This document provides notification of an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure at the New Mexico VA Healthcare System (NMVAHCS) located in Albuquerque, New Mexico. The purpose of the project is to provide renovations, new construction, equipment replacements, and utility modifications to address deficiencies at Building 43 (Central Utility Plant) related to mechanical, plumbing, accessibility, electrical, life safety, structure, and cooling. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The solicitation will be issued on or about July 15, 2023 via SAM.gov as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The magnitude of the construction project is estimated between $10-20 million. The NAICS code is 236220 with a size standard of $39.5 million. A site visit will be scheduled upon solicitation release. The point of contact is provided for any questions.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NMVAHCS CAMPUS
PROPERTY LINE
020' 20' 40'10'
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
100% CONSTRUCTION
DOCUMENTSA/E:
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa AZ, 85202
928-499-3225
Mat Perkins
Structural and Subconsultants:
P2S ENGINEERING, INC.
5000 E. Spring Street, 8th Floor
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
501-17-105
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
CIVIL DEMOLITION PLAN
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
BACK OF CURB
EDGE OF PAVEMENT
EX. CONCRETE
EX. A.C. PAVEMENT
FENCE LINE
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
FIRE HYDRANT
STREETLIGHT
WATER VALVE
STEAM MANHOLE
SIDEWALK
UNDERGROUND GAS LINE
EXISTING PROPOSED
1. ALL WORK DETAILED ON THESE PLANS AND PERFORMED UNDER THIS CONTRACT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS AND THE GEOTECHNICAL REPORT. WHERE APPLICABLE, CITY OF ALBUQUERQUE PUBLIC WORKS STANDARDS
SHALL APPLY.
2. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, RULES AND REGULATIONS WHICH APPLY TO THE
CONSTRUCTION OF THESE IMPROVEMENTS, INCLUDING EPA REGULATIONS WITH RESPECT TO STORM WATER DISCHARGE.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL POTENTIAL
OBSTRUCTIONS INCLUDING ALL UNDERGROUND UTILITIES. THE CONTRACTOR'S SURVEYOR SHALL DOCUMENT THE HORIZONTAL LOCATION
AND ELEVATION OF UTILITIES THAT ARE EXPOSED. SHOULD A CONFLICT EXIST, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) OR ENGINEER SO THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF DELAY.
4. ALL ELECTRICAL, TELEPHONE, CABLE TV, GAS AND OTHER UTILITY LINES, CABLES, AND APPURTENANCES ENCOUNTERED DURING
CONSTRUCTION THAT REQUIRE RELOCATION, SHALL BE COORDINATED WITH THE COR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATION OF ALL NECESSARY UTILITY ADJUSTMENTS. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR DELAYS OR
INCONVENIENCES CAUSED BY UTILITY COMPANY WORK CREWS. THE CONTRACTOR MAY BE REQUIRED TO RESCHEDULE HIS ACTIVITIES TO
ALLOW UTILITY CREWS TO PERFORM THEIR REQUIRED WORK.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITY LINES WITHIN THE CONSTRUCTION AREA. ANY DAMAGE TO
EXISTING FACILITIES CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE AND
APPROVED BY THE CONSTRUCTION OBSERVER.
6. CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE PROPERTY AND/OR PROJECT LIMITS. ANY DAMAGE TO ADJACENT PROPERTIES
RESULTING FROM CONSTRUCTION PROCESS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
7. OVERNIGHT PARKING OF CONSTRUCTION EQUIPMENT SHALL NOT OBSTRUCT DRIVEWAYS OR DESIGNATED TRAFFIC LANES. THE
CONTRACTOR SHALL NOT STORE ANY EQUIPMENT OR MATERIAL WITHIN THE PUBLIC RIGHT-OF-WAY.
8. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR THE PROJECT PRIOR TO COMMENCING CONSTRUCTION (I.E. BARRICADING, TOPSOIL DISTURBANCE, EXCAVATION PERMITS, EPA STORM WATER PERMITS, ETC.)
9. ALL PROPERTY CORNERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. ALL PROPERTY
CORNERS MUST BE RESET BY A REGISTERED LAND SURVEYOR.
10. THE CONTRACTOR SHALL PREPARE A CONSTRUCTION TRAFFIC CONTROL AND SIGNING PLAN AND OBTAIN APPROVAL OF SUCH PLAN FROM
THE CONTRACT OFFICER'S REPRESENTATIVE (COR), PRIOR TO BEGINNING ANY CONSTRUCTION WORK ON OR ADJACENT TO EXISTING
STREETS.
11. ALL BARRICADES AND CONSTRUCTION SIGNING SHALL CONFORM TO APPLICABLE SECTIONS OF THE "MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES" (MUTCD), US DEPARTMENT OF TRANSPORTATION, LATEST EDITION.
12. THE CONTRACTOR SHALL MAINTAIN ALL CONSTRUCTION BARRICADES AND SIGNING AT ALL TIMES. THE CONTRACTOR SHALL VERIFY THE
PROPER LOCATION OF ALL BARRICADING AT THE END AND BEGINNING OF EACH DAY.
13. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO CONFORM WITH EPA REQUIREMENTS, INCLUDING COMPLIANCE WITH NPDES
PHASE 2 REQUIREMENTS. THIS INCLUDES PREPARATION OF A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), FILING THE NOTICE OF
INTENT AND MAINTENANCE OF SWPPP BEST MANAGEMENT PLANS (BMP'S).
14. THE CONTRACTOR IS TO AVOID ALL PLANT SHUTDOWNS
15. THE CONTRACTOR IS TO PROVIDE ANY TEMPORARY UTILITIES REQUIRED TO AVOID PLANT SHUTDOWNS.
EX. CONCRETE/ A.C. PAVEMENT TO BE REMOVED
EX. LANDSCAPE TO BE REMOVED, STORED AND RE-INSTALLED
EX. ASPHALT, CURB & GUTTER TO BE REMOVED
NATIONAL HISTORIC PRESERVATION
NOTE:
STAGING AREA TO BE LOCATED ADJACENT ON THE SOUTH AND EAST SIDE OF BUILDING 43 IN A NMVAMC PROVIDED FENCED ENCLOSURE
WITH CONNEXES, LIGHTING, AND POWER. SECURITY IS TO BE PROVIDED BY THE CONTRACTOR.
EXISTING SIDEWALK
TO BE REMOVED
REMOVE EXISTING ABANDONED
FUEL LINE
EXISTING TREE STUMP
TO BE REMOVEDEXISTING CONCRETE
TO BE REPLACED EXISTING SIDEWALK
TO BE REPLACED
EXISTING ELECTRICAL
LINE/CONDUIT TO BE
FIELD VERIFIED
SEE ELECTRICAL
PLANS FOR NEW
CONNECTION AND PHASING
1"=20' F1
CIVIL DEMOLITION PLAN
EXISTING 2LF CURB
TO BE REMOVED
EXISTING SIDEWALK
TO BE REPLACED
EXISTING COMMUNICATION LINE
TO BE RELOCATED
EXISTING ELECTRICAL
LINE/CONDUIT TO
BE REMOVED/ABANDONED
-COORDINATE REMOVAL WITH
NEW INSTALLATION, REFER TO
ELECTRICAL PLANS.
2' CONCRETE CURB
HEAVY DUTY CONCRETE PAVING
QUANTITY UNITS
5" CONCRETE SIDEWALK
LF
SY
SY
DESCRIPTION
ELECTRICAL LINE LF68
COMMUNICATIONS LINE LF78
TREE STUMP EA1
EXISTING 2LF CURB
TO BE REMOVED
EXISTING UNDERGROUND
FUEL TANK TO REMAIN
IN PLACE
ADD ALTERNATE #1 - 2' CONCRETE CURB LF4
ADD ALTERNATE #1 - 2" A.C. PAVEMENT SF75
EXISTING SIDEWALK
TO BE REPLACED
EXISTING 2LF CURB
TO BE REMOVED
EXISTING FURNITURE TO BE
RELOCATED TO PROPOSED
PATIO. - SEE SHEET CS101
EXISTING LOADING
DOCK TO REMAIN
IN PLACE
EXISTING UNDERGROUND
FUEL TANK TO REMAIN
IN PLACE
EXISTING LANDSCAPE
TO BE REMOVED.
EXISTING MEDIUM PRESSURE
STEAM LINE (ABANDONED)
TO BE REMOVED
-SEE PHOTO F1, THIS SHEET
EXISTING STEAM PIPE TO BE REMOVED
STEAM PIPE IN TUNNEL LF475
N.T.S.
F8
TUNNEL STEAM PIPE
ADD ALTERNATE #1 - TREE EA2
EXISTING CONVAULT TO BE
RELOCATED BY VA.
EXISTING FIRE ALARM CONDUIT
TO BE FIELD VERIFIED
UTILITY TUNNEL
EXISTING WALL SECTION
TO BE REMOVED
7/20/2022
EXPIRES: 12/31/23 07/20/2022
INSTALL CONSTRUCTION
FENCING W/ FABRIC COVERING
CONSTRUCTION AND
SAFETY SIGN
L1
L2
L3
L10
L11
L12
L13
L15
L16
L17
L22
L23
L24
L25
L26 L27
L14
L30
L31
L32
L36
L37
L38
L33
L34
L35
L28
L29
L39
L40
L41 6.00'
L18 L1
L20 L21
L42
L43
L44L45
L46
L47
L48
L49
L50
M-7 CREDIT SOLID WASTE MANAGEMENT
-FACILITY MAINTENANCE AND RENOVATION
DIVERT RENOVATION WASTE FROM LANDFILL AND
INCINERATORS CONTRACTOR TO MANAGE WASTE
AND RECYCLABLES DURING CONSTRUCTION AND
TO PROVIDE DOCUMENTATION OF 70% DIVERSION.
EXISTING TRASH
DUMPSTER TO REMAIN
NMVAHCS CAMPUS
PROPERTY LINE
19.71'
10.83'
10.32'
6.50'
L4 L5
L6
L7
L8
L9
L51
L52
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
BACK OF CURB
EDGE OF PAVEMENT
EX. CONCRETE
EX. A.C. PAVEMENT
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
FIRE HYDRANT
STREETLIGHT
WATER VALVE
STEAM MANHOLE
SIDEWALK
UNDERGROUND GAS LINE
EXISTING PROPOSED
8" CAP & BLOW-OFF ASSEMBLY
1. EXISTING ROAD TO REMAIN OPEN (2 LANES) DURING BUSINESS HOURS - COORDINATE WITH
COR
2. SEE PHASING SHEET GC101 FOR ADDITIONAL PHASING INFORMATION
4. UTILITY SHUTDOWNS: THE VA HAS A MANDATORY REQUIREMENT TO OBTAIN APPROVAL FOR
UTILITY SHUTDOWNS. THE CONTRACTOR SHALL PROVIDE A LIST OF ALL UTILITY SHUTDOWNS
REQUIRED FOR THIS PROJECT. THIS WILL INCLUDE MEDICAL-GAS, NATURAL-GAS, ELECTRICAL, AND PLUMBING TIE-INS. THE CONTRACTOR SHALL PROVIDE ESTIMATED TIME OF EACH OUTAGE
AND PROVIDE A NARRATIVE TO THE IMPACT OF THE SHUTDOWN. CONTRACTOR TO PROVIDE
THE VA A TWO-WEEK NOTICE FOR ANY UTILITY SHUTDOWN.
"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH
CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY
INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.
LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY
WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH
COR.
OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR
CONTRACTOR TO TEMPORARILY STAGE MATERIALS.
EXISTING ROAD ACCESS (2 LANES) IS TO BE MAINTAINED DURING BUSINESS HOURS.
COORDINATE WITH COR.
020' 20' 40'10'
CONSTRUCTION FENCING
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
100% CONSTRUCTION
DOCUMENTSA/E:
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa AZ, 85202
928-499-3225
Mat Perkins
Structural and Subconsultants:
P2S ENGINEERING, INC.
5000 E. Spring Street, 8th Floor
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
501-17-105
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
CIVIL SITE PLAN
1"=20' F2
CIVIL SITE PLAN
NATIONAL HISTORIC PRESERVATION
UTILITY TUNNEL
5341.50
BLDG
5341.50
BLDG
5341.50
BLDG
5341.50
BLDG
5341.50
SW
5341.40
SW
PROPOSED
ADDITION
FF=5341.50
EXISTING
UNDERGROUND
FUEL STORAGE
TANK
N: 1475094.6232
E: 1541021.2813
5340.64
EX SW
5340.61
EX SW5341.35
EX SW
5341.37
EX SW
5341.54
EX SW
5341.51
EX SW
5341.28
SW
5341.32
SW
5341.44
SW
5341.41
SW
N: 1475149.0550
E: 1541087.2098
N: 1475249.1588
E: 1541036.0551
5341.50
BLDG
5340.76
EX SW
5341.30
SW
5341.55
EX SW
5341.53
EX SW
5341.40
SW
5341.40
SW
5341.40
SW
5341.30
SW 2
5341.00
PAD
5341.42
EX SW
6 5340.35
FL
5340.90
FL
5341.20
SW
5341.20
SW
5340.37
FL
12 11
5341.52
EX SW
5341.46
EX SW
NMVAHCS CAMPUS
PROPERTY LINE
020' 20' 40'10'
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
100% CONSTRUCTION
DOCUMENTSA/E:
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa AZ, 85202
928-499-3225
Mat Perkins
Structural and Subconsultants:
P2S ENGINEERING, INC.
5000 E. Spring Street, 8th Floor
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
501-17-105
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
CIVIL GRADING PLAN
1"=20' A1
CIVIL GRADING PLAN
020' 20' 40'10'
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
100% CONSTRUCTION
DOCUMENTSA/E:
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa AZ, 85202
928-499-3225
Mat Perkins
Structural and Subconsultants:
P2S ENGINEERING, INC.
5000 E. Spring Street, 8th Floor
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
501-17-105
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
CIVIL STORMWATER
POLLUTION PREVENTION PLAN
LIMITS OF CONSTRUCTION
BACK OF CURB
EDGE OF PAVEMENT
EX. CONCRETE
EX. A.C. PAVEMENT
SIDEWALK
EXISTING PROPOSED
CENTERLINE
RETAINING WALL
SLOPE AND FLOW DIRECTION
GRAVEL BAG
VEHICLE WASHING
TO BE CONDUCTED
WITHIN CONTRACTOR
STAGING YARD
GRAVEL BAG AROUND
EXISTING STORM DRAIN
INLET
1"=20' A1
CIVIL STORMWATER POLLUTION PREVENTION PLAN
GRAVEL CONSTRUCTION ENTRANCE - 30LF X
WIDTH OF ENTRY
CONSTRUCTION FENCING
U.S. Department of Veterans Affairs
100% CONSTRUCTION
DOCUMENTSA/E:
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa AZ, 85202
928-499-3225
Mat Perkins
Structural and Subconsultants:
P2S ENGINEERING, INC.
5000 E. Spring Street, 8th Floor
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
501-17-105
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
CIVIL DETAIL SHEET 1
NEW 4" THICK CONCRETE
SLAB-ON-GRADEEXISTING
CONCRETE SLAB
6"
COMPACTED
SUBGRADEEXISTING SUBGRADE,
DO NOT DISTURB
3/8" EXPANSION JOINT
PAD & SEALANT
NO. 4 BARS @ 12" O.C.
DRILL & EPOXY INTO
EXISTING SLAB
6" 6"
NOT TO SCALE
A3
NOT TO SCALE VA STD. SD320523-18
NOTES:
1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB OR OTHER
ADJACENT STRUCTURES.
2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS AND SHALL
EXTEND THE FULL DEPTH OF THE CONCRETE.
3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' [4572mm] OR AT A
SPACING THAT MATCHES THE ADJACENT CURB.
4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS.
5. SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF
SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB.
6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A FINE
BRUSH IN A TRANSVERSE DIRECTION.
7. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.
1" [25mm]
SCORED OR SAWCUT
CONTRACTION JOINT.
TOP OF CURB
1/4" [6mm] DEEP
SCORED JOINTS
1/4" [6mm] R. (TYP.)
FORMED JOINTS
ONLY
CLASS "B"
CONCRETE
EXPANSION JOINT WITH 1/4"
[6mm] BITUMINOUS JOINT
FILLER
1% MIN. 2%
MAX.
1% MIN.
2% MAX.
5" M
IN
VARIES PER PLANS 0' MIN.
10.5' MAX.
[3200mm]
TYPICAL SECTION
EXPANSION AND SCORED JOINT DETAIL
[5 m m
3/
5"
T Y
P
60' MAX.
[18288mm]
EXPANSION JOINT TO EXPANSION JOINT
60' MAX.
