/16 RECORD SET

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Certified Interior Designer under the laws of the State of Minnesota.

Diedre Frances Jones Certification No. C00914

COPYRIGHT This drawing is the copyrighted work product of Architect and reuse, modification or reproduction of these documents without express written consent of Architect is prohibited. The architectural or related services performed or furnished by the Architect for this project are provided subject to the care and skill ordinarily exercised by members of the architectural profession practicing under similar circumstances at the same time and in the same locality. Architect makes no warranties, express or implied, in connection with its services.

C

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DATE:

DATE: DRAWING NO.

DRAWN

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE

REHABILITATION CENTER

PROJECT #656-332

St. Cloud VA Health Care System

ROOM FINISH

SCHEDULE

11/13/2018

S1430

I201

RFS

Room Number Room Name

Finish CommentsFloor Base Wall Ceiling

001 MECH ROOM C* RB-1 EXPOSED EXPOSED *SEALED

003 BASEMENT LINK - - - - - - P/SC* *AT BEAMS

004 PROVIDER OFFICE CPT RB GWB, P AT

101 SOUTH VESTIBULE FG RB-1 GWB, P-1 GWB/P

102 WAITING CPT-1 CPT-1 GWB, P-1, P-4* AT-1 *P-4 ACCENT WALLS (SEE FINISH PLAN FOR LOCATION) 103 WAITING CPT-1 CPT-1 GWB, P-1, P-4* AT-1 *P-4 ACCENT WALLS (SEE FINISH PLAN FOR LOCATION)

104 CORRIDOR VCT-1A, VCT-1D,

VCT-1E*

RB-1 GWB, WB-1, HR-1, P-1** AT-1 *VCT-1D & VCT-1E INSETS (SEE FINISH PLAN FOR DETAILS), **SEE FINISH PLAN

FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WB-1 DETAILS

105 RECEPTION CPT-1 CPT-1 GWB, P-1, P-6* AT-1 *P-6 ACCENT WALL; INCLUDE P-6 AT ALL SOFFIT SURFACES (SEE FINISH PLAN

FOR LOCATION)

106 CLEAN UTILITY VCT-1A RB-1 GWB, P-1 AT-1

107 WORK CPT-1 CPT-1 GWB, P-1 AT-1

108 SCHEDULING CPT-1 CPT-1 GWB, P-1 AT-1

109 WC STOR. VCT-1A RB-1 GWB, WB-1, P-1* AT-1 *WB-1 AT ALL WALLS

110 MECHANICAL C* RB-1 GWB, P-1 EXP/P *SEALED

111 IT VCT-1A RB-1 GWB, P-1 EXP/P

112 LOW VOLTAGE C* RB-1 GWB, P-1 EXP/P *SEALED

113 ELECTRICAL C* RB-1 GWB, P-1 EXP/P *SEALED

114 ELECTRICAL C* RB-1 GWB, P-1 EXP/P *SEALED

115 RECYCLING VCT-1A RB-1 GWB, P-1 AT-1

116 HALLWAY VCT-1A, VCT-1C,

VCT-1D*

RB-1 GWB, WB-1, HR-1, P-1, P-5,

P-6**

AT-1 *VCT-1C & VCT-1D INSETS (SEE FINISH PLAN FOR LOCATIONS), **SEE FINISH

PLAN FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WB-1 DETAILS; P-5 &

P-6 ACCENTS (SEE FINISH PLAN FOR LOCATION)

120 SOILED LINEN RT-1A RB-1 GWB, P-1/SC AT-1

121 OP GYM RT-1A, RT-1B* RB-1 GWB, PT-5 AT-1/GWB** *SEE FINISH PLAN FOR INSET & BORDER LOCATIONS & DETAILS, **PT-1 AT GWB

SOFFITS

122 PT GYM RT-1A, RT-1B, CPT-1* RB-1 GWB, PT-5 AT-1/GWB** *RF-1B & CPT-1 INSETS (SEE FINISH PLAN FOR LOCATION), **PT-1 AT GWB

SOFFITS

123 PROS STORAGE VCT-1A RB-1 GWB, P-1 AT-1

124 EQUIP STORAGE VCT-1A RB-1 GWB, WB-1, P-1* AT-1 *SEE ELEVATIONS FOR WALL BUMPER DETAILS 125 PATIENT TOILET CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A

ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE

126 PT CHARTING CPT-1 CPT-1 GWB, P-1 AT-1

127 CLEAN LINEN VCT-1A RB-1 GWB, WB-1, P-1* AT-1 *SEE ELEVATIONS FOR WALL BUMPER DETAILS

128 ASSESSMENT/ CONSULTATION CPT-1 CPT-1 GWB, P-1 AT-1

129 T-1 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

130 T-2 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

131 T-3 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

132 T-4 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

133 T-5 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

134 T-6 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

135 T-7 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

136 STAFF VCT-1B RB-1 GWB, P-3, P-5* AT-1 *P-5 ACCENT WALL (SEE FINISH PLAN FOR LOCATION)

137 NORTH VESTIBULE FG RB-1 GWB, P-1 GWB/P

138 MUSIC CPT-1 CPT-1, CT-3* GWB, CT-3, P-1, P-6,

AWP-1**

AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS); P-1 AT WEST WALL (INCLUDE ALL JOGS),

P-6 AT REMAINING WALLS WITH AWP-1 PANELS AS SHOWN ON FINISH PLAN AND

ELEVATIONS

139 GROUP MEETING ROOM CPT-1 CPT-1 GWB, P-3, P-6* AT-1 *P-6 ACCENT WALL (SEE FINISH PLAN FOR LOCATIONS) 140 FEMALE TOILET ROOM CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A

ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE

141 MALE TOILET ROOM CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A

ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE

142 CORRIDOR VCT-1A, VCT-1D,

VCT-1E*

RB-1 GWB, WB-1, HR-1, P-1, P-4,

P-5, P-6**

AT-1 *VCT-1D & VCT-1E INSETS (SEE FINISH PLAN FOR LOCATIONS), **SEE FINISH

PLAN FOR HR-1 LOCATIONS; SEE ELEVATIONS FOR WALL BUMPER DETAILS; P-4,

P-5 & P-6 ACCENTS (SEE FINISH PLAN FOR LOCATIONS)

144 CORRIDOR VCT-1A, VCT-1C,

VCT-1E*

RB-1, CT-3** GWB, CT-3, WB-1, HR-1, P-1,

P-4, P-6***

AT-1 *VCT-1C & VCT-1E INSETS (SEE FINISH PLAN FOR LOCATIONS), **CT-3 BASE AT

CT-3 WSCT (SEE ELEVATION), ***CT-3 WSCT AT SINK (SEE ELEVATION); SEE

FINISH PLAN FOR HR-1 LOCATIONS; SEE ELEVATIONS FOR WALL BUMPER

DETAILS; P-4 & P-6 ACCENTS (SEE FINISH PLAN FOR LOCATION)

145 SPEECH LAB CPT-1 CPT-1 GWB, P-3, P-6* AT-1 *P-6 ACCENT WALL (SEE FINISH PLAN FOR LOCATIONS) 146 SPEECH THERAPY VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATION FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

147 T-8 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

148 EQ STORAGE VCT-1A RB-1 GWB, WB-1, P-1* AT-1 *SEE ELEVATIONS FOR WALL BUMPER DETAILS

149 SOILED VCT-1E RB-1 GWB(SC), P-1/SC AT-1

150 CL LINEN VCT-1E RB-1 GWB, P-1 AT-1

151 ADL BATH CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE FINISH PLAN FOR DETAILS), **CT-3 WSCT WITH CT-4A

ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE

152 T-9 VCT-1A RB-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

153 ADL KITCHEN VCT-1B RB-1 GWB, P-3 AT-1

154 ADL BED CPT-1* CPT-1* GWB, P-3, P-5** AT-1* *CONTINUE FINISHES INTO CLOSET, **P-5 ACCENT WALL, INCLUDE ALL JOGS

(SEE FINISH PLAN FOR LOCATION); CONTINUE P-5 IN CLOSET

155 OT CHARTING CPT-1 CPT-1 GWB, P-1 AT-1

156 OT CLINIC VCT-1A, VCT-1E* RB-1 GWB, P-1, P-4** AT-1/GWB*** *VCT-1E BORDER (SEE FINISH PLAN FOR DETAILS), **P-4 ACCENTS (SEE FINISH

PLAN FOR LOCATIONS), ***PT-1 AT GWB SOFFITS

160 HALLWAY VCT-1A, VCT-1C,

VCT-1E*

RB-1 GWB, WB-1, HR-1, P-1, P-4,

P-6**

AT-1 *VCT-1C & VCT-1E INSETS (SEE FINISH PLAN FOR LOCATIONS), **SEE FINISH

PLAN FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WALL BUMPER

DETAILS; P-4 & P-6 ACCENTS (SEE FINISH PLAN FOR LOCATIONS)

161 PSYCHOLOGIST CONSULTATION CPT-1 CPT-1 GWB, P-1 AT-1

162 PROVIDER OFFICE CPT-1 CPT-1 GWB, P-1 AT-1

163 LPN CPT-1 CPT-1, CT-3* GWB, P-1, CT-3** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS)

164 COORDINATOR CPT-1 CPT-1 GWB, P-1 AT-1

165 LOW VISION CLINIC VCT-1A RB-1 GWB, P-1 AT-1

166 PROCEDURE ROOM EMG VCT-1A RB-1, CT-3* GWB(SC), CT-3, P-1/SC** AT-1 *CT-3 BASE AT CT-3 WSCT (SEE ELEVATIONS FOR DETAILS), **CT-3 WSCT BEHIND

SINK (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE & AT REMAINING WALLS

167 PATIENT TOILET CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A

ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE

168 SOCIAL WORKER CONSULTATION CPT-1 CPT-1 GWB, P-1 AT-1

169 JAN CT-1 CT-3 GWB(SC), CT-3, P-1/SC* AT-1 *10 TILE HIGH CT-3 WSCT (ALL WALLS), P-1/SC ABOVE 170 FEMALE TOILET CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A

ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE

171 MALE TOILET CT-1, CT-2A* CT-3 CT-3, CT-4A, P-1/SC** AT-1 *CT-2A ACCENTS (SEE DETAIL 3/I101 FOR DETAILS), **CT-3 WSCT WITH CT-4A

ACCENT TRIM (SEE ELEVATIONS FOR DETAILS), P-1/SC ABOVE

174 LINK TO BUILDING 51 VCT-1A RB-1 GWB, WB-1, HR-1, P-1, P-5* AT-1 *SEE FINISH PLAN FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WALL

BUMPER DETAILS; P-5 ACCENT WALL (SEE FINISH PLAN FOR LOCATION)

175 PASS THROUGH FG, VCT-1A* RB-1 GWB, P-1, P-4** AT-1 *P-4 ACCENT WALLS (SEE FINISH PLAN FOR LOCATIONS) 176 LINK TO BUILDING 51 VCT-1A RB-1 GWB, WB-1, HR-1, P-1, P-5* AT-1 *SEE FINISH PLAN FOR HR-1 & WB-1 LOCATIONS; SEE ELEVATIONS FOR WALL

BUMPER DETAILS; P-5 ACCENT WALL (SEE FINISH PLAN FOR LOCATION)

S1 STAIR C, VCT-1A* RB-1** GWB, P-1 EXP/P *SEALED CONCRETE, VCT-1A AT LANDINGS, **RB-1 AT LANDINGS

S2 STAIR C* - GWB, P-1 EXP/P *SEALED CONCRETE, INCLUDING LANDINGS

1 8/16/13 ADDENDUM 1

2 9/25/14 ASI 5 TILE REVISIONS

3 10/30/14 ASI 7 Kickplate Revision

4 9/30/16 RECORD SET

File details come from the government source that posted it. Updated .