This document provides notification of an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure. The solicitation will be issued by the New Mexico VA Healthcare System on or about July 15, 2023 via SAM.gov. The project scope involves renovating, constructing, replacing equipment, and modifying utilities at Building 43 (Central Utility Plant) to address deficiencies in mechanical, plumbing, accessibility, electrical, life safety, and cooling systems. The contractor will furnish all labor, materials, equipment, and transportation to complete the work in accordance with applicable codes and specifications. The magnitude of the construction project is estimated between $10-20 million. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses listed on VetCert. The point of contact for the project is Maria Cruz-Thompson, Contracting Specialist, Network Contracting Office 22, who can be reached at maria.cruz-thompson@va.gov.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT REVIEW
DATE: APPROVED: DIRECTOR
DATE: APPROVED: CHIEF OF STAFF
DATE: APPROVED: CHIEF, SAFETY SERVICE
DATE: APPROVED: CHIEF ENGINEER
DATE: APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES
DATE: APPROVED: CONTRACTING OFFICER
DATE: APPROVED: CONTRACTING OFFICER'S REPRESENTATIVE
ALBUQUERQUE INTERNATIONAL AIRPORT
GIBSON BLVD SE
CENTRAL AVE SE
RAYMOND G. MURPHY
VA MEDICAL CENTER
W Y
O M
IN
G
B L V
D S
E
CENTRAL AVE SE
I-25
I-25
I-40
S A
N M
A T
E O
B L V
D S
E
Y A
L E
B L V
D S
E
SUNPORT
BLVD
ALBUQUERQUE
INTERNATIONAL
AIRPORT
GIBSON BLVD SE
RAYMOND G. MURPHY
VA MEDICAL CENTER
I-25
S A
N M
A T
E O
B
L V
D S
E
Y A
L E
B L V
D S
E
SUNPORT BLVD *
PROJECT
LOCATION
6" = 1'-0"
VICINITY MAP
6" = 1'-0"
LOCATION MAP
CLIENT:
Department of Veterans Affairs
AARON "AJ" DAVIS
CONTRACT SPECIALIST - CONTRACTING
OFFICER NCO18
OFFICE:5 20-629-4611
AARON.DAVIS@VA.GOV
COR:
JONATHAN ROENSCH, PE, PM
OFFICE: 505-659-5570
JONATHAN.ROENSCH@VA.GOV
PROJECT SCOPE OF WORK
The purpose of this project is to provide a designed solution to address deficiencies at our energy plant related to plumbing, accessibility, electrical, life safety, structure, and cooling for the NM VA Energy Plant (Bldg. 43 and 43A). The project will need to “Stand Alone”; the project cannot depend on another project or other funding source to make the project complete and usable.
THIS BUILDING IS NOT REQUIRED TO BE FIRE SPRINKLERED DUE TO THE OCCUPANCY TYPE. SEE LIFE SAFETY CODE SHEET FOR
ADDITIONAL INFORMATION.
Triple C utilized the information in the Noresco report dated November 19, 2018 at the express's request of the NMVA to ensure all existing conditions and benchmarks are incorporated into this project. Triple C is protected by the open content laws of the FARs.
THIRD-PARTY INSPECTIONS:
COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL
DIVISIONS (PAID BY THE GENERAL CONTRACTOR). CONTRACTOR SHALL EMPLOY THIRD-PARTY
INSPECTION CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS CONTRACT. THE
VA HAS NO INSPECTION CAPABILITY. ANY REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-
PARTY INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS SHALL BE SUPPLIED TO
THE VA/AE AS REQUIRED BY THIS CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND
PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR.
THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS ARE
FOR VA USE ONLY, WHEN PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN ON THE
CONTRACTOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ELECTRICAL:
NOT FOR CONSTRUCTION
MECHANICAL:
P2S ENGINEERING, INC.
5000 E. SPRING STREET, 8TH FLOOR
LONG BEACH, CA 90815-5218
562.497.2999
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:0
P M
G-000
COVER SHEET
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS N.
BLANCHARD
100% CONSTRUCTION
DOCUMENTS
100% CONSTRUCTION DOCUMENTS
VA258-14-D-0024
36C25818N0494
501-17-105 UPGRADE ENERGY PLANT EQUIPMENT
INFRASTRUCTURE (BLDG. 43 & 43A)
NEW MEXICO VA HEALTH CARE SYSTEM
Modifications Major modifications to the Scope of Work (SOW) and estimate, from the 35% SD to the 95% DD submission, include:
1. Removal of campus loop road reconfiguration to satisfy PSDM setback requirements. VA is pursuing these changes campus-wide with another future project.
2. Redundant diesel generator and second story in the generator room included as an alternate. PSDM redundancy requirements will be satisfied through the redundant unit-substation connected to the secondary supply from PNM.
3. Removed PV parking canopy installation from the Base Bid per direction from the VA that this additional site work would not qualify for approval under this NRM project. Included as an alternate.
4. Owner selected Option 2 including the addition on the East side of Building 43, with a new control room and phased relocation of existing control room functions to the new space. Option 2 also includes renovation of the existing space.
5. AE added a water reclamation system to the design to provide cooling tower makeup water.
6. AE includes the complete replacement of Building 43 roof with a new TPO roof as an alternate scope of work.
This work will include phased demolition, installation of new mechanical equipment curbs and supports, followed by the installation of the new roof.
Triple C A&E Group, the A-E of record for the New Mexico VA Healthcare System on Project 501-17-105, located in Albuquerque, New Mexico can certify that no Asbestos Containing Building Materials (ACBM) or Lead Based Products were designed/specified in the design.
_________________________ Signature__ __Date
Author: Mat Perkins, AIA NCARB, PMP, LEED BD+C Triple C - The A&E Group
Revisions: Date:
7/20/2022
7/20/22
7/20/2022
MATHEW PERKINS
NO.005843
07/20/2022
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/1 /2
:4
:4
P M
G-001
GENERAL DRAWING INDEX
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS N.
BLANCHARD
100% CONSTRUCTION
DOCUMENTS
SHEET INDEX
Sheet
Number Sheet Name 35% 65% 95% 100%
Q-902 EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes
Q-903 FINISH CUTSHEETS / BASIS OF DESIGN Yes Yes
PLUMBING
P-001 PLUMBING NOTES, SYMBOLS & ABBREVIATIONS No Yes Yes Yes
PD101A PLUMBING DEMOLITION PLAN - LEVEL 1 AND BASEMENT LEVEL - AREA A No Yes Yes Yes
PD101B PLUMBING DEMOLITION PLAN - LEVEL 1 - AREA B No Yes Yes Yes
PD102A PLUMBING DEMOLITION PLAN - LEVEL 2 - AREA A No Yes Yes Yes
PD102B PLUMBING DEMOLITION PLAN - LEVEL 2 - AREA B No Yes Yes Yes
PD103A PLUMBING DEMOLITION PLAN - ROOF LEVEL - AREA A No Yes Yes Yes
PD103B PLUMBING DEMOLITION PLAN - ROOF LEVEL - AREA B No Yes Yes Yes
PP101A PLUMBING PLAN - LEVEL 1 & BASEMENT LEVEL - AREA A No Yes Yes Yes
PP101B PLUMBING PLAN - LEVEL 1 - AREA B No Yes Yes Yes
PP101C PLUMBING PLAN - LEVEL 1 - AREA C No Yes Yes Yes
PP102A PLUMBING PLAN - LEVEL 2 - AREA A No Yes Yes Yes
PP102B PLUMBING PLAN - LEVEL 2 - AREA B No Yes Yes Yes
PP102C PLUMBING PLAN - LEVEL 2 - AREA C No Yes Yes Yes
PP103A PLUMBING PLAN - ROOF LEVEL - AREA A No Yes Yes Yes
PP103B PLUMBING PLAN - ROOF LEVEL - AREA B No Yes Yes Yes
PJ101A PLUMBING INSULATION PLAN - LEVEL 1 & BASEMENT - AREA A No No Yes Yes
PJ101B PLUMBING INSULATION PLAN - LEVEL 1 - AREA B No No Yes Yes
PJ101C PLUMBING INSULATION PLAN - LEVEL 1 - AREA C No No Yes Yes
PJ102A PLUMBING INSULATION PLAN - LEVEL 2 - AREA A No No Yes Yes
PJ103B PLUMBING INSULATION PLAN - ROOF LEVEL - AREA B No No Yes Yes
P-501 PLUMBING DETAILS No Yes Yes Yes
P-601 PLUMBING DIAGRAMS No Yes Yes Yes
P-701 PLUMBING SCHEDULES No Yes Yes Yes
P-901 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
P-902 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
P-903 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
P-904 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
MECHANICAL
M-001 MECHANICAL LEGEND Yes Yes Yes Yes
MD101A MECHANICAL DEMO PLAN - LEVEL 1 & BASEMENT LEVEL - AREA A Yes Yes Yes Yes
MD101B MECHANICAL DEMO PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes
MD102A MECHANICAL DEMO PLAN - LEVEL 2 - AREA A Yes Yes Yes Yes
MD102B MECHANICAL DEMO PLAN - LEVEL 2 - AREA B Yes Yes Yes Yes
MD103A MECHANICAL DEMO PLAN - ROOF LEVEL - AREA A Yes Yes Yes Yes
MD103B MECHANICAL DEMO PLAN - ROOF LEVEL - AREA B Yes Yes Yes Yes
MS101 MECHANICAL SITE PLAN No No Yes Yes
MH101A MECHANICAL DUCT PLAN - LEVEL 1 & BASEMENT LEVEL - AREA A No No Yes Yes
MH101B MECHANICAL DUCT PLAN - LEVEL 1 - AREA B No No Yes Yes
MH101C MECHANICAL DUCT PLAN - LEVEL 1 - AREA C No No Yes Yes
MH102A MECHANICAL DUCT PLAN - LEVEL 2 - AREA A No No Yes Yes
MH102B MECHANICAL DUCT PLAN - LEVEL 2 - AREA B No No Yes Yes
MH102C MECHANICAL DUCT PLAN - LEVEL 2 - AREA C No No Yes Yes
MH103A MECHANICAL DUCT PLAN - ROOF LEVEL - AREA A No No Yes Yes
MH103B MECHANICAL DUCT PLAN - ROOF LEVEL - AREA B No No Yes Yes
MP101A MECHANICAL PIPING PLAN - LEVEL 1 & BASEMENT LEVEL - AREA A Yes Yes Yes Yes
MP101B MECHANICAL PIPING PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes
MP101C MECHANICAL PIPING PLAN - LEVEL 1 - AREA C Yes Yes Yes Yes
MP102A MECHANICAL PIPING PLAN - LEVEL 2 - AREA Yes Yes Yes Yes
MP102B MECHANICAL PIPING PLAN - LEVEL 2 - AREA B Yes Yes Yes Yes
MP102C MECHANICAL PIPING PLAN - LEVEL 2 - AREA C Yes Yes Yes Yes
MP103 MECHANICAL PIPING PLAN - ROOF LEVEL - AREA Yes Yes Yes Yes
SHEET INDEX
Sheet
Number Sheet Name 35% 65% 95% 100%
GENERAL
G-000 COVER SHEET Yes Yes Yes Yes
G-001 GENERAL DRAWING INDEX No No Yes Yes
G-002 GENERAL ABBREVIATIONS & SYMBOLS Yes Yes Yes Yes
G-010 GENERAL VA PROJECT NOTES Yes Yes Yes Yes
G-011 GENERAL INDOOR AIR QUALITY NOTES No No Yes Yes
G-012 GENERAL INFECTION CONTROL NOTES AND SYMBOLS No Yes Yes Yes
G-013 GENERAL LEED AND GREEN GLOBES CHECKLISTS No No Yes Yes
G-014 GENERAL LEED CERTIFICATION No No Yes Yes
G-015 GENERAL LEED CERTIFICATION No No Yes Yes
G-016 GENERAL GREEN GLOBES CERTIFICATION No No Yes Yes
G-017 GENERAL GREEN GLOBES CERTIFICATION No No Yes Yes
G-018 GENERAL GREEN GLOBES CERTIFICATION No No Yes Yes
G-050 GENERAL TYPICAL FIXTURE MOUNTING HEIGHTS No Yes Yes Yes
GC101 GENERAL PHASING PLAN No Yes Yes Yes
GI100 GENERAL LIFE SAFETY PLANS No Yes Yes Yes
G-901 ARCHITECTURAL PHOTO REFERENCES No No Yes Yes
G-902 MEP PHOTO REFERENCES Yes Yes Yes Yes
G-903 MEP PHOTO REFERENCES No No Yes Yes
G-904 MEP PHOTO REFERENCES No No Yes Yes
G-905 MEP PHOTO REFERENCES No No Yes Yes
CIVIL
CD101 CIVIL DEMOLITION PLAN No Yes Yes Yes
CS101 CIVIL SITE PLAN Yes Yes Yes Yes
CG101 CIVIL GRADING PLAN No Yes Yes Yes
CG102 CIVIL STORMWATER POLLUTION PREVENTION PLAN No Yes Yes Yes
CG501 CIVIL DETAIL SHEET No Yes Yes Yes
CG502 CIVIL DETAIL SHEET No Yes Yes Yes
CU101 CIVIL UTLITY PLAN No No Yes Yes
C-901 EQUIPMENT CUTSHEET/ BASIS OF DESIGN No No Yes Yes
STRUCTURAL
S-001 STRUCTURAL GENERAL STRUCTURAL NOTES Yes Yes
S-002 STRUCTURAL GENERAL STRUCTURAL NOTES CONTINUED Yes Yes
S-010 STRUCTURAL TYPICAL DETAILS Yes Yes
S-011 STRUCTURAL TYPICAL DETAILS Yes Yes
S-012 STRUCTURAL TYPICAL DETAILS Yes Yes
S-013 STRUCTURAL TYPICAL DETAILS Yes Yes
S-014 STRUCTURAL TYPICAL DETAILS Yes Yes Yes Yes
S-015 STRUCTURAL TYPICAL DETAILS Yes Yes
S-020 STRUCTURAL SCHEDULES Yes
S-101 STRUCTURAL PLAN - LEVEL 1 - OVERALL Yes
S-101A STRUCTURAL FOUNDATION PLAN - AREA A Yes Yes
S-101B STRUCTURAL FOUNDATION PLAN - AREA B Yes
S-101C STRUCTURAL FOUNDATION PLAN - AREA C Yes
S-121 STRUCTURAL PLAN - LEVEL 2 - OVERALL Yes
S-121A STRUCTURAL LEVEL 2 FRAMING PLAN - AREA A Yes
S-121B STRUCTURAL LEVEL 2 FRAMING PLAN - AREA B Yes
S-121C STRUCTURAL LEVEL 2 FRAMING PLAN - AREA C Yes
S-131 STRUCTURAL PLAN - ROOF LEVEL - OVERALL Yes
S-131A STRUCTURAL ROOF FRAMING PLAN Yes Yes
S-201 STRUCTURAL FRAMING ELEVATIONS Yes
S-202 STRUCTURAL FRAMING ELEVATIONS Yes
S-203 STRUCTURAL FRAMING ELEVATIONS Yes
S-301 STRUCTURAL FOUNDATION DETAILS Yes Yes
S-401 STRUCTURAL FRAMING DETAILS Yes Yes
S-402 STRUCTURAL FRAMING DETAILS Yes
S-403 STRUCTURAL FRAMING DETAILS Yes
ARCHITECTURE
AS101 ARCHITECTURAL SITE PLAN No No Yes Yes
AD101 ARCHITECTURAL DEMOLITION PLAN - LEVEL 1 - COMPOSITE Yes Yes Yes Yes
AD102 ARCHITECTURAL DEMOLITION PLAN - LEVEL 2 - COMPOSITE Yes Yes Yes Yes
AD150 ARCHITECTURAL DEMO CEILING PLAN - LEVEL 1 - COMPOSITE Yes Yes Yes Yes
AD151 ARCHITECTURAL DEMO CEILING PLAN - LEVEL 2- COMPOSITE Yes Yes Yes Yes
AD152 ARCHITECTURAL DEMO ROOF LEVEL No Yes Yes Yes
A-101 ARCHITECTURAL PLAN - LEVEL 1 - COMPOSITE Yes Yes Yes Yes
A-101A ARCHITECTURAL PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes
A-101B ARCHITECTURAL PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes
A-101C ARCHITECTURAL PLAN - LEVEL 1 - AREA C Yes Yes Yes Yes
A-102 ARCHITECTURAL PLAN - LEVEL 2 - COMPOSITE Yes Yes Yes Yes
A-102A ARCHITECTURAL PLAN - LEVEL 2 - AREA A Yes Yes Yes Yes
A-102B ARCHITECTURAL PLAN - LEVEL 2 - AREA B Yes Yes Yes Yes
A-102C ARCHITECTURAL PLAN - ROOF LEVEL - AREA C Yes Yes Yes Yes
A-103 ARCHITECTURAL PLAN - ROOF LEVEL Yes Yes Yes Yes
A-103A ARCHITECTURAL PLAN - ROOF LEVEL - AREA A No No Yes Yes
A-103B ARCHITECTURAL PLAN - ROOF LEVEL - AREA B No No Yes Yes
AC101 ARCHITECTURAL CEILING PLAN - LEVEL 1 - COMPOSITE Yes Yes Yes Yes
AC101A ARCHITECTURAL CEILING PLAN - LEVEL 1- AREA A Yes Yes Yes Yes
AC101B ARCHITECTURAL CEILING PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes
AC101C ARCHITECTURAL CEILING PLAN - LEVEL 1- AREA C No Yes Yes Yes
AC102 ARCHITECTURAL CEILING PLAN - LEVEL 2 - COMPOSITE & PARTIAL ROOF CEILING PLAN Yes Yes Yes Yes
AC102A ARCHITECTURAL CEILING PLAN - LEVEL 2 - AREA A Yes Yes Yes Yes
AC102B ARCHTIECTURAL CEILING PLAN - LEVEL 2 - AREA B Yes Yes Yes Yes
Revisions: Date:
MP103B MECHANICAL PIPING PLAN - ROOF LEVEL - AREA B Yes Yes Yes Yes
MJ101A MECHANICAL INSULATION PLAN - LEVEL 1 & BASEMENT LEVEL - AREA A No No Yes Yes
MJ101B MECHANICAL INSULATION PLAN - LEVEL 1 - AREA B No No Yes Yes
MJ101C MECHANICAL INSULATION PLAN - LEVEL 1 - AREA C No No Yes Yes
MJ102A MECHANICAL INSULATION PLAN - LEVEL 2 - AREA A No No Yes Yes
MJ102B MECHANICAL INSULATION PLAN - LEVEL 2 - AREA B No No Yes Yes
MJ103B MECHANICAL INSULATION PLAN - ROOF LEVEL - AREA B No No Yes Yes
M-301 MECHANICAL SECTIONS No No Yes Yes
M-302 MECHANICAL SECTIONS No No Yes Yes
M-303 MECHANICAL SECTIONS No No Yes Yes
M-304 MECHANICAL SECTIONS No No Yes Yes
M-501 MECHANICAL DETAILS Yes Yes Yes Yes
M-502 MECHANICAL DETAILS Yes Yes Yes Yes
M-503 MECHANICAL DETAILS No No Yes Yes
M-601 MECHANICAL FLOW DIAGRAM Yes Yes Yes Yes
M-602 MECHANICAL STEAM DIAGRAM No No Yes Yes
M-603 MECHANICAL ISOMETRIC DIAGRAMS No No Yes Yes
M-701 MECHANICAL SCHEDULES Yes Yes Yes Yes
M-702 MECHANICAL SCHEDULES Yes Yes Yes Yes
M-801 MECHANICAL CONTROLS LEGEND Yes Yes Yes Yes
M-802 MECHANICAL CONTROLS Yes Yes Yes Yes
M-803 MECHANICAL CONTROLS Yes Yes Yes Yes
M-804 MECHANICAL CONTROLS Yes Yes Yes Yes
M-805 MECHANICAL CONTROLS Yes Yes Yes Yes
M-806 MECHANICAL CONTROLS No No Yes Yes
M-807 MECHANICAL CONTROLS No No Yes Yes
M-808 MECHANICAL POINTS SCHEDULES No No No Yes
M-901 MECHANICAL EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
M-902 MECHANICAL EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
M-903 MECHANICAL EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
M-904 MECHANICAL EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
M-905 MECHANICAL EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
M-906 MECHANICAL EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
M-907 MECHANICAL EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
M-908 MECHANICAL EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
ELECTRICAL
E-001 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS Yes Yes Yes Yes
ED101A ELECTRICAL DEMO PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes
ED101B ELECTRICAL DEMO PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes
ED102A ELECTRICAL DEMO PLAN - LEVEL 2 - AREA A Yes Yes Yes Yes
ED102B ELECTRICAL DEMO PLAN - LEVEL 2 - AREA B Yes Yes Yes Yes
ED103A ELECTRICAL DEMO PLAN - ROOF LEVEL - AREA A Yes Yes Yes Yes
ED103B ELECTRICAL DEMO PLAN - ROOF LEVEL - AREA B Yes Yes Yes Yes
EL101A ELECTRICAL LIGHTING PLAN - LEVEL 1 - AREA A No Yes Yes Yes
EL101B ELECTRICAL LIGHTING PLAN - LEVEL 1 - AREA B No Yes Yes Yes
EL101C ELECTRICAL LIGHTING PLAN - LEVEL 1 - AREA C No Yes Yes Yes
EL102A ELECTRICAL LIGHTING PLAN - LEVEL 2 - AREA A No Yes Yes Yes
EL102B ELECTRICAL LIGHTING PLAN - LEVEL 2 - AREA B No Yes Yes Yes
EP101A ELECTRICAL POWER PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes
EP101B ELECTRICAL POWER PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes
EP101C ELECTRICAL POWER PLAN - LEVEL 1 - AREA C Yes Yes Yes Yes
EP102A ELECTRICAL POWER PLAN - LEVEL 2 - AREA A Yes Yes Yes Yes
EP102B ELECTRICAL POWER PLAN - LEVEL 2 - AREA B Yes Yes Yes Yes
EP102C ELECTRICAL POWER PLAN - LEVEL 2 - AREA C Yes Yes Yes Yes
EP103A ELECTRICAL POWER PLAN - ROOF LEVEL - AREA A Yes Yes Yes Yes
EP103B ELECTRICAL POWER PLAN - ROOF LEVEL - AREA B Yes Yes Yes Yes
ET101A ELECTRICAL SYSTEMS PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes
ET101B ELECTRICAL SYSTEMS PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes
ET101C ELECTRICAL SYSTEMS PLAN - LEVEL 1 - AREA C Yes Yes Yes Yes
ET102A ELECTRICAL SYSTEMS PLAN - LEVEL 2 - AREA A Yes Yes Yes Yes
ET102B ELECTRICAL SYSTEMS PLAN - LEVEL 2 - AREA B Yes Yes Yes Yes
EG101 ELECTRICAL GROUNDING AND LIGHTNING PROTECTION PLAN Yes Yes Yes Yes
E-501 ELECTRICAL TELECOM AND SECURITY DETAILS Yes Yes Yes Yes
E-502 ELECTRICAL BONDING AND GROUNDING DETAIL Yes Yes Yes Yes
E-503 ELECTRICAL DETAILS Yes
E-601 DEMO ONE-LINE DIAGRAM Yes Yes Yes Yes
E-602 NEW ONE-LINE DIAGRAM Yes
E-701 ELECTRICAL SCHEDULES Yes Yes Yes Yes
E-702 ELECTRICAL PANEL SCHEDULES No Yes Yes Yes
E-703 ELECTRICAL PANEL SCHEDULES No Yes Yes Yes
E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No Yes Yes
E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No Yes Yes
ELECTRICAL
FA101A FIRE ALARM PLAN - LEVEL 1 - AREA A Yes
FA101B FIRE ALARM PLAN - LEVEL 1 - AREA B Yes
FA101C FIRE ALARM PLAN - LEVEL 1 - AREA C Yes
FA102A FIRE ALARM PLAN - LEVEL 2 - AREA A Yes
FA102B FIRE ALARM PLAN - LEVEL 2 - AREA B Yes
Grand total: 24
A A
7/20/2022
A-201 EXTERIOR BUILDING ELEVATIONS - NORTH & EAST Yes Yes Yes Yes
A-202 EXTERIOR BUILDING ELEVATIONS - SOUTH & WEST Yes Yes Yes Yes
A-301 ARCHITECTURAL BUILDING SECTIONS Yes Yes Yes Yes
A-351 ARCHITECTURAL WALL SECTIONS No No Yes Yes
A-401 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes
A-402 ARCHITECTURAL ENLARGED VIEWS No No Yes Yes
A-411 ARCHITECTURAL ENLARGED VIEWS AT ROOF No No Yes Yes
A-501 ARCHITECTURAL DETAILS AT NEW ADDITION Yes Yes Yes Yes
A-509 ARCHITECTURAL PLAN DETAILS No No Yes Yes
A-511 ARCHITECTURAL DETAILS AT EXISTING EXTERIOR No No Yes Yes
A-512 ARCHITECTURAL ROOF DETAILS No No Yes Yes
A-513 ARCHITECTURAL ROOF DETAILS No No Yes Yes
A-514 ARCHITECTURAL ROOF DETAILS No No Yes Yes
A-520 ARCHITECTURAL STANDARD PARTITION TYPES No Yes Yes Yes
A-521 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes
A-522 ARCHITECTURAL PARTITION FRAMING DETAILS No Yes Yes Yes
A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
A-541 ARCHITECTURAL MILLWORK DETAILS Yes Yes Yes Yes
A-551 ARCHITECTURAL DOOR AND FRAME DETAILS No Yes Yes Yes
A-600 ARCHITECTURAL DOOR FRAME SCHEDULE AND TYPES No Yes Yes Yes
A-620 ARCHITECTURAL WINDOW & FRAME SCHEDULE AND TYPES No No Yes Yes
A-701 ARCHITECTURAL STAIR PLANS AND SECTIONS No No Yes Yes
A-702 ARCHITECTURAL STAIR PLANS AND SECTIONS No No Yes Yes
A-901 ARCHITECTURAL 3D RENDERINGS No No Yes Yes
A-921 ARCHITECTURAL ISOMETRIC COMPOSITE - PIPE PAINT LOCATIONS No No Yes Yes
SIGNAGE
AW101 ARCHITECTURAL SIGNAGE PLAN - LEVEL 1 - COMPOSITE No Yes Yes Yes
AW102 ARCHITECTURAL SIGNAGE PLAN - LEVEL 2 - COMPOSITE No Yes Yes Yes
AW103 ARCHITECTURAL SIGNAGE PLAN - ROOF LEVEL - COMPOSITE No No Yes Yes
AW501 ARCHITECTURAL SIGNAGE DETAILS No Yes Yes Yes
AW601 ARCHITECTURAL SIGNAGE NOTES AND SCHEDULE No Yes Yes Yes
INTERIORS
IN001 INTERIOR FINISH FLOOR TYPES LEVEL 0, 1 & 2 No Yes Yes Yes
IN101 INTERIOR FINISH FLOOR PLAN - LEVEL 1 - COMPOSITE No Yes Yes Yes
IN102 INTERIOR FINISH FLOOR PLAN - LEVEL 2 - COMPOSITE No Yes Yes Yes
IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes Yes
IN701 INTERIOR FINISH - COLOR BOARDS Yes Yes Yes Yes
EQUIPMENT
Q-101 EQUIPMENT PLAN - LEVEL 1 - COMPOSITE No Yes Yes Yes
Q-102 EQUIPMENT PLAN - LEVEL 2 - COMPOSITE No Yes Yes Yes
Q-900 EQUIPMENT CUTSHEETS / BASIS OF DESIGN No No Yes Yes
Q-901 EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes
MATHEW PERKINS
C R
S
ARCHITECTURAL SYMBOLS
COLUMN GRID LINE
(EXISTING)
EXISTING TO REMAIN
EXISTING TO BE
REMOVED
EXISTING TO REMAIN
NEW CONSTRUCTION
ROOM TAG
ROOM NAME
ROOM NUMBER
DOOR NUMBER
SYMBOL AND MINIMUM
CLEARANCES
WALL LEGEND
AREA OR VOLUME
DETAIL - SECTION
POSITION ON SHEET
SHEET NUMBER
DETAIL - PLAN/ RCP
POSITION ON SHEET
SHEET NUMBER
BUILDING SECTION
POSITION ON SHEET
SHEET NUMBER
WALL SECTION
POSITION ON SHEET
SHEET NUMBER
EXTERIOR ELEVATION
POSITION ON SHEET
SHEET NUMBER
INTERIOR ELEVATION
POSITION ON SHEET
SHEET NUMBER
WALL TYPE TAG
FRAME TYPE -
EXTERIOR & LOUVER
CURTAIN PANEL TYPE
DRAWING NUMBER
DRAWING SCALE
DRAWING NUMBER
DRAWING SCALE
SHEET NUMBER
REFERENCING
SHEET NUMBER
VIEW TITLE
VIEW TITLE WITH
REFERENCE
KEYNOTE
DRAWING REVISION
LEVEL DATUM
LEVEL NAME
LEVEL ELEVATION
NORTH ARROW
FRAME TYPE - INTERIOR
GRAPHIC SCALE
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
18" MIN.
12" MIN. 4" MIN.
1A
≠ X# X
X
XX
XX
1T
X
Name Elevation
SIM
X-XXX
X
SIM
X-XXX
X
XXXX
X
X X
X
A-1 1/8" = 1'-0"
View Name
1/8" = 1'-0"
View NameA-1 A101R101
ROOM
NAME
150 SF
7'-0"
R 3'-11"
99.917°
DIMENSION TO FACE OF
FINISH, FACE OF
CONCRETE, COLUMN
CENTERLINE, OR AS
NOTED.
CENTERLINE
COLUMN GRID LINE
(NEW)
MATCHLINE
FOR CONTINUATION SEE: X/X-XXX
VIEW REFERENCE FOR
ADDITIONAL
INFORMATION
REFERENCE TO AREA
MATCHLINE AND VIEW
REFERENCE
SIM
X
X-XXX
SIM
X
X-XXX
SIM
X
X-XXX
X
X-XXX
SIM
V V ITEM - VA SUPPLIED &
INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR
SUPPLIED & INSTALLED
FURNITURE, FIXTURE, &
EQUIPMENT INDICATORA1000
CONTRACT LIMIT LINE
NOT IN CONTRACT AREA
X
SEE: (X/X-XXX)
LOCATION OF DEDUCT OR
ADDITIVE ALTERNATE
FIRE EXTINGUISHER,
TYPE INDICATED ON DRAWINGS
CARD READER,
ACCESS CONTROL
MATERIALS LEGEND
CONCRETE (SECTION)
GRANULAR FILL
CONCRETE MASONRY UNITS
BRICK
RIGID INSULATION (SECTION)
ACOUSTIC/THERMAL INSULATION
(SECTION)
STEEL (SECTION)
ALUMINUM (SECTION)
WOOD FINISH (SECTION)
LUMBER FINISH (SECTION)
EARTHWORK (SECTION)
STUD WALL (PLAN & SECTION)
EXISTING WALL TO REMAIN (PLAN &
SECTION)
DEMOLISHED WALL (PLAN & SECTION)
PLYWOOD (SECTION)
GROUT (SECTION)
RCP SYMBOL LEGEND
RECESSED OR SURFACE MOUNTED LIGHT
FIXTURE
LINEAR WALL WASH LUMINAIRE, MOUNTED
WITHIN ARCHITECTURAL COVE
SMOKE DETECTOR
SPEAKER
HVAC SUPPLY DIFFUSER
HVAC RETURN DIFFUSER
EXIT LIGHT
HEAT DETECTOR
HVAC EXHAUST DIFFUSER
LINEAR LUMINAIRE, WALL MOUNTED
(INDICATES DIRECTION OF LIGHT
DISTRIBUTION.)
CHANDELIER, PENDANT MOUNTED
LINEAR LUMINAIRE, PENDANT MOUNTED
STRIP OR TURRET LUMINAIRE, PENDANT
MOUNTED
STRIP OR TURRET LUMINAIRE, SURFACE
MOUNTED
(INDICATES DIRECTION OF LIGHT
DISTRIBUTION.)
RECESSED OR SURFACE MOUNTED
SQUARE DOWNLIGHT LUMINAIRE
RECESSED OR SURFACE MOUNTED ROUND
DOWNLIGHT LUMINAIRE
RECESSED OR SURFACE MOUNTED LIGHT
FIXTURE
ACOUSTICAL TILE CEILING (24X24)
ACOUSTICAL TILE CEILING (24X48)
GYPSUM CEILING - PAINTED
UPRIGHT SPRINKLER HEAD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:0
P M
G-002
GENERAL ABBREVIATIONS & SYMBOLS
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS N.
BLANCHARD
100% CONSTRUCTION
DOCUMENTS
ABBREVIATIONS
° DEGREE
± PLUS/MINUS
⌀ DIAMETER
≈ ALMOST EQUAL
∠ ANGLE
℄ CENTER LINE
∆ DELTA, DEFLECTION
ϕ ELECTRICAL PHASE
≠ NOT EQUAL
Ω OHM, OMEGA
BOUNDARY LINE
FLOW LINE
≡ IDENTITY
INITIAL LENGTH
MOMENT LINE
PROPERTY LINE, PLATE
½ ONE HALF FRACTION
¼ ONE QUARTER FRACTION
¾ THREE QUARTERS FRACTION
> GREATER THAN
≥ GREATER THAN OR EQUAL TO
< LESS THAN
≤ LESS THAN OR EQUAL TO
ABCDEFGHIJKMNOPQRSTUVWXYZ 1234567890
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT, AUGER BORING
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
ABS AIR BREAK SWITCH
AC ASBESTOS CEMENT OR ASPHALTIC
CONCRETE
ACB AIR CIRCUIT BREAKER
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACSR ALUMINUM CONDUCTOR STEEL
REINFORCED
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
ADO AUTOMATIC DOOR OPERATOR
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AL ALUMINUM
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AM ACOUSTIC MATERIAL
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ANT ANTENNA
AP ACCESS PANEL, APPROX.,
APPROXIMATE
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARR ARRESTOR
ARCH ARCHITECT, ARCHITECTURAL
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B BASELINE, BOTTOM
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEJ BRICK EXPANSION JOINT
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BO BOARD
BOT BOTTOM
BR BEDROOM, BOTTOM REGISTER
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS, CHANNEL
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN, CORNER BEAD, CIRCUIT
BREAKER
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER, CONTRACTOR
SUPPLIED & INSTALLED
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS,
CONTRACT DOCUMENTS, CEILING
DIFFUSER
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY, CORNER GUARD
C&G CURB AND GUTTER
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH CHILLER
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL
JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CM² SQUARE CENTIMETER
CM³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNDS CONDENSATE
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CERTIFICATE OF
OCCUPANCY, CLEANOUT, OR COMPANY
CO2 CARBON DIOXIDE
CODP CLEANOUT W/ DECK PLUG
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT, CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR, CONTRACTION
COORD COORDINATE
CORR CORRIDOR
CP NON-REINFORCED CONCRETE PIPE
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CR CHAIR, CRASH RAIL
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
INSTITUTE
CS CONCRETE SEALER/SURFACE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE, CURRENT
TRANSFORMER, COOLING TOWER
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER, CONTOUR, COOLING TOWER
RETURN
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CUH CABINET UNIT HEATER
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CW COLD WATER
CWB CAPILLARY WATER BARRIER
CWR COLD WATER RETURN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL, DRY BUILT, DIRECT BURIAL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DD DIVERSION DIKE
DEG, ° DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DI DUCTILE IRON
DIA, DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DMPR DAMPER
DN DOWN
DP DISTRIBUTION
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM, OR
DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT, STORM DRAINAGE
STRUCTURE
DSGN DESIGN
DW DISHWASHER, DOMESTIC WATER
DWD DRINKING WATER DISPENSER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EAM EXCEPT AS NOTED
EAT ENTERING AIR TEMPERATURE
EF EACH FACE, EXHAUST FAN
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EG EXHAUST GRILLE
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
E/P EDGE OF PAVEMEMNT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ER EXHAUST REGISTER
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EVAP EVAPORATIVE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXP JT EXPANSION JOINT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT, FEMALE, FIRE, FUSE,
FILTER
FA FIRE ALARM
FAB FABRIC
FABX FIRE ALARM BOX
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN, FIRE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E, FFE FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD, FLAT HEAD SCREWS, FIRE
HYDRANT
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FJ FELT JOINT
FL FLOORLINE, FLOOR, FLASHING, FLOW
LINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
4 WAY FOUR WAY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPH FROST PROOF HYDRANT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR
FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR
FIBERGLASS REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION, FULL SIZE
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FW FIRE WATER
FWC FABRIC WALLCOVERING
G GROUND, GAS LINE, GRAM
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON, GALVANIZED
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR, GLAZED
COATING
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFI GROUND FAULT INTERRUPT
GFMU GROUND FACE MASONRY UNIT
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GLZ-C GLAZED BLOCK-CMU
GLZ-T GLAZED BLOCK-CLAY TILE
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR GRADE
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GW GROUND WATER
GWB GYPUSM WALL BOARD
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH, HEIGHT, HUMIDIFIER
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAC HOUSEKEEPING AIDS CLOSET
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE, HANDICAPPED
HCWD HOLLOW CORE WOOD DOOR
HD HARD DRAWN
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HGSW HORN GAP SWITCH
HID HIGH INTENSITY DISCHARGE
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE, HIGH POINT,
HORSEPOWER
HPS HIGH PRESSURE SODIUM
HQ HEADQUARTERS
HR HOUR
HS HEAT-STRENGTHENED (GLASS) OR
HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER, HEAD WALL
HYD HYDRANT
HYDR HYDRAULIC
HZ HERTZ
I INTERSTATE (HIGHWAY) OR MOMENT
OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER, OR
INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
IE INVERT ELEVATION
ILLUM ILLUMINATION
IMC INTERMEDIATE METAL CONDUIT
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
INV INVERT
IP INLET PROTECTION
IRBF INDUSTRIAL RESIN BASE FLOORING
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX, JB JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JT JOINT
JST JOIST
K KILO
KCP KEENE'S CEMENT PLASTER
KD KILN DRIED OR KNOCKED DOWN
KG KILOGRAM
KN KILONEWTON
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
KV KILOVOLT
KVA KILOVOLT-AMPERE
KW KILOWATT
L ANGLE, LOUVER, LENGTH, LENGTH OF
CURVE
LA LIGHTING ARRESTOR
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LC LEAD COVERED
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE, LATENT HEAT
RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED, LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
L/S LITERS PER SECOND
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVC LENGTH OF VERTICAL CURVE
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
M METER, MEGA
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MAS MASONRY
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD METAL DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL, MEDIUM
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLO MAIN LUG ONLY
MLWK MILLWORK
mm MILLIMETER
MMP MEMBRANE WATERPROOFING
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MP MEDIUM PRESSURE
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
M/S METERS PER SECOND
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA, NON-CORROSIVE
NCOMBL NONCOMBUSTIBLE
NDC NOSE DOWN CURB
NE NORTHEAST
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING CONTRACTORS
ASSOCIATION
NRP NON-REMOVABLE
NS NARROW STILE
NTS NOT TO SCALE
NUM NUMERAL
NW NORTHWEST
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCB OIL CIRCUIT BREAKER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE
DIMENSION
OD OUTSIDE DIMENSION OUTSIDE
DIAMETER
OF/CI OWNER FURNISHED/CONTRACTOR
INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG, OVERHEAD
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM, OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF
DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSD OPEN SITE DRAIN
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
OVHD OVERHEAD
OUT OUTLET
OZ OUNCE
P PIPE, POLE
Pa PASCALES
PA PUBLIC ADDRESS
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON, PULL BOX
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE, PORTLAND
CEMENT, PRECAST
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PJF PREFORMED JOINT FILLER
PKG PACKAGE
PL PROPERTY LINE, PLATE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLAS CMU PLASTER COVERED CMU
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PNT PAINT
PO POST OFFICE, PURCHASE ORDER
PO PURCHASE ORDER POST OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRIM PRIMARY
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PRV PRESSURE RELIEF VALVE
PS PULL SWITCH
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, PRESSURE
TREATED, POINT OF TANGENT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC), POINT
OF VERTICAL CURVE
PVG PAVING
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENT
PVMT PAVEMENT
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS, RISER, RUBBER, RETURN
RA RETURN AIR
RAD RADIATOR, RADIUS
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN,
REINFORCED CONCRETE PIPE
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
RED REDUCING
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY, REFRIGERATION
REG REGISTER, REGULATOR
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RESIL T RESILIENT TILE
RET RETURN
REV REVISION
RF RADIO FREQUENCY, ROOF, RETURN
FAN
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RGS RIGID GALVANIZED STEEL
RH RIGHT HAND
RHC REHEAT COIL
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RI RUBBER INSULATED
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RVT RESILIENT VINYL TILE
RWD REDWOOD
RWL RAIN WATER LEADER
S SECOND, SOUTH, SANITARY, SEWER,
STRUCTURE
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY SEWER
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL, SCHEDULE
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR,
OR SOAP DISPENSER;
SDG SIDING
SE SOUTHEAST
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SG SUPPLY GRILLE
SGD SLIDING GLASS DOOR
1PH SINGLE PHASE
SGL SINGLE
SH SHEET
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FL SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKCP SUSPENDED KEENE'S CEMENT
PLASTER
SKLT SKYLIGHT
SL SLOPE
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMH SANITARY MODULE
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL UNIT
SP STATIC PRESSURE, SINGLE POLE
SPC SUSPENDED PLASTER CEILING
SPDT SINGLE POLE DOUBLE THROW
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPST SINGLE POLE SINGLE THROW
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SR SUPPLY REGISTER
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS, STREET, SINGLE THROW
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUP SUPPORT
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SV B SHEET VINYL BASE
SW SWITCH, SIDE WALK
SWBD SWITCHBOARD
SWDR SWING DOOR
SWGR SWITCH GEAR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD, TILE, TOP, TANGENT
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TC TOP OF CURB
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL
TEMPERATURE CONTROL PANEL;
TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
TERM TERMINAL
TH TOTAL HEAD (PUMPS)
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRSLD THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK, TOP REGISTER
TRANS TRANSOM, TRANSITION
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH, TUBE STEEL, TOP
OF STEEL, TOP OF STONE, TOP OF SLAB
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UCF UNDER COUNTER FREEZER
UCR UNDER COUNTER REFRIGERATOR
UGE UNDERGROUND ELECTRIC
UGND UNDERGROUND
UGT UNDERGROUND TELEPHONE
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UNO UNLESS NOTED OTHER WISE
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT, VENT, VALVE
VA VOLT AMPRE
VAC VACUUM
VAR VARIES
VB VINYL BASE
VC VARNISH CAMBRIC, VITRIFIED CLAY, VA
SUPPLIED & CONTRACTOR INSTALLED
VCT VINYL COMPOSITION TILE, VITRIFIED
CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VPI VERTICAL POINT OF INTERSECTION
VPOC VERTICAL POINT OF CURVE
VPOT VERTICAL POINT OF TANGENT
VR VAPOR RETARDER
VS VENT STACK
VTR VENT THROUGH ROOF
VV VA SUPPLIED & INSTALLED
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WIDE, WEST, WIDTH, WASTE, WATER,
WATT, WIRE
W/ WITH
W/O WITHOUT
WA WATT
WARR WARRANTY
WB WET BULB
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD, WINDOW DIMENSION
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WL WATER LEVEL
WLD WELDED
WM WIRE MESH
WOM WALK OFF MATT
WP WATERPROOFING, WEATHERPROOF
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP, WASTE STACK, WATER
SURFACE, WATERSTOP
WSCT WAINSCOT
WT WEIGHT
WTB WALL TILE BASE
WTL WALL TILE
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XFMR TRANSFORMER
XPS EXTRUDED POLYSTYRENE BOARD
(INSULATION)
X-STR EXISTING STRUCTURE
YD YARD
YR YEAR
Revisions: Date: 7/20/2022
MATHEW PERKINS
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN
REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL
AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE
CONTRACTOR(S) PRIOR TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES
BETWEEN EXISTING CONDITIONS AND THESE DRAWINGS, WHICH AFFECT THE SCOPE
AND INTENT OF THE WORK DESCRIBED IN CONSTRUCTION DOCUMENTS, SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR IMMEDIATELY.
4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL
DUCT SIZES AND LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR
SPECIAL KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH
EACH OTHER AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK
ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE
FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR
SHALL VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT
DOCUMENTS. REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR
PERFORMING WORK RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR
MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE
COSTLY TIME, METHOD, SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE
CONTRACT. HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING
STAGING AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF
EACH TRADE'S WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S
OPERATION OR FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE
PENETRATIONS THROUGH FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND COR,
BETWEEN DISSIMILAR METALS. SEE SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED.
SEE SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM
CONCRETE OR MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND
STICK" OR OTHER MATERIAL AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES,
DEVICES, MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL,
INTERIOR, MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION
COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY BURN PERMITS TO BE COORDINATED
WITH COR. SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
18. AN AIR QUALITY PERMIT WILL BE REQUIRED FOR THE GENERATOR FOR THIS
PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH THE
ALBUQUERQUE VA AND AIR QUALITY AUTHORITY HAVING JURISDICTION.
FIRE LIFE SAFETY NOTES
1. IF ENCOUNTERED, FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED
DURING CONSTRUCTION MUST BE RESTORED TO THEIR ORIGINAL CONDITION.
2. FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF
EGRESS MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN
FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF
EGRESS, TEMPORARY CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE
PROVIDED.
3. VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED APRIL 6,
2017, REQUIRES VA MASTER SPECIFICATIONS, DIVISION 1 - GENERAL REQUIREMENTS,
SECTION 01 35 26 - SAFETY REQUIREMENTS MADE SPECIFIC FOR THE ASSOCIATED
CONSTRUCTION WORK.
FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION
1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL
TIMES PER LOCAL FIRE DEPARTMENT.
2. FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT
ALL TIMES AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.
3. FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION.
THE NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE
FIRE MARSHAL OR LOCAL FIRE DEPARTMENT.
4. COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.
5. CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH LOCAL FIRE
CODES.
6. FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER
LOCAL FIRE CODES.
7. REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES.
TEMPORARY EXITING SHALL BE APPROVED BY THE STATE FIRE MARSHAL OR BY THE
LOCAL FIRE DEPARTMENT.
8. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.
9. PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE
FLAMERETARDANT.
10. SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS.
WHEN REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT
DETECTORS MAY BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.
11. ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT
VEHICLE ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE
PRIOR TO AND DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE
COORDINATED WITH LOCAL FIRE DEPARTMENT IN THE FIELD.
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH CLASS "a"
PROTECTION OF THE INTERNATIONAL BUILDING CODE.
2. SUBMIT FOUR SETS OF PLANS TO STATE FIRE MARSHAL FOR APPROVAL PRIOR TO THE
INSTALLATION.
3. SUBMITTAL SHALL INCLUDE FM LISTING NUMBER FOR ALL COMPONENTS, A SINGLE-LINE DIAGRAM
SHOWING PRIMARY POWER, EMERGENCY POWER RISER DIAGRAM, DETAILS OF TROUBLE
SUPERVISION & POWER LIMITED/NON POWER LIMITED CIRCUITRY, FLOOR PLANS SHOWING
LOCATION OF ALL COMPONENTS AND METHOD OF ALARM TRANSMISSION TO STATE FIRE MARSHAL
OR LOCAL FIRE DEPARTMENT.
4. THE FIRE ALARM SYSTEM SHALL…
This is the start of the file's text. The full file is on GovTribe.