[18288mm]
EXPANSION JOINT TO EXPANSION JOINT
SEE NOTE 7
(TYP) P
LA
N
S
P E
R P
E R
P
LA
N S
PLAN
'A'
C3
NOT TO SCALE VA STD. SD010000-01
F5
VA OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
U.S. Department of Veterans Affairs
TRIPLE C - THE A/E GROUP, LLC
.0
0'
.0
0'
.0 0'
.0
0'
.0 0'
.0
0'
(GENERAL CONTRACTOR)
UPGRADE ENERGY PLANT EQUIPMENT INFRASTRUCTURE
PROJ. NO. 501-17-105
2.
8.
2.
.0 0'
3.
6.
3.
6.
6.
6.
6.
6.
6.
96.00'
1.87' 44.13' 2.00'2.00' 43.87' 2.13'
SITE CONSTRUCTION SIGN
PLAN VIEW
2" x 4" FRAMING
4" x 6"POSTS
FACE
SITE SAFETY PLAN VIEW
2" x 4" FRAMING
4" x 6"POSTS
FACE
48.00'
96.00'
6.
4.
4.00'
4.00'
U.S. Department of Veterans Affairs
THIS PROJECT HAS WORKED
CL
.0
0'
.0 0'
3" 3"
4" 1"
1" 5"
1"
.0 0'
8.
48.00'
000 DAYS
WITHOUT A LOST TIME ACCIDENT
GENERAL CONTRACTORS FIRM NAME
ZERO IN ON
SAFETY
ALL VISIBLE SURFACES TO BE
PRIMED AND PAINTED
SIGN ATTACHED TOGETHER WITH
WOOD SCREW & LAG BOLTS
CHANGEABLE NUMBERS
FACE PANEL TO BE AN EXTERIOR GRADE. MDO
SHEERT OR AN ALUMINU M SKIN LAMINATED TO
A WOOD OR PLASTIC CORE IS PREFERRED
WITH EDGES PHYSICALLY SEALED.
4" x 4" POSTS
DEPTH & TYPE OF FOOTING
DETERMINED BY EXISTING
SOIL CONDITIONS.
DEPTH & TYPE OF FOOTING
DETERMINED BY EXISTING
SOIL CONDITIONS.
NOT TO SCALE
6" 6"
1' -0
A4
NOTES:
1. PROVIDE ANCHORS ONLY WHERE SHOWN
ON DRAWINGS.
2. EXTEND SLEEVE ABOVE FLOOR WHERE
SPECIFIED.
INSULATION BOLT (TYPICAL)
FLOOR
SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPE
PIPE SLEEVE
WHERE SPECIFIED
RISER
CLAMP
PIPE
PIPE SLEEVE
WHERE SPECIFIED
RISER CLAMP. BOTTOM
CLAMP REQUIRED AT
ANCHOR POINTS ONLY.
ELEVATION
PLAN
RISER CLAMP
B2
NOT TO SCALE VA STD. SD230511-25NOT TO SCALE
PIPE
OD
12"
MIN
MAX
(TYP) 6"
6' M
IN
IM
U M
C O
V E
R
S E
E N
O T
E
M
IN
V A
R
IE
S
AREAS WITHIN PUBLIC RIGHTS-OF WAY TRENCH BACKFILL
REQUIREMENTS ABOVE PIPE ZONE - TYPE II AGGREGATE BASE
BACKFILL COMPACTED TO 90% OF MAX DENSITY, OR CLSM
EXIST GRADE
4" MIN
BEDDING
PIPE ZONE (INCLUDING BEDDING)
PIPE SIZES 24" AND SMALLER:
TYPE II AGGREGATE BASE BACKFILL COMPACTED TO
90% OF MAX DENSITY, OR CLSM
PIPE SIZES LARGER THAN 24" CLSM ONLY (SEE
SPECS)
IN AREAS OF EXCESSIVE GROUND WATER OR POOR SUBGRADE MATERIAL,
USE DRAIN BACKFILL SECTION TO A MAXIMUM DEPTH OF 18" FOR
STABILIZATION. INSTALL AND COMPACT AS DIRECTED BY THE ENGINEER.
B1
NOT TO SCALE
E4
CMU SCREEN WALL
SEE DETAIL E4, THIS SHEET
WALL SCUPPER PER
DETAIL E4 THIS SHEET
EX. CURB
(2) 5' METAL MESH
STEEL GATES
CENTER LOCKING
WITH PIN
SECTION A-A SECTION B-B
NOTES:
1. ( ) INDICATES DIRECTION OF FLOW.
2. DIMENSION 'B' EQUALS 'A'+1' [305mm].
3. 1/2" [13mm] THICK STEEL DIAMOND PLATE ASTM A-36. STEEL
DIAMOND PLATE SHALL BE GIVEN ONE SHOP COAT OF PAINT
NO.1 PER VA SPECIFICATIONS. EXPOSED METAL SHALL BE
PAINTED WITH TWO COATS OF SSPC PAINT NO. 5 PER VA
SPECIFICATIONS.
4. 'H' EQUALS CURB FACE HEIGHT. DIMENSION TO BE NOTED
ON PLANS OR ESTABLISHED IN THE FIELD.
5. FOR CURB AND GUTTER, USE 2' [610mm] TRANSITIONS TO
VERTICAL CURB.
6. FOR MULTIPLE SCUPPERS PROVIDE 4" [100mm] BETWEEN
ADJACENT PANELS OF STEEL DIAMOND PLATE OR GRATE.
INTERMEDIATE POSTS FOR BARRICADE RAILINGS SHALL BE
PLACED MIDWAY IN 4" [100mm] AREA BETWEEN ADJACENT
PANELS.
7. STEEL DIAMOND PLATE OR GRATE SHALL BE DELIVERED AS
ONE PIECE, CONFORMING TO THE REQUIRED SCUPPER
DIMENSIONS. PLATES SHALL NOT BE SPLICED.
8. PROVIDE A MIN. 1" [25mm] LIP BETWEEN FLOW LINE OF
SCUPPER AND PAVEMENT SURFACE.
VARIES
EXPANSION
JOINT
CURB
6"
SIDEWALK 1' MIN.
1' (T
Y P
T Y
P
STEEL
GRATE
3/8" [10mm]
FLATHEAD STAINLESS STEEL
CAP SCREW COUNTERSINK (8
EACH MIN. PER SIDE)
CARRY PLATE TO
EDGE OF
SIDEWALK
DEPRESSED CURB
BARRICADE
RAILING
PLAN
VARIES
[1 m m
4"
[1 m m
STEEL DIAMOND PLATE
CLASS "B"
CONCRETE
1/4" [6mm] R
SCUPPER FOUNDATION SHALL CONFORM TO STANDARD
CURB CROSS SECTION BELOW PAVEMENT
GUTTER
FLOWLINE
PAVEMENT
SERVICE
N O
T E
'H
2' MAX. 2" 2"
CLASS "B" CONCRETE
EXPANSION
JOINT (TYP)
4"SEE DETAIL
BELOW
4"
4"
4"
SEE NOTE 3
10"
'B' (SEE NOTE 2)
1/8"
[3mm]
3/8" [10mm] FLATHEAD
STAINLESS STEEL CAPSCREW
COUNTERSUNK
(6 EACH SIDE MIN.)
L 2"x2"x1/4"
[50x50x6mm] TYP.
BOTH SIDES
#4 [No. 13] REBAR, 4"
[100mm] LONG
3 EACH SIDE MIN.
3/16"
[5mm]
DETAIL
(N O
T E
NOT TO SCALE
F1
CONCRETE
SWALE
NOT TO SCALE
F3
8"8"
2" C
I
6"
1'
2'
6"6"
6"
1'
2'
6" RIP-RAP
D50=3"
NOT TO SCALE
E3
NOT TO SCALE
D1
NOT TO SCALE
F4
1"
5' M
E C
H A
N
IC
A L
Y A
R D
2" ASH FORK, OR APPROVED EQUAL,
STONE CAP-GROUT TO WALL
8"x8" THROUGH WALL SCUPPER
WHERE INDICATED ON PLAN
PIPE RISER (TYP.)
SEE DETAIL A4
INSTALL PIPE SLEEVE
SEE MECH. DRAWING FOR
PIPE SIZING
'A'
3' 8" MAX.
5341.00
FG
5341.00
FG
5340.05
FG
5340.07
FG
5340.07
FG
1.5'
1.67' 1.5'
(TYP)
(TYP)
(TYP)
U.S. Department of Veterans Affairs
100% CONSTRUCTION
DOCUMENTSA/E:
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa AZ, 85202
928-499-3225
Mat Perkins
Structural and Subconsultants:
P2S ENGINEERING, INC.
5000 E. Spring Street, 8th Floor
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
501-17-105
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
CIVIL DETAIL SHEET 2
B3
NOT TO SCALE
GRADE TO EXISTING
NOT TO SCALE
B4
2.
5O
2.
5O
M
IN
C4
NOT TO SCALE
PIPE COLLAR.
SEE DETAIL B2, SHEET CG501
2.5O' MIN.
0.50%
1.
2.
3.
4.
5.
6.
EQUIPMENT.
MINIMUM 12" THICK
CONCRETE SLAB ON
SUBGRADE.
#4 AT 12" O.C. EACH WAY TOP
AND BOTTOM.
TOOLED EDGE.
EXISTING GROUND
FOR SUBBASE
REQUIREMENTS, SEE PLANS.
0.
C
LR
0.
NOTE:
COORDINATE EQUIPMENT PAD
EDGE DIMENSION AND
DIMENSION ABOVE FINISHED
FLOOR REQUIREMENTS WITH
MECHANICAL DRAWINGS.
0.50'
MIN
MSS SP-68 HIGHT PERFORMANCE
BUTTERFLY VALVE
- PER HVAC DESIGN MANUAL
PER HVAC DESIGN MANUAL
- TEMP CONNECTION SHALL BE A BLIND FLANGE
VARIES - SEE MECH PLANS
6.33'
EXISTING WALL SECTION
TO BE REMOVED
1' CONCRETE
FOUNDATION AT GRADE
#4 REBAR CENTERED HORIZ.
12" O.C. VERT.
(2) 5' METAL MESH GATES
CENTER LOCKING
WITH PIN
CMU SCREEN WALL
SEE DETAIL E4, SHEET CG501
9.
12.0'
C2
NOT TO SCALE
INSTALL CONSTRUCTION
FENCING W/ FABRIC COVERING
CONSTRUCTION AND
SAFETY SIGN
SEE MECHANICAL DRAWINGS
FOR CONNECTION INFORMATION
INSTALL ANCHORS PER
DETAIL B2- SHEET CG501
INSTALL INSULATED STEAM
AND CHILLED WATER PIPING
PIPE RISER
CONNECTION POINT
INSTALL ANCHORS PER
DETAIL B3- SHEET CG501
EX. E
LE
C.
EX. ELEC.
EX. ELEC.
EX. ELEC.
EX
. E
LE
C
EX. ELEC.
EX. ELEC.
EX. ELEC.
EX. ELEC.
EX. ELEC
EX. GAS
EX. G
AS
EX. G
AS
EX. SAN
. SEW
ER
EX. W
ATER
EX. W
ATER
EX. W
ATER
E X
. S .D
E X
. S .D
EX. S.D.
E X
. S
TE
A M
EX. STEAM
5334.29
INV.
5334.42
INV.
5334.51
INV.
5334.28
INV.
EXISTING S.D. MANHOLE.
LOCATION OF DRAINAGE FOR
TEMPORARY UTILITIES TRAILER
NMVAHCS CAMPUS
PROPERTY LINE
3" MU
10" CHR
10" CHS
10" TWS
10" TWR
8" HPS
020' 20' 40'10'
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
100% CONSTRUCTION
DOCUMENTSA/E:
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa AZ, 85202
928-499-3225
Mat Perkins
Structural and Subconsultants:
P2S ENGINEERING, INC.
5000 E. Spring Street, 8th Floor
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
501-17-105
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
CIVIL UTILITY PLAN
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
BACK OF CURB
EDGE OF PAVEMENT
EX. CONCRETE
EX. A.C. PAVEMENT
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
FIRE HYDRANT
STREETLIGHT
WATER VALVE
STEAM MANHOLE
SIDEWALK
UNDERGROUND GAS LINE
EXISTING PROPOSED
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE INSTALLATION OF ALL WORK RELATED
TO MECHANICAL UTILITIES AS SHOWN ON THIS PLAN INCLUDING: TRENCHING, BACKFILL, SUPPORTS, CLEANOUT PADS, SERVICE STOPS AND BOXES, SERVICE LINES, TESTING, CLEANING, AND STERILIZING.
ANY WORK NOT ACCEPTED BY THE ARCHITECT OR ENGINEER DUE TO IMPROPER WORKMANSHIP OR LACK
OF PROPER COORDINATION SHALL BE REMOVED AND CORRECTLY INSTALLED AT THE CONTRACTOR'S
EXPENSE, AS DIRECTED.
2. MINIMUM DEPTHS OF COVER SHALL BE: 36" FOR WATERLINES AND 48" FOR SEWER, EXCEPT AT
BUILDING CONNECTION.
3. ALL WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER CONTRACT SHALL, EXCEPT AS
OTHERWISE STATED OR PROVIDED OF HEREON, BE CONSTRUCTED IN ACCORDANCE WITH THE IAPMO
UNIFORM PLUMBING CODE & NFPA 24, LATEST EDITION.
4. UTILITY LINES SHALL BE INSTALLED PRIOR TO PAVEMENT, CURB AND GUTTER, AND/OR SIDEWALK, AS
APPLICABLE.
5. ROUGH GRADING OF SITE (+/- 0.5') SHALL BE COMPLETED PRIOR TO INSTALLATION OF UTILITY LINES.
6. CONTRACTOR WILL BE RESPONSIBLE FOR CONNECTIONS TO BUILDING DRAIN LINES AND ALL
NECESSARY FITTINGS.
7. ALL VALVES SHALL BE ANCHORED PER COA STANDARD DWG. 2333.
8. STEAM LINES SHALL BE AT MAXIMUM SLOPE OF 2%.
9. UTILITY LOCATIONS DETERMINED FROM VA MASTER UTILITY PLAN. CONTRACTOR SHALL VERIFY
INVERTS AND LOCATIONS OF EXISTING UTILITY LINES PRIOR TO BEGINNING OF WORK. ALL CONFLICTS
SHALL BE BROUGHT TO ATTENTION OF THE ENGINEER AND RESOLVED PRIOR TO BEGINNING OF WORK.
10. CONTRACTOR SHALL NOTIFY THE AUTHORITY HAVING JURISDICTION PRIOR TO INSTALLATION OF FIRE
SERVICE LINES, AND PRIOR TO TESTING OF ALL WATERLINES. CONTRACTOR SHALL COMPLETE, SIGN, AND
SUBMIT THE "CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR UNDERGROUND PIPING" IN
ACCORDANCE WITH NFPA 24.
11. EXISTING UTILITY CROSSING TO BE HAND-DIG 6' EACH SIDE OF CROSSING. CONTRACTOR TO VERIFY
ALL EXISTING UTILITIES PRIOR TO TRENCHING.
PROPERTY FENCING
APPLICABLE NOTES FROM THE CURRENT IN-PLACE REQUIREMENTS FOR DEPARTMENT OF VETERANS AFFAIRS FACILITIES: "SITE
DEVELOPMENT DESIGN MANUAL - FEBRUARY 2013"
5.2 GENERAL UTILITY DESIGN REQUIREMENTS
5.2.1 CLEARANCES AND CROSSINGS
THE A/E SHALL DESIGN THE SITE WITH THE FEWEST CROSSINGS OF UTILITIES POSSIBLE. THE A/E SHALL CONSIDER THE FOLLOWING ORDER OF PRIORITY FOR UNDERGROUND FACILITIES:
● SANITARY SEWER
● STORM SEWER
● WATER MAIN
● OTHER UTILITIES
5.2.6 MINIMUM DEPTH OF COVER
INDICATE BY NOTES ON DRAWINGS OR DETAIL SECTION, THE MINIMUM DEPTH OF COVER REQUIRED OVER EACH SPECIFIC UTILITY SYSTEM. ALL BURIED UTILITIES SHALL HAVE UNDERGROUND DETECTABLE WARNING
TAPE INSTALLED IN THE TRENCH.
● MINIMUM COVER FOR STORM SEWER LINES SHALL BE AT LEAST 2’-0” (600 MM) FROM FINISH GRADES.
● TOP OF POTABLE WATER, CHILLED WATER, FUEL AND APPURTENANCES SHALL BE AT LEAST 1’-0” (300 MM) BELOW FROST PENETRATION.
● THE MINIMUM DEPTH OF SANITARY SEWER LINES AT THE TERMINUS POINT SHALL BE 4’-0” (1200MM). WHERE
PRACTICAL, TOP OF SEWERS SHALL BE AT LEAST 1’-0” (300 MM) BELOW FROST PENETRATION. WHERE SUCH DEPTH BELOW IS NOT PRACTICAL, PROVIDE FREEZE PROTECTION AND/OR SUPPORTING FOUNDATIONS TO A
DEPTH BELOW THE FROST LINE AND SECURELY FASTEN SEWER TO FOUNDATION.
5.2.7 UTILITIES DISTRIBUTION TYPE
THE UTILITY DISTRIBUTION TYPE SHALL BE DETERMINED ON A PROJECT BY PROJECT BASIS. THE A/E MUST CONSIDER THE EXISTING SITE CONDITIONS AND BUDGET WHEN DECIDING WHAT TYPE TO USE.
5.2.7.1 TRENCHES: GENERALLY, DO NOT INSTALL MORE THAN ONE UTILITY SYSTEM IN THE SAME TRENCH. HOWEVER, DUE TO SITE CONSTRAINTS AND VALUE ENGINEERING CONCEPTS, MULTIPLE UTILITIES IN THE SAME
TRENCH WILL BE EVALUATED BY THE GOVERNMENT ON A PER CASE BASIS. PRIOR TO APPROVING ANY MULTIPLE LINE TRENCH, THE A/E SHALL DOCUMENT THAT THE USE OF THE MULTIPLE LINE TRENCH WILL NOT
NEGATIVELY IMPACT THE UTILITY SYSTEM, ADEQUATE CLEARANCES ARE PROVIDED FOR THE OPERATION AND MAINTENANCE OF THE SYSTEMS, AND THAT THE JOINT TRENCH WILL NOT POSE ANY CONTRACTIBILITY
CONSTRAINTS. THERE MUST BE A MINIMUM OF 12” (300 MM) BETWEEN THE OUTSIDE DIAMETERS OF ALL PIPES TO OBTAIN THE REQUIRED COMPACTION.
5.2.8 HORIZONTAL CLEARANCE
THE HORIZONTAL CLEARANCE SHALL BE MEASURED BETWEEN THE OUTSIDE DIMENSION OF THE PIPE, DUCT BANK, OR STRUCTURE.
5.2.8.1 WATER AND SANITARY SEWER:
MAINTAIN A HORIZONTAL CLEARANCE BETWEEN POTABLE WATER MAINS AND GRAVITY FLOW SANITARY SEWER/SANITARY SEWER FORCE MAINS OF AT LEAST 10 FEET (3M). THE HORIZONTAL CLEARANCE BETWEEN
POTABLE WATER MAINS AND SANITARY SEWER MAINS MAY BE REDUCED TO 6’-0” (1800 MM) WHEN: LOCAL CONDITIONS PREVENT A HORIZONTAL CLEARANCE OF 10’-0” (3 M), THE WATER MAIN INVERT IS A MINIMUM OF 18”
(450 MM) ABOVE THE CROWN OF THE SEWER, AND THE WATER MAIN IS IN A TRENCH, SEPARATED BY UNDISTURBED SOIL. WHEN THE SPECIFIED HORIZONTAL CLEARANCE CANNOT BE MET, THE WATER MAIN SHALL BE
CONSTRUCTED WITH MECHANICAL JOINT DUCTILE IRON PIPE PER SPECIFICATION 33 10 00 – WATER UTILITIES, AND THE SANITARY SEWER SHALL BE CONSTRUCTED WITH MECHANICAL JOINT PRESSURE RATED DUCTILE
IRON PIPE PER SPECIFICATION 33 30 00 – SANITARY SEWAGE UTILITIES. HORIZONTAL CLEARANCES SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL
QUALITY, OR AGENCY GOVERNING THE FACILITY OF POTABLE WATER MAINS AND SYSTEMS.
5.2.8.2 WATER AND CHILLED WATER:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 6’-0” (1800MM) BETWEEN POTABLE WATER MAINS AND RECLAIMED/REUSE AND CHILLED WATER MAINS.
5.2.8.3 WATER AND STORM SEWER:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 5’-0” (1500MM) BETWEEN POTABLE WATER MAINS AND STORM SEWERS.
5.2.8.4 DUCT BANKS AND PIPED UTILITIES:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 3’-0” (900 MM) BETWEEN DUCT BANKS AND PIPED UTILITIES.
5.2.9 VERTICAL CLEARANCE
THE VERTICAL CLEARANCE SHALL BE MEASURED BETWEEN THE OUTSIDE DIMENSION OF THE PIPE, DUCT BANK, OR STRUCTURE. FOR INSULATED PIPING, THE CLEARANCE SHALL BE MEASURED TO THE OUTSIDE OF THE
INSULATION. AT UTILITY CROSSINGS WHERE ADEQUATE COMPACTION OF THE BEDDING MATERIAL CANNOT BE OBTAINED, USE FLOWABLE FILL IN THE ZONES WERE COMPACTION IS IMPOSSIBLE OR IMPRACTICAL.
● MAINTAIN A MINIMUM VERTICAL CLEARANCE OF AT LEAST 1’-0” (300 MM) BETWEEN ALL UTILITIES AT CROSSINGS UNLESS OTHERWISE SPECIFIED BELOW.
● AT CROSSINGS OF POTABLE WATER MAINS AND SANITARY SEWERS, STORM SEWERS, FORCE MAINS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, WHERE THE POTABLE WATER MAIN CROSSES ABOVE
THE OTHER UTILITY, THE MINIMUM VERTICAL SEPARATION SHALL BE 18” (450 MM), OR AS REQUIRED BY THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL QUALITY, OR AGENCY GOVERNING THE
FACILITY OF POTABLE WATER, WHICHEVER IS GREATER.
