ATTACHMENT A - 6 of11 501-17-105 Dwg-Arch3 07-20-22.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26223B0010
About this file
This notification provides information about an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure at the New Mexico VA Healthcare System in Albuquerque, New Mexico. The project scope includes renovation, new construction, equipment replacements and utility modifications to address deficiencies in Building 43 related to mechanical, plumbing, accessibility, electrical, life safety, structure and cooling systems. The contractor will be responsible for supervision, labor, materials, equipment and transportation to complete all work in accordance with solicitation documents and applicable codes. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses listed in the VetCert database. The North American Industry Classification code is 236220 for commercial and institutional building construction up to $39.5 million. The VA estimates the project value to be between $10-20 million. An Invitation for Bid is expected to be issued on or around July 15, 2023 via SAM.gov. A pre-bid site visit will be scheduled. Points of contact are provided for any questions.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
CR
DN
DN
DN
UP
DN
DN
PATTERN OR COLOR CHANGE
MATERIAL FLOOR CHANGE (REFER TO IN601
FOR TRANSITION DETAILS)
DIRECTION OF FINISH
INTERIOR FINISH SYMBOLS
P-_ PAINT COLOR / WALL FINISHES
EXTENT OF WALL FINISH TYPE
CORNER GUARD LOCATIONCG
GRAIN
REFER TO SHEET IN601 FOR ROOM FINISH SCHEDULE & FINISH LEGEND
FINISHES LISTED ARE THE OVERALL FINISHES SPECIFIED FOR EACH SPACE.
REFER TO PLANS FOR ADDITIONAL WALL FINISHES REQUIRED FOR EACH SPACE.
E
D
C
B
A
1 2 3 4 5 6
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
ELECTRICAL
ROOM
MA-107MA-107
BOILER
PLANT
MA-108MA-108
STAIRS
MA-209MA-209
CHEMICAL
TESTING
ROOM
110110
CORRIDOR
117117
ENGINEERING
CONTROL
CENTER
111111
XXYYC
TOILET,
STAFF
114114
TNPG1
TOILET,
STAFF
113113
TNPG1
LOUNGE
116116
SL001
SHOWER/CHANGE
115115
SHSM1
CHILLER
ROOM
MA-109MA-109
VESTIBULE
103103
BLDG
43A 43A43A
HOUSEKEEPING
AIDS
CLOSET
112112
JANC1
STORAGE
MA-121MA-121
SRE01
VESTIBULE
MA-120MA-120
FLOOR FINISH LEGEND
NO WORK
EPY-1
FACTORY FINISH
PT-1
CORRIDOR
MA-122MA-122
STAIRCASE
MA-129MA-129
STAIRCASE
MA-128MA-128
CORRIDOR
MA-133MA-133
F
E
D
C
B
A
1 2 3 4 5 6
BOILER
ROOM -
MEZZANINE
MA-200MA-200
OFFICE
MA-203MA-203
OFA09
NEW
OFFICE
MA-204MA-204
OFA09
OFFICE
MA-205MA-205
OFA09
CORRIDOR
MA-202MA-202
TELECOM
MA-219MA-219
TETR1
NEW
OFFICE
MA-218MA-218
OFA09
STAIRS
MA-209MA-209
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
BOILER
PLANT
MA-108MA-108
NEW
ELECTRICAL
MA-211MA-211
FLOOR FINISH LEGEND
NO WORK
EPY-1
EXISTING TO
REMAIN
FACTORY
FINISH
OPEN TO LEVEL 1 OPEN TO LEVEL 1
STAIRCASE
MA-130MA-130
STAIRCASE
MA-131MA-131
ROOF BELOW
STAIRCASE
MA-132MA-132
OPEN TO LEVEL 1
OPEN TO LEVEL 1
F
2 3
MECH
AREA
MA-100MA-100
FLOOR FINISH LEGEND
C-1
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:1
P M
IN001
INTERIOR FINISH FLOOR TYPES LEVEL 0, 1 & 2
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS M. RIOS
100% CONSTRUCTION
DOCUMENTS
FLOOR FINISH SCHEDULE
FLOOR FINISH AREA
C-1 337 SF
EPY-1 10936 SF
EXISTING TO REMAIN 123 SF
PT-1 176 SF
11572 SF
INTERIOR SHEET NOTES
A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.
B. REFER TO SHEET IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.
C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.
D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.
E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY,
REFER TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.
F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS
G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,
TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE
CLOSED POSITION.
H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.
I. REFER TO AW SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO
SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /
EQUIPMENT LABELING REQUIREMENTS.
J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE
SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO
NOT TRANSMIT TO ADJACENT SPACES.
K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.
L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.
M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE
DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION
AT THE TIME OF THE BIDDING BY THE CONTRACTOR.
N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE
SHALL BE REQUESTED FROM THE COR.
O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR
CONSISTENCY.
P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH
CURRENT IBC TABLE 803.9
Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS
SPECIFIED FOR THAT SPACE UNO.
R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR
INSTALLER FINISHED ITEMS.
S. PAINT ALL WALLS (P-1) UNO.
T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL
BOARD CEILINGS (P-1) UNO.
U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT
BOUNDARY (P-2) UNO.
3/32" = 1'-0" C4
INTERIOR PLAN - LEVEL 1 - COMPOSITE FLOOR FINISH TYPES
3/32" = 1'-0" F4
INTERIOR PLAN - LEVEL 2 - COMPOSITE FLOOR FINISH TYPES
Final Color Selections to be made by Rebekah Gonzales:
Rebekah Gonzales Supervisor Interior Designer, EMS
Raymond G. Murphy VA Medical Center
NMVAHCS
1501 San Pedro SE Albuquerque, NM 87108 Phone: (505) 265-1711 x5478 Cell Phone: (505) 967-8170 Fax: (505) 256-2831 rebekah.gonzales@va.gov
NOT USED
3/32" = 1'-0" F1
INTERIOR PLAN - LEVEL 0 - COMPOSITE FLOOR FINISH TYPES
INTERIOR FINISH ABBREVIATIONS
ABBREVIATION FINISH TYPE
AT ACOUSTICAL CEILING TILE
C SEALED CONCRETE
CG CORNER GUARD
CMU CONCRETE MASONRY UNIT BLOCK
EPY EPOXY FLOORING
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RWC RIGID WALL COVERING
RWS WINDOW SHADES
S SOLID SURFACE
SS STAINLESS STEEL
TR TILE TRIM
WD PLYWOOD
WFT WALL FINISH TYPE
KEYNOTES
Revisions: Date:
MR-5 CREDIT: PURCHASING-FACILITY MAINTENANCE AND RENOVATION
PROVIDE DOCUMENTATION FOR RECYCLED CONTENT
7/20/2022
MATHEW PERKINS
NO.005843
07/20/2022
F
S
S
F
F
F
F
F
F
P B
P B
T F
S
S
S
S
S
S
S
F
S
UP
UP
DN
UP
DN
CR
DN
INTERIOR ROOM FINISH LEGEND
CEILING: AT-1
WALL: P-1, WFT-6 (OCCURS AT HAC ONLY)
WALL BASE: RB-1 (REFER TO DETAIL E9/IN601)
FLOORING: EPY-1
CEILING: GWB
WALL: P-1, PT-2, PT-3
WALL BASE: PT-2 (REFER TO DETAIL E5/IN601)
FLOORING: PT-1
A
B
C
CEILING: OPEN TO STRUCTURE
WALL: P-1
WALL BASE: EPY-1 (REFER TO DETAIL E3/IN601)
FLOORING: EPY-1
D
E
CEILING: AT-1
WALL: P-1, WFT-5
WALL BASE: EPY-1 (REFER TO DETAIL E5/IN601)
FLOORING: EPY-1
F
CEILING: OPEN TO STRUCTURE
WALL: P-1
WALL BASE: NO WALL BASE
FLOORING: NO WORK, EXISTING TO REMAIN
NOT USED
PATTERN OR COLOR CHANGE
MATERIAL FLOOR CHANGE (REFER TO IN601
FOR TRANSITION DETAILS)
DIRECTION OF FINISH
INTERIOR FINISH SYMBOLS
P-_ PAINT COLOR / WALL FINISHES
EXTENT OF WALL FINISH TYPE
CORNER GUARD LOCATIONCG
GRAIN
REFER TO SHEET IN601 FOR ROOM FINISH SCHEDULE & FINISH LEGEND
FINISHES LISTED ARE THE OVERALL FINISHES SPECIFIED FOR EACH SPACE.
REFER TO PLANS FOR ADDITIONAL WALL FINISHES REQUIRED FOR EACH SPACE.
E
D
C
B
A
1 2 3 4 5 6
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
ELECTRICAL
ROOM
MA-107MA-107
BOILER
PLANT
MA-108MA-108
STAIRS
MA-209MA-209
CHEMICAL
TESTING
ROOM
110110
CORRIDOR
117117
ENGINEERING
CONTROL
CENTER
111111
TOILET,
STAFF
114114
TOILET,
STAFF
113113
LOUNGE
116116
SHOWER/CHANGE
115115
CHILLER
ROOM
MA-109MA-109
VESTIBULE
103103
BLDG 43A
43A43A
7C
107A
107D
8A
108E
9A
A
108D
9D
7A
112HOUSEKEEPING
AIDS CLOSET
112112
7A
108B
STORAGE
MA-121MA-121
VESTIBULE
MA-120MA-120
C
C
C
C
C
A
B
B
A
A
A
B
A
E
C
C
CORRIDOR
MA-122MA-122A
CG-1
CG-1
CG-1
F
WFT-6
C
WFT-4
WFT-2
CG-1CG-1
CG-1
P-2
WFT-5
RWS-1
A-401
C8
A-402
A3
SIM
A-401
D8
A-401
E8
A-402
B7
A-402
E7
RWS-1
RWS-1
RWS-1
GREEN GLOBES
5.8 LIGHTING FEATURES
5.8.2 CONTROLLABLE SHADING
DEVICE, TYP
5.8 LIGHTING FEATURES
5.8.2 CONTROLLABLE
BLINDS SEE SHEET A-401
AND IN121
CORRIDOR
MA-133MA-133
A-402
E7
E4
A-301
E4
A-301
43-WCCH-1
43-WCCH-3
105A
5C
9E
3B
103C
6 105D
F
2 3
MECH
AREA
MA-100MA-100
F
1/4"
SAFETY AREA
INTERGRAL SAFETY
WALK ZONE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:0
P M
IN101
INTERIOR FINISH FLOOR PLAN - LEVEL 1 -
COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS M. RIOS
100% CONSTRUCTION
DOCUMENTS
INTERIOR SHEET NOTES
A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.
B. REFER TO SHEET IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.
C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.
D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.
E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY,
REFER TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.
F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS
G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,
TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE
CLOSED POSITION.
H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.
I. REFER TO AW SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO
SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /
EQUIPMENT LABELING REQUIREMENTS.
J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE
SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO
NOT TRANSMIT TO ADJACENT SPACES.
K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.
L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.
M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE
DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION
AT THE TIME OF THE BIDDING BY THE CONTRACTOR.
N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE
SHALL BE REQUESTED FROM THE COR.
O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR
CONSISTENCY.
P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH
CURRENT IBC TABLE 803.9
Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS
SPECIFIED FOR THAT SPACE UNO.
R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR
INSTALLER FINISHED ITEMS.
S. PAINT ALL WALLS (P-1) UNO.
T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL
BOARD CEILINGS (P-1) UNO.
U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT
BOUNDARY (P-2) UNO.
INTERIOR FINISH ABBREVIATIONS
ABBREVIATION FINISH TYPE
AT ACOUSTICAL CEILING TILE
C SEALED CONCRETE
CG CORNER GUARD
CMU CONCRETE MASONRY UNIT BLOCK
EPY EPOXY FLOORING
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RWC RIGID WALL COVERING
RWS WINDOW SHADES
S SOLID SURFACE
SS STAINLESS STEEL
TR TILE TRIM
WD PLYWOOD
WFT WALL FINISH TYPE
1/8" = 1'-0" E3
INTERIOR FINISHES - FLOOR PLAN - LEVEL 1
1 NO WORK
2 TRENCH DRAIN
3 SLOPE FLOOR TO DRAIN
4 PAINT HANDRAIL, GUARDRAIL AND STAIR STRUCTURE, COLOR TO MATCH EXISTING
RED
5 SPECIAL PAINT PREPARATION IS REQUIRED IN THIS SPACE. SEE SPECIFICATION 09 91
00 FOR MORE INFORMATION
6 INTEGRAL SAFETY WALK ZONE. FINAL LAYOUT AND CONFIGURATION SHALL BE
CONFIRMAND WITH THE COR AND SAFETY OFFICER BEFORE INSTALLATION
7 INTEGRAL SHOWER SAFETY ZONE. FINAL LAYOUT AND CONFIGURATION SHALL BE
CONFIRMAND WITH THE COR AND ENERGY PLANT SUPERVISOR BEFORE
INSTALLATION
1/8" = 1'-0" C1
INTERIOR FINISHES - FLOOR PLAN - LEVEL 0
KEYNOTES
Revisions: Date:
MR-5 CREDIT: PURCHASING-FACILITY MAINTENANCE AND RENOVATION
PROVIDE DOCUMENTATION FOR RECYCLED CONTENT
12" = 1'-0" F1
TUNNEL
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
F
F
DN
UP
UP
DN
DN
PATTERN OR COLOR CHANGE
MATERIAL FLOOR CHANGE (REFER TO IN601
FOR TRANSITION DETAILS)
DIRECTION OF FINISH
INTERIOR FINISH SYMBOLS
P-_ PAINT COLOR / WALL FINISHES
EXTENT OF WALL FINISH TYPE
CORNER GUARD LOCATIONCG
GRAIN
REFER TO SHEET IN601 FOR ROOM FINISH SCHEDULE & FINISH LEGEND
FINISHES LISTED ARE THE OVERALL FINISHES SPECIFIED FOR EACH SPACE.
REFER TO PLANS FOR ADDITIONAL WALL FINISHES REQUIRED FOR EACH SPACE.
INTERIOR ROOM FINISH LEGEND
CEILING: AT-1
WALL: P-1, WFT-6 (OCCURS AT HAC ONLY)
WALL BASE: RB-1 (REFER TO DETAIL E9/IN601)
FLOORING: EPY-1
CEILING: GWB
WALL: P-1, PT-2, PT-3
WALL BASE: PT-2 (REFER TO DETAIL E5/IN601)
FLOORING: PT-1
A
B
C
CEILING: OPEN TO STRUCTURE
WALL: P-1
WALL BASE: EPY-1 (REFER TO DETAIL E3/IN601)
FLOORING: EPY-1
D
E
CEILING: AT-1
WALL: P-1, WFT-5
WALL BASE: EPY-1 (REFER TO DETAIL E5/IN601)
FLOORING: EPY-1
F
CEILING: OPEN TO STRUCTURE
WALL: P-1
WALL BASE: NO WALL BASE
FLOORING: NO WORK, EXISTING TO REMAIN
NOT USED
E
D
C
B
A
1 2 3 4 5 6
202A
BOILER
ROOM -
MEZZANINE
MA-200MA-200
OFFICE
MA-203MA-203
NEW OFFICE
MA-204MA-204
OFFICE
MA-205MA-205
CORRIDOR
MA-202MA-202
TELECOM
MA-219MA-219
NEW OFFICE
MA-218MA-218
STAIRS
MA-209MA-209
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
BOILER
PLANT
MA-108MA-108
CHILLER
ROOM
MA-109MA-109
NEW
ELECTRICAL
MA-211MA-211
210A
1A
F
C A
A
A
CG-1 CG-1
A
CG-1 CG-1
CG-1
CG-1 CG-1
CG-1 CG-1
CG-1
CG-1CG-1
C
C
C
OPEN TO LEVEL 1
OPEN TO LEVEL 1
STAIRCASE
MA-130MA-130
STAIRCASE
MA-131MA-131
STAIRCASE
MA-132MA-132ROOF BELOW
RWS-1 RWS-1
GREEN GLOBES
5.8 LIGHTING FEATURES
5.8.2 CONTROLLABLE
SHADING DEVICE, TYP
5.8 LIGHTING FEATURES
5.8.2 CONTROLLABLE
BLINDS SEE SHEET A-401
AND IN102
EXISTING GENERATOR BELOW
& EXISTING WALL TO DECK TO
REMAIN FOR BASE BID
202B
F
A
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:1
P M
IN102
INTERIOR FINISH FLOOR PLAN - LEVEL 2 -
COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS M. RIOS
100% CONSTRUCTION
DOCUMENTS
INTERIOR SHEET NOTES
A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.
B. REFER TO SHEET IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.
C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.
D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.
E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY,
REFER TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.
F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS
G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,
TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE
CLOSED POSITION.
H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.
I. REFER TO AW SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO
SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /
EQUIPMENT LABELING REQUIREMENTS.
J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE
SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO
NOT TRANSMIT TO ADJACENT SPACES.
K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.
L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.
M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE
DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION
AT THE TIME OF THE BIDDING BY THE CONTRACTOR.
N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE
SHALL BE REQUESTED FROM THE COR.
O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR
CONSISTENCY.
P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH
CURRENT IBC TABLE 803.9
Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS
SPECIFIED FOR THAT SPACE UNO.
R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR
INSTALLER FINISHED ITEMS.
S. PAINT ALL WALLS (P-1) UNO.
T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL
BOARD CEILINGS (P-1) UNO.
U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT
BOUNDARY (P-2) UNO.
INTERIOR FINISH ABBREVIATIONS
ABBREVIATION FINISH TYPE
AT ACOUSTICAL CEILING TILE
C SEALED CONCRETE
CG CORNER GUARD
CMU CONCRETE MASONRY UNIT BLOCK
EPY EPOXY FLOORING
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RWC RIGID WALL COVERING
RWS WINDOW SHADES
S SOLID SURFACE
SS STAINLESS STEEL
TR TILE TRIM
WD PLYWOOD
WFT WALL FINISH TYPE
1/8" = 1'-0" E3
INTERIOR FINISHES - FLOOR PLAN - LEVEL 2
KEYNOTES
Revisions: Date:
MR-5 CREDIT: PURCHASING-FACILITY MAINTENANCE AND RENOVATION
PROVIDE DOCUMENTATION FOR RECYCLED CONTENT
1 PAINT HANDRAILS, GUARDRAIL AND STAIR STRUCTURE, COLOR TO MATCH
EXISTING RED
2 SPECIAL PAINT PREPARATION IS REQUIRED IN THIS SPACE. SEE SPECIFICATION
09 91 00 FOR MORE INFORMATION
3 PAINT ALL EXPOSED STEEL IN OFFICE TO MATCH SPECIFIED WALL COLOR
4 FUTURE OFFICE, FINISHES SHALL REMAIN AS IS.
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
WFT-1: NOT USED
PT-2
R E
F E
R T
O C
E
IL
IN
G
P
LA
N S
F O
R H
E
IG
H T
WFT-2: TOILET TILE PATTERN
P-1 , UNLESS NOTED
OTHERWISE ON FINISH
PLAN
PT-3
3' -6
TR-1
TR-2
PT-2
R E
F E
R T
O C
E
IL
IN
G
P
LA
N F
O R
H E
IG
H
T
WFT-3: SHOWER TILE PATTERN
PT-3
TR-2
PT-2
2' -0
1'
-0
6"
2' -0
1'
-0
RB-1
S-1
WFT-4: SOLID SURFACE WALL PANEL
AT WALL MOUNTED DRINKING
FOUNTAIN
P-1 , UNLESS NOTED
OTHERWISE ON FINISH
PLAN
4' -6
M
IN
4'
-2
IF FOUNTAIN DOES NOT OCCUR
AT AN ALCOVE, SOLID SURFACE
SHALL BE A MINIMUM WIDTH OF
30" WIDE WITH AN EASED EDGE
PROFILE ALL SIDES
WATER FOUNTAIN
IF FOUNTAIN OCCURS AT
AN ALCOVE, SCRIBE
SOLID SURFACE
MATERIAL TO INSIDE
CORNERS
FINISH WITH EASED
EDGE PROFILE, AT ALL
EXPOSED SIDES
E5
IN601
E5
IN601
E7
IN601
4"
EPY-1
RWC-1
P-1
UNLESS NOTED
OTHERWISE ON FINISH
PLAN
WFT-5: RIGID WALL PROTECTION
MANUFACTURER'S
STANDARD
TRIM PIECES AT ALL
SEAMS AND EDGES
E3
IN601
4' -4
4"
RB-1
RWC-1
WFT-6: RIGID WALL PROTECTION
MANUFACTURER'S
STANDARD
TRIM PIECES AT ALL
SEAMS AND EDGES
E9
IN601
4' -1
P-1
UNLESS NOTED
OTHERWISE ON FINISH
PLAN
RESILIENT BASE AS SCHEDULED
EPOXY FLOOR
WATER VAPOR CONTROL SYSTEM
TOP OF SLAB
PARTITION AS SCHEDULED
WALL TILE AS SCHEDULED
TR-2 (SEE FINISH LEGEND THIS SHEET)
GROUT
THIN SET PORCELAIN FLOOR
TILE AS SCHEDULED
WATER VAPOR CONTROL
SYSTEM/CRACK SUPPRESSION
MEMBRANE
TOP OF SLAB
PARTITION AS SCHEDULED
3/4" RADIUS COVE
EPOXY FLOORING AS
SCHEDULED
TOP OF SLAB
PARTITION AS SCHEDULED
4"
1/8" METAL COVE STRIP
DOOR FRAME BEYOND
TRANSITION STRIP AS
SCHEDULED
EPOXY FLOOR AS
SCHEDULED
CENTER LINE OF
FLOOR FINISH
CHANGE OR SEAM
DOOR AS SCHEDULED
C CENTER LINE OF DOOR
L
PORCELAIN TILE
CEMENTITIOUS SETTING BED
SLAB
NOTE: REFER TO INTERIOR FINISH PLANS FOR LOCATIONS
RESILIENT BASE AS SCHEDULED
FLOOR AS SCHEDULED
WATER VAPOR CONTROL SYSTEM
TOP OF SLAB
PARTITION AS SCHEDULED
WALL PROTECTION AS SCHEDULED
M
IN
1"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:1
P M
IN601
INTERIOR FINISH LEGEND AND ROOM FINISH
SCHEDULE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K.
MCDERMOTT
100% CONSTRUCTION
DOCUMENTS
FINISH LEGEND
SYMBOL FINISH TYPE SPEC SECTION MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE NOTES
AT-1 ACOUSTICAL CEILING TILE 09 51 00 ARMSTRONG * CORTEGA SQUARE LAY-IN-769A WHITE 24"X48" PRELUDE XL 15/16" GRID SYSTEM
C-1 SEALED CONCRETE REFER TO SPECIFICATIONS REFER TO SPECIFICATIONS N/A N/A
CG-1 CORNER GUARD 10 26 00 C/S ACROVYN * CO-8 183128-6 STAINLESS STEEL 3" LEGS
CMU-1 CONCRETE MASONRY UNIT BLOCK UTILITY BLOCK COMPANY OR CREGO BLOCK * BURNISHED WHITE SANDS 910
EPY-1 EPOXY FLOORING 09 67 23.30 STONHARD* STONGARD MR COOL SHALE
P-1 PAINT 09 91 00 GLIDDEN/ PPG* N/A EPOXY / EGG SHELL DELICATE WHITE FIELD
P-2 PAINT 09 91 00 GLIDDEN/ PPG* N/A EPOXY / EGG SHELL SURREY BEIGE #30YY DOOR JAMB/TRIM ONLY
PL-1 PLASTIC LAMINATE 12 32 00 WILSONART * N/A N/A KENSINGTON MAPLE 10776
PT-1 PORCELAIN TILE 09 30 13 DALTILE * PORTFOLIO PORTFOLIO NOCE PF11 12"X24" 1/3 STAGGER INSTALL / GROUT SEALED WITH SILTANIUM/ GROUT COLOR: MAPEI 106 WALNUT
PT-2 PORCELAIN TILE 09 30 13 DALTILE * PORTFOLIO PORTFOLIO NOCE PF11 6"X24" WALL TILE, 1/3 STAGGER INSTALL / GROUT SEALED WITH SILTANIUM/ GROUT COLOR: MAPEI 106 WALNUT
PT-3 PORCELAIN TILE 09 30 13 DALTILE * PORTFOLIO RANDPM LINEAR EARTH BLEND PF14 12"X27" SHEET ACCENT WALL TILE MOSAIC / GROUT SEALED WITH SILTANIUM/ GROUT COLOR: MAPEI 106 WALNUT
RB-1 RESILIENT BASE 09 65 13 ROPPE * PINNACLE RUBBER BASE COVE 114 LUNAR DUST 4"
RWC-1 RIGID WALL COVERING 10 26 00 C/S ACROVYN * WALL COVERING ACROVYN SOLID COLOR 513 KHAKI BROWN 48" HIGH WALL PROTECTION AT VESTIBULE AND HAC
RWS-1 WINDOW SHADES 12 24 00 MECHOSHADE * 1500 SERIES THERMOVEIL / DENSE BASKETWEAVE INSIDE WINDOW FRAME MOUNT SILVER BIRCH 1519 3% OPEN, VENDOR TO SITE MEASURE FOR FINAL UNIT SIZING
S-1 SOLID SURFACE 12 36 00 AVONITE * N/A N/A CASABLANCA
SS-1 STAINLESS STEEL TBD * TBD
TR-1 TILE TRIM 09 30 13 SCHLUTER * JOLLY METALLIC GREY TOP FINISH PIECE AT RESTROOM WALL TILE
TR-2 TILE TRIM 09 30 13 SCHLUTER * DILEX-AHK STONE GREY COVE FINISH PIECE AT RESTROOM WALL TILE
WD-1 PLYWOOD PLYWOOD* * APPLIED TO ALL TELECOMMUNICATIONS ROOM WALLS
WFT-1 WALL FINISH TYPE SEE F1 DETAIL THIS SHEET
ROOM FINISH SCHEDULE
LEVEL NO. NAME AREA
FLOOR WALLS CEILING
NOTESFINISH BASE
NORTH EAST SOUTH WEST
MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
Not Placed MA-210 NEW GENERATOR ROOM, ADD-ALT NO.7 Not Placed
EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_00 MA-100 MECH AREA 337 SF C-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 -
LEVEL_01 103 VESTIBULE 107 SF EPY-1 EPY-1 GWB P-1, WFT-5 GWB P-1, WFT-5 GWB P-1, WFT-5 GWB P-1, WFT-5 AT-1
LEVEL_01 110 CHEMICAL TESTING ROOM 122 SF EPY-1 RB-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 AT-1
LEVEL_01 111 ENGINEERING CONTROL CENTER 331 SF EPY-1 RB-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 AT-1
LEVEL_01 112 HOUSEKEEPING AIDS CLOSET 55 SF EPY-1 RB-1 CMU CMU-1, WFT-6 CMU CMU-1, WFT-6 CMU CMU-1, WFT-6 CMU CMU-1, WFT-6 AT-1 REFERENCE WALL FINISH TYPES ON SHEET IN601
LEVEL_01 113 TOILET, STAFF 55 SF PT-1 PT-2, TR-2 CMU CMU-1, WFT-2 GWB P-1, WFT-2 GWB P-1, WFT-2 GWB P-1, WFT-2 GWB P-1 REFERENCE WALL FINISH TYPES ON SHEET IN601
LEVEL_01 114 TOILET, STAFF 55 SF PT-1 PT-2, TR-2 CMU CMU-1, WFT-2 GWB P-1, WFT-2 GWB P-1, WFT-2 GWB P-1, WFT-2 GWB P-1 REFERENCE WALL FINISH TYPES ON SHEET IN601
LEVEL_01 115 SHOWER/CHANGE 66 SF PT-1 PT-2, TR-2 GWB P-1, WFT-3 GWB P-1, WFT-2, WFT-3 GWB P-1, WFT-2 GWB P-1, WFT-2, WFT-3 GWB P-1 REFERENCE WALL FINISH TYPES ON SHEET IN601
LEVEL_01 116 LOUNGE 219 SF EPY-1 RB-1 GWB P-1 CMU, GWB CMU-1, P-1 CMU CMU-1 GWB P-1 AT-1 REFERENCE WALL FINISH TYPES ON SHEET IN601
LEVEL_01 117 CORRIDOR 134 SF EPY-1 RB-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 AT-1
LEVEL_01 MA-105 SUPPLY ROOM 575 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_01 MA-106 GENERATOR ROOM 375 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_01 MA-107 ELECTRICAL ROOM 546 SF EPY-1 EPY-1 GWB P-1 GWB P-1 CMU CMU-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_01 MA-108 BOILER PLANT 3353 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_01 MA-109 CHILLER ROOM 2680 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_01 MA-120 VESTIBULE 112 SF EPY-1 EPY-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 CMU CMU-1 OPEN TO STRUCTURE
LEVEL_01 MA-121 STORAGE 211 SF EPY-1 EPY-1 CMU/ GWB CMU-1, P-1 CMU CMU-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_01 MA-122 CORRIDOR 96 SF EPY-1 RB-1 CMU CMU-1 - - CMU CMU-1 - - AT-1
LEVEL_01 MA-133 CORRIDOR 66 SF EPY-1 RB-1 GWB P-1 GWB P-1, WFT-4 CMU CMU-1 GWB P-1 AT-1
LEVEL_02 MA-200 BOILER ROOM - MEZZANINE 427 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_02 MA-202 CORRIDOR 150 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1
LEVEL_02 MA-203 OFFICE 132 SF EPY-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1
LEVEL_02 MA-204 NEW OFFICE 94 SF EPY-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1
LEVEL_02 MA-205 OFFICE 96 SF EPY-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1
LEVEL_02 MA-211 NEW ELECTRICAL 929 SF EPY-1 EPY-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN TO STRUCTURE
LEVEL_02 MA-218 NEW OFFICE 126 SF EPY-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1
LEVEL_02 MA-219 TELECOM 123 SF EXISTING TO
REMAIN
EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
1/2" = 1'-0" F1
WALL FINISH TYPES
* (OR APPROVED EQUAL) MATERIALS ARE PROVIDED AS THE BASIS OF DESIGN, ALL MATERIAL SUBSTITUTIONS ARE SUBJECT TO OWNERS APPROVAL.
FINAL APPROVAL SHALL BE MADE BY ABQ VA COR AND ABQ VA INTERIORS PERSONNEL.
ALL TILE GROUT SHALL BE SEALED WITH SILTANIUM, OR APPROVED EQUAL.
Final Color Selections to be made by Rebekah Gonzales:
Rebekah Gonzales Supervisor Interior Designer, EMS Raymond G. Murphy VA Medical Center
NMVAHCS
1501 San Pedro SE Albuquerque, NM 87108 Phone: (505) 265-1711 x5478 Cell Phone: (505) 967-8170 Fax: (505) 256-2831 rebekah.gonzales@va.gov
6" = 1'-0" E7
EXPOXY TO RESILIENT BASE (TOE BASE)
6" = 1'-0"
E5
PORCELAIN TILE TO TILE WALL
6" = 1'-0" E3
EPOXY FLOOR COVE DETAIL
6" = 1'-0" B1
THRESHOLD - EPOXY FLOOR TO PORCELAIN TILE
Revisions: Date:
MR-5 CREDIT: PURCHASING-FACILITY MAINTENANCE AND RENOVATION PROVIDE DOCUMENTATION FOR RECYCLED CONTENT
0 1" 2" 4"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
0 1'-0" 2'-0" 4'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
6" = 1'-0" E9
RESILIENT TO RESILIENT BASE W WALL PROTECTION (TOE BASE)
7/20/2022
MATHEW PERKINS
PAINT
MANUFACT: PPG/ GLIDDEN (or equal)
COLOR: DELICATE WHITE
SHEEN LEVEL: EGG SHELL FINISH
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title Project Title
LocationChecke d
Drawn
MRP HG
Project Number
Board Number
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
P-1
501-17-105
1501 SAN PEDRO SE
ALBUQUERQUE, NM 87108
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com
NEW MEXICO VA HEALTH CARE SYSTEM
P-2 MANUFACT: PPG/GLIDDEN (or equal)
COLOR: SURREY BEIGE #30YY
SHEEN LEVEL: EGG SHELL
ACOUSTICAL CEILING TILE
MANUFACT: ARMSTRONG (or equal)
COLLECTION: CORTEGA
COLOR: WHITE
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title Project Title
LocationChecke d
Drawn
MRP HG
Project Number
Board Number
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
AT-1
501-17-105
1501 SAN PEDRO SE
ALBUQUERQUE, NM 87108
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com
NEW MEXICO VA HEALTH CARE SYSTEM
MILLWORK & COUNTER TOPS
PLASTIC LAMINATE
MANUFACT: WILSONART (or equal)
COLOR: KENSINGTON MAPLE 10776
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title Project Title
LocationChecke d
Drawn
MRP HG
Project Number
Board Number
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
PL-1
501-17-105
1501 SAN PEDRO SE
ALBUQUERQUE, NM 87108
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com
NEW MEXICO VA HEALTH CARE SYSTEM
FLOORING & WALL BASE
WALL BASE
MANUFACT: ROPPE (or equal)
COLLECTION: PINNACLE RUBBER BASE
COLOR: LUNAR DUST 114
SIZE: 4"
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title Project Title
LocationChecke d
Drawn
MRP HG
Project Number
Board Number
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
RB-1
501-17-105
1501 SAN PEDRO SE
ALBUQUERQUE, NM 87108
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com
NEW MEXICO VA HEALTH CARE SYSTEM
SOLID SURFACE
MANUFACT: AVONITE (or equal)
COLOR: CASABLANCA
S-1
PORCELIAN TILE
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title Project Title
LocationChecke d
Drawn
MRP HG
Project Number
Board Number
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
PT-3
501-17-105
1501 SAN PEDRO SE
ALBUQUERQUE, NM 87108
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com
NEW MEXICO VA HEALTH CARE SYSTEM
EPY-1
EPOXY FLOORING
MANUFACT: STONHARD (or equal)
COLLECTION: STONGARD MR
COLOR: COOL SHALE
MANUFACT: DALTILE (or equal)
COLLECTION: PORTFOLIO
COLOR: EARTH BLEND PF14
SIZE: RANDOM LINEAR MOSAIC
PORCELIAN TILE
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title Project Title
LocationChecke d
Drawn
MRP HG
Project Number
Board Number
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
PT-2
501-17-105
1501 SAN PEDRO SE
ALBUQUERQUE, NM 87108
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com
NEW MEXICO VA HEALTH CARE SYSTEM
WALL TILE
MANUFACT: DALTILE (or equal)
COLLECTION: PORTFOLIO
COLOR: NOCE PF11
SIZE: 6"X24" 1/3 STAGGER INSTALL
PT-1
FLOOR TILE
MANUFACT: DALTILE (or equal)
COLLECTION: PORTFOLIO
COLOR: NOCE PF11
SIZE: 12"X24" 1/3 STAGGER INSTALL
CORNER GUARD / WALL PROTECTION/
ACCOUSTIC WALL PANEL
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title Project Title
LocationChecke d
Drawn
MRP HG
Project Number
Board Number
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO
ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
CG-1
501-17-105
1501 SAN PEDRO SE
ALBUQUERQUE, NM 87108
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com
NEW MEXICO VA HEALTH CARE SYSTEM
CORNER GUARD
MANUFACT: C/S ACROVYN (or equal)
COLLECTION: ACO-8
COLOR: STAINLESS STEEL
CONCRETE MASONRY WALLS
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title Project Title
LocationChecke d
Drawn
MRP HG
Project Number
Board Number
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
CMU-1
501-17-105
1501 SAN PEDRO SE
ALBUQUERQUE, NM 87108
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)Triple C A& E Group 2266 S. Dobson Road, Suite 200 Mesa, AZ 85202 www.triplecaeg.com
NEW MEXICO VA HEALTH CARE SYSTEM
CONCRETE MASONRY UNIT
MANUFACT: UTILITY BLOCK COMPANY,
CREGO BLOCK AND SUPPLY(or equal)
TYPE: BURNISHED
COLOR: WHITE SANDS 910
RWC-1
RIGID WALL COVERING
MANUFACT: C/S ACROVYN (or equal)
COLLECTION: .040 ACROVYN WALL
COLOR: 513 KHAKI BROWN
ACC-1
ACCOUSTICAL WALL PANEL
MANUFACT: AUTEX (or equal)
COLLECTION: CUBE
COLOR: STAINLESS FLATIRON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:2
P M
IN701
INTERIOR FINISH - COLOR BOARDS
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS M. RIOS
100% CONSTRUCTION
DOCUMENTS
FINAL APPROVAL SHALL BE MADE BY
ABQ VA COR AND ABQ VA INTERIORS
PERSONNEL.
MR-5 CREDIT: PURCHASING - FACILITY MAINTENANCE AND RENOVATION
PURCHASE AT LEAST 50%, BY COST, OF THE TOTAL MAINTENANCE AND
RENOVATION MATERIALS THAT MEET AT LEAST ONE OF THE FOLLOWING
CRITERIA. INCLUDE PRODUCTS SPECIFIED IN MATERIALS AND RESOURCES
PREREQUISITE: FACILITY MAINTENANCE AND RENOVATION POLICY. THERE IS
NO MINIMUM SCOPE OF RENOVATION OR NEW CONSTRUCTION WORK
REQUIRED FOR ELIGIBILITY OF THIS CREDIT. EACH PURCHASE CAN RECEIVE
CREDIT FOR EACH CRITERION MET.
Revisions: Date: 7/20/2022
MATHEW PERKINS
BFP
UP
UP
DN
UP
DN
CR
DN
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
A-202
C2
A-202
F2
A-201
C2
A-201
F2
E
D
C
B
A
1 2 3 4 5 6
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
ELECTRICAL
ROOM
MA-107MA-107
BOILER
PLANT
MA-108MA-108
STAIRS
MA-209MA-209
CHEMICAL
TESTING
ROOM
110110
CORRIDOR
117117
ENGINEERING
CONTROL
CENTER
111111
TOILET,
STAFF
114114
TOILET,
STAFF
113113
LOUNGE
116116
SHOWER/CHANGE
115115
CHILLER
ROOM
MA-109MA-109
VESTIBULE
103103
BLDG 43A
43A43A
7C
107A
107D
8A
108E
9A
A
108D
9D
7A
HOUSEKEEPING
AIDS CLOSET
112112
7A
108B
STORAGE
MA-121MA-121
VESTIBULE
MA-120MA-120
CORRIDOR
MA-122MA-122
A1080 F3065
A5077 A5082
F2017M
A1067
A5075
A5109M A5200
A5090
A5082 F2017M
A1067 A5075
A5109M A5090 A5200
F2015
K1552
R7250M
M2055M2055
E0117M
F0275
E0117M
E0117M
F0275F0275
CA041MCA041M
CA041MCA041M
F0500
F0505
A5075 P4700
A5107 P2000 A5077
P2451M
P5210M
A5170
M2055M2055
F0795MF0225
F0225
F0225
F0795M F0225
F0225 F0225
F0225
F0225 F0795M
F0225F0225
A-402
B7
A-401
D8
A-401
C8
A-401
E8
A-402
A3
SIM
A-402
E7
CA041M
CT020
CA041M
CT020
K4665
CA041M
K4500M
A1145
CS040
CT020
A5077
K2515
A5215M
U0005
A1012
A1015 A1015
A5135
C02D0 X1060M
F2000
F2000
F3200
R2200M
F2300
U0001
A5077
U0004
F2017 M3073
U0005
CORRIDOR
MA-133MA-133
U0005
U0005
F2300
P1965
5 6
A5077
A5215M
CS230
9E
3B
103C
5C
6 105D
105A
108B
ELEC EQUIP TO REMAIN,
(BASE BID)
P2100
F
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
C
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:2
P M
Q-101
EQUIPMENT PLAN - LEVEL 1 - COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS M. RIOS
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F2
EQUIPMENT PLAN - LEVEL 1 - COMPOSITE
1 FURNITURE NOT IN CONTRACT
2 NEW STAIRCASE
3 NEW LOCKERS
4 EXISTING STAIRCASE TO REMAIN
5 NEW EXHAUST HOOD, REFER TO MECHANICAL FOR ADDTIONAL INFORMATION
6 OWNER'S EXISTING ELECTRIC STOVE
JSN Schedule
JSN Nomenclature Furn. By/
Installed By R4000 Ice Maker, Freestanding, SS VV
R7250M Refrigerator/Freezer, 20 Cubic Feet, SS VV
U0001 Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top, w/ trays for chemical spillage CC
U0002 Task Light, Freestanding VV
U0003 Power Washer VV
U0004 Chemical Cleaning Solution Dispenser VV
U0005 Container, Combination, Trash/Recycling, Small VV
U0006 Monitor Arm, Quad monitors CC
U0007 Single Wall Mount Monitor Arm CC
X1060M Cabinet, base, 1 door CC
JSN Schedule
JSN Nomenclature Furn. By/
Installed By F2017M Waste Receptacle, SS, 12 GAL VV
F2300 Rack, Information, Wall Mounted VV
F3065 Whiteboard/Bulletin Board, Combination VC
F3200 Clock, Battery, 12in Dia CC
K1552 Brewer, Coffee, Auto, Elect, 3 Burner, Front/Back VV
K2515 Dishwasher, Household CC
K4500M Stove, Household, 4 Burner, w/Oven, Electric, SS VC
K4665 Oven, Microwave, Consumer, SS CC
M2055 Shelving, Storage, Wire, CRS, w/Adjustable Shelves VV
M3073 Basket, Infectious Waste, Step-on VV
P1965 Eyewash, Eye-Face, Sink Mounted, Hands-free CC
P2000 Eyewash, Wall Mounted, Hands-Free CC
P2100 Disposal, Garbage, 2 HP Motor CC
P2451M Valve, Mixing, Thermostatic, serving double eyewash stations CC
P4700 Sink, Mop, Molded Stone CC
P5210M Shower, Single, Hand-Held CC
R2200M Fountain, Water, SS CC
JSN Schedule
JSN Nomenclature Furn. By/
Installed By C03P0 Cabinet, Sink, U/C/B, 2 Door CC
C04F0M Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC
C04P0M Cabinet, Sink, U/C/B, 2 Door CC
C05F0 Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC
CA041M Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top CC
CS040 Sink, SS, Single Compartment CC
CS230 Sink, SS, Double Compartment CC
CT020 Countertop, Solid Surface CC
E0117M Workstation, Straight, Free Standing sit to stand CC
F0225 Chair, Stacking VV
F0275 Chair, Swivel, High Back VV
F0500 Cart, Janitor's VV
F0505 Bucket, Mop, With Wringer, 26 Quart VV
F0795M Table, Dining VV
F2000 Basket, Wastepaper, Fire Resistant VV
F2015 Basket, Wastepaper, SS, 2 Swinging Doors VV
F2017 Waste Receptacle, 24 Gal VV
JSN Schedule
JSN Nomenclature Furn. By/
Installed By A1012 Telephone, Wall Mounted, 1 Line VV
A1015 Telephone, Desk, Multiple Line 12 x 12 VV
A1035 Locker, Single Tier CC
A1067 Mirror, Float Glass, ADA Accessible CC
A1080 Mirror, Posture, Wall Mtd 28" x 6" CC
A1145 Shelving, Mobile, Manual CC
A5075 Dispenser, Soap, Disposable CC
A5077 Dispenser, Hand Sanitizer, Hands-Free VC
A5082 Dispenser, Paper Towel, Sensor, Hands Free VC
A5090 Disposal, Sanitary Napkin, SS, Surface Mounted VC
A5107 Dispenser, Glove, Surgical/Examination, Wall Mntd CC
A5109M Corner Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible CC
A5135 Shelf, Utility W/ Mop/Broom Holders, SS, Surf Mntd CC
A5170 Rod, Shower Curtain, 1"Diameter, W/Curtain & Hooks CC
A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd VC
A5215 Bracket, Television, Wall-Mounted, Tilt/Angle CC
C02D0 Cabinet, U/C/B,4 Drawer CC
NOTE:
1. JSN NUMBERS THAT END WITH AN "M" SUFFIX INDICATE THAT THE ITEM IS A MODIFIED VERSION OF THE
VA'S EQUIPMENT LIST
2. JSN NUMBERS THAT START WITH A "U" PREFIX INDICATE THAT THE ITEM DOES NOT HAVE A NUMBER IN
THE VA EQUIPMENT LIST
3. ALL FURNITURE PURCHASED SHOULD FOLLOW CRITERIA NOTED UNDER MR-5 PURCHASING-FACILITY
MAINTENANCE AND RENOVATION (OPTION 2) FURNITURE. SEE SHEET G-015
Revisions: Date:
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
DN
UP
UP
DN
DN
A-202
C2
A-202
F2
A-201
C2
A-201
F2
E
D
C
B
A
1 2 3 4 5 6
202A
BOILER
ROOM -
MEZZANINE
MA-200MA-200
OFFICE
MA-203MA-203
NEW OFFICE
MA-204MA-204
OFFICE
MA-205MA-205
CORRIDOR
MA-202MA-202
TELECOM
MA-219MA-219
NEW OFFICE
MA-218MA-218
STAIRS
MA-209MA-209
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
BOILER
PLANT
MA-108MA-108
CHILLER
ROOM
MA-109MA-109
NEW
ELECTRICAL
MA-211MA-211
210A
A
M1825 F0705M
F0420 M2070
F0275
F0650 F0275
E0042
F0750 F0225
E0042
M1825
F0420 M2070
F0275
E0042 F0650
STAIRCASE
MA-130MA-130
STAIRCASE
MA-131MA-131
F0705M
202B
F
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
C
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:4
P M
Q-102
EQUIPMENT PLAN - LEVEL 2 - COMPOSITE
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS M. RIOS
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F2
EQUIPMENT PLAN - LEVEL 2 - COMPOSITE
1 NEW DOOR
2 NEW STAIRCASE
3 EXISTING STAIRCASE TO REMAIN
4 EXISTING FURNITURE TO REMAIN
5 OPEN TO LEVEL 1 BELOW
NOTE:
1. JSN NUMBERS THAT END WITH AN "M" SUFFIX INDICATE THAT THE ITEM IS A MODIFIED VERSION OF THE
VA'S EQUIPMENT LIST
2. JSN NUMBERS THAT START WITH A "U" PREFIX INDICATE THAT THE ITEM DOES NOT HAVE A NUMBER IN
THE VA EQUIPMENT LIST
3. ALL FURNITURE PURCHASED SHOULD FOLLOW CRITERIA NOTED UNDER MR-5 PURCHASING-FACILITY
MAINTENANCE AND RENOVATION (OPTION 2) FURNITURE. SEE SHEET G-015
Revisions: Date:
JSN Schedule
JSN Nomenclature Furn. By/
Installed By R4000 Ice Maker, Freestanding, SS VV
R7250M Refrigerator/Freezer, 20 Cubic Feet, SS VV
U0001 Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top, w/ trays for chemical spillage CC
U0002 Task Light, Freestanding VV
U0003 Power Washer VV
U0004 Chemical Cleaning Solution Dispenser VV
U0005 Container, Combination, Trash/Recycling, Small VV
U0006 Monitor Arm, Quad monitors CC
U0007 Single Wall Mount Monitor Arm CC
X1060M Cabinet, base, 1 door CC
JSN Schedule
JSN Nomenclature Furn. By/
Installed By F2017M Waste Receptacle, SS, 12 GAL VV
F2300 Rack, Information, Wall Mounted VV
F3065 Whiteboard/Bulletin Board, Combination VC
F3200 Clock, Battery, 12in Dia CC
K1552 Brewer, Coffee, Auto, Elect, 3 Burner, Front/Back VV
K2515 Dishwasher, Household CC
K4500M Stove, Household, 4 Burner, w/Oven, Electric, SS VC
K4665 Oven, Microwave, Consumer, SS CC
M2055 Shelving, Storage, Wire, CRS, w/Adjustable Shelves VV
M3073 Basket, Infectious Waste, Step-on VV
P1965 Eyewash, Eye-Face, Sink Mounted, Hands-free CC
P2000 Eyewash, Wall Mounted, Hands-Free CC
P2100 Disposal, Garbage, 2 HP Motor CC
P2451M Valve, Mixing, Thermostatic, serving double eyewash stations CC
P4700 Sink, Mop, Molded Stone CC
P5210M Shower, Single, Hand-Held CC
R2200M Fountain, Water, SS CC
JSN Schedule
JSN Nomenclature Furn. By/
Installed By C03P0 Cabinet, Sink, U/C/B, 2 Door CC
C04F0M Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC
C04P0M Cabinet, Sink, U/C/B, 2 Door CC
C05F0 Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC
CA041M Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top CC
CS040 Sink, SS, Single Compartment CC
CS230 Sink, SS, Double Compartment CC
CT020 Countertop, Solid Surface CC
E0117M Workstation, Straight, Free Standing sit to stand CC
F0225 Chair, Stacking VV
F0275 Chair, Swivel, High Back VV
F0500 Cart, Janitor's VV
F0505 Bucket, Mop, With Wringer, 26 Quart VV
F0795M Table, Dining VV
F2000 Basket, Wastepaper, Fire Resistant VV
F2015 Basket, Wastepaper, SS, 2 Swinging Doors VV
F2017 Waste Receptacle, 24 Gal VV
JSN Schedule
JSN Nomenclature Furn. By/
Installed By A1012 Telephone, Wall Mounted, 1 Line VV
A1015 Telephone, Desk, Multiple Line 12 x 12 VV
A1035 Locker, Single Tier CC
A1067 Mirror, Float Glass, ADA Accessible CC
A1080 Mirror, Posture, Wall Mtd 28" x 6" CC
A1145 Shelving, Mobile, Manual CC
A5075 Dispenser, Soap, Disposable CC
A5077 Dispenser, Hand Sanitizer, Hands-Free VC
A5082 Dispenser, Paper Towel, Sensor, Hands Free VC
A5090 Disposal, Sanitary Napkin, SS, Surface Mounted VC
A5107 Dispenser, Glove, Surgical/Examination, Wall Mntd CC
A5109M Corner Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible CC
A5135 Shelf, Utility W/ Mop/Broom Holders, SS, Surf Mntd CC
A5170 Rod, Shower Curtain, 1"Diameter, W/Curtain & Hooks CC
A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd VC
A5215 Bracket, Television, Wall-Mounted, Tilt/Angle CC
C02D0 Cabinet, U/C/B,4 Drawer CC
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:4
P M
Q-900
EQUIPMENT CUTSHEETS / BASIS OF DESIGN
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS H.
GARDINER
100% CONSTRUCTION
DOCUMENTS
***ALL ITEMS ON THIS SHEET ARE CONTRACTOR PURCHASED
CONTRACTOR INSTALLED ***
THIS INFORMATION HAS BEEN PROVIDED TO SHOWCASE THE
BASIS OF DESIGN
CONTRACTOR SHALL SUBMIT ALL EQUIPMENT FOR
APPROVAL BY VA/AE
SUBSTITUTIONS WILL BE SUBJECT TO OWNER APPROVAL
Revisions: Date: 7/20/2022
MATHEW PERKINS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:4
P M
Q-901
EQUIPMENT CUTSHEETS / BASIS OF DESIGN
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS N.
BLANCHARD
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
***ALL ITEMS ON THIS SHEET ARE CONTRACTOR PURCHASED
CONTRACTOR INSTALLED ***
THIS INFORMATION HAS BEEN PROVIDED TO SHOWCASE THE
BASIS OF DESIGN
CONTRACTOR SHALL SUBMIT ALL EQUIPMENT FOR
APPROVAL BY VA/AE
SUBSTITUTIONS WILL BE SUBJECT TO OWNER APPROVAL
7/20/2022
MATHEW PERKINS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:4
P M
Q-902
EQUIPMENT CUTSHEETS / BASIS OF DESIGN
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17…