ATTACHMENT A - 6 of11 501-17-105 Dwg-Arch3 07-20-22.pdf

PDF 8 MB Posted

Attached to
Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure
Solicitation number
36C26223B0010
Issued by

About this file

This notification provides information about an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure at the New Mexico VA Healthcare System in Albuquerque, New Mexico. The project scope includes renovation, new construction, equipment replacements and utility modifications to address deficiencies in Building 43 related to mechanical, plumbing, accessibility, electrical, life safety, structure and cooling systems. The contractor will be responsible for supervision, labor, materials, equipment and transportation to complete all work in accordance with solicitation documents and applicable codes. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses listed in the VetCert database. The North American Industry Classification code is 236220 for commercial and institutional building construction up to $39.5 million. The VA estimates the project value to be between $10-20 million. An Invitation for Bid is expected to be issued on or around July 15, 2023 via SAM.gov. A pre-bid site visit will be scheduled. Points of contact are provided for any questions.

View the file

Other files

File Type Posted
C01 AWARD NOTIFICATION 36C26223B0010 .pdf PDF
C01 36C26223C0246 AWARD NOTIFICATION.pdf PDF
S06 36C26223B0010 0004.docx DOCX document
S06 36C26223B0010 0003.docx DOCX document
S06 36C26223B0010 0002.pdf PDF
ATTACHMENT 1 - SIGN-IN SHEET 36C26223B0010.pdf PDF
S06 36C26223B0010 0001.pdf PDF
ATTACHMENT B - 501-17-105 Specifications 100 percent 07-20-22.pdf PDF
ATTACHMENT A - 4 of11 501-17-105 Dwg Arch1 07-20-22.pdf PDF
ATTACHMENT D - RFI FORM 501-17-105.docx DOCX document
ATTACHMENT A - 10 of11 501-17-105 Dwg Elec 1-2 07-20-22.pdf PDF
ATTACHMENT A - 5 of11 501-17-105 Dwg Arch2-07-20-22.pdf PDF
ATTACHMENT E - WAGE DETERMINATION - NM20230044 06-09-2023.pdf PDF
ATTACHMENT A - 3 of11 501-17-105 Dwg Struc 07-20-22.pdf PDF
ATTACHMENT A - 2 of11 501-17-105 Dwg Civil 07-20-22.pdf PDF
ATTACHMENT C - SCOPE OF WORK - 501-17-105.pdf PDF
ATTACHMENT A - 1of11 501-17-105 DwgGen 07-20-22.pdf PDF
ATTACHMENT A - 7 of11 501-17-105 Dwg Plumb 07-20-22.pdf PDF
ATTACHMENT A - 8 of11 501-17-105 Dwg Mech1 07-20-22.pdf PDF
ATTACHMENT A - 11 of11 501-17-105 Dwg Elec 2-2 07-20-22.pdf PDF
ATTACHMENT A - 9 of11 501-17-105 Dwg-Mech2 07-20-22.pdf PDF
S02 36C26223B0010 .docx DOCX document
S03. Pre-Solicitaiton Notice 36C26223B0010.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

CR

DN

DN

DN

UP

DN

DN

PATTERN OR COLOR CHANGE

MATERIAL FLOOR CHANGE (REFER TO IN601

FOR TRANSITION DETAILS)

DIRECTION OF FINISH

INTERIOR FINISH SYMBOLS

P-_ PAINT COLOR / WALL FINISHES

EXTENT OF WALL FINISH TYPE

CORNER GUARD LOCATIONCG

GRAIN

REFER TO SHEET IN601 FOR ROOM FINISH SCHEDULE & FINISH LEGEND

FINISHES LISTED ARE THE OVERALL FINISHES SPECIFIED FOR EACH SPACE.

REFER TO PLANS FOR ADDITIONAL WALL FINISHES REQUIRED FOR EACH SPACE.

E

D

C

B

A

1 2 3 4 5 6

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

ELECTRICAL

ROOM

MA-107MA-107

BOILER

PLANT

MA-108MA-108

STAIRS

MA-209MA-209

CHEMICAL

TESTING

ROOM

110110

CORRIDOR

117117

ENGINEERING

CONTROL

CENTER

111111

XXYYC

TOILET,

STAFF

114114

TNPG1

TOILET,

STAFF

113113

TNPG1

LOUNGE

116116

SL001

SHOWER/CHANGE

115115

SHSM1

CHILLER

ROOM

MA-109MA-109

VESTIBULE

103103

BLDG

43A 43A43A

HOUSEKEEPING

AIDS

CLOSET

112112

JANC1

STORAGE

MA-121MA-121

SRE01

VESTIBULE

MA-120MA-120

FLOOR FINISH LEGEND

NO WORK

EPY-1

FACTORY FINISH

PT-1

CORRIDOR

MA-122MA-122

STAIRCASE

MA-129MA-129

STAIRCASE

MA-128MA-128

CORRIDOR

MA-133MA-133

F

E

D

C

B

A

1 2 3 4 5 6

BOILER

ROOM -

MEZZANINE

MA-200MA-200

OFFICE

MA-203MA-203

OFA09

NEW

OFFICE

MA-204MA-204

OFA09

OFFICE

MA-205MA-205

OFA09

CORRIDOR

MA-202MA-202

TELECOM

MA-219MA-219

TETR1

NEW

OFFICE

MA-218MA-218

OFA09

STAIRS

MA-209MA-209

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

BOILER

PLANT

MA-108MA-108

NEW

ELECTRICAL

MA-211MA-211

FLOOR FINISH LEGEND

NO WORK

EPY-1

EXISTING TO

REMAIN

FACTORY

FINISH

OPEN TO LEVEL 1 OPEN TO LEVEL 1

STAIRCASE

MA-130MA-130

STAIRCASE

MA-131MA-131

ROOF BELOW

STAIRCASE

MA-132MA-132

OPEN TO LEVEL 1

OPEN TO LEVEL 1

F

2 3

MECH

AREA

MA-100MA-100

FLOOR FINISH LEGEND

C-1

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:5

:1

P M

IN001

INTERIOR FINISH FLOOR TYPES LEVEL 0, 1 & 2

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS M. RIOS

100% CONSTRUCTION

DOCUMENTS

FLOOR FINISH SCHEDULE

FLOOR FINISH AREA

C-1 337 SF

EPY-1 10936 SF

EXISTING TO REMAIN 123 SF

PT-1 176 SF

11572 SF

INTERIOR SHEET NOTES

A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.

B. REFER TO SHEET IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.

C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.

D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.

E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY,

REFER TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.

F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS

G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,

TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE

CLOSED POSITION.

H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

I. REFER TO AW SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO

SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /

EQUIPMENT LABELING REQUIREMENTS.

J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE

SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO

NOT TRANSMIT TO ADJACENT SPACES.

K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.

L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.

M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE

DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION

AT THE TIME OF THE BIDDING BY THE CONTRACTOR.

N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE

SHALL BE REQUESTED FROM THE COR.

O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR

CONSISTENCY.

P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH

CURRENT IBC TABLE 803.9

Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS

SPECIFIED FOR THAT SPACE UNO.

R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR

INSTALLER FINISHED ITEMS.

S. PAINT ALL WALLS (P-1) UNO.

T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL

BOARD CEILINGS (P-1) UNO.

U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT

BOUNDARY (P-2) UNO.

3/32" = 1'-0" C4

INTERIOR PLAN - LEVEL 1 - COMPOSITE FLOOR FINISH TYPES

3/32" = 1'-0" F4

INTERIOR PLAN - LEVEL 2 - COMPOSITE FLOOR FINISH TYPES

Final Color Selections to be made by Rebekah Gonzales:

Rebekah Gonzales Supervisor Interior Designer, EMS

Raymond G. Murphy VA Medical Center

NMVAHCS

1501 San Pedro SE Albuquerque, NM 87108 Phone: (505) 265-1711 x5478 Cell Phone: (505) 967-8170 Fax: (505) 256-2831 rebekah.gonzales@va.gov

NOT USED

3/32" = 1'-0" F1

INTERIOR PLAN - LEVEL 0 - COMPOSITE FLOOR FINISH TYPES

INTERIOR FINISH ABBREVIATIONS

ABBREVIATION FINISH TYPE

AT ACOUSTICAL CEILING TILE

C SEALED CONCRETE

CG CORNER GUARD

CMU CONCRETE MASONRY UNIT BLOCK

EPY EPOXY FLOORING

P PAINT

PL PLASTIC LAMINATE

PT PORCELAIN TILE

RB RESILIENT BASE

RWC RIGID WALL COVERING

RWS WINDOW SHADES

S SOLID SURFACE

SS STAINLESS STEEL

TR TILE TRIM

WD PLYWOOD

WFT WALL FINISH TYPE

KEYNOTES

Revisions: Date:

MR-5 CREDIT: PURCHASING-FACILITY MAINTENANCE AND RENOVATION

PROVIDE DOCUMENTATION FOR RECYCLED CONTENT

7/20/2022

MATHEW PERKINS

NO.005843

07/20/2022

F

S

S

F

F

F

F

F

F

P B

P B

T F

S

S

S

S

S

S

S

F

S

UP

UP

DN

UP

DN

CR

DN

INTERIOR ROOM FINISH LEGEND

CEILING: AT-1

WALL: P-1, WFT-6 (OCCURS AT HAC ONLY)

WALL BASE: RB-1 (REFER TO DETAIL E9/IN601)

FLOORING: EPY-1

CEILING: GWB

WALL: P-1, PT-2, PT-3

WALL BASE: PT-2 (REFER TO DETAIL E5/IN601)

FLOORING: PT-1

A

B

C

CEILING: OPEN TO STRUCTURE

WALL: P-1

WALL BASE: EPY-1 (REFER TO DETAIL E3/IN601)

FLOORING: EPY-1

D

E

CEILING: AT-1

WALL: P-1, WFT-5

WALL BASE: EPY-1 (REFER TO DETAIL E5/IN601)

FLOORING: EPY-1

F

CEILING: OPEN TO STRUCTURE

WALL: P-1

WALL BASE: NO WALL BASE

FLOORING: NO WORK, EXISTING TO REMAIN

NOT USED

PATTERN OR COLOR CHANGE

MATERIAL FLOOR CHANGE (REFER TO IN601

FOR TRANSITION DETAILS)

DIRECTION OF FINISH

INTERIOR FINISH SYMBOLS

P-_ PAINT COLOR / WALL FINISHES

EXTENT OF WALL FINISH TYPE

CORNER GUARD LOCATIONCG

GRAIN

REFER TO SHEET IN601 FOR ROOM FINISH SCHEDULE & FINISH LEGEND

FINISHES LISTED ARE THE OVERALL FINISHES SPECIFIED FOR EACH SPACE.

REFER TO PLANS FOR ADDITIONAL WALL FINISHES REQUIRED FOR EACH SPACE.

E

D

C

B

A

1 2 3 4 5 6

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

ELECTRICAL

ROOM

MA-107MA-107

BOILER

PLANT

MA-108MA-108

STAIRS

MA-209MA-209

CHEMICAL

TESTING

ROOM

110110

CORRIDOR

117117

ENGINEERING

CONTROL

CENTER

111111

TOILET,

STAFF

114114

TOILET,

STAFF

113113

LOUNGE

116116

SHOWER/CHANGE

115115

CHILLER

ROOM

MA-109MA-109

VESTIBULE

103103

BLDG 43A

43A43A

7C

107A

107D

8A

108E

9A

A

108D

9D

7A

112HOUSEKEEPING

AIDS CLOSET

112112

7A

108B

STORAGE

MA-121MA-121

VESTIBULE

MA-120MA-120

C

C

C

C

C

A

B

B

A

A

A

B

A

E

C

C

CORRIDOR

MA-122MA-122A

CG-1

CG-1

CG-1

F

WFT-6

C

WFT-4

WFT-2

CG-1CG-1

CG-1

P-2

WFT-5

RWS-1

A-401

C8

A-402

A3

SIM

A-401

D8

A-401

E8

A-402

B7

A-402

E7

RWS-1

RWS-1

RWS-1

GREEN GLOBES

5.8 LIGHTING FEATURES

5.8.2 CONTROLLABLE SHADING

DEVICE, TYP

5.8 LIGHTING FEATURES

5.8.2 CONTROLLABLE

BLINDS SEE SHEET A-401

AND IN121

CORRIDOR

MA-133MA-133

A-402

E7

E4

A-301

E4

A-301

43-WCCH-1

43-WCCH-3

105A

5C

9E

3B

103C

6 105D

F

2 3

MECH

AREA

MA-100MA-100

F

1/4"

SAFETY AREA

INTERGRAL SAFETY

WALK ZONE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:0

P M

IN101

INTERIOR FINISH FLOOR PLAN - LEVEL 1 -

COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS M. RIOS

100% CONSTRUCTION

DOCUMENTS

INTERIOR SHEET NOTES

A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.

B. REFER TO SHEET IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.

C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.

D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.

E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY,

REFER TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.

F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS

G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,

TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE

CLOSED POSITION.

H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

I. REFER TO AW SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO

SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /

EQUIPMENT LABELING REQUIREMENTS.

J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE

SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO

NOT TRANSMIT TO ADJACENT SPACES.

K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.

L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.

M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE

DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION

AT THE TIME OF THE BIDDING BY THE CONTRACTOR.

N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE

SHALL BE REQUESTED FROM THE COR.

O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR

CONSISTENCY.

P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH

CURRENT IBC TABLE 803.9

Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS

SPECIFIED FOR THAT SPACE UNO.

R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR

INSTALLER FINISHED ITEMS.

S. PAINT ALL WALLS (P-1) UNO.

T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL

BOARD CEILINGS (P-1) UNO.

U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT

BOUNDARY (P-2) UNO.

INTERIOR FINISH ABBREVIATIONS

ABBREVIATION FINISH TYPE

AT ACOUSTICAL CEILING TILE

C SEALED CONCRETE

CG CORNER GUARD

CMU CONCRETE MASONRY UNIT BLOCK

EPY EPOXY FLOORING

P PAINT

PL PLASTIC LAMINATE

PT PORCELAIN TILE

RB RESILIENT BASE

RWC RIGID WALL COVERING

RWS WINDOW SHADES

S SOLID SURFACE

SS STAINLESS STEEL

TR TILE TRIM

WD PLYWOOD

WFT WALL FINISH TYPE

1/8" = 1'-0" E3

INTERIOR FINISHES - FLOOR PLAN - LEVEL 1

1 NO WORK

2 TRENCH DRAIN

3 SLOPE FLOOR TO DRAIN

4 PAINT HANDRAIL, GUARDRAIL AND STAIR STRUCTURE, COLOR TO MATCH EXISTING

RED

5 SPECIAL PAINT PREPARATION IS REQUIRED IN THIS SPACE. SEE SPECIFICATION 09 91

00 FOR MORE INFORMATION

6 INTEGRAL SAFETY WALK ZONE. FINAL LAYOUT AND CONFIGURATION SHALL BE

CONFIRMAND WITH THE COR AND SAFETY OFFICER BEFORE INSTALLATION

7 INTEGRAL SHOWER SAFETY ZONE. FINAL LAYOUT AND CONFIGURATION SHALL BE

CONFIRMAND WITH THE COR AND ENERGY PLANT SUPERVISOR BEFORE

INSTALLATION

1/8" = 1'-0" C1

INTERIOR FINISHES - FLOOR PLAN - LEVEL 0

KEYNOTES

Revisions: Date:

MR-5 CREDIT: PURCHASING-FACILITY MAINTENANCE AND RENOVATION

PROVIDE DOCUMENTATION FOR RECYCLED CONTENT

12" = 1'-0" F1

TUNNEL

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

F

F

DN

UP

UP

DN

DN

PATTERN OR COLOR CHANGE

MATERIAL FLOOR CHANGE (REFER TO IN601

FOR TRANSITION DETAILS)

DIRECTION OF FINISH

INTERIOR FINISH SYMBOLS

P-_ PAINT COLOR / WALL FINISHES

EXTENT OF WALL FINISH TYPE

CORNER GUARD LOCATIONCG

GRAIN

REFER TO SHEET IN601 FOR ROOM FINISH SCHEDULE & FINISH LEGEND

FINISHES LISTED ARE THE OVERALL FINISHES SPECIFIED FOR EACH SPACE.

REFER TO PLANS FOR ADDITIONAL WALL FINISHES REQUIRED FOR EACH SPACE.

INTERIOR ROOM FINISH LEGEND

CEILING: AT-1

WALL: P-1, WFT-6 (OCCURS AT HAC ONLY)

WALL BASE: RB-1 (REFER TO DETAIL E9/IN601)

FLOORING: EPY-1

CEILING: GWB

WALL: P-1, PT-2, PT-3

WALL BASE: PT-2 (REFER TO DETAIL E5/IN601)

FLOORING: PT-1

A

B

C

CEILING: OPEN TO STRUCTURE

WALL: P-1

WALL BASE: EPY-1 (REFER TO DETAIL E3/IN601)

FLOORING: EPY-1

D

E

CEILING: AT-1

WALL: P-1, WFT-5

WALL BASE: EPY-1 (REFER TO DETAIL E5/IN601)

FLOORING: EPY-1

F

CEILING: OPEN TO STRUCTURE

WALL: P-1

WALL BASE: NO WALL BASE

FLOORING: NO WORK, EXISTING TO REMAIN

NOT USED

E

D

C

B

A

1 2 3 4 5 6

202A

BOILER

ROOM -

MEZZANINE

MA-200MA-200

OFFICE

MA-203MA-203

NEW OFFICE

MA-204MA-204

OFFICE

MA-205MA-205

CORRIDOR

MA-202MA-202

TELECOM

MA-219MA-219

NEW OFFICE

MA-218MA-218

STAIRS

MA-209MA-209

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

BOILER

PLANT

MA-108MA-108

CHILLER

ROOM

MA-109MA-109

NEW

ELECTRICAL

MA-211MA-211

210A

1A

F

C A

A

A

CG-1 CG-1

A

CG-1 CG-1

CG-1

CG-1 CG-1

CG-1 CG-1

CG-1

CG-1CG-1

C

C

C

OPEN TO LEVEL 1

OPEN TO LEVEL 1

STAIRCASE

MA-130MA-130

STAIRCASE

MA-131MA-131

STAIRCASE

MA-132MA-132ROOF BELOW

RWS-1 RWS-1

GREEN GLOBES

5.8 LIGHTING FEATURES

5.8.2 CONTROLLABLE

SHADING DEVICE, TYP

5.8 LIGHTING FEATURES

5.8.2 CONTROLLABLE

BLINDS SEE SHEET A-401

AND IN102

EXISTING GENERATOR BELOW

& EXISTING WALL TO DECK TO

REMAIN FOR BASE BID

202B

F

A

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:1

P M

IN102

INTERIOR FINISH FLOOR PLAN - LEVEL 2 -

COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS M. RIOS

100% CONSTRUCTION

DOCUMENTS

INTERIOR SHEET NOTES

A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.

B. REFER TO SHEET IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.

C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.

D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.

E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY,

REFER TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.

F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS

G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,

TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE

CLOSED POSITION.

H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

I. REFER TO AW SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO

SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /

EQUIPMENT LABELING REQUIREMENTS.

J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE

SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO

NOT TRANSMIT TO ADJACENT SPACES.

K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.

L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.

M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE

DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION

AT THE TIME OF THE BIDDING BY THE CONTRACTOR.

N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE

SHALL BE REQUESTED FROM THE COR.

O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR

CONSISTENCY.

P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH

CURRENT IBC TABLE 803.9

Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS

SPECIFIED FOR THAT SPACE UNO.

R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR

INSTALLER FINISHED ITEMS.

S. PAINT ALL WALLS (P-1) UNO.

T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL

BOARD CEILINGS (P-1) UNO.

U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT

BOUNDARY (P-2) UNO.

INTERIOR FINISH ABBREVIATIONS

ABBREVIATION FINISH TYPE

AT ACOUSTICAL CEILING TILE

C SEALED CONCRETE

CG CORNER GUARD

CMU CONCRETE MASONRY UNIT BLOCK

EPY EPOXY FLOORING

P PAINT

PL PLASTIC LAMINATE

PT PORCELAIN TILE

RB RESILIENT BASE

RWC RIGID WALL COVERING

RWS WINDOW SHADES

S SOLID SURFACE

SS STAINLESS STEEL

TR TILE TRIM

WD PLYWOOD

WFT WALL FINISH TYPE

1/8" = 1'-0" E3

INTERIOR FINISHES - FLOOR PLAN - LEVEL 2

KEYNOTES

Revisions: Date:

MR-5 CREDIT: PURCHASING-FACILITY MAINTENANCE AND RENOVATION

PROVIDE DOCUMENTATION FOR RECYCLED CONTENT

1 PAINT HANDRAILS, GUARDRAIL AND STAIR STRUCTURE, COLOR TO MATCH

EXISTING RED

2 SPECIAL PAINT PREPARATION IS REQUIRED IN THIS SPACE. SEE SPECIFICATION

09 91 00 FOR MORE INFORMATION

3 PAINT ALL EXPOSED STEEL IN OFFICE TO MATCH SPECIFIED WALL COLOR

4 FUTURE OFFICE, FINISHES SHALL REMAIN AS IS.

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

WFT-1: NOT USED

PT-2

R E

F E

R T

O C

E

IL

IN

G

P

LA

N S

F O

R H

E

IG

H T

WFT-2: TOILET TILE PATTERN

P-1 , UNLESS NOTED

OTHERWISE ON FINISH

PLAN

PT-3

3' -6

TR-1

TR-2

PT-2

R E

F E

R T

O C

E

IL

IN

G

P

LA

N F

O R

H E

IG

H

T

WFT-3: SHOWER TILE PATTERN

PT-3

TR-2

PT-2

2' -0

1'

-0

6"

2' -0

1'

-0

RB-1

S-1

WFT-4: SOLID SURFACE WALL PANEL

AT WALL MOUNTED DRINKING

FOUNTAIN

P-1 , UNLESS NOTED

OTHERWISE ON FINISH

PLAN

4' -6

M

IN

4'

-2

IF FOUNTAIN DOES NOT OCCUR

AT AN ALCOVE, SOLID SURFACE

SHALL BE A MINIMUM WIDTH OF

30" WIDE WITH AN EASED EDGE

PROFILE ALL SIDES

WATER FOUNTAIN

IF FOUNTAIN OCCURS AT

AN ALCOVE, SCRIBE

SOLID SURFACE

MATERIAL TO INSIDE

CORNERS

FINISH WITH EASED

EDGE PROFILE, AT ALL

EXPOSED SIDES

E5

IN601

E5

IN601

E7

IN601

4"

EPY-1

RWC-1

P-1

UNLESS NOTED

OTHERWISE ON FINISH

PLAN

WFT-5: RIGID WALL PROTECTION

MANUFACTURER'S

STANDARD

TRIM PIECES AT ALL

SEAMS AND EDGES

E3

IN601

4' -4

4"

RB-1

RWC-1

WFT-6: RIGID WALL PROTECTION

MANUFACTURER'S

STANDARD

TRIM PIECES AT ALL

SEAMS AND EDGES

E9

IN601

4' -1

P-1

UNLESS NOTED

OTHERWISE ON FINISH

PLAN

RESILIENT BASE AS SCHEDULED

EPOXY FLOOR

WATER VAPOR CONTROL SYSTEM

TOP OF SLAB

PARTITION AS SCHEDULED

WALL TILE AS SCHEDULED

TR-2 (SEE FINISH LEGEND THIS SHEET)

GROUT

THIN SET PORCELAIN FLOOR

TILE AS SCHEDULED

WATER VAPOR CONTROL

SYSTEM/CRACK SUPPRESSION

MEMBRANE

TOP OF SLAB

PARTITION AS SCHEDULED

3/4" RADIUS COVE

EPOXY FLOORING AS

SCHEDULED

TOP OF SLAB

PARTITION AS SCHEDULED

4"

1/8" METAL COVE STRIP

DOOR FRAME BEYOND

TRANSITION STRIP AS

SCHEDULED

EPOXY FLOOR AS

SCHEDULED

CENTER LINE OF

FLOOR FINISH

CHANGE OR SEAM

DOOR AS SCHEDULED

C CENTER LINE OF DOOR

L

PORCELAIN TILE

CEMENTITIOUS SETTING BED

SLAB

NOTE: REFER TO INTERIOR FINISH PLANS FOR LOCATIONS

RESILIENT BASE AS SCHEDULED

FLOOR AS SCHEDULED

WATER VAPOR CONTROL SYSTEM

TOP OF SLAB

PARTITION AS SCHEDULED

WALL PROTECTION AS SCHEDULED

M

IN

1"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

NOT FOR

CONSTRUCTION

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:1

P M

IN601

INTERIOR FINISH LEGEND AND ROOM FINISH

SCHEDULE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS K.

MCDERMOTT

100% CONSTRUCTION

DOCUMENTS

FINISH LEGEND

SYMBOL FINISH TYPE SPEC SECTION MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE NOTES

AT-1 ACOUSTICAL CEILING TILE 09 51 00 ARMSTRONG * CORTEGA SQUARE LAY-IN-769A WHITE 24"X48" PRELUDE XL 15/16" GRID SYSTEM

C-1 SEALED CONCRETE REFER TO SPECIFICATIONS REFER TO SPECIFICATIONS N/A N/A

CG-1 CORNER GUARD 10 26 00 C/S ACROVYN * CO-8 183128-6 STAINLESS STEEL 3" LEGS

CMU-1 CONCRETE MASONRY UNIT BLOCK UTILITY BLOCK COMPANY OR CREGO BLOCK * BURNISHED WHITE SANDS 910

EPY-1 EPOXY FLOORING 09 67 23.30 STONHARD* STONGARD MR COOL SHALE

P-1 PAINT 09 91 00 GLIDDEN/ PPG* N/A EPOXY / EGG SHELL DELICATE WHITE FIELD

P-2 PAINT 09 91 00 GLIDDEN/ PPG* N/A EPOXY / EGG SHELL SURREY BEIGE #30YY DOOR JAMB/TRIM ONLY

PL-1 PLASTIC LAMINATE 12 32 00 WILSONART * N/A N/A KENSINGTON MAPLE 10776

PT-1 PORCELAIN TILE 09 30 13 DALTILE * PORTFOLIO PORTFOLIO NOCE PF11 12"X24" 1/3 STAGGER INSTALL / GROUT SEALED WITH SILTANIUM/ GROUT COLOR: MAPEI 106 WALNUT

PT-2 PORCELAIN TILE 09 30 13 DALTILE * PORTFOLIO PORTFOLIO NOCE PF11 6"X24" WALL TILE, 1/3 STAGGER INSTALL / GROUT SEALED WITH SILTANIUM/ GROUT COLOR: MAPEI 106 WALNUT

PT-3 PORCELAIN TILE 09 30 13 DALTILE * PORTFOLIO RANDPM LINEAR EARTH BLEND PF14 12"X27" SHEET ACCENT WALL TILE MOSAIC / GROUT SEALED WITH SILTANIUM/ GROUT COLOR: MAPEI 106 WALNUT

RB-1 RESILIENT BASE 09 65 13 ROPPE * PINNACLE RUBBER BASE COVE 114 LUNAR DUST 4"

RWC-1 RIGID WALL COVERING 10 26 00 C/S ACROVYN * WALL COVERING ACROVYN SOLID COLOR 513 KHAKI BROWN 48" HIGH WALL PROTECTION AT VESTIBULE AND HAC

RWS-1 WINDOW SHADES 12 24 00 MECHOSHADE * 1500 SERIES THERMOVEIL / DENSE BASKETWEAVE INSIDE WINDOW FRAME MOUNT SILVER BIRCH 1519 3% OPEN, VENDOR TO SITE MEASURE FOR FINAL UNIT SIZING

S-1 SOLID SURFACE 12 36 00 AVONITE * N/A N/A CASABLANCA

SS-1 STAINLESS STEEL TBD * TBD

TR-1 TILE TRIM 09 30 13 SCHLUTER * JOLLY METALLIC GREY TOP FINISH PIECE AT RESTROOM WALL TILE

TR-2 TILE TRIM 09 30 13 SCHLUTER * DILEX-AHK STONE GREY COVE FINISH PIECE AT RESTROOM WALL TILE

WD-1 PLYWOOD PLYWOOD* * APPLIED TO ALL TELECOMMUNICATIONS ROOM WALLS

WFT-1 WALL FINISH TYPE SEE F1 DETAIL THIS SHEET

ROOM FINISH SCHEDULE

LEVEL NO. NAME AREA

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

Not Placed MA-210 NEW GENERATOR ROOM, ADD-ALT NO.7 Not Placed

EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_00 MA-100 MECH AREA 337 SF C-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 -

LEVEL_01 103 VESTIBULE 107 SF EPY-1 EPY-1 GWB P-1, WFT-5 GWB P-1, WFT-5 GWB P-1, WFT-5 GWB P-1, WFT-5 AT-1

LEVEL_01 110 CHEMICAL TESTING ROOM 122 SF EPY-1 RB-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 AT-1

LEVEL_01 111 ENGINEERING CONTROL CENTER 331 SF EPY-1 RB-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 AT-1

LEVEL_01 112 HOUSEKEEPING AIDS CLOSET 55 SF EPY-1 RB-1 CMU CMU-1, WFT-6 CMU CMU-1, WFT-6 CMU CMU-1, WFT-6 CMU CMU-1, WFT-6 AT-1 REFERENCE WALL FINISH TYPES ON SHEET IN601

LEVEL_01 113 TOILET, STAFF 55 SF PT-1 PT-2, TR-2 CMU CMU-1, WFT-2 GWB P-1, WFT-2 GWB P-1, WFT-2 GWB P-1, WFT-2 GWB P-1 REFERENCE WALL FINISH TYPES ON SHEET IN601

LEVEL_01 114 TOILET, STAFF 55 SF PT-1 PT-2, TR-2 CMU CMU-1, WFT-2 GWB P-1, WFT-2 GWB P-1, WFT-2 GWB P-1, WFT-2 GWB P-1 REFERENCE WALL FINISH TYPES ON SHEET IN601

LEVEL_01 115 SHOWER/CHANGE 66 SF PT-1 PT-2, TR-2 GWB P-1, WFT-3 GWB P-1, WFT-2, WFT-3 GWB P-1, WFT-2 GWB P-1, WFT-2, WFT-3 GWB P-1 REFERENCE WALL FINISH TYPES ON SHEET IN601

LEVEL_01 116 LOUNGE 219 SF EPY-1 RB-1 GWB P-1 CMU, GWB CMU-1, P-1 CMU CMU-1 GWB P-1 AT-1 REFERENCE WALL FINISH TYPES ON SHEET IN601

LEVEL_01 117 CORRIDOR 134 SF EPY-1 RB-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 AT-1

LEVEL_01 MA-105 SUPPLY ROOM 575 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_01 MA-106 GENERATOR ROOM 375 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_01 MA-107 ELECTRICAL ROOM 546 SF EPY-1 EPY-1 GWB P-1 GWB P-1 CMU CMU-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_01 MA-108 BOILER PLANT 3353 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_01 MA-109 CHILLER ROOM 2680 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_01 MA-120 VESTIBULE 112 SF EPY-1 EPY-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 OPEN TO STRUCTURE

LEVEL_01 MA-121 STORAGE 211 SF EPY-1 EPY-1 CMU/ GWB CMU-1, P-1 CMU CMU-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_01 MA-122 CORRIDOR 96 SF EPY-1 RB-1 CMU CMU-1 - - CMU CMU-1 - - AT-1

LEVEL_01 MA-133 CORRIDOR 66 SF EPY-1 RB-1 GWB P-1 GWB P-1, WFT-4 CMU CMU-1 GWB P-1 AT-1

LEVEL_02 MA-200 BOILER ROOM - MEZZANINE 427 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_02 MA-202 CORRIDOR 150 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1

LEVEL_02 MA-203 OFFICE 132 SF EPY-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1

LEVEL_02 MA-204 NEW OFFICE 94 SF EPY-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1

LEVEL_02 MA-205 OFFICE 96 SF EPY-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1

LEVEL_02 MA-211 NEW ELECTRICAL 929 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE

LEVEL_02 MA-218 NEW OFFICE 126 SF EPY-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1

LEVEL_02 MA-219 TELECOM 123 SF EXISTING TO

REMAIN

EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

1/2" = 1'-0" F1

WALL FINISH TYPES

* (OR APPROVED EQUAL) MATERIALS ARE PROVIDED AS THE BASIS OF DESIGN, ALL MATERIAL SUBSTITUTIONS ARE SUBJECT TO OWNERS APPROVAL.

FINAL APPROVAL SHALL BE MADE BY ABQ VA COR AND ABQ VA INTERIORS PERSONNEL.

ALL TILE GROUT SHALL BE SEALED WITH SILTANIUM, OR APPROVED EQUAL.

Final Color Selections to be made by Rebekah Gonzales:

Rebekah Gonzales Supervisor Interior Designer, EMS Raymond G. Murphy VA Medical Center

NMVAHCS

1501 San Pedro SE Albuquerque, NM 87108 Phone: (505) 265-1711 x5478 Cell Phone: (505) 967-8170 Fax: (505) 256-2831 rebekah.gonzales@va.gov

6" = 1'-0" E7

EXPOXY TO RESILIENT BASE (TOE BASE)

6" = 1'-0"

E5

PORCELAIN TILE TO TILE WALL

6" = 1'-0" E3

EPOXY FLOOR COVE DETAIL

6" = 1'-0" B1

THRESHOLD - EPOXY FLOOR TO PORCELAIN TILE

Revisions: Date:

MR-5 CREDIT: PURCHASING-FACILITY MAINTENANCE AND RENOVATION PROVIDE DOCUMENTATION FOR RECYCLED CONTENT

0 1" 2" 4"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

0 1'-0" 2'-0" 4'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

6" = 1'-0" E9

RESILIENT TO RESILIENT BASE W WALL PROTECTION (TOE BASE)

7/20/2022

MATHEW PERKINS

PAINT

MANUFACT: PPG/ GLIDDEN (or equal)

COLOR: DELICATE WHITE

SHEEN LEVEL: EGG SHELL FINISH

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title Project Title

LocationChecke d

Drawn

MRP HG

Project Number

Board Number

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

P-1

501-17-105

1501 SAN PEDRO SE

ALBUQUERQUE, NM 87108

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com

NEW MEXICO VA HEALTH CARE SYSTEM

P-2 MANUFACT: PPG/GLIDDEN (or equal)

COLOR: SURREY BEIGE #30YY

SHEEN LEVEL: EGG SHELL

ACOUSTICAL CEILING TILE

MANUFACT: ARMSTRONG (or equal)

COLLECTION: CORTEGA

COLOR: WHITE

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title Project Title

LocationChecke d

Drawn

MRP HG

Project Number

Board Number

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

AT-1

501-17-105

1501 SAN PEDRO SE

ALBUQUERQUE, NM 87108

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com

NEW MEXICO VA HEALTH CARE SYSTEM

MILLWORK & COUNTER TOPS

PLASTIC LAMINATE

MANUFACT: WILSONART (or equal)

COLOR: KENSINGTON MAPLE 10776

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title Project Title

LocationChecke d

Drawn

MRP HG

Project Number

Board Number

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PL-1

501-17-105

1501 SAN PEDRO SE

ALBUQUERQUE, NM 87108

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com

NEW MEXICO VA HEALTH CARE SYSTEM

FLOORING & WALL BASE

WALL BASE

MANUFACT: ROPPE (or equal)

COLLECTION: PINNACLE RUBBER BASE

COLOR: LUNAR DUST 114

SIZE: 4"

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title Project Title

LocationChecke d

Drawn

MRP HG

Project Number

Board Number

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

RB-1

501-17-105

1501 SAN PEDRO SE

ALBUQUERQUE, NM 87108

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com

NEW MEXICO VA HEALTH CARE SYSTEM

SOLID SURFACE

MANUFACT: AVONITE (or equal)

COLOR: CASABLANCA

S-1

PORCELIAN TILE

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title Project Title

LocationChecke d

Drawn

MRP HG

Project Number

Board Number

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PT-3

501-17-105

1501 SAN PEDRO SE

ALBUQUERQUE, NM 87108

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com

NEW MEXICO VA HEALTH CARE SYSTEM

EPY-1

EPOXY FLOORING

MANUFACT: STONHARD (or equal)

COLLECTION: STONGARD MR

COLOR: COOL SHALE

MANUFACT: DALTILE (or equal)

COLLECTION: PORTFOLIO

COLOR: EARTH BLEND PF14

SIZE: RANDOM LINEAR MOSAIC

PORCELIAN TILE

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title Project Title

LocationChecke d

Drawn

MRP HG

Project Number

Board Number

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PT-2

501-17-105

1501 SAN PEDRO SE

ALBUQUERQUE, NM 87108

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com

NEW MEXICO VA HEALTH CARE SYSTEM

WALL TILE

MANUFACT: DALTILE (or equal)

COLLECTION: PORTFOLIO

COLOR: NOCE PF11

SIZE: 6"X24" 1/3 STAGGER INSTALL

PT-1

FLOOR TILE

MANUFACT: DALTILE (or equal)

COLLECTION: PORTFOLIO

COLOR: NOCE PF11

SIZE: 12"X24" 1/3 STAGGER INSTALL

CORNER GUARD / WALL PROTECTION/

ACCOUSTIC WALL PANEL

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title Project Title

LocationChecke d

Drawn

MRP HG

Project Number

Board Number

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO

ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

CG-1

501-17-105

1501 SAN PEDRO SE

ALBUQUERQUE, NM 87108

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com

NEW MEXICO VA HEALTH CARE SYSTEM

CORNER GUARD

MANUFACT: C/S ACROVYN (or equal)

COLLECTION: ACO-8

COLOR: STAINLESS STEEL

CONCRETE MASONRY WALLS

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title Project Title

LocationChecke d

Drawn

MRP HG

Project Number

Board Number

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

CMU-1

501-17-105

1501 SAN PEDRO SE

ALBUQUERQUE, NM 87108

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com

NEW MEXICO VA HEALTH CARE SYSTEM

CONCRETE MASONRY UNIT

MANUFACT: UTILITY BLOCK COMPANY,

CREGO BLOCK AND SUPPLY(or equal)

TYPE: BURNISHED

COLOR: WHITE SANDS 910

RWC-1

RIGID WALL COVERING

MANUFACT: C/S ACROVYN (or equal)

COLLECTION: .040 ACROVYN WALL

COLOR: 513 KHAKI BROWN

ACC-1

ACCOUSTICAL WALL PANEL

MANUFACT: AUTEX (or equal)

COLLECTION: CUBE

COLOR: STAINLESS FLATIRON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

NOT FOR

CONSTRUCTION

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:2

P M

IN701

INTERIOR FINISH - COLOR BOARDS

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS M. RIOS

100% CONSTRUCTION

DOCUMENTS

FINAL APPROVAL SHALL BE MADE BY

ABQ VA COR AND ABQ VA INTERIORS

PERSONNEL.

MR-5 CREDIT: PURCHASING - FACILITY MAINTENANCE AND RENOVATION

PURCHASE AT LEAST 50%, BY COST, OF THE TOTAL MAINTENANCE AND

RENOVATION MATERIALS THAT MEET AT LEAST ONE OF THE FOLLOWING

CRITERIA. INCLUDE PRODUCTS SPECIFIED IN MATERIALS AND RESOURCES

PREREQUISITE: FACILITY MAINTENANCE AND RENOVATION POLICY. THERE IS

NO MINIMUM SCOPE OF RENOVATION OR NEW CONSTRUCTION WORK

REQUIRED FOR ELIGIBILITY OF THIS CREDIT. EACH PURCHASE CAN RECEIVE

CREDIT FOR EACH CRITERION MET.

Revisions: Date: 7/20/2022

MATHEW PERKINS

BFP

UP

UP

DN

UP

DN

CR

DN

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

A-202

C2

A-202

F2

A-201

C2

A-201

F2

E

D

C

B

A

1 2 3 4 5 6

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

ELECTRICAL

ROOM

MA-107MA-107

BOILER

PLANT

MA-108MA-108

STAIRS

MA-209MA-209

CHEMICAL

TESTING

ROOM

110110

CORRIDOR

117117

ENGINEERING

CONTROL

CENTER

111111

TOILET,

STAFF

114114

TOILET,

STAFF

113113

LOUNGE

116116

SHOWER/CHANGE

115115

CHILLER

ROOM

MA-109MA-109

VESTIBULE

103103

BLDG 43A

43A43A

7C

107A

107D

8A

108E

9A

A

108D

9D

7A

HOUSEKEEPING

AIDS CLOSET

112112

7A

108B

STORAGE

MA-121MA-121

VESTIBULE

MA-120MA-120

CORRIDOR

MA-122MA-122

A1080 F3065

A5077 A5082

F2017M

A1067

A5075

A5109M A5200

A5090

A5082 F2017M

A1067 A5075

A5109M A5090 A5200

F2015

K1552

R7250M

M2055M2055

E0117M

F0275

E0117M

E0117M

F0275F0275

CA041MCA041M

CA041MCA041M

F0500

F0505

A5075 P4700

A5107 P2000 A5077

P2451M

P5210M

A5170

M2055M2055

F0795MF0225

F0225

F0225

F0795M F0225

F0225 F0225

F0225

F0225 F0795M

F0225F0225

A-402

B7

A-401

D8

A-401

C8

A-401

E8

A-402

A3

SIM

A-402

E7

CA041M

CT020

CA041M

CT020

K4665

CA041M

K4500M

A1145

CS040

CT020

A5077

K2515

A5215M

U0005

A1012

A1015 A1015

A5135

C02D0 X1060M

F2000

F2000

F3200

R2200M

F2300

U0001

A5077

U0004

F2017 M3073

U0005

CORRIDOR

MA-133MA-133

U0005

U0005

F2300

P1965

5 6

A5077

A5215M

CS230

9E

3B

103C

5C

6 105D

105A

108B

ELEC EQUIP TO REMAIN,

(BASE BID)

P2100

F

V V ITEM - VA SUPPLIED & INSTALLED

V C ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

C C ITEM - CONTRACTOR SUPPLIED &

INSTALLED

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

A1000

EQUIPMENT / FURNITURE LEGEND

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

C

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:2

P M

Q-101

EQUIPMENT PLAN - LEVEL 1 - COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS M. RIOS

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F2

EQUIPMENT PLAN - LEVEL 1 - COMPOSITE

1 FURNITURE NOT IN CONTRACT

2 NEW STAIRCASE

3 NEW LOCKERS

4 EXISTING STAIRCASE TO REMAIN

5 NEW EXHAUST HOOD, REFER TO MECHANICAL FOR ADDTIONAL INFORMATION

6 OWNER'S EXISTING ELECTRIC STOVE

JSN Schedule

JSN Nomenclature Furn. By/

Installed By R4000 Ice Maker, Freestanding, SS VV

R7250M Refrigerator/Freezer, 20 Cubic Feet, SS VV

U0001 Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top, w/ trays for chemical spillage CC

U0002 Task Light, Freestanding VV

U0003 Power Washer VV

U0004 Chemical Cleaning Solution Dispenser VV

U0005 Container, Combination, Trash/Recycling, Small VV

U0006 Monitor Arm, Quad monitors CC

U0007 Single Wall Mount Monitor Arm CC

X1060M Cabinet, base, 1 door CC

JSN Schedule

JSN Nomenclature Furn. By/

Installed By F2017M Waste Receptacle, SS, 12 GAL VV

F2300 Rack, Information, Wall Mounted VV

F3065 Whiteboard/Bulletin Board, Combination VC

F3200 Clock, Battery, 12in Dia CC

K1552 Brewer, Coffee, Auto, Elect, 3 Burner, Front/Back VV

K2515 Dishwasher, Household CC

K4500M Stove, Household, 4 Burner, w/Oven, Electric, SS VC

K4665 Oven, Microwave, Consumer, SS CC

M2055 Shelving, Storage, Wire, CRS, w/Adjustable Shelves VV

M3073 Basket, Infectious Waste, Step-on VV

P1965 Eyewash, Eye-Face, Sink Mounted, Hands-free CC

P2000 Eyewash, Wall Mounted, Hands-Free CC

P2100 Disposal, Garbage, 2 HP Motor CC

P2451M Valve, Mixing, Thermostatic, serving double eyewash stations CC

P4700 Sink, Mop, Molded Stone CC

P5210M Shower, Single, Hand-Held CC

R2200M Fountain, Water, SS CC

JSN Schedule

JSN Nomenclature Furn. By/

Installed By C03P0 Cabinet, Sink, U/C/B, 2 Door CC

C04F0M Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC

C04P0M Cabinet, Sink, U/C/B, 2 Door CC

C05F0 Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC

CA041M Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top CC

CS040 Sink, SS, Single Compartment CC

CS230 Sink, SS, Double Compartment CC

CT020 Countertop, Solid Surface CC

E0117M Workstation, Straight, Free Standing sit to stand CC

F0225 Chair, Stacking VV

F0275 Chair, Swivel, High Back VV

F0500 Cart, Janitor's VV

F0505 Bucket, Mop, With Wringer, 26 Quart VV

F0795M Table, Dining VV

F2000 Basket, Wastepaper, Fire Resistant VV

F2015 Basket, Wastepaper, SS, 2 Swinging Doors VV

F2017 Waste Receptacle, 24 Gal VV

JSN Schedule

JSN Nomenclature Furn. By/

Installed By A1012 Telephone, Wall Mounted, 1 Line VV

A1015 Telephone, Desk, Multiple Line 12 x 12 VV

A1035 Locker, Single Tier CC

A1067 Mirror, Float Glass, ADA Accessible CC

A1080 Mirror, Posture, Wall Mtd 28" x 6" CC

A1145 Shelving, Mobile, Manual CC

A5075 Dispenser, Soap, Disposable CC

A5077 Dispenser, Hand Sanitizer, Hands-Free VC

A5082 Dispenser, Paper Towel, Sensor, Hands Free VC

A5090 Disposal, Sanitary Napkin, SS, Surface Mounted VC

A5107 Dispenser, Glove, Surgical/Examination, Wall Mntd CC

A5109M Corner Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible CC

A5135 Shelf, Utility W/ Mop/Broom Holders, SS, Surf Mntd CC

A5170 Rod, Shower Curtain, 1"Diameter, W/Curtain & Hooks CC

A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd VC

A5215 Bracket, Television, Wall-Mounted, Tilt/Angle CC

C02D0 Cabinet, U/C/B,4 Drawer CC

NOTE:

1. JSN NUMBERS THAT END WITH AN "M" SUFFIX INDICATE THAT THE ITEM IS A MODIFIED VERSION OF THE

VA'S EQUIPMENT LIST

2. JSN NUMBERS THAT START WITH A "U" PREFIX INDICATE THAT THE ITEM DOES NOT HAVE A NUMBER IN

THE VA EQUIPMENT LIST

3. ALL FURNITURE PURCHASED SHOULD FOLLOW CRITERIA NOTED UNDER MR-5 PURCHASING-FACILITY

MAINTENANCE AND RENOVATION (OPTION 2) FURNITURE. SEE SHEET G-015

Revisions: Date:

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

DN

UP

UP

DN

DN

A-202

C2

A-202

F2

A-201

C2

A-201

F2

E

D

C

B

A

1 2 3 4 5 6

202A

BOILER

ROOM -

MEZZANINE

MA-200MA-200

OFFICE

MA-203MA-203

NEW OFFICE

MA-204MA-204

OFFICE

MA-205MA-205

CORRIDOR

MA-202MA-202

TELECOM

MA-219MA-219

NEW OFFICE

MA-218MA-218

STAIRS

MA-209MA-209

SUPPLY

ROOM

MA-105MA-105

GENERATOR

ROOM

MA-106MA-106

BOILER

PLANT

MA-108MA-108

CHILLER

ROOM

MA-109MA-109

NEW

ELECTRICAL

MA-211MA-211

210A

A

M1825 F0705M

F0420 M2070

F0275

F0650 F0275

E0042

F0750 F0225

E0042

M1825

F0420 M2070

F0275

E0042 F0650

STAIRCASE

MA-130MA-130

STAIRCASE

MA-131MA-131

F0705M

202B

F

GENERAL NOTES

A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.

B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.

C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION

WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE

REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL

BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE

PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS

AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO

INSTALLATION.

H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE

THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN

TO MATCH EXISTING CONDITIONS AND FINISHES.

KEYNOTES

V V ITEM - VA SUPPLIED & INSTALLED

V C ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

C C ITEM - CONTRACTOR SUPPLIED &

INSTALLED

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

A1000

EQUIPMENT / FURNITURE LEGEND

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

KEY PLAN

NOT FOR

CONSTRUCTION

A B

C

B

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:4

P M

Q-102

EQUIPMENT PLAN - LEVEL 2 - COMPOSITE

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS M. RIOS

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F2

EQUIPMENT PLAN - LEVEL 2 - COMPOSITE

1 NEW DOOR

2 NEW STAIRCASE

3 EXISTING STAIRCASE TO REMAIN

4 EXISTING FURNITURE TO REMAIN

5 OPEN TO LEVEL 1 BELOW

NOTE:

1. JSN NUMBERS THAT END WITH AN "M" SUFFIX INDICATE THAT THE ITEM IS A MODIFIED VERSION OF THE

VA'S EQUIPMENT LIST

2. JSN NUMBERS THAT START WITH A "U" PREFIX INDICATE THAT THE ITEM DOES NOT HAVE A NUMBER IN

THE VA EQUIPMENT LIST

3. ALL FURNITURE PURCHASED SHOULD FOLLOW CRITERIA NOTED UNDER MR-5 PURCHASING-FACILITY

MAINTENANCE AND RENOVATION (OPTION 2) FURNITURE. SEE SHEET G-015

Revisions: Date:

JSN Schedule

JSN Nomenclature Furn. By/

Installed By R4000 Ice Maker, Freestanding, SS VV

R7250M Refrigerator/Freezer, 20 Cubic Feet, SS VV

U0001 Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top, w/ trays for chemical spillage CC

U0002 Task Light, Freestanding VV

U0003 Power Washer VV

U0004 Chemical Cleaning Solution Dispenser VV

U0005 Container, Combination, Trash/Recycling, Small VV

U0006 Monitor Arm, Quad monitors CC

U0007 Single Wall Mount Monitor Arm CC

X1060M Cabinet, base, 1 door CC

JSN Schedule

JSN Nomenclature Furn. By/

Installed By F2017M Waste Receptacle, SS, 12 GAL VV

F2300 Rack, Information, Wall Mounted VV

F3065 Whiteboard/Bulletin Board, Combination VC

F3200 Clock, Battery, 12in Dia CC

K1552 Brewer, Coffee, Auto, Elect, 3 Burner, Front/Back VV

K2515 Dishwasher, Household CC

K4500M Stove, Household, 4 Burner, w/Oven, Electric, SS VC

K4665 Oven, Microwave, Consumer, SS CC

M2055 Shelving, Storage, Wire, CRS, w/Adjustable Shelves VV

M3073 Basket, Infectious Waste, Step-on VV

P1965 Eyewash, Eye-Face, Sink Mounted, Hands-free CC

P2000 Eyewash, Wall Mounted, Hands-Free CC

P2100 Disposal, Garbage, 2 HP Motor CC

P2451M Valve, Mixing, Thermostatic, serving double eyewash stations CC

P4700 Sink, Mop, Molded Stone CC

P5210M Shower, Single, Hand-Held CC

R2200M Fountain, Water, SS CC

JSN Schedule

JSN Nomenclature Furn. By/

Installed By C03P0 Cabinet, Sink, U/C/B, 2 Door CC

C04F0M Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC

C04P0M Cabinet, Sink, U/C/B, 2 Door CC

C05F0 Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC

CA041M Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top CC

CS040 Sink, SS, Single Compartment CC

CS230 Sink, SS, Double Compartment CC

CT020 Countertop, Solid Surface CC

E0117M Workstation, Straight, Free Standing sit to stand CC

F0225 Chair, Stacking VV

F0275 Chair, Swivel, High Back VV

F0500 Cart, Janitor's VV

F0505 Bucket, Mop, With Wringer, 26 Quart VV

F0795M Table, Dining VV

F2000 Basket, Wastepaper, Fire Resistant VV

F2015 Basket, Wastepaper, SS, 2 Swinging Doors VV

F2017 Waste Receptacle, 24 Gal VV

JSN Schedule

JSN Nomenclature Furn. By/

Installed By A1012 Telephone, Wall Mounted, 1 Line VV

A1015 Telephone, Desk, Multiple Line 12 x 12 VV

A1035 Locker, Single Tier CC

A1067 Mirror, Float Glass, ADA Accessible CC

A1080 Mirror, Posture, Wall Mtd 28" x 6" CC

A1145 Shelving, Mobile, Manual CC

A5075 Dispenser, Soap, Disposable CC

A5077 Dispenser, Hand Sanitizer, Hands-Free VC

A5082 Dispenser, Paper Towel, Sensor, Hands Free VC

A5090 Disposal, Sanitary Napkin, SS, Surface Mounted VC

A5107 Dispenser, Glove, Surgical/Examination, Wall Mntd CC

A5109M Corner Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible CC

A5135 Shelf, Utility W/ Mop/Broom Holders, SS, Surf Mntd CC

A5170 Rod, Shower Curtain, 1"Diameter, W/Curtain & Hooks CC

A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd VC

A5215 Bracket, Television, Wall-Mounted, Tilt/Angle CC

C02D0 Cabinet, U/C/B,4 Drawer CC

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

7/20/2022

MATHEW PERKINS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

NOT FOR

CONSTRUCTION

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:4

P M

Q-900

EQUIPMENT CUTSHEETS / BASIS OF DESIGN

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS H.

GARDINER

100% CONSTRUCTION

DOCUMENTS

***ALL ITEMS ON THIS SHEET ARE CONTRACTOR PURCHASED

CONTRACTOR INSTALLED ***

THIS INFORMATION HAS BEEN PROVIDED TO SHOWCASE THE

BASIS OF DESIGN

CONTRACTOR SHALL SUBMIT ALL EQUIPMENT FOR

APPROVAL BY VA/AE

SUBSTITUTIONS WILL BE SUBJECT TO OWNER APPROVAL

Revisions: Date: 7/20/2022

MATHEW PERKINS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

NOT FOR

CONSTRUCTION

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:4

P M

Q-901

EQUIPMENT CUTSHEETS / BASIS OF DESIGN

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17-105

11/25/2019 M. PERKINS N.

BLANCHARD

100% CONSTRUCTION

DOCUMENTS

Revisions: Date:

***ALL ITEMS ON THIS SHEET ARE CONTRACTOR PURCHASED

CONTRACTOR INSTALLED ***

THIS INFORMATION HAS BEEN PROVIDED TO SHOWCASE THE

BASIS OF DESIGN

CONTRACTOR SHALL SUBMIT ALL EQUIPMENT FOR

APPROVAL BY VA/AE

SUBSTITUTIONS WILL BE SUBJECT TO OWNER APPROVAL

7/20/2022

MATHEW PERKINS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Structural and Subconsultants:

NOT FOR

CONSTRUCTION

2058 S Dobson Rd., Suite 10, Mesa, AZ 85202

(480) 454-6408 www.unitedstr.com

B

IM

/5

-1

-1

O p ti m iz e

B

E n e rg y P la n t

/5

-1

-1

.4

.A

R C

H .r v t

/2 /2

:0

:4

P M

Q-902

EQUIPMENT CUTSHEETS / BASIS OF DESIGN

TRIPLE C THE A/E GROUP

2266 S. Dobson Road, Suite 200

Mesa, AZ 85202

(928) 499-3225

Mat Perkins

P2S ENGINEERING, INC.

5000 E. Spring Street

8th Floor

Long Beach, CA 90815-5218

Contact: Mikhail Fuks

UPGRADE ENERGY PLANT

EQUIPMENT INFRASTRUCTURE

(BLDG. 43 & 43A)

1501 SAN PEDRO SE ALBUQUERQUE, NM 87108

501-17…