● WHERE 18” (450 MM) CANNOT BE MAINTAINED OR WHERE POTABLE WATER LINES CROSS UNDER GRAVITY SEWERS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, ADDITIONAL PROTECTION SHALL BE
PROVIDED AS REQUIRED BY THE AGENCY GOVERNING THE FACILITY OF POTABLE WATER. ADDITIONAL PROTECTION SHALL CONSIST OF CONSTRUCTING BOTH PIPING SYSTEMS WITH DUCTILE IRON PIPE WITH
RESTRAINED MECHANICAL JOINTS OR USE OF CONCRETE ENCASEMENT. THE ADDITIONAL PROTECTION SHALL EXTEND A MINIMUM DISTANCE OF 10’-0” (3 M) OUTSIDE THE LIMITS OF THE CROSSING.
● SANITARY SEWER FORCE MAINS SHALL ONLY CROSS UNDER POTABLE WATER MAINS WITH A MINIMUM VERTICAL CLEARANCE OF 18” (450 MM). WHEN THE VERTICAL CLEARANCE BETWEEN THE POTABLE WATER
MAIN AND THE FORCE MAIN IS LESS THAN 18” (450 MM), BOTH THE WATER MAIN AND THE FORCE MAIN SHALL BE CONSTRUCTED WITH RESTRAINED MECHANICAL JOINT DUCTILE IRON PIPE AS INDICATED ABOVE FOR
ADDITIONAL PROTECTION.
● THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS AND PIPED UTILITIES SHALL BE 2’-0” (300 MM) AND THE MINIMUM VERTICAL CLEARANCE SHALL BE 18” (450 MM).
● THE MINIMUM VERTICAL CLEARANCE TO ALL STEAM, PUMPED CONDENSATE, AND HOT WATER, AND OTHER UTILITIES SHALL BE AT LEAST 18” (450 MM). WHEN THIS VERTICAL CLEARANCE CANNOT BE MAINTAINED, THE INSULATION THICKNESS ON THE STEAM, CONDENSATE, OR HOT WATER MAIN SHALL BE INCREASED BY 50%.
CONSTRUCT 22.5° BEND - SEE DETAIL B4, SHEET CG502
1"=20' F2
CIVIL UTILITY PLAN
CONSTRUCT 45° BEND - SEE DETAIL B4, SHEET CG502
CONSTRUCT 90° ELBOW - SEE DETAIL B4, SHEET CG502
CROSSING EXISTING UTILITY LINE. SEE UTILITY SEPARATION NOTES
CONSTRUCT 2" PVC (SCH 80) CONDUIT - ROUTE FIBER OPTIC CABLING
CONNECT TO EXISTING COMM LINE
INSTALL 15kV ELECTRICAL LINE -EX. TO BE REMOVED, REFER TO ELECTRICAL PLANS
NOT USED
NOT USED
10" ASTM SCHEDULE 40 PVC CHILLED WATERLINE W/ INSULATION
3" STEEL STEAM RETURN LINE
QUANTITY UNITS
8" STEEL STEAM LINE W/ INSULATION
LF
LF
LF
DESCRIPTION
10" PVC 22.5° BEND EA4
10" PVC 45° BEND EA4
10" PVC 90° ELBOW EA4
2" PVC SCH 80 CONDUIT LF100
8" STEEL 22.5° BEND EA1
8" STEEL 45° BEND EA1
8" STEEL 90° ELBOW EA1
3" STEEL 22.5° BEND EA1
3" STEEL 45° BEND EA1
3" STEEL 90° ELBOW EA1
1. ALL ELECTRICAL CONDUIT SHOWN IS FOR REFERENCE ONLY. PLEASE SEE ELECTRICAL SITE PLAN
FOR PHASING AND BRANCH CIRCUITING.
2. COMMUNICATIONS CONDUIT SHOWN IS FOR REFERENCE ONLY,
PLEASE SEE TECHNOLOGY SITE PLAN FOR PHASING AND DETAILED INFORMATION.
1. CONTRACTOR TO HAVE AIR QUALITY PERMIT IN PLACE PRIOR TO CONSTRUCTION.
NOT USED
EXISTING UNDERGROUND OIL FUEL TANK
EXISTING REDI-CALL BOX
INSTALLATION OF UNDERGROUND STORAGE TANK (UST) TO MEET ALL REQUIREMENTS OF NEW
MEXICO ENVIRONMENT PETROLEUM STORAGE TANK BUREAU (PSTU). DOUBLE WALL TANK AND
PIPING REQUIRED. INSTALL WATER TIGHT SUMP AT TANK CONNECTION AND CONNECTION TO
EXISTING UST. INSTALL LEAK DETECTION MONITORING SYSTEM WITHIN INTERSTITIAL SPACES OF
TANK AND PIPE.
MONITORING OF UST SYSTEM TO MEET REQUIREMENTS OF PSTU AND NFPA 30, 31.
SEE PLUMBING SHEETS FOR ADDITIONAL INFORMATION
1. ABOVE GROUND STORAGE TANK TO MEET REQUIREMENTS OF NFPA 37 AND 110.
NATIONAL HISTORIC PRESERVATION
EXISTING FUEL / OIL LINE TO REMAIN, PROTECT IN PLACE
EXISTING UTILITY BELOW. HAND DIG 6' EACH SIDE OF CROSSING. SEE UTILITY NOTES
FOR STANDARD UTILITY DEPTHS. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES
PRIOR TO TRENCHING.
UTILITY TUNNEL
INSTALL 3000AMP TRANSFORMER/SWITCH - SEE ELECTRICAL PLANS