ATTACHMENT A - 4 of11 501-17-105 Dwg Arch1 07-20-22.pdf

PDF 17 MB Posted

Attached to
Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure
Solicitation number
36C26223B0010
Issued by

About this file

This notification provides details for an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure at the New Mexico VA Healthcare System. The project scope includes renovations, new construction, equipment replacements and utility modifications to address deficiencies at Building 43, the Central Utility Plant, and will be procured as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The work includes general construction, alterations, mechanical, electrical and utility systems work. The solicitation will be an Invitation for Bid issued on or around July 15, 2023 via SAM.gov. The project magnitude is estimated between $10-20 million. The point of contact is Maria Cruz-Thompson, Contracting Specialist at the Network Contracting Office 22 in Long Beach, CA.

View the file

Other files

File Type Posted
C01 AWARD NOTIFICATION 36C26223B0010 .pdf PDF
C01 36C26223C0246 AWARD NOTIFICATION.pdf PDF
S06 36C26223B0010 0004.docx DOCX document
S06 36C26223B0010 0003.docx DOCX document
S06 36C26223B0010 0002.pdf PDF
ATTACHMENT 1 - SIGN-IN SHEET 36C26223B0010.pdf PDF
S06 36C26223B0010 0001.pdf PDF
ATTACHMENT A - 6 of11 501-17-105 Dwg-Arch3 07-20-22.pdf PDF
ATTACHMENT B - 501-17-105 Specifications 100 percent 07-20-22.pdf PDF
ATTACHMENT D - RFI FORM 501-17-105.docx DOCX document
ATTACHMENT A - 10 of11 501-17-105 Dwg Elec 1-2 07-20-22.pdf PDF
ATTACHMENT A - 5 of11 501-17-105 Dwg Arch2-07-20-22.pdf PDF
ATTACHMENT E - WAGE DETERMINATION - NM20230044 06-09-2023.pdf PDF
ATTACHMENT A - 3 of11 501-17-105 Dwg Struc 07-20-22.pdf PDF
ATTACHMENT A - 2 of11 501-17-105 Dwg Civil 07-20-22.pdf PDF
ATTACHMENT C - SCOPE OF WORK - 501-17-105.pdf PDF
ATTACHMENT A - 1of11 501-17-105 DwgGen 07-20-22.pdf PDF
ATTACHMENT A - 7 of11 501-17-105 Dwg Plumb 07-20-22.pdf PDF
ATTACHMENT A - 8 of11 501-17-105 Dwg Mech1 07-20-22.pdf PDF
ATTACHMENT A - 11 of11 501-17-105 Dwg Elec 2-2 07-20-22.pdf PDF
ATTACHMENT A - 9 of11 501-17-105 Dwg-Mech2 07-20-22.pdf PDF
S02 36C26223B0010 .docx DOCX document
S03. Pre-Solicitaiton Notice 36C26223B0010.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKING

MANZANO

ROAD

S

DN

DN

DN

DN

DN

DN

SOUTH VETERANS LOOP ROAD

MANZANO ROAD

B56 B43A

AREA O

F W

ORK,

SEE CIVIL

AREA O

F W

ORK,

SEE CIVIL

EXISTING UNDERGROUND

UTILITY TUNNEL

AREA OF W

ORK,

SEE CIVIL

15 11

NEW UNDERGROUND FUEL STORAGE TANK

AND DAY TANK ON CONCRETE PAD TO

SUPPORT NEW GENERATOR SYSTEM,

SEE CIVIL AND PLUMBING DRAWINGS

EXISTING ELECTRICAL MANHOLE

EXISTING ELEC EQUIP

ON CONCRETE PAD TO

REMAIN

AREA O

F W

ORK,

SEE C

IVIL

25'-0" M

IN

REPLACE MEMBRANE ROOFING SYSTEM

(PHASE 3)

NEW GENERATOR FLUES THROUGH ROOF

(PHASE 1), EXISTING GENERATOR FLUE TO

REMAIN

BASE BID

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

A C

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:1

P M

AS101

ARCHITECTURAL SITE PLAN

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS N.

BLANCHARD

100% CONSTRUCTION

DOCUMENTS

1" = 10'-0" F2

ARCHITECTURAL SITE PLAN COMPOSITE

1 EXISTING LANDSCAPE TO REMAIN

2 EXISTING SIDEWALK

3 EXISTING PARKING AREA TO REMAIN

4 REPLACE EXISTING PARKING CANOPY WITH NEW PHOTOVOLTAIC PARKING

CANOPY

5 NEW CONCRETE PAVING, SEE CIVIL DRAWINGS

6 NEW SIDEWALK, SEE CIVIL DRAWINGS

7 NEW BUILDING ADDITION

8 NEW COOLING TOWER AND ENCLOSURE ON ROOF

9 NEW STAIRS ACCESS TO NEW SECOND STORY, BASE BID

10 NEW STAIRS ACCESS TO NEW SECOND STORY ROOF, BASE BID

11 EXISTING LANDSCAPE TO BE REPLACED AT NEW UTILITY TRENCH, SEE CIVIL AND

MECHANICAL DRAWINGS

12 EXISTING LANDSCAPE TO REMAIN, OR BE REPLACED TO LIKE MATCH EXISTING

WITHIN CONTRACTOR STAGING AREA, SEE CIVIL DRAWINGS

13 EXISTING THERMAL STORAGE TANK TO REMAIN

14 NEW DRAINAGE SWALE, SEE CIVIL DRAWINGS

15 NEW MANWAY AT NEW UNDERGROUND FUEL TANK, SEE CIVIL DRAWINGS

16 EXISTING SIDEWALK TO BE REPLACED AT NEW UTILITY TRENCH, SEE CIVIL AND

MECHANICAL DRAWINGS

17 EXISTING LOADING DOCK TO REMAIN

18 EXISTING DUMPSTER TO REMAIN

19 EXISTING MANHOLE DRAIN IN MANZANO ROAD FOR USE AS NECESSARY FOR

TEMPORARY UTILITIES TRAILER, SEE CIVIL DRAWINGS

20 NEW MECHANICAL EQUIPMENT ON NEW CONCRETE EQUIPMENT PAD

21 NEW ELECTRICAL EQUIPMENT ON NEW CONCRETE EQUIPMENT PAD

22 NEW CMU SCREEN WALL WITH GATE FOR TEMPORARY NEW CONNECTIONS, SEE

CIVIL DRAWINGS

23 NEW SECURITY CAMERAS MOUNTED ON BUILDING, SEE PLANS

Revisions: Date: 7/20/2022

MATHEW PERKINS

NO.005843

07/20/2022

F

F

F

F

F

P B

P B

T F

UP

UP

DN

S

DN

DN

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

E

D

C

B

A

1 2 3 4 5 6 25'-0" 23'-6" 23'-6" 19'-0" 19'-0"

BOILER

PLANT

MA-108MA-108 CHILLER

ROOM

MA-109MA-109

ELECTRICAL

ROOM

MA-107MA-107

GENERATOR

ROOM

MA-106MA-106

SUPPLY

ROOM

MA-105MA-105

STAIRS

MA-209MA-209

SHOWER/CHANGE

115115

VESTIBULE

103103

BLDG

43A 43A43A

1'-6 1/8"

1' -5

3'

-4

85'-10 1/8"

6'-6"

3'-3 1/4"

REMOVE SHOWER / CHANGE

ROOM FOR NEW PUMPS

INSTALLED IN PHASE 2,

REMAINING ARCHITECTURAL

RENOVATION OF THIS AREA

OCCURS IN PHASE 3

4'-5"

INSIDE EXISTING CHANNELS TO REMAIN

PHASE 1,

REMOVE KNOCK-OUT PANEL

'-0

'-0

'-0

'-0

5' -1

0"

ELEC EQUIP TO REMAIN,

(BASE BID)

NEW UNDERGROUND FUEL STORAGE TANK

AND DAY TANK ON CONCRETE PAD TO

SUPPORT NEW GENERATOR SYSTEM,

SEE CIVIL AND PLUMBING DRAWINGS

4 1/2" 9'-9 1/2"

3'-4" 2'-1 5/8" 3'-4" 4'-0"

4' -6

CONTROL

ROOM

MA-104MA-104

CHEMICAL

TESTING

ROOM

MA-111MA-111

RESTROOM/LOCKER

ROOM

MA-103MA-103

C2

G-901

F2

G-901

D2

G-901

D5

G-901

F9

G-901

F7

G-901

WALL TYPE LEGEND

PARTIAL DEMOLISHED WALL

DEMOLISHED WALL, FIXTURE OR

FURNISHING

EXISTING WALL,

FIXTURE OR FURNISHING

CONCRETE MASONARY UNIT WALL

1 HR FIRE RATING

2 HR FIRE RATING

SMOKE RATING

NEW WALL

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

A

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:1

P M

AD101

ARCHITECTURAL DEMOLITION PLAN - LEVEL 1

- COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS D. YOUNG

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F3

ARCHITECTURAL DEMOLITION PLAN - LEVEL 1 - COMPOSITE

1 REMOVE WALL AND WINDOW; CONTRACTOR SHALL MAINTAIN CONTINUITY OF

OCCUPANCY SEPARATIONS DURING CONSTRUCTION

2 REMOVE ALL FIXTURES AND FINISHES IN SPACE

3 REMOVE HARDSCAPE FOR NEW ADDITION. REFER TO CIVIL DRAWINGS FOR

ADDITIONAL INFORMATION.

4 REMOVE PARTIAL WALL FOR NEW DOOR

5 REMOVE EXISTING MECHANICAL EQUIPMENT. REFER TO MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

6 REMOVE EXISTING LOUVER, PHASE 1

7 REMOVE TESTING ROOM ENTIRELY, CAP ALL PLUMBING. REFER TO PLUMBING

DRAWINGS FOR ADDITIONAL INFORMATION.

8 REMOVE EXISTING DOOR

9 REMOVE OVERHEAD COILING DOOR

10 COLUMN TO REMAIN, PROTECT IN PLACE

11 REMOVE PARTIAL WALL FOR NEW WINDOWS

12 REMOVE EXTERIOR WALL, FOR NEW CMU INFILL

13 EQUIPMENT TO BE RELOCATED. REFER TO ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

14 REMOVE EXISTING ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

15 REMOVE EXISTING EMERGENCY SHOWER/ EYE WASH. REFER TO PLUMBING

DRAWINGS FOR ADDITIONAL INFORMATION.

16 REMOVE DRINKING FOUNTAIN, CAP ALL PLUMBING

17 REMOVE EXISTING DUCT, REFER TO MECHANICAL DRAWINGS FOR MORE

INFORMATION

18 REMOVE TOILET AND SHOWER FOR INSTALLATION OF MECHANICAL WORK

REQUIRED, THIS ELIMINATES SHOWER FACILITIES DURING CONSTRUCTION.

REMOVE PORTION OF EXISTING SLAB FOR NEW RECESSED SLAB AND DRAINS

20 EXISTING STOVE AND ICE MAKER TO BE RELOCATED

21 EXISTING ABANDONED PIPE PENETRATIONS TO BE FILLED

22 REMOVE EXISTING LOUVER AND PORTION OF WALL TO RAISE HEADER

23 REMOVE PORTION OF WALL FOR NEW LOUVER

24 EXISTING LOUVER AT EXISTING GENERATOR TO REMAIN

25 EQUIPTMENT PAD TO BE REPLACED

26 EXISTING DOOR TO BE RELOCATED, SAWCUT FLOOR FLOR NEW FOOTINGS, PHASE

1, SEE STRUCTURAL

27 REMOVE STUCCO, SHEATHING, & FURRING TO REPAIR METAL STUDS. REMOVE

FROM GRADE TO UNDERSIDE OF CHANNEL.

Revisions: Date:

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

DN

DN

UP

WH

S

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

E

D

C

B

A

1 2 3 4 5 6

OFFICE

MA-203MA-203

OFFICE

MA-205MA-205BOILER

ROOM -

MEZZANINE

MA-200MA-200

CORRIDOR

MA-202MA-202

9' -4

4 5

4'-6"

9 9

SUPPLY

ROOM

MA-105MA-105

8 8 8 8 8

110'-0"

25'-0" 23'-6" 23'-6" 19'-0" 19'-0"

F5

G-901

D9

G-901

STAIR

MA-110MA-110

GENERATOR

ROOM

MA-106MA-106

ELECTRICAL

ROOM

MA-107MA-107

BOILER

PLANT

MA-108MA-108

CHILLER

ROOM

MA-109MA-109

TELECOM

MA-204MA-204

WALL TYPE LEGEND

PARTIAL DEMOLISHED WALL

DEMOLISHED WALL, FIXTURE OR

FURNISHING

EXISTING WALL,

FIXTURE OR FURNISHING

CONCRETE MASONARY UNIT WALL

1 HR FIRE RATING

2 HR FIRE RATING

SMOKE RATING

NEW WALL

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:1

P M

AD102

ARCHITECTURAL DEMOLITION PLAN - LEVEL 2

- COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS D. YOUNG

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F3

ARCHITECTURAL DEMOLITION PLAN - LEVEL 2 - COMPOSITE

1 REMOVE PORTION OF WALL AND ALL WINDOWS, LEAVE EXISTING DOOR.

CONTRACTOR SHALL MAINTAIN CONTINUITY OF OCCUPANCY SEPARATIONS

DURING CONSTRUCTION

2 EXISTING EQUIPMENT AND PAD TO BE RELOCATED. REFER TO MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

4 REMOVE PORTION OF WALL FOR NEW DOOR

5 EXISTING WALL TO REMAIN

6 REMOVE ELECTRICAL AND DATA OUTLETS. REFER TO ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

7 EXISTING STAIRCASE TO REMAIN

8 REMOVE PORTION OF WALL FOR NEW WINDOWS, PHASE 1

9 EXISTING FURNITURE TO REMAIN

10 REMOVE EXISTING PIPES, REFER TO MECHANICAL DRAWINGS FOR MORE

INFORMATION

11 EXISTING TELECOM ROOM TO REMAIN OPERATION UNTIL REPLACEMENT ROOM IS

CONSTRUCTED IN PHASE 3

12 EXISTING ABANDONED PIPE PENETRATIONS TO BE FILLED

13 FUTURE NEW PIPE PENETRATIONS THROUGH WALL, SEE MECHANICAL PLUMBING

DRAWINGS

14 EXISTING RAILING ON STAIRCASE TO BE REMOVED IN COORDINATION OF NEW

GATE AND ROOF ACCESS

15 REMOVE PORTION OF WALL FOR NEW LOUVERS

Revisions: Date:

0 2'-0" 4'-0" 8'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

J J

JFJJJ

S

F

H

WH

E

D

C

B

A

1 2 3 4 5 6

GENERATOR

ROOM

MA-106MA-106

ELECTRICAL

ROOM

MA-107MA-107

BOILER

PLANT

MA-108MA-108

CHILLER

ROOM

MA-109MA-109

BLDG

43A 43A43A

VESTIBULE

103103

SHOWER/CHANGE

115115

STAIRS

MA-209MA-209

SUPPLY

ROOM

MA-105MA-105

1 1

6 7

2 2

CHILLER

ROOM

MA-109MA-109

WITH STRUCTURAL DRAWINGS

PHASE 1, COORDINATE

EXTENT OF DEMOLITION

REMOVE SHOWER / CHANGE

ROOM FOR NEW PUMPS

INSTALLED IN PHASE 2,

REMAINING ARCHITECTURAL

RENOVATION OF THIS AREA

OCCURS IN PHASE 3

P H

A S

E

ELEC EQUIP TO REMAIN,

(BASE BID)

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

RCP SYMBOL LEGEND

DEMOLISHED HVAC SUPPLY DIFFUSER

DEMOLISHED HVAC RETURN

DIFFUSER

EXIT LIGHT

DEMOLISHED TILE CEILING (24X48)

DEMOLISHED LIGHT FIXTURE

DEMOLISHED LINEAR FIXTURE

DEMOLISHED HIGH BAY PENDANT FIXTURE

DEMOLISHED HIGH BAY FIXTURE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:2

P M

AD150

ARCHITECTURAL DEMO CEILING PLAN -

LEVEL 1 - COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS D. YOUNG

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F2

ARCHITECTURAL DEMO CEILING PLAN - LEVEL 1 - COMPOSITE

1 REMOVE ACOUSTICAL CEILING, LIGHT FIXTURES AND MECHANICAL DIFFUSERS.

REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2 REMOVE EXISTING SWITCHBOARD IN ITS ENTIRETY. REFER TO ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION, PHASE 1

3 REMOVE EXISTING 15kV SWITCH IN ITS ENTIRETY. REFER TO ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION, PHASE 1

4 REMOVE MECHANICAL DUCT, REFER TO MECHANICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

5 REMOVE OVERHEAD COILING DOOR

6 REMOVE EXISTING DOOR

7 REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

8 REMOVE EXISTING EMERGENCY SHOWER/ EYE WASH. REFER TO PLUMBING

DRAWINGS FOR ADDITIONAL INFORMATION.

9 REMOVE PORTION OF WALL FOR NEW WINDOWS, PHASE 1

10 EXISTING ABANDONED PIPE PENETRATIONS TO BE FILLED

11 EXISTING FLOOR DRAIN TO BE REMOVED

12 EXISTING METAL DECK TO REMAIN EXPOSED SHALL BE REFINISHED AND

REPAINTED, EXISTING STEEL FRAMING NOT SHOWN FOR CLARITY

Revisions: Date:

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

H H

H H

H H

H H

H H

H H

H

E

D

C

B

A

1 2 3 4 5 6

OFFICE

MA-203MA-203

OFFICE

MA-205MA-205

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

BOILER

PLANT

MA-108MA-108

STAIRS

MA-209MA-209

CHILLER

ROOM

MA-109MA-109

NEW

ELECTRICAL

MA-211MA-211

9' -4

6 6 6

7 7

7 7 77

12'-0"12'-0"

TELECOM

MA-219MA-219

TETR1

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

RCP SYMBOL LEGEND

DEMOLISHED HVAC SUPPLY DIFFUSER

DEMOLISHED HVAC RETURN

DIFFUSER

EXIT LIGHT

DEMOLISHED TILE CEILING (24X48)

DEMOLISHED LIGHT FIXTURE

DEMOLISHED LINEAR FIXTURE

DEMOLISHED HIGH BAY PENDANT FIXTURE

DEMOLISHED HIGH BAY FIXTURE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:2

P M

AD151

ARCHITECTURAL DEMO CEILING PLAN -

LEVEL 2- COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS D. YOUNG

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F2

ARCHITECTURAL DEMO CEILING PLAN - LEVEL 2 - COMPOSITE

1 REMOVE PORTION OF WALL

3 EXISTING WALL TO REMAIN

4 REMOVE MECHANICAL DUCT. REFER TO MECHANICAL PLANS FOR ADDITIONAL

INFORMATION.

5 REMOVE EXISTING LIGHTING, PHASE 2 TYP. REFER TO ELECTRICAL PLANS FOR

ADDITIONAL INFORMATION.

6 REMOVE CEILING, REPLACE LIGHT FIXTURES AND DIFFUSERS. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL INFORMATION.

7 REMOVE PORTION OF EXISTING WALL FOR WINDOWS, PHASE 1. SEE A-121.

8 REMOVE SECURITY CAMERA. REFER TO ELECTRICAL PLANS FOR ADDITIONAL

INFORMATION. EXISTING IT CLOSET TO REMAIN OPERATIONAL UNTIL NEW

TELECOM ROOM IS CONSTRUCTED, PHASE 3

9 REMOVE MECHANICAL EQUIPMENT. REFER TO MECHANICAL PLANS FOR

ADDITIONAL INFORMATION.

10 REMOVE PORTION OF EXISTING WALL FOR NEW EXTERIOR DOOR, PHASE 1

11 REMOVE PORTION OF WALL FOR NEW OFFICE AND TELECOM ROOM EXPANSION,

PHASE 3

12 EXISTING TELECOM ROOM TO REMAIN OPERATION UNTIL REPLACEMENT ROOM IS

CONSTRUCTED IN PHASE 3

Revisions: Date:

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

WALL TYPE LEGEND

PARTIAL DEMOLISHED WALL

DEMOLISHED WALL, FIXTURE OR

FURNISHING

EXISTING WALL,

FIXTURE OR FURNISHING

CONCRETE MASONARY UNIT WALL

1 HR FIRE RATING

2 HR FIRE RATING

SMOKE RATING

NEW WALL

E

D

C

B

A

1 2 3 4 5 6

R.D.

R.D.

R.D.

R.D.

V A

LLE

Y

VALLEY

VALLEY

VALLEY

VA

LL

EY

VALLEY

V A

L L E

Y

V A

L L E

Y

RIDGE RIDGE

V A

L L E

Y

V

ALLE

Y

VALLEY

VALLEY

VALLEY

RIDGE RIDGE

R

ID

G E

R

ID

G E

VALLEY

O.R.D.

O.R.D.

O.R.D.

O.R.D.

112'-2 1/2"

'-2

/2

S L O

P E

S L O

P E

SLOPESLOPE

3'-8 3/8" 9'-3 1/4"

5/

8"

'-3

/4

B2

G-901

B5

G-901

NOTE:

ALL EXHAUST FAN HOODS TO BE REPLACED WITH RE-

ROOFING, ALL PARAPET COPING AND ROOF FLASHING TO BE

REPLACED. EXISTING TAPERED LIGHTWEIGHT CONCRETE ON

METAL DECK TO REMAIN.

REPLACE ROOFING

(PHASE 3)

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:2

P M

AD152

ARCHITECTURAL DEMO ROOF LEVEL

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS N.

BLANCHARD

100% CONSTRUCTION

DOCUMENTS

1 REMOVE EXISTING EXHAUST FANS, BASE BID. REFER TO MECHANICAL PLANS FOR

ADDITONAL INFORMATION.

2 REMOVE EXISTING ROOF COMPLETELY, PREP FOR NEW ROOF

3 EXISTING MECHANICAL EQUIPMENT ON EXISTING METAL GRATE PLATFORM.

REFER TO MECHANICAL PLANS FOR ADDITIONAL INFORMATION.

4 EXISTING WALKING PAD TO BE REMOVED AND REPLACED WITH NEW ROOF

5 EXISTING ROOF DRAINS TO REMAIN

6 REMOVE EXISTING SCREEN WALL

7 REMOVE EXISTING MECHANICAL EQUIPMENT. REFER TO MECHANICAL PLANS FOR

ADDITONAL INFORMATION.

8 REMOVE EXISTING AIR HANDLER UNIT. REFER TO MECHANICAL PLANS FOR

ADDITONAL INFORMATION.

9 REMOVE EXISTING ROOF, DECKING, AND STRUCTURE FOR NEW ROOF HATCH

10 EXISTING GUY-WIRES TO BE REUSED FOR REPLACED EQUIPMENT

11 EXISTING METAL PANEL ROOFING TO REMAIN

12 DEMO EXISTING ROOF DRAINS FOR RELOCATION

Revisions: Date:

1/8" = 1'-0" E3

ARCHITECTURAL PLAN - ROOF LEVEL DEMOLITION PLAN

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

C R

F

S

S

F

CR

4 4

W

F

F

F

F

F

CR

C R

CR

C R

CR

T F

CR

CR

C R

S

S

S

S

S

S

S

F

S

UP

UP

DN

S

UP

DN

CR

DN

A-202

C2

A-202

F2

A-201

C2

A-201

F2

E

D

C

B

A

1 2 3 4 5 6

C4

A-301

C4

A-301

E1

A-301

E1

A-301

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

ELECTRICAL

ROOM

MA-107MA-107 BOILER

PLANT

MA-108MA-108

STAIRS

MA-209MA-209

CHEMICAL

TESTING

ROOM

110110

C O

R R

ID

O

R

7 ENGINEERING

CONTROL

CENTER

111111

TOILET,

STAFF

114114

TOILET,

STAFF

113113

LOUNGE

116116

SHOWER/CHANGE

115115

CHILLER

ROOM

MA-109MA-109

VESTIBULE

103103

BLDG

43A 43A43A

7C

107A

107D

8A

108E

9A 43

A

108D

9D

7A

HOUSEKEEPING

AIDS

CLOSET

112112

M A

T C

H L

IN

E

O

R C

O N

T

IN

U A

T

IO

N S

E

/A

-1 B

M A

T C

H L

R C

O N

T

IN

U A

T

IO

N S

E

/A

-1 A

MATCHLINE

FOR CONTINUATION SEE: E3/A-101C

MATCHLINE

FOR CONTINUATION SEE: F3/A-101B

3' -4

2'

-9

3' -4

2'

-9

7A

108B

STORAGE

MA-121MA-121

VESTIBULE

MA-120MA-120

P8

P

P

P8

A

A4

E

E

L4 A

P8

E4 L4

P

P8

P

P8

4'-8"

2'-7 5/8"

14'-6 3/8"

2'-8" 3'-4" 2'-8" 3'-4" 2'-8" 3'-4"

22'-8" 6'-4" 6'-6 3/8"

1'-4"

5'-4" 5'-8" 4'-0" 1'-4" 20'-0" 2'-8" 20'-0" 9 1/2" 2 1/2"

61'-4"

6' -0

M

IN

3' -4

8"

3' -4

8"

5' -0

A4

'-0

'-0

'-0

'-0

5/

8"

STAIRCASE

MA-129MA-129

STAIRCASE

MA-128MA-128

9B

1'-1" 25'-0" 23'-6" 23'-6" 19'-0" 19'-0" 1'-2"

9'-9 5/8" 6'-8 3/8" 8'-9 1/4" 3'-2 1/2" 5'-11"

6 7/8"

4 1/2"

3B11

6' -7

/8

1'

-7

/2

6' -7

/8

8' -3

6' -0

3'

-4

6' -8

3'

-4

/8

8'-0" 4'-8" 6'-4" 1'-0 5/8"

7F 76 77

C1

A-301

C1

A-301

A

A

103C

323232

8B

9E

P

105A

5B 10

5C

9C

H O

L D

95 129

CORRIDOR

MA-133MA-133

'-1

CORRIDOR

MA-122MA-122

2' -0

1'-6"

6' -4

/8

E4

A-301

E4

A-301

MATCHLINE

FOR CONTINUATION SEE: E3/A-101C

MATCHLINE

FOR CONTINUATION SEE: F2/A-101A

105D

WL-3

WL-1

WL-2

L6

F

IL

L O

P E

N

IN

G

F

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

WALL TYPE LEGEND

PARTIAL DEMOLISHED WALL

DEMOLISHED WALL, FIXTURE OR

FURNISHING

EXISTING WALL,

FIXTURE OR FURNISHING

CONCRETE MASONARY UNIT WALL

1 HR FIRE RATING

2 HR FIRE RATING

SMOKE RATING

NEW WALL

V V ITEM - VA SUPPLIED & INSTALLED

V C ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

C C ITEM - CONTRACTOR SUPPLIED &

INSTALLED

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

A1000

EQUIPMENT / FURNITURE LEGEND

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

C

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:5

:4

P M

A-101

ARCHITECTURAL PLAN - LEVEL 1 -

COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS H.

GARDINER

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F3

ARCHITECTURAL PLAN - LEVEL 1 - COMPOSITE

PROGRAM FOR DESIGN

Name Number

Room Program

Code Room Name Abbreviation

Room Program Area Area

AREA

DIFFERENCE

AREA

PERCENTAG

E

BOILER PLANT MA-108 * BOILER 3349 SF 3353 SF 4 SF 100%

CHILLER ROOM MA-109 * CHILLER 2682 SF 2680 SF -2 SF 100%

FA 3: Engineering Control Center: 7 7929 SF 7981 SF 52 SF

FA 5: Shop Area

HOUSEKEEPING AIDS

CLOSET

112 JANC1 HAC 60 SF 55 SF -5 SF 92%

STORAGE MA-121 SRE01 STR 300 SF 211 SF -89 SF 70%

FA 5: Shop Area: 2 360 SF 266 SF -94 SF

ENGINEERING SERVICE: 14 8789 SF 8750 SF -39 SF

LEVEL_01: 18 8789 SF 9158 SF 369 SF

LEVEL_02

CORRIDOR MA-202 * CORR 0 SF 150 SF 150 SF

: 1 0 SF 150 SF 150 SF

: 1 0 SF 150 SF 150 SF

ENGINEERING SERVICE

FA 2: Administrative and Operations Area

OFFICE MA-205 OFA09 OFFICE 100 SF 96 SF -4 SF 96%

NEW OFFICE MA-204 OFA09 OFFICE 100 SF 94 SF -6 SF 94%

OFFICE MA-203 OFA09 OFFICE 100 SF 132 SF 32 SF 132%

NEW OFFICE MA-218 OFA09 OFFICE 125 SF 126 SF 1 SF 101%

FA 2: Administrative and Operations Area: 4 425 SF 449 SF 24 SF

FA 3: Engineering Control Center

BOILER ROOM - MEZZANINE MA-200 * MEZZ 385 SF 427 SF 42 SF 111%

NEW ELECTRICAL MA-211 * ELECT 930 SF 929 SF -1 SF 100%

FA 3: Engineering Control Center: 2 1315 SF 1356 SF 41 SF

ENGINEERING SERVICE: 6 1740 SF 1805 SF 65 SF

OFFICE OF INFORMATION & TECHNOLOGY

FA 4: Telecommunications Support Area

TELECOM MA-219 TETR1 TR 81 SF 123 SF 42 SF 152%

FA 4: Telecommunications Support Area: 1 81 SF 123 SF 42 SF

OFFICE OF INFORMATION & TECHNOLOGY: 1 81 SF 123 SF 42 SF

LEVEL_02: 8 1821 SF 2078 SF 257 SF

ROOF LEVEL

EXISTING STAIR MA-209 STAIR 0 SF 33 SF 33 SF

: 1 0 SF 33 SF 33 SF

: 1 0 SF 33 SF 33 SF

ROOF LEVEL: 1 0 SF 33 SF 33 SF

Grand total: 29 10985 SF 11605 SF 995 SF

PROGRAM FOR DESIGN

Name Number

Room Program

Code Room Name Abbreviation

Room Program Area Area

AREA

DIFFERENCE

AREA

PERCENTAG

E

LEVEL_00

ENGINEERING SERVICE

FA 3: Engineering Control Center

MECH AREA MA-100 TUNNEL 0 SF 337 SF 337 SF

FA 3: Engineering Control Center: 1 0 SF 337 SF 337 SF

ENGINEERING SERVICE: 1 0 SF 337 SF 337 SF

LEVEL_00: 1 0 SF 337 SF 337 SF

LEVEL_01

CIRCULATION

CIRCULATION

CORRIDOR 117 * CORR 0 SF 134 SF 134 SF

VESTIBULE MA-120 * VEST 0 SF 112 SF 112 SF

CORRIDOR MA-122 CORR 0 SF 96 SF 96 SF

CORRIDOR MA-133 CORR 0 SF 66 SF 66 SF

CIRCULATION: 4 0 SF 408 SF 408 SF

CIRCULATION: 4 0 SF 408 SF 408 SF

ENGINEERING SERVICE

FA 2: Administrative and Operations Area

VESTIBULE 103 * VEST 100 SF 107 SF 7 SF 107%

TOILET, STAFF 113 TNPG1 TLT 60 SF 55 SF -5 SF 92%

TOILET, STAFF 114 TNPG1 TLT 60 SF 55 SF -5 SF 92%

SHOWER/CHANGE 115 SHSM1 SHWR/CHN

G

70 SF 66 SF -4 SF 95%

LOUNGE 116 SL001 LOUNGE 210 SF 219 SF 9 SF 104%

FA 2: Administrative and Operations Area: 5 500 SF 503 SF 3 SF

FA 3: Engineering Control Center

CHEMICAL TESTING ROOM 110 * CTR 130 SF 122 SF -8 SF 94%

ENGINEERING CONTROL

CENTER

111 XXYYC ECC 300 SF 331 SF 31 SF 110%

SUPPLY ROOM MA-105 * BOILER 575 SF 575 SF 0 SF 100%

GENERATOR ROOM MA-106 * GEN 375 SF 375 SF 0 SF 100%

ELECTRICAL ROOM MA-107 * ELECT 518 SF 546 SF 28 SF 105%

PROGRAM FOR DESIGN

Name Number

Room Program

Code Room Name Abbreviation

Room Program Area Area

AREA

DIFFERENCE

AREA

PERCENTAG

E

Not Placed

ENGINEERING SERVICE

FA 3: Engineering Control Center

NEW GENERATOR ROOM,

ADD-ALT NO.7

MA-210 * GEN 375 SF Not Placed

FA 3: Engineering Control Center: 1 375 SF 0 SF 0 SF

ENGINEERING SERVICE: 1 375 SF 0 SF 0 SF

Not Placed: 1 375 SF 0 SF 0 SF

1 FURNITURE NOT IN CONTRACT

2 NEW STAIRCASE, REFER TO A-701 AND A-702 FOR MORE INFORMATION

3 NEW LOCKERS

4 EXISTING STAIRCASE TO REMAIN

5 NEW CHILLER, PHASE 2, REFER TO MECHANICAL DRAWINGS FOR MORE

INFORMATION

6 NEW CHILLER, PHASE 2, REFER TO MECHANICAL DRAWINGS FOR MORE

INFORMATION

7 EXISTING TUNNEL, BELOW

8 CR, DEACTIVATES DURING AN EVENT, DO NOT PROHIBIT EMERGENCY EGRESS

• ELECTRICAL ROOM EQUIPMENT HAS OVERLAPPING CLEARANCES TO UTILIZE EXISTING SPACE TO MEET PROGRAM NEEDS.

Revisions: Date:

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

F

F

F

F

P B

P B

T

O

F

UP

DN

UP

DN

A-202

F2

A-201

C2

1 2 3 4

E1

A-301

E1

A-301

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

ELECTRICAL

ROOM

MA-107MA-107

BOILER

PLANT

MA-108MA-108

STAIRS

MA-209MA-209

107A

C

107D

108D

108E

A

M A

T C

H L

R C

O N

T

IN

U A

T

IO

N S

E

/A

-1 B

A

108B

STORAGE

MA-121MA-121

VESTIBULE

MA-120MA-120

2STAIRCASE

MA-129MA-129

STAIRCASE

MA-128MA-128

P

P8

P

P8

12'-8" 11'-5"

3'-11 5/8" 6'-4 3/4" 1'-0 5/8"

P H

A S

E

'-6

4'-4 3/4"

A-402

B7

P8

A-701

D1

A-702

B1

6' -0

/8

3'

-4

/8

P

A-509

D1

E4

A-301

E4

A-301

MATCHLINE

FOR CONTINUATION SEE: E3/A-101C

WL-3

WL-2

P 8 107F

9E

WL-1

5.10.1.3 NOISE AT OPEN OFFICES,

DOUBLE DUAL-PANE WINDOWS IN CMU

WALL TO PROVIDE AVERAGE 42DB

WITHIN CONTROL CENTER FROM

BOILER ROOM

P8

11'-10 1/2"

WL-6

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

WALL TYPE LEGEND

PARTIAL DEMOLISHED WALL

DEMOLISHED WALL, FIXTURE OR

FURNISHING

EXISTING WALL,

FIXTURE OR FURNISHING

CONCRETE MASONARY UNIT WALL

1 HR FIRE RATING

2 HR FIRE RATING

SMOKE RATING

NEW WALL

V V ITEM - VA SUPPLIED & INSTALLED

V C ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

C C ITEM - CONTRACTOR SUPPLIED &

INSTALLED

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

A1000

EQUIPMENT / FURNITURE LEGEND

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:5

:5

P M

A-101A

ARCHITECTURAL PLAN - LEVEL 1 - AREA A

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS H.

GARDINER

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0" F2

ARCHITECTURAL PLAN - LEVEL 1 - AREA A

1 NEW STAIRCASE, PHASE 1. REFER TO A-701 AND A-702 FOR MORE INFORMATION

2 NEW OVERHEAD COILING DOOR; SEE DOOR SCHEDULE ON A-600

3 CONTROL PANEL

4 HIGH DENSITY STORAGE UNIT, MECHANICAL ASSIT MOBILE SYSTEM

5 NEW DUCT, REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION

6 NEW DOOR, VESTIBULE AND STORAGE ROOM, PHASE 3

7 RELOCATE EXISTING DOOR AND FIRE EXTINGUISHER FOR NEW COLUMN

8 CR, DEACTIVATES DURING AN EVENT, DO NOT PROHIBIT EMERGENCY EGRESS,

PHASE 1

9 NEW METAL PANEL WALL INFILL ON EXISTING CURB TO MATCH EXISTING, PHASE 1

10 NEW ELECTRICAL ROOM, PHASE 1

11 NEW WATER HEATER, SEE PLUMBING DRAWINGS, PHASE 1

12 NEW EQUIPMENT PAD, SEE CIVIL DRAWINGS

13 EXISTING LOUVER TO BE REPLACED TO BE LIKE NEW

14 NEW LOUVER THROUGH EXTERIOR METAL PANEL WALL SYSTEM

15 NEW / RELOCATED DAMPERS THROUGH WALL ABOVE DOOR, SEE MECHANICAL

DRAWINGS

16 NEW EQUIPMENT ON CONCRETE PAD, SEE CIVIL AND ELECTRICAL DRAWINGS

Revisions: Date:

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

F

P B

P B

F

UP

CR

DN

A-202

C2

E

D

C

B

A

4 5 6

C4

A-301

C4

A-301

E1

A-301

E1

A-301

8'-8"

SHOWER/CHANGE

115115

VESTIBULE

103103

CHILLER

ROOM

MA-109MA-109

BLDG

43A 43A43A

D

108D

108E

A

M A

T C

H L

R C

O N

T

IN

U A

T

IO

N S

E

/A

-1 A

MATCHLINE

FOR CONTINUATION SEE: E3/A-102C9"1'-4 3/4"

A-202

F2

HYDRONIC SUPPLY/

HYDRONIC RETURN

6'-2 1/2"

'-0

/4

1'-7 1/8"

10"

11'-5 3/8"

5' -0

109B

E

E4

A4

L4

P8

P

L4

A-402

E7

B

A-509

B7

103C

REMOVE SHOWER / CHANGE

ROOM FOR NEW CHILLER AND

PUMPS INSTALLED IN PHASE 2,

REMAINING ARCHITECTURAL

RENOVATION OF THIS AREA

OCCURS IN PHASE 3

6' -9

5.10.1.3 NOISE AT OPEN

OFFICES, DOUBLE DUAL-PANE

WINDOWS IN CMU WALL TO

PROVIDE AVERAGE 42DB

WITHIN CONTROL CENTER

FROM BOILER ROOM

BOILER

PLANT

MA-108MA-108

108B

6'-6" 7'-6" 6'-4 5/8" 4'-0"

C

LE

A R

4' -0

M

IN

'-9

7' -7

2' -0

6'

-0

10 1/4"

3'-8"

4"

2' -8

2'

-8

2' -8

2'

-0

2'-8" 8"

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

WALL TYPE LEGEND

PARTIAL DEMOLISHED WALL

DEMOLISHED WALL, FIXTURE OR

FURNISHING

EXISTING WALL,

FIXTURE OR FURNISHING

CONCRETE MASONARY UNIT WALL

1 HR FIRE RATING

2 HR FIRE RATING

SMOKE RATING

NEW WALL

V V ITEM - VA SUPPLIED & INSTALLED

V C ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

C C ITEM - CONTRACTOR SUPPLIED &

INSTALLED

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

A1000

EQUIPMENT / FURNITURE LEGEND

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:5

:5

P M

A-101B

ARCHITECTURAL PLAN - LEVEL 1 - AREA B

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS H.

GARDINER

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0" F3

ARCHITECTURAL PLAN - LEVEL 1 - AREA B

1 NEW LOCKERS; SEE A-401, PHASE 3

2 EXISTING STAIRCASE TO REMAIN

3 EXISTING EXIT DOOR TO REMAIN OPERATIONAL DURING CONSTRUCTION

4 NEW REPLACED RECESSED FLOOR SLAB IN THIS SPACE, REFER TO STRUCTURAL

FOR ADDITIONAL INFORMATION, PHASE 3

5 NEW INFILL TO MATCH EXISTING WALL ASSEMBLY WHERE DOORS WERE

REMOVED, PHASE 2

6 NEW PUMP, REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION

7 NEW CHILLER, PHASE 2, REFER TO MECHANICAL DRAWINGS FOR MORE

INFORMATION

8 EXISTING TO REMAIN, NO WORK IN THIS AREA

9 NEW ACCESS CONTROL, PHASE VARIES, REFER TO ELECTRICAL DRAWINGS

10 NEW DRIVEWAY, PHASE 1, SEE CIVIL DRAWINGS

11 CARD READER DEACTIVATES DURING AN EVENT, DO NOT PROHIBIT EMERGENCY

EGRESS, PHASE 3

12 NEW PREFAB METAL GRATE STEPS FOR ACCESS TO CHILLER CONTROLS TO

MATCH EXISTING

13 NEW CONCRETE EQUIPMENT PAD, PHASE 2, REFER TO STRUCTURAL DRAWINGS

FOR MORE INFORMATION

14 NEW 1-HR CMU WALL TO MEZZANINE ABOVE, PHASE 2

Revisions: Date:

0 2'-0" 4'-0" 8'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

O O

F

F

A-201

F2

E

3 4 5 6

C4

A-301

8'-8"

CHEMICAL

TESTING

ROOM

110110

HOUSEKEEPING

AIDS

CLOSET

112112

CORRIDOR

117117

ENGINEERING

CONTROL

CENTER

111111

TOILET,

STAFF

114114

TOILET,

STAFF

113113

LOUNGE

116116

A

A-401

C8

A-401

D8

A-401

E8 A-402

A3

MATCHLINE

FOR CONTINUATION SEE: F3/A-101B

32 32 32

A-202

C2

A-201

C2

'-7

/8

12'-11 5/8" 4'-0" 1'-4" 20'-0" 2'-8" 20'-0" 1'-7 3/4"

9'-8 5/8" 6'-8 3/8"

8" 3'

-4

2' -8

8'

-0

3' -4

3' -4

1'

-3

/8

4' -4

/8

4'-8"

2'-7 5/8"

7'-3 1/4" 7'-3 1/4" 2'-1 7/8"

62'-8" NOMINAL3 3/4" 3 3/4"

3/

4"

3/

4" 8'

-5

/8

3' -4

2'

-9

3' -4

3'-4" 2'-8" 3'-4" 2'-8" 3'-4" 11'-0" 2'-0" 4'-6 3/8"

P8

P

P

P8

A

A4

E

E

A4

L4

E4

P8

1' -8

/4

2'-11 1/8"

10" 3'-4" 2'-1 5/8" 3'-4" 3'-1 1/2"

3' -8

3'

-4

5' -4

3'

-4

P

CLEAR

3'-6" MIN

C

LE

A R

4' -6

M

IN

7F

3B

C1

A-301

C1

A-301

1'-11 5/8" 5'-4"

A

A

L4

23'-6" 19'-0" 19'-0"

E

P

CORRIDOR

MA-133MA-133

A-402

E7

F

A

-1 A

F

A

-1 B

SHOWER/CHANGE

115115

VESTIBULE

103103

CHILLER

ROOM

MA-109MA-109

BOILER

PLANT

MA-108MA-108

77 1'-6 5/8"

MIN

1'-6"

A-402

A3

SIM

F

10'-5 1/2"

N

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

WALL TYPE LEGEND

PARTIAL DEMOLISHED WALL

DEMOLISHED WALL, FIXTURE OR

FURNISHING

EXISTING WALL,

FIXTURE OR FURNISHING

CONCRETE MASONARY UNIT WALL

1 HR FIRE RATING

2 HR FIRE RATING

SMOKE RATING

NEW WALL

V V ITEM - VA SUPPLIED & INSTALLED

V C ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

C C ITEM - CONTRACTOR SUPPLIED &

INSTALLED

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

A1000

EQUIPMENT / FURNITURE LEGEND

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

C

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:5

:0

P M

A-101C

ARCHITECTURAL PLAN - LEVEL 1 - AREA C

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS H.

GARDINER

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0" E3

ARCHITECTURAL PLAN - LEVEL 1 - AREA C

1 FURNITURE NOT IN CONTRACT

2 PROVIDE INSULATED JACKET FOR NEW PLUMBING FIXTURE P-TRAPS. SEE

PLUMBING SHEETS FOR DETAILS.

3 NEW COLUMN FOR ROOF ACCESS ABOVE

4 RECESSED FLOOR SLAB IN THIS SPACE, REFER TO STRUCTURAL FOR ADDITIONAL

INFORMATION

5 NEW SIT TO STAND WORK STATIONS

6 CR, DEACTIVATES DURING AN EVENT, DO NOT PROHIBIT EMERGENCY EGREES

7 GROMMET FOR WIRE MANAGMENT INCLUDED IN CONTROL ROOM CONSOLES

8 UNDERCABINET TASK LIGHTING, REFER TO ENLARGED PLAN A-401

9 INTERCOM AND REMOTE ACCESS TO BE MONITORED FROM ENGINEERING

CONTROL CENTER

10 INSTALL NEW METAL STUDS AND SILL TRACK.

11 PATCH AND REPAIR GYPSUM BOARD, FASTEN TO NEW STUDS.

EXAMPLE OF TYPICAL CHEMICAL TESTING COUNTER

FEATURING:

• SINGLE-COMPARTMENT RECESSED SINK WITH EYEWASH

• SOLID SURFACE COUNTERS WITH TASK LIGHTING

• METAL CABINETS AND SMALL EQUIPMENT SHELF

• APPLICABLE SIGNAGE FOR STORAGE AND PROCESSING

• TEST-PORTS, AS SPECIFIED

• HAND SANITIZER, WIPES AND EYE-PROTECTION, AS REQUIRED

TYPICALLY, TESTING IS LIMITED TO NON-HAZARDOUS WATER-BASED ANALYSIS

OF pH, ALKALINITY, CHLORINE, HARDNESS, MINERAL AND METAL CONTENT, SALT

LEVELS, PHOSPHATES OR BACTERIA.

Revisions: Date:

0 2'-0" 4'-0" 8'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

T

C R

F

F

F

S

S

H

FF

F

F

CR

S

S

S

S

F

F

F

F

F

CR

C R

F

W

FF

F F

F

F

F

F

F F

F

F F

F

F

CR

C R

CR

C R

CR

C R

A

T

T

H

H

F

F

F

H

F

CR

CR

C R

H

H

F

H

H

F

DN

U…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .