This document provides notification of an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure. The solicitation will be issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 for renovation, new construction, equipment replacements, and utility modifications to address deficiencies at the New Mexico VA Campus Building 43 Central Utility Plant related to mechanical, plumbing, accessibility, electrical, life safety, structure, and cooling. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures and certain other items necessary for completion. The project will be procured as a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns listed as verified in the VetBiz Vendor Information Pages VIP database. The estimated value is between $10-20 million. The IFB solicitation will be issued on or around July 15, 2023 via SAM.gov. The point of contact is listed.

View the file

Other files

File Type Posted
C01 AWARD NOTIFICATION 36C26223B0010 .pdf PDF
C01 36C26223C0246 AWARD NOTIFICATION.pdf PDF
S06 36C26223B0010 0004.docx DOCX document
S06 36C26223B0010 0003.docx DOCX document
S06 36C26223B0010 0002.pdf PDF
ATTACHMENT 1 - SIGN-IN SHEET 36C26223B0010.pdf PDF
S06 36C26223B0010 0001.pdf PDF
ATTACHMENT A - 6 of11 501-17-105 Dwg-Arch3 07-20-22.pdf PDF
ATTACHMENT B - 501-17-105 Specifications 100 percent 07-20-22.pdf PDF
ATTACHMENT A - 4 of11 501-17-105 Dwg Arch1 07-20-22.pdf PDF
ATTACHMENT D - RFI FORM 501-17-105.docx DOCX document
ATTACHMENT A - 10 of11 501-17-105 Dwg Elec 1-2 07-20-22.pdf PDF
ATTACHMENT A - 5 of11 501-17-105 Dwg Arch2-07-20-22.pdf PDF
ATTACHMENT E - WAGE DETERMINATION - NM20230044 06-09-2023.pdf PDF
ATTACHMENT A - 3 of11 501-17-105 Dwg Struc 07-20-22.pdf PDF
ATTACHMENT A - 2 of11 501-17-105 Dwg Civil 07-20-22.pdf PDF
ATTACHMENT C - SCOPE OF WORK - 501-17-105.pdf PDF
ATTACHMENT A - 1of11 501-17-105 DwgGen 07-20-22.pdf PDF
ATTACHMENT A - 7 of11 501-17-105 Dwg Plumb 07-20-22.pdf PDF
ATTACHMENT A - 8 of11 501-17-105 Dwg Mech1 07-20-22.pdf PDF
ATTACHMENT A - 11 of11 501-17-105 Dwg Elec 2-2 07-20-22.pdf PDF
S02 36C26223B0010 .docx DOCX document
S03. Pre-Solicitaiton Notice 36C26223B0010.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

E

D

TYP.

MECH AREA-1

MA-100-1

1" CHR

1" CHS

6" HPS

8" HPS

12" CHR

12" CHS

4" CND

4" CND

8" HPS

6" HPS

1 1/2" V

2" CND

2" HPS

2" CND

3" CND

4" CND

3" CND

3" CND

FCU-100

TYP.

2 3

E

D

C

B

A

STORAGE

MA-121

ELECTRICAL ROOM

MA-107

VESTIBULE

MA-120

GENERATOR ROOM

MA-106

BOILER PLANT

MA-108

STAIRS

MA-209

SUPPLY ROOM

MA-105

CORRIDOR

ENGINEERING

CONTROL CENTER

/F3 MJ101C

F

M

J B

TYP.

EG-1 (E)

4" CHS

4" CHR

3" HPS

1 1/2" CND

1" FOR

1" FOR

3" FWPD

3" FWPD

4" FWPD

2" FWPD

3/4" CF

1/2" BWS

3/4" CF

1/2" BWS

3/4" CF

1/2" BWS

1/2" BWS

3/4" CF

2" CHR

2" CHS

1 1/2" LPR

1 1/2" LPS

4" CND

2" CND

1 1/4" LPR

1 1/4" LPR

3/4" LPR

8" HPS

4" HPS

8" HPS

8" HPS

8" HPS

2" CND

2" LPS

1" CHR

1" CHS

3/4" CND

3/4" CHS

3/4" CHR

3/4" LPS

3/4" LPR

3/4" LPR

3/4" LPR

10" CHR

10" CHS

4" CND

BFD-43-ML (E)

CST-43-ML (E)

43-DT-1 (E)

FCU-121

43-BOT-1

STB-433ML (E)

STB-432ML (E)

STB-431ML (E)

1 1/4" CHR

8" HPS

6" HPS

3/4" CHS

3/4" CHR

3/4" LPS

3/4" LPR

1 1/2" LPS

3/4" LPR

1 1/2" CHR

1 1/2" CHS

2" CHR

2" CHS

1 1/2" LPR

1 1/2" LPS

1" LPS

3/4" LPR

3" LPS

FCU-110

TYP.

TYP.

TYP.

TYP.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A

A

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:4

:5

A M

MJ101A

MECHANICAL INSULATION PLAN - LEVEL 1 &

BASEMENT LEVEL - AREA A

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS G. WEAVER

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0" F1

MECHANICAL INSULATION PLAN - BASEMENT LEVEL - AREA A

1/4" = 1'-0"

F4

MECHANICAL INSULATION PLAN - LEVEL 1 - AREA A

GENERAL SHEET NOTES

KEYNOTES

1 CONTRACTOR SHALL PROVIDE INSULATION ON NEW PIPING AND VALVES, NO ASBESTOS CONTAINING

MATERIAL ARE PERMISSIBLE.

2 CONTRACTOR SHALL REMOVE EXISTING DAMAGED INSULATION AND INSTALL NEW INSULATION ON

EXISTING PIPING AND VALVES, NO ASBESTOS CONTAINING MATERIAL ARE PERMISSIBLE.

INSULATION LEGEND

NEW INSULATION ON EXISTING PIPING.

CONTRACTOR SHALL REMOVE EXISTING INSULATION AS

REQUIRED TO INSTALL NEW INSULATION.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

NEW INSULATION ON NEW PIPING.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND

B43A.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

J. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

K. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

L. CONTRACTOR TO PROVIDE TEMPORARY UTILITIES TO MAINTAIN UNINTERRUPTED

SERVICE AT ALL TIMES.

M. SEE M-001 FOR ADDITIONAL GENERAL NOTES.

N. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 23 05 11, SUBMITTALS.

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

07/20/2022

4 5 6

E

D

C

B

A

TOILET, STAFF

BLDG 43A-2

43A-2

SHOWER/CHANGE

ENGINEERING

CONTROL CENTER

F

M

J A

TYP.

/F3 MJ101C

1" CF

10" CHS

10" CHS

10" TWS 10" CHS

10" CHS

10" CHR

10" TWS

10" TWR

T W

S

C H

S

T W

S

C H

S

T W

S

10" CHS

10" CHR

10" CHS

C H

R

T W

S

10" TWS

T W

S

C H

R

C H

S

10" TWS

10" TWS

10" TWS

10" TWR

10" TWS

10" CHR

10" CHS

8" HPS

1" CF

10" TWS

T W

S

10" TWR 10" TWS

10" CHS

10" CHR

10" CHR

C H

R 1" CF

1" CF

3" V

10" CHS

10" TWR

10" TWS

10" TWS

10" TWS

6" TWS

6" TWS

10" CHS

3" V

10" CHS

8" TWR

43-WCCH-2 (E)

43-P11 (E)

43-P10 (E)

43-P13 (E)

43-P9 (E)

HE-2 (E)

A

-P

E

A

-P

E

43-P6

43-P7 (E)

43-P12

HE-1 (E)

43-P14 (E)

43-WCCH-3

43-P8 (E)43-WCCH-1

43-SS-1 (E)

1" LPS

3/4" LPR

3" LPS

1" LPS

3/4" LPR

3" LPS

FCU-113

TYP.

TYP.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:4

:1

A M

MJ101B

MECHANICAL INSULATION PLAN - LEVEL 1 -

AREA B

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS G. WEAVER

100% CONSTRUCTION

DOCUMENTS

GENERAL SHEET NOTES

KEYNOTES

1/4" = 1'-0" F4

MECHANICAL INSULATION PLAN - LEVEL 1 - AREA B

1 CONTRACTOR SHALL PROVIDE INSULATION ON NEW PIPING AND VALVES, NO ASBESTOS CONTAINING

MATERIAL ARE PERMISSIBLE.

2 CONTRACTOR SHALL REMOVE EXISTING DAMAGED INSULATION AND INSTALL NEW INSULATION ON

EXISTING PIPING AND VALVES, NO ASBESTOS CONTAINING MATERIAL ARE PERMISSIBLE.

INSULATION LEGEND

NEW INSULATION ON EXISTING PIPING.

CONTRACTOR SHALL REMOVE EXISTING INSULATION AS

REQUIRED TO INSTALL NEW INSULATION.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

NEW INSULATION ON NEW PIPING.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND

B43A.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

J. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

K. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

L. CONTRACTOR TO PROVIDE TEMPORARY UTILITIES TO MAINTAIN UNINTERRUPTED

SERVICE AT ALL TIMES.

M. SEE M-001 FOR ADDITIONAL GENERAL NOTES.

N. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 23 05 11, SUBMITTALS.

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

E

CHEMICAL TESTING

ROOM

CORRIDOR

TOILET, STAFF

ENGINEERING

CONTROL CENTER

HOUSEKEEPING AIDS

CLOSET

CORRIDOR

MA-122

TOILET, STAFF

114 LOUNGE

/F4 MJ101B/F4 MJ101A

TYP.

1 1/4" CHR

1 1/4" CHS

1 1/4" LPR

1 1/4" LPS

3/4" CHR

3/4" CHS

3/4" LPR

3/4" LPS

1" CHR

1" CHS

1" LPR

1" LPS

3/4" LPS

3/4" LPR

3/4" CHS

3/4" CHR

3/4" CHS

3/4" CHR

3/4" CHR

3/4" CHS

3/4" LPR

3/4" LPS

3/4" CHR

3/4" LPS

3/4" LPR

3/4" CHS

8" HPS

6" HPS

3/4" CHS

3/4" CHR

3/4" LPS

3/4" LPR

1 1/2" LPS

3/4" LPR

1 1/2" CHR

1 1/2" CHS

1" LPS

3/4" LPR

3" LPS

2" CHR

2" CHS

1 1/2" LPR

1 1/2" LPS

1" LPS

3/4" LPR

3" LPS

FCU-111

FCU-110

FCU-117

FCU-116

FCU-113

F

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

C

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:4

:2

A M

MJ101C

MECHANICAL INSULATION PLAN - LEVEL 1 -

AREA C

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS G. WEAVER

100% CONSTRUCTION

DOCUMENTS

GENERAL SHEET NOTES

KEYNOTES

INSULATION LEGEND

NEW INSULATION ON EXISTING PIPING.

CONTRACTOR SHALL REMOVE EXISTING INSULATION AS

REQUIRED TO INSTALL NEW INSULATION.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

NEW INSULATION ON NEW PIPING.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

1/4" = 1'-0" F3

MECHANICAL INSULATION PLAN - LEVEL 1 - AREA C

1 CONTRACTOR SHALL PROVIDE INSULATION ON NEW PIPING AND VALVES, NO ASBESTOS CONTAINING

MATERIAL ARE PERMISSIBLE.

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND

B43A.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

J. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

K. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

L. CONTRACTOR TO PROVIDE TEMPORARY UTILITIES TO MAINTAIN UNINTERRUPTED

SERVICE AT ALL TIMES.

M. SEE M-001 FOR ADDITIONAL GENERAL NOTES.

N. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 23 05 11, SUBMITTALS.

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

1 2 3 4

D

C

B

A

BOILER ROOM -

MEZZANINE

MA-200

SUPPLY ROOM

MA-105

BOILER PLANT

MA-108

NEW ELECTRICAL

MA-211

NEW OFFICE

MA-204

OFFICE

MA-218

F

M

J B

TYP.

TYP.

TYP.

TYP.

TYP.

8" HPS

10" CHR

10" CHS

6" CHR

6" CHS

8" HPS

6" HPS

2" CHR

2" CHS

3/4" LPS

3/4" LPR 3/4" LPR

3/4" LPS

3/4" LPS

3/4" LPR

2" CHR

2" CHS

6" LPS

6" LPS

6" LPS

4" LPS 3" HPS

3" LPS

H P

S

8" HPS

4" HPS

H P

S

3/4" CHS

3/4" CHR

1 1/2" LPS

1 1/2" LPS 3/4" CND

3/4" CND

1" CND

1 1/2" LPS 1" CND

3/4" CND

3/4" CND

1 1/2" LPS

2" CND

3/4" CND

3" LPS

2" CND

1 1/2" LPS

3/4" CND

3" LPS

1 1/2" LPS

2" CND

1 1/2" HPS

4" HPS

4" HPS

3/4" LPS

3/4" CHR

3/4" CHS

3/4" LPS

3" CHS

3" CHR

1 1/2" LPS

3/4" LPR

1 1/2" CHR

1 1/2" CHS

3" LPS

BFD-43-ML (E)

CST-43-ML (E)

43-UH-6

43-UH-5

43-UH-4

43-UH-3

43-UH-7

FCU-218

43-DWBP-1

43-DOAS-1

FCU-218

10" CHS

2 1/2" CHS

2 1/2" CHR

10" CHR

8" HPS

3" CND

1" LPS

1 1/2" CND

3" LPS

3/4" CHR

3/4" CHS

TYP.

TYP.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:4

:4

A M

MJ102A

MECHANICAL INSULATION PLAN - LEVEL 2 -

AREA A

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS G. WEAVER

100% CONSTRUCTION

DOCUMENTS

GENERAL SHEET NOTES

KEYNOTES

1/4" = 1'-0" F3

MECHANICAL INSULATION PLAN - LEVEL 2 - AREA A

1 CONTRACTOR SHALL PROVIDE INSULATION ON NEW PIPING AND VALVES, NO ASBESTOS CONTAINING

MATERIAL ARE PERMISSIBLE.

2 CONTRACTOR SHALL REMOVE EXISTING DAMAGED INSULATION AND INSTALL NEW INSULATION ON

EXISTING PIPING AND VALVES, NO ASBESTOS CONTAINING MATERIAL ARE PERMISSIBLE.

INSULATION LEGEND

NEW INSULATION ON EXISTING PIPING.

CONTRACTOR SHALL REMOVE EXISTING INSULATION AS

REQUIRED TO INSTALL NEW INSULATION.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

NEW INSULATION ON NEW PIPING.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND

B43A.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

J. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

K. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

L. CONTRACTOR TO PROVIDE TEMPORARY UTILITIES TO MAINTAIN UNINTERRUPTED

SERVICE AT ALL TIMES.

M. SEE M-001 FOR ADDITIONAL GENERAL NOTES.

N. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 23 05 11, SUBMITTALS.

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

D

C

B

A

CORRIDOR

MA-202

OFFICE

MA-203

EXIST. TELECO

ROOM

MA-219

OFFICE

MA-205

CHILLER ROOM

MA-109

CORRIDOR

MA-202

OFFICE

MA-218

V-20

V-21

V-23

V-24

V-14

V-11

V-555

V-568

F

M

J A

TYP.

TYP.

43-UH-1

43-UH-2

BCU-109B

BCU-109A

43-STS-1

6" CHR

6" CHS

T W

S

10" CHS10" CHS

10" CHR

10" CHS

10" CHS

T W

R

C H

R

10" CHS

10" CHR

2" CHR

2" CHS

10" CHS

10" CHR

10" TWR

10" CHS

10" CHS

T W

R

T W

R

T W

S

C H

R

C H

S

6" CHS

6" CHR

10" CHR

10" TWR

C H

S

C H

S

C H

S

C H

S

10" CHR

2" CHS

2" CHR

2 1/2" CHS

2 1/2" CHR

10" CHR

12" TWR

10" CHS

C H

S

T W

S

10" TWS

3" V

10" CHR

10" TWS

H P

S

8" HPS

8" HPS

10" CHS

T W

S

T W

S

10" TWR

6" TWS

6" TWS

8" HPS

10" CHR

12" TWS 10" CHS

6" HPS

3" CND

10" TWS

10" TWR

3" CND

C H

S

1" LPS

1 1/2" CND

3" LPS

2 1/2" LPS

1 1/4" CND

2 1/2" LPS

1" LPS

3/4" CND

1 1/2" LPS

2" CHR

3" V

3/4" CHR

3/4" CHS

3" V

3/4" LPR

1" LPS

3" LPS

10" TWR

C H

R

C H

R

10" CHR

10" CHS

10" CHS

2" CHR

2" CHS

3" LPS

3/4" CND

3/4" CND

3/4" CND

1 1/2" LPS

3/4" CND

1" CND

2" LPS

1" CND

2" LPS

3/4" CND

1 1/2" LPS

3/4" CND

3/4" CND

3/4" CND

2" LPS

3/4" CND

1 1/2" LPS

1 1/2" CND

TYP.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:4

:5

A M

MJ102B

MECHANICAL INSULATION PLAN - LEVEL 2 -

AREA B

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS G. WEAVER

100% CONSTRUCTION

DOCUMENTS

GENERAL SHEET NOTES

KEYNOTES

1/4" = 1'-0" F4

MECHANICAL INSULATION PLAN - LEVEL 2 - AREA B

1 CONTRACTOR SHALL PROVIDE INSULATION ON NEW PIPING AND VALVES, NO ASBESTOS CONTAINING

MATERIAL ARE PERMISSIBLE.

2 CONTRACTOR SHALL REMOVE EXISTING DAMAGED INSULATION AND INSTALL NEW INSULATION ON

EXISTING PIPING AND VALVES, NO ASBESTOS CONTAINING MATERIAL ARE PERMISSIBLE.

INSULATION LEGEND

NEW INSULATION ON EXISTING PIPING.

CONTRACTOR SHALL REMOVE EXISTING INSULATION AS

REQUIRED TO INSTALL NEW INSULATION.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

NEW INSULATION ON NEW PIPING.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND

B43A.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

J. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

K. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

L. CONTRACTOR TO PROVIDE TEMPORARY UTILITIES TO MAINTAIN UNINTERRUPTED

SERVICE AT ALL TIMES.

M. SEE M-001 FOR ADDITIONAL GENERAL NOTES.

N. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 23 05 11, SUBMITTALS.

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

D

C

B

A

V-5

V-511

V-1

V-3

V-2

V-4

V-6

V-510

V-513

V-512

TYP.

43-CT-2 (E)

43-CT-1 (E)

43-CT-3 (E)

43-GH-1(E)

43-CT-4

43-GH-2(E)

12" TWR

10" TWR

10" TWR

10" TWR

6" TWS

6" TWS

10" TWS

10" TWS

10" TWS

12" TWS

T W

R

12" TWS

T W

S

T W

S

T W

S

T W

S

2 1/2" TWS

2 1/2" TWS

2 1/2" TWS

2 1/2" TWS

2 1/2" TWS

2 1/2" TWS

4" TWS

4" TWS

2 1/2" TWS 2 1/2" TWS

10" TWR10" TWR

12" TWS

12" TWR

T W

S

1 1/2" LPS

3/4" CND

12" TWS

12" TWS

12" TWS

3/4" CND

1 1/2" LPS

1 1/2" LPS

3/4" CND

3/4" CND

1 1/2" LPS

1 1/2" LPS

3/4" CND

6" TWS

6" TWS

1 1/2" LPS

3/4" CND

1 1/2" LPS

3/4" CND

10" TWR

10" TWR

10" TWR

10" TWR

10" TWR

10" TWR

T W

S

TYP.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:4

:2

A M

MJ103B

MECHANICAL INSULATION PLAN - ROOF

LEVEL - AREA B

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS G. WEAVER

100% CONSTRUCTION

DOCUMENTS

GENERAL SHEET NOTES

KEYNOTES

INSULATION LEGEND

NEW INSULATION ON EXISTING PIPING.

CONTRACTOR SHALL REMOVE EXISTING INSULATION AS

REQUIRED TO INSTALL NEW INSULATION.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

NEW INSULATION ON NEW PIPING.

SEE SPEC 23 07 11 FOR ADDITIONAL INFORMATION.

NTS

F4

MECHANICAL INSULATION PLAN - ROOF LEVEL - AREA B

1 CONTRACTOR SHALL PROVIDE INSULATION ON NEW PIPING AND VALVES, NO ASBESTOS CONTAINING

MATERIAL ARE PERMISSIBLE.

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND

B43A.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

J. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

K. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

L. CONTRACTOR TO PROVIDE TEMPORARY UTILITIES TO MAINTAIN UNINTERRUPTED

SERVICE AT ALL TIMES.

M. SEE M-001 FOR ADDITIONAL GENERAL NOTES.

N. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 23 05 11, SUBMITTALS.

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

EDCBA

18"x18" EXH

12" TWS

12" TWS

10" CHS

10" TWS

10" TWS

10" CHR

10" TWS

10" CHS

10" TWS

10" TWS

10" TWS

10" CHS

10" TWS

43-CT-1 (E)43-CT-2 (E)43-CT-3 (E)

43-CT-4

43-GH-1(E)

WATER

TREATMENT

(E)

43-P7 (E)43-P8 (E)

43-P12

43-WCCH-2 (E)

43-P13 (E)

HE-2 (E)

4" TWS 4" TWS 6" TWS 4" TWS

2 1/2" TWS2 1/2" TWS2 1/2" TWS

3" V

3" V

3" V2" MU 2" MU

10" TWR10" TWR 10" TWR

T W

S

"x

E X

H

T W

S

C H

S

C H

S

T W

S

T W

S

T W

S

T W

S

T W

R

T W

S

T W

S

T W

S

T W

S

T W

S

T W

S

T W

R8

C H

R

10" CHS

10" CHR

10" CHS

1 2 3 4 5

1 2 3 4 5

6 6 6

5' - 0 23/32"

17 17

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:3

:1

A M

M-301

MECHANICAL SECTIONS

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS L.FALK

100% CONSTRUCTION

DOCUMENTS

GENERAL SHEET NOTES

KEYNOTES

1/4" = 1'-0" F4

MECHANICAL SECTION WEST

1 PROVIDE NEW 800 TON CENTRIFUGAL CHILLER WITH HEAT RECOVERY CONDENSER AND 2030

COMPLIANT REFRIGERANT.

2 THE CHILLER VARIABLE SPEED DRIVE SHALL BE SHIPPED LOOSE AND SITE INSTALLED TO FACILITATE

CHILLER INSTALLATION.

3 CONTRACTOR SHALL PROVIDE CHILLER MAINTENANCE CLEARANCE AS RECOMMENDED BY

MANUFACTURER. MINIMUM DISTANCE IS 48 INCHES.

4 CONNECT 3", SCHEDULE 40 A53 STEEL EMERGENCY RELIEF VENT TO CHILLER RELIEF CONNECTIONS WITH 6" FLEXIBLE CONNECTORS. COMBINE RELIEF PORTS AND EXTEND 3" VENT PIPE UP THRU ROOF THROUGH EXISTING PENETRATION. TERMINATE WITH GOOSENECK 10'-0" ABOVE ROOF. SUPPORT WITH

A MINIMUM OF THREE GUIDE WIRES. REPAIR AND MAKE WATERTIGHT ROOF PENETRATION.

5 WHILE MANEUVERING CHILLER INTO PLACE, ROTATE CHILLER AS REQUIRED FOR INSTALLATION.

6 INSTALL NEW CHILLED WATER PUMP.

7 INSTALL NEW TOWER WATER SUPPLY PUMP.

8 CONNECT NEW 10" TWS LINE TO EXISTING 10" TWS PIPING.

9 CONNECT 3", SCHEDULE 40 A53 STEEL EMERGENCY RELIEF VENT TO CHILLER RELIEF CONNECTIONS WITH 6" FLEXIBLE CONNECTORS. COMBINE RELIEF PORTS AND EXTEND 3" VENT PIPE UP THRU ROOF THROUGH EXISTING PENETRATION. TERMINATE WITH GOOSENECT 10'-0" ABOVE ROOF. SUPPORT WITH

A MINIMUM OF THREE GUIDE WIRES. REPAIR AND MAKE WATERTIGHT ROOF PENETRATION.

10 RISE INSULATED 10" CHS AND CHR LINE ADJACENT TO BUILDING. COORDINATE CHILLED WATER

BUILDING PENETRATIONS WITH EXISTING AND NEW WORK.

11 PROVIDE NEW POINT OF CONNECTION WITH BUTTERFLY ISOLATION VALVE FOR EMERGENCY UTILITY

SERVICE PIPING. SEE MECHANICAL SITE PLANS FOR EXTERIOR TERMINATION LOCATION.

12 CONNECT TO EXISTING CHILLED WATER RETURN PIPING THE BRANCH PIPING FROM THE PRIMARY CHILLED WATER PUMPS. INSTALL A PIPE REDUCER AS REQUIRED. REMOVE PIPING INSULATION AS REQUIRED FOR WELDING OF PIPE CONNECTION. INSTALL PIPE INSULATION ABUTING AGAINST EXISTING INSULATION OVERLAPPING WITH PVC JACKETING AND INSULATION TAPE. INSTALL INSULATION TO

PROVIDING A CONTINUOUS, INSULATING WATER BARRIER.

13 CONNECT TO EXISTING CHILLED WATER SUPPLY PIPING. INSTALL A PIPE REDUCER AS REQUIRED.

REMOVE PIPING INSULATION AS REQUIRED FOR WELDING OF PIPE CONNECTION. INSTALL PIPE INSULATION ABUTING AGAINST EXISTING INSULATION OVERLAPPING WITH PVC JACKETING AND INSULATION TAPE. INSTALL INSULATION TO PROVIDE A CONTINUOUS, INSULATING WATER BARRIER.

INSTALL 3/4" WELD-O-LET AND 3/4" PIPE CONNECTION WITH LOCKABLE BALL VALVE AND CAP 12 INCHES

UPSTREAM OF VALVE OVERHEAD TO FACILITY PIPE SECTION FLUSHING AND CLEANING.

14 CONNECT TO EXISTING CHILLED WATER RETURN PIPING. INSTALL A PIPE REDUCER AS REQUIRED.

REMOVE PIPING INSULATION AS REQUIRED FOR WELDING OF PIPE CONNECTION. INSTALL PIPE INSULATION ABUTING AGAINST EXISTING INSULATION OVERLAPPING WITH PVC JACKETING AND INSULATION TAPE. INSTALL INSULATION TO PROVIDE A CONTINUOUS, INSULATING WATER BARRIER.

INSTALL 3/4" WELD-O-LET AND 3/4" PIPE CONNECTION WITH LOCKABLE BALL VALVE AND CAP 12 INCHES

UPSTREAM OF VALVE OVERHEAD TO FACILITY PIPE SECTION FLUSHING AND CLEANING.

15 CONNECT TO EXISTING CONDENSER WATER RETURN PIPE RISER TO COOLING TOWER. PROVIDE 3/4" WELD-O-LET AND 3/4" PIPE CONNECTION WITH LOCKABLE BALL VALVE AND CAP 12 INCHES UPSTREAM

OF VALVE OVERHEAD TO FACILITY PIPE SECTION FLUSHING AND CLEANING.

16 NEW 10" TWS LINE UP TO NEW COOLING TOWER 43-CT-4 AND DOWN TO NEW PUMP 43-P15 ON FIRST

FLOOR.

17 RISE 3" A53 STEEL REFRIGERANT AGAINST COOLING TOWER SCREEN WALL. RISE REFRIGERANT VENT

24 INCHES ABOVE TOP OF SCREEN WALL AND PROVIDE GOOSENECK TERMINATION. PAINT

REFRIGERANT VENT TO MATCH COOLING TOWER SCREEN WALL. SEE DETAILM-501/F8.

18 EXISTING LOW WALL EXHAUST FOR REFRIGERANT PURGE EXHAUST.

19 PROVIDE NEW RELIEF AIR GRAVITY HOOD IN NEW LOCATION TO ALLOW FOR COOLING TOWER

INSTALLATION. SEE SHEET M-701.

20 PROVIDE NEW VARIABLE VOLUME SERIES BLOWER COIL UNIT WITH INTAKE VENTILATION SUPPLIED BY ROOF MOUNTED DEDICATED OUTDOOR AIR UNIT AND CHILLED WATER AND STEAM COIL COOLING AND

HEATING. SEE MECHANICAL SCHEDULES.

21 CONNECT NEW TOWER WATER RETURN EQUALIZING LINE BETWEEN ALL EXISTING AND NEW COOLING

TOWER.

22 EXTEND PLUMBING PIPING TO NEW COOLING TOWER MATCH EXISTING CONFIGURATION.

23 PROVIDE NEW BUTTERFLY VALVE AND CAP.

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND

B43A.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

J. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

K. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

L. CONTRACTOR TO PROVIDE TEMPORARY UTILITIES TO MAINTAIN UNINTERRUPTED

SERVICE AT ALL TIMES.

M. SEE M-001 FOR ADDITIONAL GENERAL NOTES.

N. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 23 05 11, SUBMITTALS.

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

T ectonic Cop yright 2007

MEP Level 1 0' - 0"

MEP Level 2 12' - 0"

MEP Roof 26' - 6"

E D C B A

FOUNDATION

-3' - 0"

10" CHS

10" CHS

10" TWS

10" TWR10" TWR

2 1/2" TWS 2 1/2" TWS 2 1/2" TWS

10" TWR 10" TWR

43-CT-3 (E)

10" TWR

43-CT-2 (E)43-CT-1 (E)

43-CT-4

43-WCCH-2 (E)

43PX(E)

10" CHS

10" TWS

10" TWR

10" CHR

10" TWR

12" TWR

18"x18" EXH

10" CHR

10" CHS

C H

S

C H

R

T W

S

C H

R

T W

S

-P

E

C H

S

T W

R

C H

R

C H

S

C H

R

C H

S

T W

R

T W

S

T W

S

T W

S

T W

S

T W

R

T W

R

T W

R

T W

R

"x

E X

H

"x

E X

H

1 2 3 4 5

2 3 4 5

MCCEP(E)

20 20

21 21 21

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:3

:2

A M

M-302

MECHANICAL SECTIONS

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS L.FALK

100% CONSTRUCTION

DOCUMENTS

NTS

F4

MECHANICAL SECTION EAST

GENERAL SHEET NOTES

KEYNOTES

1 PROVIDE NEW 800 TON CENTRIFUGAL CHILLER WITH HEAT RECOVERY CONDENSER AND 2030

COMPLIANT REFRIGERANT.

2 THE CHILLER VARIABLE SPEED DRIVE SHALL BE SHIPPED LOOSE AND SITE INSTALLED TO FACILITATE

CHILLER INSTALLATION.

3 CONTRACTOR SHALL PROVIDE CHILLER MAINTENANCE CLEARANCE AS RECOMMENDED BY

MANUFACTURER. MINIMUM DISTANCE IS 48 INCHES.

4 CONNECT 3", SCHEDULE 40 A53 STEEL EMERGENCY RELIEF VENT TO CHILLER RELIEF CONNECTIONS WITH 6" FLEXIBLE CONNECTORS. COMBINE RELIEF PORTS AND EXTEND 3" VENT PIPE UP THRU ROOF THROUGH EXISTING PENETRATION. TERMINATE WITH GOOSENECK 10'-0" ABOVE ROOF. SUPPORT WITH

A MINIMUM OF THREE GUIDE WIRES. REPAIR AND MAKE WATERTIGHT ROOF PENETRATION.

5 WHILE MANEUVERING CHILLER INTO PLACE, ROTATE CHILLER AS REQUIRED FOR INSTALLATION.

6 INSTALL NEW CHILLED WATER PUMP.

7 INSTALL NEW TOWER WATER SUPPLY PUMP.

8 CONNECT NEW 10" TWS LINE TO EXISTING 10" TWS PIPING.

9 CONNECT 3", SCHEDULE 40 A53 STEEL EMERGENCY RELIEF VENT TO CHILLER RELIEF CONNECTIONS WITH 6" FLEXIBLE CONNECTORS. COMBINE RELIEF PORTS AND EXTEND 3" VENT PIPE UP THRU ROOF THROUGH EXISTING PENETRATION. TERMINATE WITH GOOSENECT 10'-0" ABOVE ROOF. SUPPORT WITH

A MINIMUM OF THREE GUIDE WIRES. REPAIR AND MAKE WATERTIGHT ROOF PENETRATION.

10 RISE INSULATED 10" CHS AND CHR LINE ADJACENT TO BUILDING. COORDINATE CHILLED WATER

BUILDING PENETRATIONS WITH EXISTING AND NEW WORK.

11 PROVIDE NEW POINT OF CONNECTION WITH BUTTERFLY ISOLATION VALVE FOR EMERGENCY UTILITY

SERVICE PIPING. SEE MECHANICAL SITE PLANS FOR EXTERIOR TERMINATION LOCATION.

12 CONNECT TO EXISTING CHILLED WATER RETURN PIPING THE BRANCH PIPING FROM THE PRIMARY CHILLED WATER PUMPS. INSTALL A PIPE REDUCER AS REQUIRED. REMOVE PIPING INSULATION AS REQUIRED FOR WELDING OF PIPE CONNECTION. INSTALL PIPE INSULATION ABUTING AGAINST EXISTING INSULATION OVERLAPPING WITH PVC JACKETING AND INSULATION TAPE. INSTALL INSULATION TO

PROVIDING A CONTINUOUS, INSULATING WATER BARRIER.

13 CONNECT TO EXISTING CHILLED WATER SUPPLY PIPING. INSTALL A PIPE REDUCER AS REQUIRED.

REMOVE PIPING INSULATION AS REQUIRED FOR WELDING OF PIPE CONNECTION. INSTALL PIPE INSULATION ABUTING AGAINST EXISTING INSULATION OVERLAPPING WITH PVC JACKETING AND INSULATION TAPE. INSTALL INSULATION TO PROVIDE A CONTINUOUS, INSULATING WATER BARRIER.

INSTALL 3/4" WELD-O-LET AND 3/4" PIPE CONNECTION WITH LOCKABLE BALL VALVE AND CAP 12 INCHES

UPSTREAM OF VALVE OVERHEAD TO FACILITY PIPE SECTION FLUSHING AND CLEANING.

14 CONNECT TO EXISTING CHILLED WATER RETURN PIPING. INSTALL A PIPE REDUCER AS REQUIRED.

REMOVE PIPING INSULATION AS REQUIRED FOR WELDING OF PIPE CONNECTION. INSTALL PIPE INSULATION ABUTING AGAINST EXISTING INSULATION OVERLAPPING WITH PVC JACKETING AND INSULATION TAPE. INSTALL INSULATION TO PROVIDE A CONTINUOUS, INSULATING WATER BARRIER.

INSTALL 3/4" WELD-O-LET AND 3/4" PIPE CONNECTION WITH LOCKABLE BALL VALVE AND CAP 12 INCHES

UPSTREAM OF VALVE OVERHEAD TO FACILITY PIPE SECTION FLUSHING AND CLEANING.

15 CONNECT TO EXISTING CONDENSER WATER RETURN PIPE RISER TO COOLING TOWER. PROVIDE 3/4" WELD-O-LET AND 3/4" PIPE CONNECTION WITH LOCKABLE BALL VALVE AND CAP 12 INCHES UPSTREAM

OF VALVE OVERHEAD TO FACILITY PIPE SECTION FLUSHING AND CLEANING.

16 NEW 10" TWS LINE UP TO NEW COOLING TOWER 43-CT-4 AND DOWN TO NEW PUMP 43-P15 ON FIRST

FLOOR.

17 RISE 3" A53 STEEL REFRIGERANT AGAINST COOLING TOWER SCREEN WALL. RISE REFRIGERANT VENT

24 INCHES ABOVE TOP OF SCREEN WALL AND PROVIDE GOOSENECK TERMINATION. PAINT

REFRIGERANT VENT TO MATCH COOLING TOWER SCREEN WALL. SEE DETAILM-501/F8.

18 EXISTING LOW WALL EXHAUST FOR REFRIGERANT PURGE EXHAUST.

19 PROVIDE NEW RELIEF AIR GRAVITY HOOD IN NEW LOCATION TO ALLOW FOR COOLING TOWER

INSTALLATION. SEE SHEET M-701.

20 PROVIDE NEW VARIABLE VOLUME SERIES BLOWER COIL UNIT WITH INTAKE VENTILATION SUPPLIED BY ROOF MOUNTED DEDICATED OUTDOOR AIR UNIT AND CHILLED WATER AND STEAM COIL COOLING AND

HEATING. SEE MECHANICAL SCHEDULES.

21 CONNECT NEW TOWER WATER RETURN EQUALIZING LINE BETWEEN ALL EXISTING AND NEW COOLING

TOWER.

22 EXTEND PLUMBING PIPING TO NEW COOLING TOWER MATCH EXISTING CONFIGURATION.

23 PROVIDE NEW BUTTERFLY VALVE AND CAP.

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND

B43A.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

J. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

K. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

L. CONTRACTOR TO PROVIDE TEMPORARY UTILITIES TO MAINTAIN UNINTERRUPTED

SERVICE AT ALL TIMES.

M. SEE M-001 FOR ADDITIONAL GENERAL NOTES.

N. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 23 05 11, SUBMITTALS.

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

0' - 0"

MEP Level 2 12' - 0"

MEP Roof 26' - 6"

1 2

7 8

43-GH-1(E)

43-CT-4

43-P7 (E)

43-P8 (E)

10" CHR

10" TWS

10" CHS

10" CHS

10" TWR

6" TWS

T W

S

3" V

2" CHR 2" CHS 4" ORD

3" RD

T W

S

T W

S

T W

R

T W

R

10" TWS

T W

R

C H

S

MEP Level 1 0' - 0"

MEP Level 2 12' - 0"

MEP Roof 26' - 6"

4 5 6

43-CT-1 (E)43-CT-4

43-P8 (E)

43-P7 (E)

1 2 5 7 8

43-GH-1(E)

10" CHR

10" CHS

10" TWR

10" TWS

10" CHS

10" CHR

T W

S

T W

S

T W

S

T W

S

T W

S

T W

S 1

T W

S

C H

S

3" V

3" RD

3" ORD

2" CHS

10" CHR

2 1/2" TWS

2 1/2" TWS

T W

R

2" MU

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.M

P .r v t

/2 /2

:3

:4

A M

M-303

MECHANICAL SECTIONS

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS L.FALK

100% CONSTRUCTION

DOCUMENTS

GENERAL SHEET NOTES

KEYNOTES

1/4" = 1'-0" F2

MECHANICAL SECTION SOUTH

1/4" = 1'-0"

F6

MECHANICAL SECTION NORTH

1 PROVIDE NEW 800 TON CENTRIFUGAL CHILLER WITH HEAT RECOVERY CONDENSER AND 2030

COMPLIANT REFRIGERANT.

2 THE CHILLER VARIABLE SPEED DRIVE SHALL BE SHIPPED LOOSE AND SITE INSTALLED TO FACILITATE

CHILLER INSTALLATION.

3 THE CONTROL PANEL SHALL BE SHIPPED LOOSE AND SITE INSTALLED TO FACILITATE CHILLER

INSTALLATION.

4 PROVIDE 42" CLEARANCE FOR ALL VARIABLE SPEED DRIVES AND DISCONNECTS.

5 CONTRACTOR SHALL PROVIDE CHILLER MAINTENANCE CLEARANCE AS RECOMMENDED BY

MANUFACTURER. MINIMUM DISTANCE IS 48 INCHES.

6 CONTRACTOR SHALL PROVIDE NATIONAL ELECTRIC CODE CLEARANCE IN FRONT OF CHILLER CONTROL

PANEL. MINIMUM DISTANCE IS 42 INCHES.

7 CONNECT 3", SCHEDULE 40 A53 STEEL EMERGENCY RELIEF VENT TO CHILLER RELIEF CONNECTIONS WITH 6" FLEXIBLE CONNECTORS. COMBINE RELIEF PORTS AND EXTEND 3" VENT PIPE UP THRU ROOF THROUGH EXISTING PENETRATION. TERMINATE WITH GOOSENECK 10'-0" ABOVE ROOF. SUPPORT WITH

A MINIMUM OF THREE GUIDE WIRES. REPAIR AND MAKE WATERTIGHT ROOF PENETRATION.

8 WHILE MANEUVERING CHILLER INTO PLACE, ROTATE CHILLER AS REQUIRED FOR INSTALLATION.

9 INSTALL NEW CHILLED WATER…