This notification provides details for an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure at the New Mexico VA Healthcare System. The project scope includes renovations, new construction, equipment replacements and utility modifications to address deficiencies at Building 43, the Central Utility Plant, and will be procured as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The work includes general construction, alterations, mechanical, electrical and utility systems work. The solicitation will be an Invitation for Bid issued on or around July 15, 2023 via SAM.gov. The project magnitude is estimated between $10-20 million. The point of contact is Maria Cruz-Thompson, Contracting Specialist at the Network Contracting Office 22 in Long Beach, CA.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKING
MANZANO
ROAD
S
DN
DN
DN
DN
DN
DN
SOUTH VETERANS LOOP ROAD
MANZANO ROAD
B56 B43A
AREA O
F W
ORK,
SEE CIVIL
AREA O
F W
ORK,
SEE CIVIL
EXISTING UNDERGROUND
UTILITY TUNNEL
AREA OF W
ORK,
SEE CIVIL
15 11
NEW UNDERGROUND FUEL STORAGE TANK
AND DAY TANK ON CONCRETE PAD TO
SUPPORT NEW GENERATOR SYSTEM,
SEE CIVIL AND PLUMBING DRAWINGS
EXISTING ELECTRICAL MANHOLE
EXISTING ELEC EQUIP
ON CONCRETE PAD TO
REMAIN
AREA O
F W
ORK,
SEE C
IVIL
25'-0" M
IN
REPLACE MEMBRANE ROOFING SYSTEM
(PHASE 3)
NEW GENERATOR FLUES THROUGH ROOF
(PHASE 1), EXISTING GENERATOR FLUE TO
REMAIN
BASE BID
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
A C
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:1
P M
AS101
ARCHITECTURAL SITE PLAN
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS N.
BLANCHARD
100% CONSTRUCTION
DOCUMENTS
1" = 10'-0" F2
ARCHITECTURAL SITE PLAN COMPOSITE
1 EXISTING LANDSCAPE TO REMAIN
2 EXISTING SIDEWALK
3 EXISTING PARKING AREA TO REMAIN
4 REPLACE EXISTING PARKING CANOPY WITH NEW PHOTOVOLTAIC PARKING
CANOPY
5 NEW CONCRETE PAVING, SEE CIVIL DRAWINGS
6 NEW SIDEWALK, SEE CIVIL DRAWINGS
7 NEW BUILDING ADDITION
8 NEW COOLING TOWER AND ENCLOSURE ON ROOF
9 NEW STAIRS ACCESS TO NEW SECOND STORY, BASE BID
10 NEW STAIRS ACCESS TO NEW SECOND STORY ROOF, BASE BID
11 EXISTING LANDSCAPE TO BE REPLACED AT NEW UTILITY TRENCH, SEE CIVIL AND
MECHANICAL DRAWINGS
12 EXISTING LANDSCAPE TO REMAIN, OR BE REPLACED TO LIKE MATCH EXISTING
WITHIN CONTRACTOR STAGING AREA, SEE CIVIL DRAWINGS
13 EXISTING THERMAL STORAGE TANK TO REMAIN
14 NEW DRAINAGE SWALE, SEE CIVIL DRAWINGS
15 NEW MANWAY AT NEW UNDERGROUND FUEL TANK, SEE CIVIL DRAWINGS
16 EXISTING SIDEWALK TO BE REPLACED AT NEW UTILITY TRENCH, SEE CIVIL AND
MECHANICAL DRAWINGS
17 EXISTING LOADING DOCK TO REMAIN
18 EXISTING DUMPSTER TO REMAIN
19 EXISTING MANHOLE DRAIN IN MANZANO ROAD FOR USE AS NECESSARY FOR
TEMPORARY UTILITIES TRAILER, SEE CIVIL DRAWINGS
20 NEW MECHANICAL EQUIPMENT ON NEW CONCRETE EQUIPMENT PAD
21 NEW ELECTRICAL EQUIPMENT ON NEW CONCRETE EQUIPMENT PAD
22 NEW CMU SCREEN WALL WITH GATE FOR TEMPORARY NEW CONNECTIONS, SEE
CIVIL DRAWINGS
23 NEW SECURITY CAMERAS MOUNTED ON BUILDING, SEE PLANS
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
07/20/2022
F
F
F
F
F
P B
P B
T F
UP
UP
DN
S
DN
DN
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
E
D
C
B
A
1 2 3 4 5 6 25'-0" 23'-6" 23'-6" 19'-0" 19'-0"
BOILER
PLANT
MA-108MA-108 CHILLER
ROOM
MA-109MA-109
ELECTRICAL
ROOM
MA-107MA-107
GENERATOR
ROOM
MA-106MA-106
SUPPLY
ROOM
MA-105MA-105
STAIRS
MA-209MA-209
SHOWER/CHANGE
115115
VESTIBULE
103103
BLDG
43A 43A43A
1'-6 1/8"
1' -5
3'
-4
85'-10 1/8"
6'-6"
3'-3 1/4"
REMOVE SHOWER / CHANGE
ROOM FOR NEW PUMPS
INSTALLED IN PHASE 2,
REMAINING ARCHITECTURAL
RENOVATION OF THIS AREA
OCCURS IN PHASE 3
4'-5"
INSIDE EXISTING CHANNELS TO REMAIN
PHASE 1,
REMOVE KNOCK-OUT PANEL
'-0
'-0
'-0
'-0
5' -1
0"
ELEC EQUIP TO REMAIN,
(BASE BID)
NEW UNDERGROUND FUEL STORAGE TANK
AND DAY TANK ON CONCRETE PAD TO
SUPPORT NEW GENERATOR SYSTEM,
SEE CIVIL AND PLUMBING DRAWINGS
4 1/2" 9'-9 1/2"
3'-4" 2'-1 5/8" 3'-4" 4'-0"
4' -6
CONTROL
ROOM
MA-104MA-104
CHEMICAL
TESTING
ROOM
MA-111MA-111
RESTROOM/LOCKER
ROOM
MA-103MA-103
C2
G-901
F2
G-901
D2
G-901
D5
G-901
F9
G-901
F7
G-901
WALL TYPE LEGEND
PARTIAL DEMOLISHED WALL
DEMOLISHED WALL, FIXTURE OR
FURNISHING
EXISTING WALL,
FIXTURE OR FURNISHING
CONCRETE MASONARY UNIT WALL
1 HR FIRE RATING
2 HR FIRE RATING
SMOKE RATING
NEW WALL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
A
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:1
P M
AD101
ARCHITECTURAL DEMOLITION PLAN - LEVEL 1
- COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS D. YOUNG
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F3
ARCHITECTURAL DEMOLITION PLAN - LEVEL 1 - COMPOSITE
1 REMOVE WALL AND WINDOW; CONTRACTOR SHALL MAINTAIN CONTINUITY OF
OCCUPANCY SEPARATIONS DURING CONSTRUCTION
2 REMOVE ALL FIXTURES AND FINISHES IN SPACE
3 REMOVE HARDSCAPE FOR NEW ADDITION. REFER TO CIVIL DRAWINGS FOR
ADDITIONAL INFORMATION.
4 REMOVE PARTIAL WALL FOR NEW DOOR
5 REMOVE EXISTING MECHANICAL EQUIPMENT. REFER TO MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
6 REMOVE EXISTING LOUVER, PHASE 1
7 REMOVE TESTING ROOM ENTIRELY, CAP ALL PLUMBING. REFER TO PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
8 REMOVE EXISTING DOOR
9 REMOVE OVERHEAD COILING DOOR
10 COLUMN TO REMAIN, PROTECT IN PLACE
11 REMOVE PARTIAL WALL FOR NEW WINDOWS
12 REMOVE EXTERIOR WALL, FOR NEW CMU INFILL
13 EQUIPMENT TO BE RELOCATED. REFER TO ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
14 REMOVE EXISTING ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
15 REMOVE EXISTING EMERGENCY SHOWER/ EYE WASH. REFER TO PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
16 REMOVE DRINKING FOUNTAIN, CAP ALL PLUMBING
17 REMOVE EXISTING DUCT, REFER TO MECHANICAL DRAWINGS FOR MORE
INFORMATION
18 REMOVE TOILET AND SHOWER FOR INSTALLATION OF MECHANICAL WORK
REQUIRED, THIS ELIMINATES SHOWER FACILITIES DURING CONSTRUCTION.
REMOVE PORTION OF EXISTING SLAB FOR NEW RECESSED SLAB AND DRAINS
20 EXISTING STOVE AND ICE MAKER TO BE RELOCATED
21 EXISTING ABANDONED PIPE PENETRATIONS TO BE FILLED
22 REMOVE EXISTING LOUVER AND PORTION OF WALL TO RAISE HEADER
23 REMOVE PORTION OF WALL FOR NEW LOUVER
24 EXISTING LOUVER AT EXISTING GENERATOR TO REMAIN
25 EQUIPTMENT PAD TO BE REPLACED
26 EXISTING DOOR TO BE RELOCATED, SAWCUT FLOOR FLOR NEW FOOTINGS, PHASE
1, SEE STRUCTURAL
27 REMOVE STUCCO, SHEATHING, & FURRING TO REPAIR METAL STUDS. REMOVE
FROM GRADE TO UNDERSIDE OF CHANNEL.
Revisions: Date:
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
DN
DN
UP
WH
S
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
E
D
C
B
A
1 2 3 4 5 6
OFFICE
MA-203MA-203
OFFICE
MA-205MA-205BOILER
ROOM -
MEZZANINE
MA-200MA-200
CORRIDOR
MA-202MA-202
9' -4
4 5
4'-6"
9 9
SUPPLY
ROOM
MA-105MA-105
8 8 8 8 8
110'-0"
25'-0" 23'-6" 23'-6" 19'-0" 19'-0"
F5
G-901
D9
G-901
STAIR
MA-110MA-110
GENERATOR
ROOM
MA-106MA-106
ELECTRICAL
ROOM
MA-107MA-107
BOILER
PLANT
MA-108MA-108
CHILLER
ROOM
MA-109MA-109
TELECOM
MA-204MA-204
WALL TYPE LEGEND
PARTIAL DEMOLISHED WALL
DEMOLISHED WALL, FIXTURE OR
FURNISHING
EXISTING WALL,
FIXTURE OR FURNISHING
CONCRETE MASONARY UNIT WALL
1 HR FIRE RATING
2 HR FIRE RATING
SMOKE RATING
NEW WALL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:1
P M
AD102
ARCHITECTURAL DEMOLITION PLAN - LEVEL 2
- COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS D. YOUNG
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F3
ARCHITECTURAL DEMOLITION PLAN - LEVEL 2 - COMPOSITE
1 REMOVE PORTION OF WALL AND ALL WINDOWS, LEAVE EXISTING DOOR.
CONTRACTOR SHALL MAINTAIN CONTINUITY OF OCCUPANCY SEPARATIONS
DURING CONSTRUCTION
2 EXISTING EQUIPMENT AND PAD TO BE RELOCATED. REFER TO MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
4 REMOVE PORTION OF WALL FOR NEW DOOR
5 EXISTING WALL TO REMAIN
6 REMOVE ELECTRICAL AND DATA OUTLETS. REFER TO ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
7 EXISTING STAIRCASE TO REMAIN
8 REMOVE PORTION OF WALL FOR NEW WINDOWS, PHASE 1
9 EXISTING FURNITURE TO REMAIN
10 REMOVE EXISTING PIPES, REFER TO MECHANICAL DRAWINGS FOR MORE
INFORMATION
11 EXISTING TELECOM ROOM TO REMAIN OPERATION UNTIL REPLACEMENT ROOM IS
CONSTRUCTED IN PHASE 3
12 EXISTING ABANDONED PIPE PENETRATIONS TO BE FILLED
13 FUTURE NEW PIPE PENETRATIONS THROUGH WALL, SEE MECHANICAL PLUMBING
DRAWINGS
14 EXISTING RAILING ON STAIRCASE TO BE REMOVED IN COORDINATION OF NEW
GATE AND ROOF ACCESS
15 REMOVE PORTION OF WALL FOR NEW LOUVERS
Revisions: Date:
0 2'-0" 4'-0" 8'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
J J
JFJJJ
S
F
H
WH
E
D
C
B
A
1 2 3 4 5 6
GENERATOR
ROOM
MA-106MA-106
ELECTRICAL
ROOM
MA-107MA-107
BOILER
PLANT
MA-108MA-108
CHILLER
ROOM
MA-109MA-109
BLDG
43A 43A43A
VESTIBULE
103103
SHOWER/CHANGE
115115
STAIRS
MA-209MA-209
SUPPLY
ROOM
MA-105MA-105
1 1
6 7
2 2
CHILLER
ROOM
MA-109MA-109
WITH STRUCTURAL DRAWINGS
PHASE 1, COORDINATE
EXTENT OF DEMOLITION
REMOVE SHOWER / CHANGE
ROOM FOR NEW PUMPS
INSTALLED IN PHASE 2,
REMAINING ARCHITECTURAL
RENOVATION OF THIS AREA
OCCURS IN PHASE 3
P H
A S
E
ELEC EQUIP TO REMAIN,
(BASE BID)
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
RCP SYMBOL LEGEND
DEMOLISHED HVAC SUPPLY DIFFUSER
DEMOLISHED HVAC RETURN
DIFFUSER
EXIT LIGHT
DEMOLISHED TILE CEILING (24X48)
DEMOLISHED LIGHT FIXTURE
DEMOLISHED LINEAR FIXTURE
DEMOLISHED HIGH BAY PENDANT FIXTURE
DEMOLISHED HIGH BAY FIXTURE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:2
P M
AD150
ARCHITECTURAL DEMO CEILING PLAN -
LEVEL 1 - COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS D. YOUNG
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F2
ARCHITECTURAL DEMO CEILING PLAN - LEVEL 1 - COMPOSITE
1 REMOVE ACOUSTICAL CEILING, LIGHT FIXTURES AND MECHANICAL DIFFUSERS.
REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2 REMOVE EXISTING SWITCHBOARD IN ITS ENTIRETY. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION, PHASE 1
3 REMOVE EXISTING 15kV SWITCH IN ITS ENTIRETY. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION, PHASE 1
4 REMOVE MECHANICAL DUCT, REFER TO MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
5 REMOVE OVERHEAD COILING DOOR
6 REMOVE EXISTING DOOR
7 REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
8 REMOVE EXISTING EMERGENCY SHOWER/ EYE WASH. REFER TO PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
9 REMOVE PORTION OF WALL FOR NEW WINDOWS, PHASE 1
10 EXISTING ABANDONED PIPE PENETRATIONS TO BE FILLED
11 EXISTING FLOOR DRAIN TO BE REMOVED
12 EXISTING METAL DECK TO REMAIN EXPOSED SHALL BE REFINISHED AND
REPAINTED, EXISTING STEEL FRAMING NOT SHOWN FOR CLARITY
Revisions: Date:
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
H H
H H
H H
H H
H H
H H
H
E
D
C
B
A
1 2 3 4 5 6
OFFICE
MA-203MA-203
OFFICE
MA-205MA-205
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
BOILER
PLANT
MA-108MA-108
STAIRS
MA-209MA-209
CHILLER
ROOM
MA-109MA-109
NEW
ELECTRICAL
MA-211MA-211
9' -4
6 6 6
7 7
7 7 77
12'-0"12'-0"
TELECOM
MA-219MA-219
TETR1
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
RCP SYMBOL LEGEND
DEMOLISHED HVAC SUPPLY DIFFUSER
DEMOLISHED HVAC RETURN
DIFFUSER
EXIT LIGHT
DEMOLISHED TILE CEILING (24X48)
DEMOLISHED LIGHT FIXTURE
DEMOLISHED LINEAR FIXTURE
DEMOLISHED HIGH BAY PENDANT FIXTURE
DEMOLISHED HIGH BAY FIXTURE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:2
P M
AD151
ARCHITECTURAL DEMO CEILING PLAN -
LEVEL 2- COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS D. YOUNG
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F2
ARCHITECTURAL DEMO CEILING PLAN - LEVEL 2 - COMPOSITE
1 REMOVE PORTION OF WALL
3 EXISTING WALL TO REMAIN
4 REMOVE MECHANICAL DUCT. REFER TO MECHANICAL PLANS FOR ADDITIONAL
INFORMATION.
5 REMOVE EXISTING LIGHTING, PHASE 2 TYP. REFER TO ELECTRICAL PLANS FOR
ADDITIONAL INFORMATION.
6 REMOVE CEILING, REPLACE LIGHT FIXTURES AND DIFFUSERS. REFER TO
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL INFORMATION.
7 REMOVE PORTION OF EXISTING WALL FOR WINDOWS, PHASE 1. SEE A-121.
8 REMOVE SECURITY CAMERA. REFER TO ELECTRICAL PLANS FOR ADDITIONAL
INFORMATION. EXISTING IT CLOSET TO REMAIN OPERATIONAL UNTIL NEW
TELECOM ROOM IS CONSTRUCTED, PHASE 3
9 REMOVE MECHANICAL EQUIPMENT. REFER TO MECHANICAL PLANS FOR
ADDITIONAL INFORMATION.
10 REMOVE PORTION OF EXISTING WALL FOR NEW EXTERIOR DOOR, PHASE 1
11 REMOVE PORTION OF WALL FOR NEW OFFICE AND TELECOM ROOM EXPANSION,
PHASE 3
12 EXISTING TELECOM ROOM TO REMAIN OPERATION UNTIL REPLACEMENT ROOM IS
CONSTRUCTED IN PHASE 3
Revisions: Date:
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
WALL TYPE LEGEND
PARTIAL DEMOLISHED WALL
DEMOLISHED WALL, FIXTURE OR
FURNISHING
EXISTING WALL,
FIXTURE OR FURNISHING
CONCRETE MASONARY UNIT WALL
1 HR FIRE RATING
2 HR FIRE RATING
SMOKE RATING
NEW WALL
E
D
C
B
A
1 2 3 4 5 6
R.D.
R.D.
R.D.
R.D.
V A
LLE
Y
VALLEY
VALLEY
VALLEY
VA
LL
EY
VALLEY
V A
L L E
Y
V A
L L E
Y
RIDGE RIDGE
V A
L L E
Y
V
ALLE
Y
VALLEY
VALLEY
VALLEY
RIDGE RIDGE
R
ID
G E
R
ID
G E
VALLEY
O.R.D.
O.R.D.
O.R.D.
O.R.D.
112'-2 1/2"
'-2
/2
S L O
P E
S L O
P E
SLOPESLOPE
3'-8 3/8" 9'-3 1/4"
5/
8"
'-3
/4
B2
G-901
B5
G-901
NOTE:
ALL EXHAUST FAN HOODS TO BE REPLACED WITH RE-
ROOFING, ALL PARAPET COPING AND ROOF FLASHING TO BE
REPLACED. EXISTING TAPERED LIGHTWEIGHT CONCRETE ON
METAL DECK TO REMAIN.
REPLACE ROOFING
(PHASE 3)
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:2
P M
AD152
ARCHITECTURAL DEMO ROOF LEVEL
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS N.
BLANCHARD
100% CONSTRUCTION
DOCUMENTS
1 REMOVE EXISTING EXHAUST FANS, BASE BID. REFER TO MECHANICAL PLANS FOR
ADDITONAL INFORMATION.
2 REMOVE EXISTING ROOF COMPLETELY, PREP FOR NEW ROOF
3 EXISTING MECHANICAL EQUIPMENT ON EXISTING METAL GRATE PLATFORM.
REFER TO MECHANICAL PLANS FOR ADDITIONAL INFORMATION.
4 EXISTING WALKING PAD TO BE REMOVED AND REPLACED WITH NEW ROOF
5 EXISTING ROOF DRAINS TO REMAIN
6 REMOVE EXISTING SCREEN WALL
7 REMOVE EXISTING MECHANICAL EQUIPMENT. REFER TO MECHANICAL PLANS FOR
ADDITONAL INFORMATION.
8 REMOVE EXISTING AIR HANDLER UNIT. REFER TO MECHANICAL PLANS FOR
ADDITONAL INFORMATION.
9 REMOVE EXISTING ROOF, DECKING, AND STRUCTURE FOR NEW ROOF HATCH
10 EXISTING GUY-WIRES TO BE REUSED FOR REPLACED EQUIPMENT
11 EXISTING METAL PANEL ROOFING TO REMAIN
12 DEMO EXISTING ROOF DRAINS FOR RELOCATION
Revisions: Date:
1/8" = 1'-0" E3
ARCHITECTURAL PLAN - ROOF LEVEL DEMOLITION PLAN
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
C R
F
S
S
F
CR
4 4
W
F
F
F
F
F
CR
C R
CR
C R
CR
T F
CR
CR
C R
S
S
S
S
S
S
S
F
S
UP
UP
DN
S
UP
DN
CR
DN
A-202
C2
A-202
F2
A-201
C2
A-201
F2
E
D
C
B
A
1 2 3 4 5 6
C4
A-301
C4
A-301
E1
A-301
E1
A-301
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
ELECTRICAL
ROOM
MA-107MA-107 BOILER
PLANT
MA-108MA-108
STAIRS
MA-209MA-209
CHEMICAL
TESTING
ROOM
110110
C O
R R
ID
O
R
7 ENGINEERING
CONTROL
CENTER
111111
TOILET,
STAFF
114114
TOILET,
STAFF
113113
LOUNGE
116116
SHOWER/CHANGE
115115
CHILLER
ROOM
MA-109MA-109
VESTIBULE
103103
BLDG
43A 43A43A
7C
107A
107D
8A
108E
9A 43
A
108D
9D
7A
HOUSEKEEPING
AIDS
CLOSET
112112
M A
T C
H L
IN
E
O
R C
O N
T
IN
U A
T
IO
N S
E
/A
-1 B
M A
T C
H L
R C
O N
T
IN
U A
T
IO
N S
E
/A
-1 A
MATCHLINE
FOR CONTINUATION SEE: E3/A-101C
MATCHLINE
FOR CONTINUATION SEE: F3/A-101B
3' -4
2'
-9
3' -4
2'
-9
7A
108B
STORAGE
MA-121MA-121
VESTIBULE
MA-120MA-120
P8
P
P
P8
A
A4
E
E
L4 A
P8
E4 L4
P
P8
P
P8
4'-8"
2'-7 5/8"
14'-6 3/8"
2'-8" 3'-4" 2'-8" 3'-4" 2'-8" 3'-4"
22'-8" 6'-4" 6'-6 3/8"
1'-4"
5'-4" 5'-8" 4'-0" 1'-4" 20'-0" 2'-8" 20'-0" 9 1/2" 2 1/2"
61'-4"
6' -0
M
IN
3' -4
8"
3' -4
8"
5' -0
A4
'-0
'-0
'-0
'-0
5/
8"
STAIRCASE
MA-129MA-129
STAIRCASE
MA-128MA-128
9B
1'-1" 25'-0" 23'-6" 23'-6" 19'-0" 19'-0" 1'-2"
9'-9 5/8" 6'-8 3/8" 8'-9 1/4" 3'-2 1/2" 5'-11"
6 7/8"
4 1/2"
3B11
6' -7
/8
1'
-7
/2
6' -7
/8
8' -3
6' -0
3'
-4
6' -8
3'
-4
/8
8'-0" 4'-8" 6'-4" 1'-0 5/8"
7F 76 77
C1
A-301
C1
A-301
A
A
103C
323232
8B
9E
P
105A
5B 10
5C
9C
H O
L D
95 129
CORRIDOR
MA-133MA-133
'-1
CORRIDOR
MA-122MA-122
2' -0
1'-6"
6' -4
/8
E4
A-301
E4
A-301
MATCHLINE
FOR CONTINUATION SEE: E3/A-101C
MATCHLINE
FOR CONTINUATION SEE: F2/A-101A
105D
WL-3
WL-1
WL-2
L6
F
IL
L O
P E
N
IN
G
F
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
WALL TYPE LEGEND
PARTIAL DEMOLISHED WALL
DEMOLISHED WALL, FIXTURE OR
FURNISHING
EXISTING WALL,
FIXTURE OR FURNISHING
CONCRETE MASONARY UNIT WALL
1 HR FIRE RATING
2 HR FIRE RATING
SMOKE RATING
NEW WALL
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
C
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:4
P M
A-101
ARCHITECTURAL PLAN - LEVEL 1 -
COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS H.
GARDINER
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F3
ARCHITECTURAL PLAN - LEVEL 1 - COMPOSITE
PROGRAM FOR DESIGN
Name Number
Room Program
Code Room Name Abbreviation
Room Program Area Area
AREA
DIFFERENCE
AREA
PERCENTAG
E
BOILER PLANT MA-108 * BOILER 3349 SF 3353 SF 4 SF 100%
CHILLER ROOM MA-109 * CHILLER 2682 SF 2680 SF -2 SF 100%
FA 3: Engineering Control Center: 7 7929 SF 7981 SF 52 SF
FA 5: Shop Area
HOUSEKEEPING AIDS
CLOSET
112 JANC1 HAC 60 SF 55 SF -5 SF 92%
STORAGE MA-121 SRE01 STR 300 SF 211 SF -89 SF 70%
FA 5: Shop Area: 2 360 SF 266 SF -94 SF
ENGINEERING SERVICE: 14 8789 SF 8750 SF -39 SF
LEVEL_01: 18 8789 SF 9158 SF 369 SF
LEVEL_02
CORRIDOR MA-202 * CORR 0 SF 150 SF 150 SF
: 1 0 SF 150 SF 150 SF
: 1 0 SF 150 SF 150 SF
ENGINEERING SERVICE
FA 2: Administrative and Operations Area
OFFICE MA-205 OFA09 OFFICE 100 SF 96 SF -4 SF 96%
NEW OFFICE MA-204 OFA09 OFFICE 100 SF 94 SF -6 SF 94%
OFFICE MA-203 OFA09 OFFICE 100 SF 132 SF 32 SF 132%
NEW OFFICE MA-218 OFA09 OFFICE 125 SF 126 SF 1 SF 101%
FA 2: Administrative and Operations Area: 4 425 SF 449 SF 24 SF
FA 3: Engineering Control Center
BOILER ROOM - MEZZANINE MA-200 * MEZZ 385 SF 427 SF 42 SF 111%
NEW ELECTRICAL MA-211 * ELECT 930 SF 929 SF -1 SF 100%
FA 3: Engineering Control Center: 2 1315 SF 1356 SF 41 SF
ENGINEERING SERVICE: 6 1740 SF 1805 SF 65 SF
OFFICE OF INFORMATION & TECHNOLOGY
FA 4: Telecommunications Support Area
TELECOM MA-219 TETR1 TR 81 SF 123 SF 42 SF 152%
FA 4: Telecommunications Support Area: 1 81 SF 123 SF 42 SF
OFFICE OF INFORMATION & TECHNOLOGY: 1 81 SF 123 SF 42 SF
LEVEL_02: 8 1821 SF 2078 SF 257 SF
ROOF LEVEL
EXISTING STAIR MA-209 STAIR 0 SF 33 SF 33 SF
: 1 0 SF 33 SF 33 SF
: 1 0 SF 33 SF 33 SF
ROOF LEVEL: 1 0 SF 33 SF 33 SF
Grand total: 29 10985 SF 11605 SF 995 SF
PROGRAM FOR DESIGN
Name Number
Room Program
Code Room Name Abbreviation
Room Program Area Area
AREA
DIFFERENCE
AREA
PERCENTAG
E
LEVEL_00
ENGINEERING SERVICE
FA 3: Engineering Control Center
MECH AREA MA-100 TUNNEL 0 SF 337 SF 337 SF
FA 3: Engineering Control Center: 1 0 SF 337 SF 337 SF
ENGINEERING SERVICE: 1 0 SF 337 SF 337 SF
LEVEL_00: 1 0 SF 337 SF 337 SF
LEVEL_01
CIRCULATION
CIRCULATION
CORRIDOR 117 * CORR 0 SF 134 SF 134 SF
VESTIBULE MA-120 * VEST 0 SF 112 SF 112 SF
CORRIDOR MA-122 CORR 0 SF 96 SF 96 SF
CORRIDOR MA-133 CORR 0 SF 66 SF 66 SF
CIRCULATION: 4 0 SF 408 SF 408 SF
CIRCULATION: 4 0 SF 408 SF 408 SF
ENGINEERING SERVICE
FA 2: Administrative and Operations Area
VESTIBULE 103 * VEST 100 SF 107 SF 7 SF 107%
TOILET, STAFF 113 TNPG1 TLT 60 SF 55 SF -5 SF 92%
TOILET, STAFF 114 TNPG1 TLT 60 SF 55 SF -5 SF 92%
SHOWER/CHANGE 115 SHSM1 SHWR/CHN
G
70 SF 66 SF -4 SF 95%
LOUNGE 116 SL001 LOUNGE 210 SF 219 SF 9 SF 104%
FA 2: Administrative and Operations Area: 5 500 SF 503 SF 3 SF
FA 3: Engineering Control Center
CHEMICAL TESTING ROOM 110 * CTR 130 SF 122 SF -8 SF 94%
ENGINEERING CONTROL
CENTER
111 XXYYC ECC 300 SF 331 SF 31 SF 110%
SUPPLY ROOM MA-105 * BOILER 575 SF 575 SF 0 SF 100%
GENERATOR ROOM MA-106 * GEN 375 SF 375 SF 0 SF 100%
ELECTRICAL ROOM MA-107 * ELECT 518 SF 546 SF 28 SF 105%
PROGRAM FOR DESIGN
Name Number
Room Program
Code Room Name Abbreviation
Room Program Area Area
AREA
DIFFERENCE
AREA
PERCENTAG
E
Not Placed
ENGINEERING SERVICE
FA 3: Engineering Control Center
NEW GENERATOR ROOM,
ADD-ALT NO.7
MA-210 * GEN 375 SF Not Placed
FA 3: Engineering Control Center: 1 375 SF 0 SF 0 SF
ENGINEERING SERVICE: 1 375 SF 0 SF 0 SF
Not Placed: 1 375 SF 0 SF 0 SF
1 FURNITURE NOT IN CONTRACT
2 NEW STAIRCASE, REFER TO A-701 AND A-702 FOR MORE INFORMATION
3 NEW LOCKERS
4 EXISTING STAIRCASE TO REMAIN
5 NEW CHILLER, PHASE 2, REFER TO MECHANICAL DRAWINGS FOR MORE
INFORMATION
6 NEW CHILLER, PHASE 2, REFER TO MECHANICAL DRAWINGS FOR MORE
INFORMATION
7 EXISTING TUNNEL, BELOW
8 CR, DEACTIVATES DURING AN EVENT, DO NOT PROHIBIT EMERGENCY EGRESS
• ELECTRICAL ROOM EQUIPMENT HAS OVERLAPPING CLEARANCES TO UTILIZE EXISTING SPACE TO MEET PROGRAM NEEDS.
Revisions: Date:
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
F
F
F
F
P B
P B
T
O
F
UP
DN
UP
DN
A-202
F2
A-201
C2
1 2 3 4
E1
A-301
E1
A-301
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
ELECTRICAL
ROOM
MA-107MA-107
BOILER
PLANT
MA-108MA-108
STAIRS
MA-209MA-209
107A
C
107D
108D
108E
A
M A
T C
H L
R C
O N
T
IN
U A
T
IO
N S
E
/A
-1 B
A
108B
STORAGE
MA-121MA-121
VESTIBULE
MA-120MA-120
2STAIRCASE
MA-129MA-129
STAIRCASE
MA-128MA-128
P
P8
P
P8
12'-8" 11'-5"
3'-11 5/8" 6'-4 3/4" 1'-0 5/8"
P H
A S
E
'-6
4'-4 3/4"
A-402
B7
P8
A-701
D1
A-702
B1
6' -0
/8
3'
-4
/8
P
A-509
D1
E4
A-301
E4
A-301
MATCHLINE
FOR CONTINUATION SEE: E3/A-101C
WL-3
WL-2
P 8 107F
9E
WL-1
5.10.1.3 NOISE AT OPEN OFFICES,
DOUBLE DUAL-PANE WINDOWS IN CMU
WALL TO PROVIDE AVERAGE 42DB
WITHIN CONTROL CENTER FROM
BOILER ROOM
P8
11'-10 1/2"
WL-6
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
WALL TYPE LEGEND
PARTIAL DEMOLISHED WALL
DEMOLISHED WALL, FIXTURE OR
FURNISHING
EXISTING WALL,
FIXTURE OR FURNISHING
CONCRETE MASONARY UNIT WALL
1 HR FIRE RATING
2 HR FIRE RATING
SMOKE RATING
NEW WALL
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:5
P M
A-101A
ARCHITECTURAL PLAN - LEVEL 1 - AREA A
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS H.
GARDINER
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" F2
ARCHITECTURAL PLAN - LEVEL 1 - AREA A
1 NEW STAIRCASE, PHASE 1. REFER TO A-701 AND A-702 FOR MORE INFORMATION
2 NEW OVERHEAD COILING DOOR; SEE DOOR SCHEDULE ON A-600
3 CONTROL PANEL
4 HIGH DENSITY STORAGE UNIT, MECHANICAL ASSIT MOBILE SYSTEM
5 NEW DUCT, REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION
6 NEW DOOR, VESTIBULE AND STORAGE ROOM, PHASE 3
7 RELOCATE EXISTING DOOR AND FIRE EXTINGUISHER FOR NEW COLUMN
8 CR, DEACTIVATES DURING AN EVENT, DO NOT PROHIBIT EMERGENCY EGRESS,
PHASE 1
9 NEW METAL PANEL WALL INFILL ON EXISTING CURB TO MATCH EXISTING, PHASE 1
10 NEW ELECTRICAL ROOM, PHASE 1
11 NEW WATER HEATER, SEE PLUMBING DRAWINGS, PHASE 1
12 NEW EQUIPMENT PAD, SEE CIVIL DRAWINGS
13 EXISTING LOUVER TO BE REPLACED TO BE LIKE NEW
14 NEW LOUVER THROUGH EXTERIOR METAL PANEL WALL SYSTEM
15 NEW / RELOCATED DAMPERS THROUGH WALL ABOVE DOOR, SEE MECHANICAL
DRAWINGS
16 NEW EQUIPMENT ON CONCRETE PAD, SEE CIVIL AND ELECTRICAL DRAWINGS
Revisions: Date:
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
F
P B
P B
F
UP
CR
DN
A-202
C2
E
D
C
B
A
4 5 6
C4
A-301
C4
A-301
E1
A-301
E1
A-301
8'-8"
SHOWER/CHANGE
115115
VESTIBULE
103103
CHILLER
ROOM
MA-109MA-109
BLDG
43A 43A43A
D
108D
108E
A
M A
T C
H L
R C
O N
T
IN
U A
T
IO
N S
E
/A
-1 A
MATCHLINE
FOR CONTINUATION SEE: E3/A-102C9"1'-4 3/4"
A-202
F2
HYDRONIC SUPPLY/
HYDRONIC RETURN
6'-2 1/2"
'-0
/4
1'-7 1/8"
10"
11'-5 3/8"
5' -0
109B
E
E4
A4
L4
P8
P
L4
A-402
E7
B
A-509
B7
103C
REMOVE SHOWER / CHANGE
ROOM FOR NEW CHILLER AND
PUMPS INSTALLED IN PHASE 2,
REMAINING ARCHITECTURAL
RENOVATION OF THIS AREA
OCCURS IN PHASE 3
6' -9
5.10.1.3 NOISE AT OPEN
OFFICES, DOUBLE DUAL-PANE
WINDOWS IN CMU WALL TO
PROVIDE AVERAGE 42DB
WITHIN CONTROL CENTER
FROM BOILER ROOM
BOILER
PLANT
MA-108MA-108
108B
6'-6" 7'-6" 6'-4 5/8" 4'-0"
C
LE
A R
4' -0
M
IN
'-9
7' -7
2' -0
6'
-0
10 1/4"
3'-8"
4"
2' -8
2'
-8
2' -8
2'
-0
2'-8" 8"
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
WALL TYPE LEGEND
PARTIAL DEMOLISHED WALL
DEMOLISHED WALL, FIXTURE OR
FURNISHING
EXISTING WALL,
FIXTURE OR FURNISHING
CONCRETE MASONARY UNIT WALL
1 HR FIRE RATING
2 HR FIRE RATING
SMOKE RATING
NEW WALL
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:5
P M
A-101B
ARCHITECTURAL PLAN - LEVEL 1 - AREA B
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS H.
GARDINER
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" F3
ARCHITECTURAL PLAN - LEVEL 1 - AREA B
1 NEW LOCKERS; SEE A-401, PHASE 3
2 EXISTING STAIRCASE TO REMAIN
3 EXISTING EXIT DOOR TO REMAIN OPERATIONAL DURING CONSTRUCTION
4 NEW REPLACED RECESSED FLOOR SLAB IN THIS SPACE, REFER TO STRUCTURAL
FOR ADDITIONAL INFORMATION, PHASE 3
5 NEW INFILL TO MATCH EXISTING WALL ASSEMBLY WHERE DOORS WERE
REMOVED, PHASE 2
6 NEW PUMP, REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION
7 NEW CHILLER, PHASE 2, REFER TO MECHANICAL DRAWINGS FOR MORE
INFORMATION
8 EXISTING TO REMAIN, NO WORK IN THIS AREA
9 NEW ACCESS CONTROL, PHASE VARIES, REFER TO ELECTRICAL DRAWINGS
10 NEW DRIVEWAY, PHASE 1, SEE CIVIL DRAWINGS
11 CARD READER DEACTIVATES DURING AN EVENT, DO NOT PROHIBIT EMERGENCY
EGRESS, PHASE 3
12 NEW PREFAB METAL GRATE STEPS FOR ACCESS TO CHILLER CONTROLS TO
MATCH EXISTING
13 NEW CONCRETE EQUIPMENT PAD, PHASE 2, REFER TO STRUCTURAL DRAWINGS
FOR MORE INFORMATION
14 NEW 1-HR CMU WALL TO MEZZANINE ABOVE, PHASE 2
Revisions: Date:
0 2'-0" 4'-0" 8'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
O O
F
F
A-201
F2
E
3 4 5 6
C4
A-301
8'-8"
CHEMICAL
TESTING
ROOM
110110
HOUSEKEEPING
AIDS
CLOSET
112112
CORRIDOR
117117
ENGINEERING
CONTROL
CENTER
111111
TOILET,
STAFF
114114
TOILET,
STAFF
113113
LOUNGE
116116
A
A-401
C8
A-401
D8
A-401
E8 A-402
A3
MATCHLINE
FOR CONTINUATION SEE: F3/A-101B
32 32 32
A-202
C2
A-201
C2
'-7
/8
12'-11 5/8" 4'-0" 1'-4" 20'-0" 2'-8" 20'-0" 1'-7 3/4"
9'-8 5/8" 6'-8 3/8"
8" 3'
-4
2' -8
8'
-0
3' -4
3' -4
1'
-3
/8
4' -4
/8
4'-8"
2'-7 5/8"
7'-3 1/4" 7'-3 1/4" 2'-1 7/8"
62'-8" NOMINAL3 3/4" 3 3/4"
3/
4"
3/
4" 8'
-5
/8
3' -4
2'
-9
3' -4
3'-4" 2'-8" 3'-4" 2'-8" 3'-4" 11'-0" 2'-0" 4'-6 3/8"
P8
P
P
P8
A
A4
E
E
A4
L4
E4
P8
1' -8
/4
2'-11 1/8"
10" 3'-4" 2'-1 5/8" 3'-4" 3'-1 1/2"
3' -8
3'
-4
5' -4
3'
-4
P
CLEAR
3'-6" MIN
C
LE
A R
4' -6
M
IN
7F
3B
C1
A-301
C1
A-301
1'-11 5/8" 5'-4"
A
A
L4
23'-6" 19'-0" 19'-0"
E
P
CORRIDOR
MA-133MA-133
A-402
E7
F
A
-1 A
F
A
-1 B
SHOWER/CHANGE
115115
VESTIBULE
103103
CHILLER
ROOM
MA-109MA-109
BOILER
PLANT
MA-108MA-108
77 1'-6 5/8"
MIN
1'-6"
A-402
A3
SIM
F
10'-5 1/2"
N
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
WALL TYPE LEGEND
PARTIAL DEMOLISHED WALL
DEMOLISHED WALL, FIXTURE OR
FURNISHING
EXISTING WALL,
FIXTURE OR FURNISHING
CONCRETE MASONARY UNIT WALL
1 HR FIRE RATING
2 HR FIRE RATING
SMOKE RATING
NEW WALL
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
C
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:0
P M
A-101C
ARCHITECTURAL PLAN - LEVEL 1 - AREA C
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS H.
GARDINER
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" E3
ARCHITECTURAL PLAN - LEVEL 1 - AREA C
1 FURNITURE NOT IN CONTRACT
2 PROVIDE INSULATED JACKET FOR NEW PLUMBING FIXTURE P-TRAPS. SEE
PLUMBING SHEETS FOR DETAILS.
3 NEW COLUMN FOR ROOF ACCESS ABOVE
4 RECESSED FLOOR SLAB IN THIS SPACE, REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION
5 NEW SIT TO STAND WORK STATIONS
6 CR, DEACTIVATES DURING AN EVENT, DO NOT PROHIBIT EMERGENCY EGREES
7 GROMMET FOR WIRE MANAGMENT INCLUDED IN CONTROL ROOM CONSOLES
8 UNDERCABINET TASK LIGHTING, REFER TO ENLARGED PLAN A-401
9 INTERCOM AND REMOTE ACCESS TO BE MONITORED FROM ENGINEERING
CONTROL CENTER
10 INSTALL NEW METAL STUDS AND SILL TRACK.
11 PATCH AND REPAIR GYPSUM BOARD, FASTEN TO NEW STUDS.
EXAMPLE OF TYPICAL CHEMICAL TESTING COUNTER
FEATURING:
• SINGLE-COMPARTMENT RECESSED SINK WITH EYEWASH
• SOLID SURFACE COUNTERS WITH TASK LIGHTING
• METAL CABINETS AND SMALL EQUIPMENT SHELF
• APPLICABLE SIGNAGE FOR STORAGE AND PROCESSING
• TEST-PORTS, AS SPECIFIED
• HAND SANITIZER, WIPES AND EYE-PROTECTION, AS REQUIRED
TYPICALLY, TESTING IS LIMITED TO NON-HAZARDOUS WATER-BASED ANALYSIS
OF pH, ALKALINITY, CHLORINE, HARDNESS, MINERAL AND METAL CONTENT, SALT
LEVELS, PHOSPHATES OR BACTERIA.
Revisions: Date:
0 2'-0" 4'-0" 8'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
T
C R
F
F
F
S
S
H
FF
F
F
CR
S
S
S
S
F
F
F
F
F
CR
C R
F
W
FF
F F
F
F
F
F
F F
F
F F
F
F
CR
C R
CR
C R
CR
C R
A
T
T
H
H
F
F
F
H
F
CR
CR
C R
H
H
F
H
H
F
DN
U…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .