ATTACHMENT A - 8 of11 501-17-105 Dwg Mech1 07-20-22.pdf
PDF 15 MB Posted
- Solicitation number
- 36C26223B0010
About this file
This notification provides details of an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure at the New Mexico VA Healthcare System. The project scope includes renovations, new construction, equipment replacements and utility modifications to address deficiencies at Building 43, the Central Utility Plant, and involves general construction, alterations, mechanical and electrical work and utility systems. The solicitation will be issued on or around July 15, 2023 as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses listed on VetCert with a NAICS code of 236220 and project magnitude between $10-20 million. A pre-solicitation site visit will be scheduled. The point of contact is Maria Cruz-Thompson, Contracting Specialist at Network Contracting Office 22, who can be reached at maria.cruz-thompson@va.gov.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SD
24"x12"
24"/12"
12" o
V
HWR
HWS
DOWN
CHR
CHS
GENERAL NOTES:MECHANICAL SYMBOL LEGENDABBREVIATIONS
VALVE ASSEMBLY
FIRE DAMPER
FLEXIBLE DUCT
ACOUSTICAL DUCT LINING
FLEXIBLE CONNECTION
MANUAL BALANCING DAMPER
SMOKE DAMPER
MITERED ELBOW (ALL MITERED ELBOWS ARE TO HAVE
VANES EXCEPT TRANSFER AIR SOUND ELBOW)
EXISTING DUCT TO BE REMOVED
CONNECT NEW DUCT TO EXISTING DUCT
SUPPLY DUCT, SECTION
EXHAUST DUCT, SECTION
RETURN DUCT, SECTION
DUCT TRANSITION
OR REGISTER
STANDARD RADIUS ELBOW
SHORT RADIUS VANED ELBOW (ALL SHORT
RADIUS ELBOWS ARE TO HAVE VANES PER
SMACNA)
CEILING RETURN AIR REGISTER OR TRANSFER AIR GRILLE
INDICATES A RECTANGULAR DUCT SIZE (WIDTH x DEPTH)
INDICATES A FLAT OVAL DUCT SIZE (WIDTH x DEPTH)
INDICATES A ROUND DUCT SIZE
IF THROW IS SOMETHING OTHER THAN 4-WAY)
CEILING DIFFUSERS (ARROWS DENOTE THROW PATTERN
DUCTED EXHAUST REGISTER
SIDEWALL EXHAUST OR RETURN AIR GRILLE
SIDEWALL SUPPLY REGISTER
H
T
ACCESS DOOR
SEE CONTROL DRAWINGS FOR TYPE
ROOM HUMIDISTAT/HUMIDITY TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
ROOM THERMOSTAT/TEMP. TRANSMITTER LOCATION ONLY
DUCT MOUNTED STATIC PRESSURE PROBE
XX - ## NUMBERS REFER TO SPECIFIC EQUIPMENT
SYMBOL INDICATES NEW EQUIPMENT
EQUIPMENT SYMBOLS
IDENTIFIED IN EQUIPMENT SCHEDULE
CFM
SYMBOL INDICATES GRILLE OR
DIFFUSER IDENTIFIED IN EQUIPMENT SCHEDULE
SIDEWALL GRILLE DIMENSION WHERE
SHOWN ON PLANS
LETTERS REFER TO THE EQUIPMENT TYPE
ACCESS DOOR
AIR CONDITIONING UNIT
ABOVE FINISHED FLOOR
ACOUSTIC LINING
ACU
AD
AFF
AL
BOP
BOD
BOTTOM OF PIPE
BOTTOM OF DUCT
CUBIC FEET PER MINUTE
CLEANOUT
CFM
CO
MOTOR CONTROL CENTERMCC
NOT APPLICABLE
NOT IN CONTRACT
NUMBER (QUANTITY)
NA
NIC
NO.
OUTSIDE AIR
OPPOSED BLADE DAMPER
OA
OBD
PSIG
PRV PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH GAGE
QUADRANT
QUANTITYQTY
QUAD
RETURN AIRR.A.
SMOKE CONTROL DAMPERSCD
EXHAUSTEXH
FLAT TOP
FEET PER MINUTE
FT
FPM
DEGREES FAHRENHEIT
FAN COIL UNIT
FIRE DAMPER
FLEXIBLE
FCU
FD
FLEX
°F
TOPT TOP OF PIPE TRAPEZE
VENT THRU ROOFVTR
VEL
VAV VARIABLE AIR VOLUME
VELOCITY
GALLONS PER HOUR
GALLONS PER MINUTE
GPH
GPM
HAND DAMPER (VOLUME DAMPER)
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HD
HEPA
INCHESIN
MAKE-UP WATER
CONDENSATE DRAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
PIPING SYMBOLS
DIRECTION OF FLOW
DIRECTION OF PIPE PITCH (DOWN)
WATER FLOW MEASURING DEVICE
PLUG VALVE
VALVE SYMBOLS
GATE VALVE
GLOBE VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
THREE-WAY MODULATING CONTROL VALVE
TWO-WAY CONTROL VALVE
SAFETY VALVE OR PRESSURE RELIEF
MANUAL AIR VENT
SOLENOID VALVE
3/4" GATE VALVE WITH ADAPTER TO 3/4"
HOSE THREAD
BUTTERFLY VALVE
BALL VALVE
VALVE IN RISE
WCO
WH
WALL CLEANOUT
WALL HYDRANT
V
VAC
VOLTS
VOLTS, ALTERNATING CURRENT
TP TOTAL PRESSURE (INCHES OF WATER)
SP STATIC PRESSURE (INCHES OF WATER)
Rh
RPS
RELATIVE HUMIDITY
ROOM PRESSURE SENSOR
KWH
KW KILOWATT
KILOWATT HOUR
HB HOSE BIBB
FS FLOOR SINK
FCO FLOOR CLEANOUT
ENT ENTERING
DX DIRECT EXPANSION
BTU
BTUH
BRITISH THERMAL UNIT
BTU PER HOUR
BHP BRAKE HORSEPOWER
DUCTWORK SYMBOLS
VENT
SECTION SYMBOLS
SDVV SINGLE DUCT VARIABLE VOLUME
ST SOUND TRAP
TYP. TYPICAL
CONT. CONTINUATION
D DRAIN
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
FT. FEET
F.G. FILTER GAUGE
FB FLAT BOTTOM
MA MAIN AIR (CONTROLS)
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
COMBINATION FIRE/SMOKE DAMPER
DUCTED RETURN REGISTER
DUCT MOUNTED SMOKE DETECTOR
1HR FIRE BARRIER (VERIFY WITH ARCHITECTURAL
DRAWINGS)
CO ROOM CARBON DIOXIDE SENSOR LOCATION ONLY2
CD
CONTRACTOR SHALL PROVIDE NEW PIPING IDENTIFICATION LABELS PER
SPECIFICATION SECTION 09 91 00 FOR ALL MECHANICAL AND PLUMBING PIPING (NEW
AND EXISTING TO REMAIN) IN BUILDING 43 AND 43A. CONTRACTOR SHALL SUBMIT
COORDINATION DRAWINGS FOR VA AND A/E REVIEW AND APPROVAL PRIOR TO THE
START OF WORK.
CONTRACTOR SHALL INSULATE ALL NEW MECHANICAL PIPING AND EXISTING PIPING
IDENTIFIED IN PLAN PER SPECIFICATION SECTION 23 07 11, NO ASBESTOS
CONTAINING MATERIALS ARE PERMISSIBLE.
ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN
FURRED CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.
PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR CHASES
FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, COILS, FANS, CONTROLS, ETC.
THEY SHALL BE FURNISHED UNDER DIVISION 23 AND INSTALLED UNDER THE
ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING SHALL MATCH
CLASSIFICATION OF WALL AND CEILING FIRE RATING.
WATER PIPE CONNECTIONS TO WATER COILS SHALL BE MADE SO THERE WILL BE
COUNTER FLOW BETWEEN WATER AND AIR.
COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS
DOORS, ETC., WITH THE ARCHITECTURAL REFLECTED CEILING PLAN(S).
ALL ROUND RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL
SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.
THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED. ALL DUCT SIZES SHOWN ON DRAWINGS ARE NET INSIDE DIMENSIONS.
PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING
AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS
REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES
OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE
PROVIDE HOSE CONNECTION ON VALVE.
PROVIDE TURNING VANES IN ALL SQUARE ELBOWS, EXCEPT TRANSFER AIR SOUND
ELBOWS.
THE CFM OF EACH DIFFUSER, REGISTER, ETC., IS INDICATED AS A NUMBER NEXT TO
THE SYMBOL DESIGNATION ON THE DRAWINGS.
REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE
RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. PROVIDE APPROVED FIRE
DAMPERS IN ALL REQUIRED PENETRATIONS FOR DUCTWORK, GRILLES, REGISTERS
AND DIFFUSERS. ALL PIPE AND DUCTWORK PENETRATIONS OF FIRE, SMOKE AND
FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE
BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND FIRE
PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN EQUIPMENT
ACCESS AND SERVICEABILITY.
CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS, SLEEVES,
AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND PLUMBING
EQUIPMENT, DUCTWORK AND PIPING, ETC. CONTRACTOR SHALL COORDINATE WITH
GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID CONFLICTS AND TO
MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY
MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO
ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT IN A
MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE BUILDING
STRUCTURAL SYSTEM.
SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, DUCT WALL PENETRATIONS
AND FITTING CONNECTIONS ON ALL DUCT SYSTEMS.
IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND
UNCLEAR SUBMITTALS WILL BE REJECTS AND MARKED AS "REVISE AND RESUBMIT".
ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT SELECTIONS FOR THE
PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE.COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT
CLEARANCES. PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS,
VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE
MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE PERSONNEL. ACCESS
POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.
EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR TO
NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
THE CONTRACTOR SHALL REMOVE ALL EXISTING EQUIPMENT, DUCTWORK, PIPING,
CONTROL PANELS, CONTROL DEVICES, AND ASSOCIATED ITEMS WHICH ARE BEING
REPLACED, IN THEIR ENTIRETY. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING
ALL DEMOLISHED ITEMS FROM THE SITE. REFER TO SPECIFICATIONS FOR MORE
INFORMATION.
1.
2.
3.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
FD
SD
FSD
XX - #
##x#
SINGLE LINE PIPE SYMBOLS
DOUBLE LINE PIPE SYMBOLS
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
ELBOW - DOWN
ELBOW - UP
PIPE RISE - DROP
ELBOW - DOWN TO TEE
TEE - DOWN
TEE - UP
ELBOW - UP TO TEE
END CAP
FLEX CONNECTION
PIPE REDUCER - CONCENTRIC
PIPE REDUCER - ECCENTRIC
PIPE STRAINER
UNION - SCREWED
AIR VENT - AUTOMATIC
AIR VENT - MANUAL
GAUGE - DIFFERENTIAL
GAUGE - PRESSURE
GAUGE - PRESSURE
GAUGE - PRESSURE WITH COCK
GAUGE - TEMPERATURE
PIPE - CAPPED WITH SHUT-OFF VALVE
PIPE ANCHOR
PIPE EXPANSION JOINT
P
PS
A
F
PS
TS
PIPE GUIDE
SENSOR - FLOW
SWITCH - FLOW
SWITCH - PRESSURE
SWITCH - TEMPERATURE
TEMPERATURE - PRESSURE TEST FITTING
THERMOMETER
THERMOMETER WELL
SECTION NUMBER
DRAWING NUMBER WHERE
DETAILED
DETAIL LOCATION
DRAWING NUMBER WHERE
DETAILED
X#
X###
X#/X###
DETAIL LOCATION X#
SECTION LOCATION X#
SECTION
DETAIL
SCALE
SCALE
FITTING SYMBOLS
RS REFRIGERATION SUCTION
RL REFRIGERATION LIQUID
VALVE - BALL LEVER
VALVE - GATE MANUAL
VALVE - BUTTERFLY LEVER
VALVE - BUTTERFLY MOTORIZED
VALVE - GLOBE MANUAL
VALVE - GLOBE LEVER
VALVE - PLUG LEVER
VALVE - PLUG MANUAL
VALVE - PRESSURE REGULATING
VALVE - CHECK
M
VALVE - PRESSURE RELIEF
TWS TOWER WATER SUPPLY
TWR TOWER WATER RETURN
TWB TOWER WATER BYPASS
HPS STEAM - HIGH PRESSURE SUPPLY
HPR CONDENSATE - HIGH PRESSURE RETURN
LPR STEAM - LOW PRESSURE RETURN
CND STEAM - CONDENSATE RETURN
PC STEAM - PUMPED CONDENSATE
R REFRIGERATION
MU
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
DRAIND
SOLENOID VALVE
PLUG VALVE
GATE VALVE
DIAPHRAGM VALVE
GLOBE VALVE
CIRCUIT SETTER
STEAM TRAP INVERTED BUCKET
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
RELIEF VALVE
PRESSURE REDUCING VALVE
ELBOW - DOWN
ELBOW - UP
PIPE RISE - DROP
ELBOW - DOWN TO TEE
TEE - DOWN
END CAP
PIPE REDUCER - CONCENTRIC
PIPE REDUCER - ECCENTRIC
UNION - SCREWED
SINGLE LINE PIPE SYMBOLS
DOUBLE LINE PIPE SYMBOLS
PIPE STRAINER
THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING
SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE
PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,
ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING BUILDING
MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.
THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING
SERVICES FOR REMOVALS WITH OWNER AUTHORIZED REPRESENTATIVE AND SHALL
CONFORM TO THEIR REQUIREMENTS.
DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE
MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT
THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY WHICH ARE
OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE OWNER'S
REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED OUTSIDE OF
THE SUITE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE FACILITY.
THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK ZONE
AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC. FOR ALL
WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST
AND FUMES.
THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE
TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE FOR
APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN
OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL
COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH
ACCEPTABLE ROUTING AND ACCESS FOR MATERIALS REQUIRED FOR THE NEW
INSTALLATION.
SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING FOR HVAC,
FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.
ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED ON
FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND MEASUREMENT DATA.
ALL DATA OBTAINED VIA TESTING AND MEASURING OF THE EXISTING AIR HANDLING
UNIT, AND THE ASSOCIATED RETURN/RELIEF FAN, SUPPLY AIR DUCTS, EXHAUST, AND
RETURN AIR DUCTS PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW WORK
SCOPE OF WORK SHALL BE UTILIZED TO ESTABLISH NEW HVAC SYSTEM
PERFORMANCE AND BALANCE DATA FOR THE RENOVATION. DATA SHALL BE
FORWARDED TO THE PROJECT ENGINEER FOR REVIEW AND COMMENT PRIOR TO
DEMOLITION.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES
INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL.
ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT PRIOR
TO START OF WORK.
ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS
A
B
C
D
E
F
G
H
I
GENERAL DEMO NOTES:
ACCESS DOORAD
AIR HANDLING UNITAHU
COMPRESSED AIR
CONDENSATE DRAIN
CA
CD
DETAIL REFERENCE
SECTION AND DETAIL TITLES
2HR FIRE BARRIER (VERIFY WITH ARCHITECTURAL
DRAWINGS)
2HR SMOKE BARRIER (VERIFY WITH
ARCHITECTURAL
DRAWINGS)
RISE IN DUCT
MPS STEAM - MEDIUM PRESSURE SUPPLY
MPR CONDENSATE - MEDIUM PRESSURE RETURN
LPS STEAM - LOW PRESSURE SUPPLY
RPM REVOLUTIONS PER MINUTE
PMT ROOM PRESSURE MONITOR
ROOM PRESSURE SENSOR
ROOM PRESSURE MONITOR
RPS
PMT
RTU ROOF TOP UNIT
CBD CONTINUOUS BLOWDOWN
TES THERMAL ENERGY STORAGE
HEAT EXCHANGERHX
PF PLATE AND FRAME
CTPD CONDENSATE TRANSFER PUMP DISCHARGE
CTPS CONDENSATE TRANSFER PUMP SUCTION
FWPD FEED WATER PUMP DISCHARGE
FWPS FEED WATER PUMP SUCTION
BWS BOILER WATER SAMPLE
CF CHEMICAL FEED
CFP CHEMICAL FEED PUMP
FLOOR DRAINFD
BCU BLOWER COIL UNIT
EXISTING DUCT/ PIPING AND EQUIPMENT
GENERAL NOTES:
HOT TAPPING, OR PRESSURE TAPPING, SHALL BE USED TO PERFORM A
CONNECTION TO AN EXISTING PIPE WITHOUT STOPPING FLOW AND DRAINING THE
PIPE. A HOT TAP SHALL BE MADE AS A FIRST STEP IN A MECHANICAL LINE STOPPING
PROCESS USING THE PROCEDURE AS FOLLOWS:
A. A WELD NOZZLE WITH GATE VALVE SHALL BE INSTALLED ON PIPE TO
BE PLUGGED.
B. THE WELD NOZZLE AND GATE VALVE ASSEMBLY SHALL BE PRESSURE
TESTED AND TAPPING MACHINE ATTACHED.
C. THE GATE VALVE SHALL BE OPENED, HOT TAP COMPLETED, AND
COUPON OR CUT PORTION RETAINED BY LATCHES ON PILOT DRILL.
D. CUTTER AND COUPON RETRACTED AND VALVE CLOSED.
E. FLUID DRAINED FROM TAP ASSEMBLY AND TAP ASSEMBLY REMOVED.
FOR THE MECHANICAL LINE STOP METHOD. THE LINE STOP MACHINE IS ATTACHED
TO THE HOT TAP CONNECTION. THE LINE STOPPER IS HYDRAULICALLY OR
MECHANICALLY PUSHED INTO THE LINE TO SEAL THE PIPE.
ALL MECHANICAL AND ELECTRICAL HOT WORK (HOT TAPS) SHALL REQUIRE A 15 DAY
ADVANCE NOTICE AND APPROVED BY THE VA PRIOR TO THE START OF ANY WORK.
1.
2.
3..
V
T STEAM TRAP
STEAM TRAP INVERTED BUCKET
VALVE ASSEMBLY - STEAM PRESSURE REDUCING
POINT OF NEW CONNECTION TO EXISTING
KEYED NOTE
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
EXTENT OF DEMO TO EXISTING
EXTENT OF DEMO PIPING TO EXISTING PIPING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:3
:5
A M
M-001
MECHANICAL LEGEND
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K. LUKE
100% CONSTRUCTION
DOCUMENTS
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
07/20/2022
DN
1 2 3 4
E
D
C
B
A
BFD-43-ML (E)
10" HPS
10" HPS
CST-43-ML (E)
4 4
F
M
D B
C1
G-903
F6
G-904
F3
G-904
F1
G-904
C3
G-904
4" CND
3" CND
4" CND
4" CND
F5
G-902
"x
22"x20"
"x
E6
G-902
C6
G-903
B3
G-902
3/4" HPS 3/4" HPS
C8
G-905
43-DT-1 (E)
LPG TANK (E)
EG-1 (E)
3/4" FWPD
3/4" CF 3/4" FWPD
3/4" CF
1/2" BWS
1/2" BWS 1/2" BWS
3/4" CF
1/2" BWS
2 1/2" V
2 1/2" V
2" FWPD
2" FWPD
1/2" BWS
3/4" CF
2 1/2" V
2 1/2" V
3/4" CF
1/2" BWS
2 1/2" V
2 1/2" V
2" FWPD
2" FWPD
2" V
2" FWPD
2" FWPD
2" FWPD
2" FWPD
2" FWPD
2" FWPD
2" FWPD
4" FWPD
4" FWPD
2" FWPD
2" FWPD
3/4" FWPD
3/4" FWPD4" BF
4" BF
3/4" CND
2" FWPD 2" FWPD
3/4" CND
3/4" CF
1/2" BWS
1" HPS
2" CND
3/4" CF
3/4" CF
3/4" CF
1/2" BWS
1/2" BWS
STB-433ML (E)
STB-432ML (E)
STB-431ML (E)
1" LPS
2 3
E
D
CRU-43-BB (E)
F1
G-902
8" HPS
4" CND
12" CHS
12" CHR
6" HPS
2" HPS
2" CND
1 1/2" V
3" CND
6" HPS
12"x14"
20"x14"
4" CND
3" CND
2" CND
2 1/2" HPS
2 1/2" HPS
2 1/2" HPS
MECH AREA-2
MA-100-2
ELECTRICAL ROOM
MA-107
GENERATOR ROOM
MA-106
SUPPLY ROOM
MA-105
STAIR
MA-110
CHEMICAL TESTING
ROOM
MA-111
BOILER PLANT
MA-108
CONTROL ROOM
MA-104
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
A
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:4
:0
A M
MD101A
MECHANICAL DEMO PLAN - LEVEL 1 &
BASEMENT LEVEL - AREA A
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K. LUKE
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" F4
MECHANICAL DEMO PLAN - LEVEL 1 - AREA A
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL OBTAIN ALL AVAILABLE AS-BUILT
DRAWINGS FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT
SITE PRIOR TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND
DEVICES, AND DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING
DRAWINGS SHOWING EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE
LOCATIONS AND TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE
DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS AND
LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO
SPECIFICATION SECTION 23 50 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 23 05 10 AND 23 05 11
FOR APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND
APPROVED BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE
WORK.
E. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
F. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES,
REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH
EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN
THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE
BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR
AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED
ON THE ROUTE DRAWING.
G. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION.
H. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS.
I. ALL CONTROL WIRING SHALL BE ROUTED IN CONDUIT TO EACH CONTROL
DEVICE.
J. AS-BUILT NOTE: THE BUILDING'S VERTICAL STRUCTURE AND GRID LAYOUT IS
SHOWN BASED ON RECORD DOCUMENTS AND / OR LASER SCANS OF THE AREA.
COLUMNS MAY BE OFFSET FROM GRID LINES WITHOUT AN IDENTIFYING GRID
LINE AND ALL GRID LINES MAY NOT HOST COLUMNS ON ALL LEVELS.
K. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND
B43A.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
N. SEE SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
O. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
1/4" = 1'-0" F1
MECHANICAL DEMO PLAN - BASEMENT LEVEL - AREA A
1 CONTRACTOR SHALL REPLACE EXISTING 6” STEAM GATE VALVES WITH 8" VALVES FROM HIGH PRESSURE STEAM SUPPLY PIPING FROM BOILER STB-431ML, STB-432ML AND STB-433ML. CONTRACTOR
SHALL PHASE THE VALVE REPLACEMENT WITH SEQUENCED BOILER SHUTDOWNS. PROVIDE
TEMPORARY BOILER TO MAINTAIN N+1 REDUNDANCY AT ALL TIMES, SEE SHEET M-602 FOR ADDITIONAL
INFORMATION.
2 REMOVE EXISTING EXHAUST FAN, DUCT AND LOUVER. PROVIDED TEMPORARY EXHAUST DUCTING WHILE NEW BUILDING ADDITION IS BEING CONSTRUCTED. COORDINATE ROUTING WITH EXISTING
CONDITIONS AND NEW CONSTRUCTION.
3 MAINTAIN EXISTING CONTROLS UNTIL NEW CONTROLS ARE COMMISSIONED AND ACCEPTED BY THE
OWNER. DEMONSTRATE A MINIMUM OF THREE WEEKS OPERATION OF NEW CONTROLS PRIOR TO
REMOVAL OF EXISTING.
4 REMOVE EXISTING SUPPLY AIR DIFFUSERS AND DUCT WORK.
5 REMOVE ABANDONED 6” MEDIUM PRESSURE STEAM LINE BACK TO THE END OF RUN. LINE LOCATED IN
THE UTILITY TUNNEL, SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
4 5 6
E
D
C
B
A
43-WCCH-1 (E)
43-WCCH-2 (E)
43-WCCH-3 (E)
43-P14 (E)
43-P13 (E)
43-P8 (E)
43-P7 (E)
43-P6 (E)
43-P9 (E)
43-P10 (E)
43-P11 (E)
HE-2 (E)
HE-1 (E)43A-P2 (E)
43A-P1 (E)
10" TWS
10" TWR
10" CHR
F
M
D A
43-P12 (E) 7
6" CHS
6" CHR
6 7
6 7
C1
G-903
F6
G-904
F3
G-904
F1
G-904
C3
G-904
C6
G-904
6"x6"
F3
G-902
E3
G-902
C H
S
T W
S
T W
S
T W
S
T W
S
C H
S
T W
S
C H
S
C H
S
C H
S
C H
S
10" CHS
10" CHS
10" TWS
10" TWS
D9
G-902
F5
G-902
F8
G-902 10" TWS10" TWS
10" CHS
10" CHS
10" CHR
10"
10"
10"x10"
12"x10"
10"ø
10"ø
10"ø
"x
"x
6" CHR
6" CHS
10" TWR
10" TWS
10" TWR
10" TWS
10" TWS
1" CF
1" CF
C8
G-905
B7
G-905
E8
G-902
3/4" FWPD
1/2" BWS
3/4" CF
3/4" CF
3/4" CF
1/2" BWS
1/2" BWS
1" LPS
10" CHS
C H
R
10" CHR
8" CHR
8" TWR
3" V
BLDG 43A
43A
VESTIBULE
CHILLER ROOM
MA-109
RESTROOM/LOCKER
ROOM
MA-103
CONTROL ROOM
MA-104
CHEMICAL TESTING
ROOM
MA-111
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:4
:1
A M
MD101B
MECHANICAL DEMO PLAN - LEVEL 1 - AREA B
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K. LUKE
100% CONSTRUCTION
DOCUMENTS
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL OBTAIN ALL AVAILABLE AS-BUILT
DRAWINGS FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT
SITE PRIOR TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND
DEVICES, AND DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING
DRAWINGS SHOWING EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE
LOCATIONS AND TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE
DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS AND
LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO
SPECIFICATION SECTION 23 50 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 23 05 10 AND 23 05 11
FOR APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND
APPROVED BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE
WORK.
E. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
F. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES,
REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH
EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN
THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE
BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR
AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED
ON THE ROUTE DRAWING.
G. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION.
H. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS.
I. ALL CONTROL WIRING SHALL BE ROUTED IN CONDUIT TO EACH CONTROL
DEVICE.
J. AS-BUILT NOTE: THE BUILDING'S VERTICAL STRUCTURE AND GRID LAYOUT IS
SHOWN BASED ON RECORD DOCUMENTS AND / OR LASER SCANS OF THE AREA.
COLUMNS MAY BE OFFSET FROM GRID LINES WITHOUT AN IDENTIFYING GRID
LINE AND ALL GRID LINES MAY NOT HOST COLUMNS ON ALL LEVELS.
K. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND
B43A.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
N. SEE SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
O. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
1/4" = 1'-0" F4
MECHANICAL DEMO PLAN - LEVEL 1 - AREA B
1 REMOVE EXISTING 500 TON TRANE WATER COOLED CENTRIFUGAL CHILLER. PROVIDE UNINTERRUPTED OPERATION OF THE CHILLED AND CONDENSER WATER SYSTEMS DURING REMOVAL.REMOVE EXISTING CHILLER AND CHILLED AND CONDENSER WATER PIPE CONNECTIONS AND PIPING TO THE EXTENT DENOTED ON PLANS. REMOVE ALL CONTROL DEVICES, VALVES, OTHER PIPE ACCESSORIES. FOR ELECTRICAL DEMOLITION, SEE ELECTRICAL SHEETS. FOR CONCRETE BASE DEMOLITION, SHEE SHEET
AD101B.
2 REMOVE EXISTING EXHAUST FAN, DUCT AND LOUVER. PROVIDED TEMPORARY EXHAUST DUCTING WHILE NEW BUILDING ADDITION IS BEING CONSTRUCTED. COORDINATE ROUTING WITH EXISTING
CONDITIONS AND NEW CONSTRUCTION.
3 MAINTAIN EXISTING CONTROLS UNTIL NEW WORKSTATION AND CONTROLS ARE COMMISSIONED AND
ACCEPTED BY THE OWNER. DEMONSTRATE A MINIMUM OF THREE WEEKS OPERATION OF NEW
CONTROLS PRIOR TO REMOVAL OF EXISTING. CONTRACTOR SHALL INCORPORATE ALL BOILER PLANT CONTROL AND DATA STREAMS/POINTS, THESE POINTS SHALL BE RECOMMISSIONED TO BE ACCESSED BY THE WEBCTRL/AUTOMATED LOGIC SOFTWARE SYSTEM. COORDINATE WITH REQUIREMENTS FROM 23 09 11 AND 23 09 23, INSTRUMENTATION AND CONTROL FOR BOILER PLANT AND DIRECT DIGITAL
CONTROL SYSTEM FOR HAVC.
4 REMOVE EXISTING SUPPLY AIR DIFFUSERS AND DUCT WORK.
5 REMOVE EXISTING CHILLER DISCONNECT AND OTHER ELECTRICAL GEAR. FOR ELECTRICAL
DEMOLITION, SEE ELECTRICAL SHEETS.
6 REMOVE PRIMARY CHILLED WATER PUMP AND ASSOCIATED ISOLATION BUTTERFLY VALVES, CHECK VALVES, PIPE FLANGES, PIPE INSULATION, INLET STRAINERS, SUCTION STRAINERS, TRIPLE DUTY
VALVES, PRESSURE GAUGE ASSEMBLIES, CONTROL DEVICES AND OTHER PIPING ACCESSORIES.
CONTRACTOR SHALL ISOLATE PUMP BACK TO THE NEAREST ISOLATION VALVE AND COORDINATE WITH
THE CHILLER REPLACEMENT.
7 REMOVE EXISTING PUMP CONCRETE PAD. SAW CUT EXISTING CONCRETE SLAB AS REQUIRED FOR NEW
EQUIPMENT PADS, SEE MECHANICAL PIPING PLANS FOR EQUIPMENT LAYOUT.
8 EXISTING MOTOR CONTROL CENTER. ELECTRICAL SWITCH GEAR TO REMAIN IN OPERATION DURING
PROJECT.
9 EXISTING WATER TREATMENT SKID TO REMAIN IN OPERATION DURING PROJECT.
10 CONTRACTOR SHALL REMOVE AND RELOCATE EXISTING PUMP 43-P14 (E) TO PROVIDE CLEAR ACCESS
FOR NEW CHILLER 43-WCCH-3.
11 REMOVE ALL CONDENSER WATER PIPING, VALVES, PIPE ACCESSORIES, PIPE STANCHIONS AND
ASSOCIATED PIPE SUPPORTS FOR CHILLER REPLACEMENT.
12 REMOVE ALL CHILLED WATER PIPING AND INSULATION, VALVES, PIPE ACCESSORIES, PIPE STANCHIONS
AND ASSOCIATED PIPE SUPPORTS FOR CHILLER REPLACEMENT.
13 REMOVE EXISTING CHILLER CONCRETE BASE. SAW CUT EXISTING CONCRETE SLAB AS REQUIRED FOR
NEW EQUIPMENT PADS. SEE ARCHITECTURAL DEMOLITION PLANS FOR PAD REMOVAL AND SEE
MECHANICAL PIPING PLANS FOR EQUIPMENT LAYOUT.
14 EXISTING PLATE AND FRAME HEAT EXCHANGER TO REMAIN IN OPERATION. PROTECT ALL CONTROL
DEVICES AND ELECTRONICS THROUGHOUT PROJECT.
15 REMOVE EXISTING CHS LINE TO RECONFIGURE HEAT EXCHANGER TO INTEGRATED CONFIGURATION, SEE SHEET M-601 FOR ADDITIONAL INFORMATION.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
1 2 3 4
D
C
B
A
30"ø OA
30"ø OA
BFD-43-ML (E)
CST-43-ML (E)
20"x22"
F
M
D B
B2
G-902 B1
G-902
C3
G-903
43-UH-6
43-DWBP-1
43-UH-7
43-UH-5
43-UH-4
43-UH-3
1 1/4" HPS
2" HPS
1 1/4" HPS
3" LPS6" LPS
1/4" HPS
2 1/2" HPS
1" HPS
C3
G-902
C3
G-902
1" CND
1 1/2" LPS
4" CHR
4" CHS3" HPS
3" HPS
10" CHS
10" CHR
3" CND
8" HPS
6" HPS
8" HPS
8" HPS
8" HPS
5" HPS
8" HPS
8" HPS
8" HPS
5" HPS
10" CHR
10" CHS
8" HPS
6" HPS
4" CND
1 1/4" HPS
2" HPS
1 1/2" HPS
1 1/2" HPS
1 1/2" HPS
2" FWPD
4" CHR
4" CHS
C H
S
C H
R
H P
S 1 1/2" CND
C H
S
C H
R
6" HPS
L P
S
/4
C
N D
/2
H
P S
1/2" HPS
1 1/2" CND
3" LPS
1" LPS
1 1/2" LPS
3/4" CND
2" CND
2" CND
2" CND
3/4" CND
3/4" CND
2" CND
2" CND
2" CND
3" LPS
1 1/2" LPS
3" LPS
1 1/2" LPS
3" LPS
1 1/2" LPS
1 1/4" LPS
1 1/2" LPS
1 1/4" LPS
3/4" CND
3/4" CND
1" CND
STB-431ML (E)
STB-432ML (E)
STB-433ML (E)
2" CND
3/4" CND
6" LPS
6" LPS
6" LPS
2 1/2" HPS
2 1/2" HPS
10" CHR
43-SS-1 (E)
ELECTRICAL ROOM
MA-107
SUPPLY ROOM
MA-105
BOILER PLANT
MA-108
BOILER ROOM -
MEZZANINE
MA-200
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:4
:2
A M
MD102A
MECHANICAL DEMO PLAN - LEVEL 2 - AREA A
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K. LUKE
100% CONSTRUCTION
DOCUMENTS
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL OBTAIN ALL AVAILABLE AS-BUILT
DRAWINGS FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT
SITE PRIOR TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND
DEVICES, AND DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING
DRAWINGS SHOWING EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE
LOCATIONS AND TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE
DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS AND
LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO
SPECIFICATION SECTION 23 50 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 23 05 10 AND 23 05 11
FOR APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND
APPROVED BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE
WORK.
E. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
F. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES,
REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH
EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN
THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE
BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR
AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED
ON THE ROUTE DRAWING.
G. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION.
H. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS.
I. ALL CONTROL WIRING SHALL BE ROUTED IN CONDUIT TO EACH CONTROL
DEVICE.
J. AS-BUILT NOTE: THE BUILDING'S VERTICAL STRUCTURE AND GRID LAYOUT IS
SHOWN BASED ON RECORD DOCUMENTS AND / OR LASER SCANS OF THE AREA.
COLUMNS MAY BE OFFSET FROM GRID LINES WITHOUT AN IDENTIFYING GRID
LINE AND ALL GRID LINES MAY NOT HOST COLUMNS ON ALL LEVELS.
K. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND
B43A.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
N. SEE SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
O. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
SCALE: 1/4" = 1'-0"F3
MECHANICAL DEMO PLAN - LEVEL 2 - AREA A
1 EXISTING POTABLE WATER BOOSTER PUMP TO BE RELOCATED.
2 EXISTING STEAM PRESSURE REDUCING VALVE STATIONS WITH BYPASS 43-PRV-3 AND 43-PRV-4 TO BE REMOVED AND REPLACED, SEE SHEET MP102A. ENSURE NO INTERRUPTIONS TO SERVICE, PROVIDE
TEMPORARY STEAM SERVICE.
3 REMOVE AND REPLACE EXISTING STEAM UNIT HEATER, STEAM SUPPLY AND CONDENSATE VALVE
ASSEMBLIES TO BE REMOVED AND REPLACED.
4 REMOVE EXISTING SUPPLY AIR DIFFUSERS AND DUCT WORK.
5 RETAIN AND REUSE EXISTING SUPPLY AIR DIFFUSERS AND DUCT WORK.
6 REMOVE, RETAIN, AND RELOCATE SIDE STREAM FILTER TO FIRST LEVEL AREA B. PROVIDE NEW PIPING
TO NEW LOCATION, SEE MECHANICAL PIPING SHEETS FOR ADDITIONAL INFORMATION.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
D
C
B
A
10" CHS
6" CHS
10" CHS
10" CHR
10" CHR
43-FCU-1
12"x10"
12"x12"
"x
12"x18"
12"x5"
8"ø18"x10"
"x
F
M
D A
B2
G-902
C3
G-903
43-UH-1
43-UH-2
E2
G-902
1/4" HPS
2 1/2" HPS
10" TWR
T W
R
T W
R
10" CHR
10" TWR
10" CHS 10" CHS
C H
S
C H
S
10" CHS
10" CHS
10" CHR
C3
G-902
"x
1 1/2" CND
3" LPS
1" LPS
T W
S
C H
R
"x
E X
H
18"x18" EXH
6" CHS
6" CHR
C H
S
10" CHS
10" CHS
C H
S
T W
R
C H
R
10" CHR
3" LPS
2 1/2" LPS
2 1/2" LPS
2" LPS
2" LPS
3/4" LPS
1 1/2" LPS
1" LPS
1 1/2" CND
3/4" CND
3/4" CND
1 1/4" CND
1 1/4" CND
1" CND
3/4" CND
1" CND
1 1/2" LPS
3/4" CND
3/4" CND
3/4" CND
1 1/2" LPS
3/4" CND
3/4" CND
1 1/2" LPS
3/4" CND
10" TWS
T W
S
10" TWS
10" CHS
6" CHS
6" CHR
6" CHR
10" CHS
T W
R
C H
R 1
T W
R
10" TWR
3" V
F
CHILLER ROOM
MA-109
CORRIDOR
MA-202
OFFICE
MA-203 OFFICE
MA-205
NEW OFFICE
MA-204
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:4
:3
A M
MD102B
MECHANICAL DEMO PLAN - LEVEL 2 - AREA B
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K. LUKE
100% CONSTRUCTION
DOCUMENTS
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL OBTAIN ALL AVAILABLE AS-BUILT
DRAWINGS FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT
SITE PRIOR TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND
DEVICES, AND DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING
DRAWINGS SHOWING EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE
LOCATIONS AND TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE
DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS AND
LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO
SPECIFICATION SECTION 23 50 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 23 05 10 AND 23 05 11
FOR APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND
APPROVED BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE
WORK.
E. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
F. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES,
REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH
EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN
THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE
BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR
AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED
ON THE ROUTE DRAWING.
G. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION.
H. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS.
I. ALL CONTROL WIRING SHALL BE ROUTED IN CONDUIT TO EACH CONTROL
DEVICE.
J. AS-BUILT NOTE: THE BUILDING'S VERTICAL STRUCTURE AND GRID LAYOUT IS
SHOWN BASED ON RECORD DOCUMENTS AND / OR LASER SCANS OF THE AREA.
COLUMNS MAY BE OFFSET FROM GRID LINES WITHOUT AN IDENTIFYING GRID
LINE AND ALL GRID LINES MAY NOT HOST COLUMNS ON ALL LEVELS.
K. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND
B43A.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
N. SEE SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
O. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
1/4" = 1'-0" F4
MECHANICAL DEMO PLAN - LEVEL 2 - AREA B
1 EXISTING STEAM UNIT HEATER, STEAM SUPPLY AND CONDENSATE VALVE ASSEMBLIES TO BE
REMOVED AND REPLACED. REFER TO SHEET MP-102B FOR NEW LOCATION OF HEATER.
2 REMOVE EXISTING SUPPLY AIR DIFFUSERS AND DUCT WORK.
3 REMOVE EXISTING FAN COIL UNIT AND DUCT WORK. CAP EXISTING PIPE CONNECTIONS TO BE
REROUTED WITH NEW FAN COIL UNITS.
4 REMOVE EXISTING OUTDOOR AIR INTAKE DUCT TO ROOF.
5 LIMITS OF DEMOLITION. PIPING SYSTEM SHALL HAVE A MECHANICAL LINE STOP OR ICE PLUG TO STOP
FLOW AND ALLOW FOR NEW ISOLATION VALVE INSTALLATION.
6 REMOVE EXISTING LOW PRESSURE STEAM SUPPLY AND CONDENSATE RETURN VALVE ASSEMBLIES
SERVING THE EXISTING COOLING TOWER BASIN HEATERS. PHASE REPLACEMENT TO MAINTAIN
UNINTERRUPTED COOLING TOWER OPERATION. PROVIDE TEMPORARY ELECTRICAL BASIN HEATERS TO
ELIMINATE FREEZING DURING REPLACEMENT IN FREEZING AMBIENT CONDITIONS.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
D
C
B
A
43-EAC-1
43-REF-4(E)
43-REF-5(E)
43-EAC-2
43-EAC-3
43-EF-5
43-BIH-3(E)
43-BIH-2(E)
43-EF-3
43-EF-4
43-BIH-1(E)
FGE-431RF(E)
FGE-432RF(E)
FGE-433RF(E)
43-GH-5
43-GH-4
43-GH-3
43-EF-10
43-EF-9
43-EF-8
43-EF-7
43-EF-6
43-GH-6(E)
43-GH-7(E)
43-RTU-1
F
M
D B
E5
G-903
E7
G-903
E6
G-903
E9
G-903
E3
G-903
E4
G-903
E8
G-903
E2
G-903
E1
G-903
B1
G-903
18"x18" EXH
14"x14" EXH
6" V 20"x22"
C6
G-905
B8
G-905
B6
G-905
BF-2
2 1/2" V
2 1/2" V
2 1/2"
2 1/2" V
2 1/2" V
4" FWPD 4" FWPD
4" FWPD4" FWPD
12" HPS
2 1/2" V 2 1/2" V
4" FWPD
4" FWPD
2" FWPD
2" FWPD
1" V 4" V
1 1/2" CND
4" V 4" V
1 1/2" V
2" FWPD
2" FWPD
2" FWPD
2" FWPD
16"ø EXH
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:4
:4
A M
MD103A
MECHANICAL DEMO PLAN - ROOF LEVEL -
AREA A
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K. LUKE
100% CONSTRUCTION
DOCUMENTS
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL OBTAIN ALL AVAILABLE AS-BUILT
DRAWINGS FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT
SITE PRIOR TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND
DEVICES, AND DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING
DRAWINGS SHOWING EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE
LOCATIONS AND TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE
DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS AND
LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO
SPECIFICATION SECTION 23 50 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 23 05 10 AND 23 05 11
FOR APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND
APPROVED BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE
WORK.
E. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
F. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES,
REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH
EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN
THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE
BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR
AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED
ON THE ROUTE DRAWING.
G. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION.
H. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS.
I. ALL CONTROL WIRING SHALL BE ROUTED IN CONDUIT TO EACH CONTROL
DEVICE.
J. AS-BUILT NOTE: THE BUILDING'S VERTICAL STRUCTURE AND GRID LAYOUT IS
SHOWN BASED ON RECORD DOCUMENTS AND / OR LASER SCANS OF THE AREA.
COLUMNS MAY BE OFFSET FROM GRID LINES WITHOUT AN IDENTIFYING GRID
LINE AND ALL GRID LINES MAY NOT HOST COLUMNS ON ALL LEVELS.
K. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B43 AND
B43A.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
N. SEE SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
O. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
1/4" = 1'-0" F3
MECHANICAL DEMO PLAN - ROOF LEVEL - AREA A
1 REMOVE EXISTING ROOF TOP UNIT, ASSOCIATED DUCT WORK AND PIPING. PROVIDE NEW ROOF/
REPLACEMENT ROOF PER ARCHITECTURAL SHEETS, COORDINATE ALL MECHANICAL EQUIPMENT
REMOVAL WITH ROOF REPLACEMENT.
2 REMOVE EXISTING EVAPORATIVE AIR CONDITIONING UNIT AND ASSOCIATED DUCT WORK. SEAL ALL
DUCT PENETRATIONS, COORDINATE ALL MECHANICAL EQUIPMENT REMOVAL WITH ROOF
REPLACEMENT.
3 REMOVE, RETAIN, AND RELOCATE SIDE STREAM FILTER TO FIRST LEVEL. PROVIDE NEW PIPING TO NEW
LOCATION, SEE MECHANICAL PIPING SHEETS FOR MORE INFORMATION.
4 REMOVE AND REINSTALL EXISTING ROOF MOUNTED HOOD AND CURB AS NECESSARY FOR ROOF
REPLACEMENT, RETAIN EXISTING HOOD. COORDINATE ALL MECHANICAL EQUIPMENT REMOVAL WITH
ROOF REPLACEMENT.
5 REMOVE EXISTING ROOF MOUNTED HOOD AND CURB, COORDINATE ALL MECHANICAL EQUIPMENT
REMOVAL WITH ROOF REPLACEMENT.
6 REMOVE AND REINSTALL EXISTING ROOF MOUNTED EXHAUST FAN AND CURB AS NECESSARY FOR ROOF REPLACEMENT, RETAIN EXISTING EXHAUST FAN. COORDINATE ALL MECHANICAL EQUIPMENT REMOVAL WITH ROOF REPLACEMENT. REWORK DUCTING AS NECESSARY TO ELEVATE THE EXHAUST
FAN WITH THE ROOF REPLACEMENT. PROIVDE TEMPORARY REFRIGERANT EXHAUST DURING
REPLACEMENT.
7 REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND CURB, COORDINATE ALL MECHANICAL
EQUIPMENT REMOVAL WITH ROOF REPLACEMENT.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
D
C
B
A
43-EAC-1
43-CT-2 (E)
43-CT-1 (E)
43-CT-3 (E)
43-GH-2(E)
43-OAH-6
43-GH-1(E)
6" TWS
6" TWS
F
M
D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .