ATTACHMENT A - 5 of11 501-17-105 Dwg Arch2-07-20-22.pdf
PDF 13 MB Posted
- Solicitation number
- 36C26223B0010
About this file
This notification provides details for an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure at the New Mexico VA Healthcare System. The solicitation will be issued via Contract Opportunities at SAM.gov on or around July 15, 2023 for general construction, alterations, mechanical, electrical and utility systems work. The project scope includes renovation, new construction, equipment replacements and utility modifications to address deficiencies at Building 43, the Central Utility Plant. The magnitude of work is estimated between $10-20 million. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses listed in VetCert. The NAICS code is 236220 for Commercial and Institutional Building Construction. A site visit will be scheduled after solicitation release. The point of contact is Maria Cruz-Thompson, Contracting Specialist at the Network Contracting Office 22 in Long Beach, California.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
E D C B A
LEVEL_00
-12' - 0"
ROOF LEVEL
26' - 6"
E1
A-301
E1
A-301
35 35
A
L39
C1
A-301
C1
A-301
BASE
BID
B9
A-551
L115
CJ
EP-2EP-2
EP-2
EP-2
EP-2 EP-2
EP-2
A
WL-3
WL-4
'-3
3' -6
CJ
C J
C J
7A
LI
G
H T
F
IX
T U
R E
9' -6
LI
G
H T
F
IX
T U
R E
9' -6
CJ
F
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
123456
LEVEL_00
-12' - 0"
ROOF LEVEL
26' - 6"
C4
A-301
C4
A-301
A
12 12
'-9
/2
137 138
10095129
L39
BEYOND
'-5
/4
CJ
CJ
EP-2
CREDIT EQ-8 DAYLIGHTING AND QUALITY VIEWS
INSTALL SKYLIGHTS AND CLERESTORY WINDOWS
SEE SHEET A-121C
E4
A-301
E4
A-301
5.8 LIGHTING FEATURES
5.8.6 65% ACCESS TO DAYLIGHTING
EP-1
EP-2
EP-2
EP-2
3' -6
WL-2
'-1
1" 14 '-0
8' -0
9' -6
EP-1
CIP-1
TRANSLUCENT PANEL
WINDOW SYSTEM
TL-1
ARCHITECTURAL COLOR PALETTE
EXTERIOR INSULATION
FINISHING SYSTEM
CAST IN PLACE
CONCRETE
CONCRETE
MASONRY UNIT
(BURNISHED)
CMU-1
VISION GLASS
BRONZE TO
MATCH EXISTING
GL-1
NOTE: MATERIALS ARE PROVIDED AS THE BASIS OF DESIGN,
ALL MATERIAL SUBSTITUTIONS ARE SUBJECT TO OWNERS
APPROVAL.
EXTERIOR ACCENT
PAINT, ALL TRIM, ALL
REVEALS, ALL
DOORS(SWING AND
ROLL UP) ALL DOOR
TRIM AND WINDOW
TRIM
EP-2
SLATE GRAY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:2
P M
A-201
EXTERIOR BUILDING ELEVATIONS - NORTH &
EAST
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K.
MCDERMOTT
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" C2
EXTERIOR ELEVATION - NORTH
1/8" = 1'-0" F2
EXTERIOR ELEVATION - EAST
1 NEW METAL PANEL WALL SYSTEM TO MATCH EXISTING INSULATED METAL PANEL
SET IN EXISTING HOLLOW METAL FRAME, PAINT EP-2
2 NEW STAIRCASE TO GENSET MEZZANINE, REFER TO A-701 AND A-702 FOR
ADDITIONAL INFORMATION
3 NEW MECHANICAL EXHAUST, REFER TO MECHANICAL SHEETS FOR ADDITIONAL
INFORMATION IN STAINLESS STEEL FINISH
4 NEW ALUMINUM WINDOW IN NEW CMU, BRONZE GLAZING TO MATCH EXISTING,
SEE EP-2 AND GL-1
5 NEW EFIS WALL SYSTEM, TO MATCH EP-1
6 NEW LOUVER SCREEN, ANODIZED ALUMINUM FACTORY FINISH
7 THERMAL ENERGY STORAGE TANK, REFER TO MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION
8 SCREEN WALL HIDDEN FOR CLARITY, REFER TO SHEET A-620, SEE EP-2
9 NEW SKYLIGHT, SEE TL-1
10 NEW VISION GLASS, BRONZE GLAZING TO MATCH EXISTING, SEE EP-2 AND GL-1
12 NEW TRANSLUCENT PANEL IN NEW CMU, SEE TL-1
13 NEW TRANSLUCENT PANEL IN EXISTING STUCCO, SEE TL-1
14 NEW HM DOOR IN EXISTING STUCCO
15 EXISTING UTILITY TUNNEL TO REMAIN
16 EXISTING PARAPET COPING AND FLASHING TO BE REMOVED AND REPLACED
WITH ROOFING, SEE EP-1
17 NEW LOUVER SCREEN, REFER TO A-620 FOR ADDITIONAL INFORMATION,
ANODIZED ALUMINUM FACTORY FINISH
18 EXISTING STUCCO SHALL BE REPAIRED AND BUILDING PAINTED TO MATCH EP-1
FINISH COLOR
19 EXISTING METAL PANEL ROOF SYSTEM TO REMAIN
EXISTING STUCCO AT FENESTRATION
EXISTING STUCCO AT PENETRATIONS
EXISTING STUCCO, ENLARGED
EXISTING STUCCO TO BE REPAIRED
REPAIR CRACKS AND
JOINTS IN EXISTING
STUCCO AS NECESSARY
FOR NEW PAINT FINISH,
SEE IMAGE BELOW FOR
ENLARGEMENT
CLEAN EXISTING JOINTS
IN STUCCO AS
NECESSARY FOR NEW
PAINT FINISH
INSPECT AND REPAIR
SEALS ON ALL
PENETRATIONS FOR NEW
PAINT FINISH
INSPECT AND REPAIR
DAMAGED STUCCO AT BASE,
CORNERS, SEAMS AND
JOINTS. REPAIR ALL DEFECTS
PRIOR TO NEW PAINT FINISH
Revisions: Date:
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
NO.005843
07/20/2022
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
EDCBA
LEVEL_00
-12' - 0"
ROOF LEVEL
26' - 6"
E1
A-301
E1
A-301
C1
A-301
C1
A-301
L39
L115
141140140
A-511
F4
BEYOND
BEYOND
5'-6" 9'-0" 10'-0" 1'-0"
D2
A-511
EP-2
EP-2
CJ
C J
C J
CJ
18'-0" 2'-1" 13'-5"
CJ
LI
G
H T
F
IX
T U
R E
9' -6
'-9
'-0
'-0
NEW
SURVEILANCE
CAMERA
NEW
SURVEILANCE
CAMERA
EP-2
EP-2
2B
3C
'-0
9' -8
3'
-6
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
1 2 3 4 5 6
LEVEL_00
-12' - 0"
ROOF LEVEL
26' - 6"
C4
A-301
C4
A-301
A
'-3
110 109 108 107110
BEYOND
BEYOND
E4
A-301
E4
A-301
B
B
A
A
8' -0
WL-1
CJ
C J
C J
LI
G
H T
F
IX
T U
R E
9' -6
LI
G H
T F
IX
T
U R
E 8'
-6
3' -6
'-5
/4
'-0
'-8
/8
12'-0" 2'-0" 21'-6" 2'-0" 17'-0" 2'-0" 17'-3"2'-1" 12'-0"
L39
BEYOND
8' -0
WL-6
EP-1
CIP-1
TRANSLUCENT PANEL
WINDOW SYSTEM
TL-1
ARCHITECTURAL COLOR PALETTE
EXTERIOR INSULATION
FINISHING SYSTEM
CAST IN PLACE
CONCRETE
CONCRETE
MASONRY UNIT
(BURNISHED)
CMU-1
VISION GLASS
BRONZE TO
MATCH EXISTING
GL-1
NOTE: MATERIALS ARE PROVIDED AS THE BASIS OF DESIGN,
ALL MATERIAL SUBSTITUTIONS ARE SUBJECT TO OWNERS
APPROVAL.
EXTERIOR ACCENT
PAINT, ALL TRIM, ALL
REVEALS, ALL
DOORS(SWING AND
ROLL UP) ALL DOOR
TRIM AND WINDOW
TRIM
EP-2
SLATE GRAY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:4
P M
A-202
EXTERIOR BUILDING ELEVATIONS - SOUTH &
WEST
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K.
MCDERMOTT
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" C2
EXTERIOR ELEVATION - SOUTH
1/8" = 1'-0" F2
EXTERIOR ELEVATION - WEST
1 NEW LOUVER SCREEN, ANODIZED ALUMINUM FACTORY FINISH
2 NEW STAIRCASE, SEE EP-2
3 NEW MECHANICAL EXHAUST, REFER TO MECHANICAL SHEETS FOR ADDITIONAL
INFORMATION IN STAINLESS STEEL FINISH
4 NEW TRANSLUCENT PANEL IN EXISTING STUCCO, SEE TL-1
5 NEW EFIS WALL SYSTEM, TO MATCH EP-1
6 EXISTING STAIRCASE TO REMAIN
7 KALWALL WALL FACADE
8 EXISTING DETACHED ADJACENT BUILDING HIDDEN FOR CLARITY
9 NEW SCUPPER AND DOWNSPOUT, SEE EP-2
10 NEW SKYLIGHT, SEE TL-1
11 NEW TRANSLUCENT PANEL IN EXISTING STUCCO, SEE TL-1
12 NEW HM DOOR IN EXISTING STUCCO, BASE BID
13 EXISTING TO REMAIN
14 NEW STAIRCASE TO GENSET MEZZANINE, BASE BID. REFER TO A-701 AND A-702
FOR ADDITIONAL INFORMATION
15 EXISTING STUCCO SHALL BE REPAIRED AND BUILDING PAINTED TO MATCH DRY
RIVER
16 FUTURE NEW PIPE PENETRATIONS THROUGH WALL, SEE MECHANICAL PLUMBING
DRAWINGS
Revisions: Date:
EP-2 EP-2
EP-2
EP-2
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
EP-2
7/20/2022
MATHEW PERKINS
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
E D C B A
LEVEL_00
-12' - 0"
ROOF LEVEL
26' - 6"
E1
A-301
E1
A-301
ENGINEERING
CONTROL
CENTER
111111
CHILLER
ROOM
MA-109MA-109
OFFICE
MA-203MA-203
CORRIDOR
MA-202MA-202
CHILLER
ROOM
MA-109MA-109
8 1
A-351
F1
A-351
F3
CORRIDOR
MA-122MA-122
C1
A-301
C1
A-301
9' -8
D6
A-501
43-P9
1.8 ENVELOPE
CMU WALLS SHOULD BE R-9.5 MINIMUM,
CMU WALLS BELOW GRADE SHOULD BE R-7.5,
FLOORS, HEATED SLABS R-15 FOR 24" BELOW,
R-5 UNDER FULL SLAB
4' -8
7'
-4
A-551
B5
A-551
C5
B
A-511
B5
LI
G
H T
F
IX
T U
R E
'-2
S E
C U
R
IT
Y C
A M
E R
A
'-2
'-0
43-WCCH-343-WCCH-1
F
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
1 2 3 4 5 6
ROOF LEVEL
26' - 6"
FOUNDATION
-2' - 0"
C4
A-301
C4
A-301
GENERATOR
ROOM
MA-106MA-106
BOILER
PLANT
MA-108MA-108
CHILLER
ROOM
MA-109MA-109
1'-1"19'-11"
9D
110'-0"
25'-0" .23'-6" 23'-6" 19'-0" 19'-0"
7F
A-511
F6
A-551
B9
'-5
/4
'-3
/2
'-6
'-0
E4
A-301
E4
A-301
NEW PIPE
PENETRATIONS
THROUGH WALL
NEW
SURVEILANCE
CAMERA
1'-1"
9C
8' -0
A-513
D3
43-WCCH-1
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
LEVEL_00
-12' - 0"
ROOF LEVEL
26' - 6"
SECOND_FLOOR_BEAM
10' - 11"
FOUNDATION
-2' - 0"
C4
A-301
C4
A-301
LOUNGE
116116
CORRIDOR
MA-122MA-122
CORRIDOR
117117
HOUSEKEEPING
AIDS
CLOSET
112112
9' -0
8' -0
8' -0
53' - 5 3/16"
A-351
F7
A-351
E5
'-6
/4
'-9
/2
" 11 11
E
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
E D C B A
LEVEL_00
-12' - 0"
ROOF LEVEL
26' - 6"
FOUNDATION
-2' - 0"
CT_FRAME
30' - 6"
E1
A-301
E1
A-301
C1
A-301
C1
A-301
SUPPLY
ROOM
MA-105MA-105
GENERATOR
ROOM
MA-106MA-106
ELECTRICAL
ROOM
MA-107MA-107
STORAGE
MA-121MA-121
NEW
ELECTRICAL
MA-211MA-211
A-551
B5
A-551
C5
A-521
F1
A-521
E6
LI
G
H T
IN
G
'-9
/4
LI
G
H T
IN
G
9' -9
D3
A-513
A-512
B4
EXISTING ELEC EQUIPMENT TO REMAIN,
BASE BID
F
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
C
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:1
P M
A-301
ARCHITECTURAL BUILDING SECTIONS
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K.
MCDERMOTT
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" C4
BUILDING SECTION - TRANSVERSE SECTION AT NEW ADDITION
1/8" = 1'-0" E1
BUILDING SECTION - LONGITUDINAL SECTION AT EXISTING PLANT
1 NEW LOUVER SCREEN, ANODIZED ALUMINUM FACTORY FINISH
2 NEW EXHAUST VENTILATORS, REFER TO MECHANICAL SHEETS FOR ADDITIONAL
INFORMATION
3 NEW EFIS WALL SYSTEM
4 NEW ANGLED GYPSUM WALLBOARD SOFFIT FOR CONTROL MONITORS, REFER TO
A-531 FOR ADDITIONAL INFORMATION
5 NEW MECHANICAL EXHUAST, REFER TO MECHANICAL SHEETS FOR ADDITIONAL
INFORMATION
6 NEW DOWNSPOUT
7 NEW GENSET, REFER TO MECHANICAL SHEETS FOR ADDITIONAL INFORMATION,
PHASE 1
8 THERMAL ENERGY STORAGE TANK, REFER TO MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION
9 NEW ROOF TOP DEDICATED OUTDOOR AIR SYSTEM, REFER TO MECHANICAL
SHEETS FOR ADDITIONAL INFORMATION
10 REMOVE WIND-GIRT FOR NEW FLOOR, REFER TO STRUCTURAL SHEETS FOR
ADDITIONAL INFORMATION, PHASE 1
11 NEW SKYLIGHT
12 NEW SCREEN WALL
13 NEW 1-HR RATED WALL AND WINDOW SYSTEM
14 NEW STEEL FRAMING, SEE STRUCTURAL
15 NEW BIRD SCREEN OVER COOLING TOWER TO MATCH EXISTING
17 EXISTING STEEL FRAMING TO BE REMOVED
18 PAINT ALL EXPOSED STEEL IN SPACE TO MATCH SPECIFIED WALL COLOR
1/8" = 1'-0" C1
BUILDING SECTION - LONGITUDINAL
C4
C1
F4
C4
F4
1/8" = 1'-0" E4
BUILDING SECTION - NEW ELECTRICAL ROOM
Revisions: Date:
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
FOUNDATION
-2' - 0"
CORRIDOR
MA-122MA-122
ENGINEERING
CONTROL
CENTER
111111
A-501
D9
C1
A-301
6' -9
T
O P
O F
M A
S O
N R
Y
'-0
A-501
F7
A-551
B2
A-521
B6
10 11
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
E
ROOF LEVEL
26' - 6"
FOUNDATION
-2' - 0"
CT_FRAME
30' - 6"
CHILLER
ROOM
MA-109MA-109
ENGINEERING
CONTROL
CENTER
111111
A-511
C8
A-511
B7
A-551
B5
A-511
F8
A-551
B6
A-551
D6
9' -8
T O
P O
F S
C R
E E
N W
A
LL
'-0
A-512
F5
A-531
E4
'-6
4'
-0
3' -3
/2
1/ 2"
OFFICE
MA-203MA-203
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
SECOND_FLOOR_BEAM
10' - 11"
FOUNDATION
-2' - 0"
LOUNGE
116116
A-501
D9
'-0
A-501
F9
BEYOND
3' -0
T
Y P
3' -6
T
Y P
SLOPE
LEVEL_01
0' - 0"
LEVEL_02
12' - 0"
LEVEL_00
-12' - 0"
BASEMENT_TANK_BOT
-13' - 0"
BASEMENT_OFFSET_1/4"
-11' - 11 3/4"
SECOND_FLOOR_BEAM
10' - 11"
FOUNDATION
-2' - 0"
HOUSEKEEPING
AIDS
CLOSET
112112
A-501
D9
'-0
D1
A-501
BEYOND A-501
D4
7' -0
6' -9
LI
G
H T
F
IX
T U
R E
S 9'
-6
A5135
A5075
A-501
F95
SLOPE
C E
IL
IN
G 8'
-0
A-531
B8
BEYOND
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A B
C
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:2
P M
A-351
ARCHITECTURAL WALL SECTIONS
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS D. YOUNG
100% CONSTRUCTION
DOCUMENTS
1 EXISTING UTILITY TUNNEL TO REMAIN
2 NEW CONCRETE SIDEWALK, SEE CIVIL DRAWINGS
3 NEW EIFS WALL SYSTEM, SEE EXTERIOR ELEVATIONS FOR COLOR, R-9.5 MIN
ABOVE GRADE, R-7.5 BELOW
4 NEW R-15 MIN RIGID INSULATION ON AGGREGATE BASE COURSE WITH VAPOR
BARRIER
5 NEW CONCRETE FLOOR SLAB, SEE STRUCTURAL AND INTERIOR FINISHES, R-5
MIN
6 NEW BURNISHED CMU AT INTERIOR
7 NEW SUSPENDED CEILING SYSTEM
8 NEW EXTERIOR LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
9 NEW HOLLOW CORE CONCRETE DECK SYSTEM
10 NEW TPO ROOFING TO EXTEND UP WALL TO UNDER CAP, R-30 MIN
11 NEW CURB AT SCREEN WALL BRACE
12 NEW PREFINISHED PARAPET CAP, SEE EXTERIOR ELEVATIONS FOR COLOR
13 NEW ROOF TOP SCREEN WALL SYSTEM, BASIS OF DESIGN: STURDISTRUCT BY
ARCHITECTURAL LOUVERS
14 NEW SCUPPER
15 NEW CONCRETE FOOTING, SEE STRUCTURAL DRAWINGS, PROVIDE R-15 MIN TO
24" BELOW GRADE
16 NEW PREFABRICATED PREFINISHED STEEL GRATE STAIR SYSTEM, TO MATCH
EXISTING
17 NEW PREFABRICATED STEEL GUARD AND HANDRAIL
18 NEW FOOTING AND NEW STEEL COLUMN STAIR SUPPORT, SEE STRUCTURAL
DRAWINGS
19 NEW TRANSLUCENT PANEL WINDOW SYSTEM WITH VISION PANEL OPENING, SEE
WINDOW TYPE ELEVATIONS, SHEET A-620
20 NEW WALL BASE, SEE INTERIOR FINISHES FOR ADDITIONAL INFORMATION
21 NEW ROOF PLATFORM AND SCREEN WALL. SEE A-401 FOR PLAN AND
STRUCTURAL DRAWINGS FOR LAYOUT.
22 NEW SCREEN WALL BRACING, SEE STRUCTURAL, PAINTED TO MATCH SCREEN
WALL
23 NEW COOLING TOWER AND ENCLOSURE ON ROOF
24 NEW COOLING TOWER PLATFORM, SEE ENLARGED PLAN, SHEET A-411
25 EXISTING STUCCO WALL SYSTEM TO BE REPAIRED
26 NEW TPO ROOFING TO EXTEND UP WALL TO UNDER SILL FLASHING, R-30 MIN
27 REMOVE EXISTING STUCCO FOR NEW ROOF SYSTEM, SEE DETAIL
28 NEW BURNISHED CMU WALL, SEE PLAN AND PARTITION TYPES FOR ADDITIONAL
INFORMATION
29 NEW FIRE RATED SHUTTER INTEGRATED WITH FIRE ALARM
30 NEW NON-RATED INTERIOR OBSERVATION WINDOW, SEE WINDOW TYPES
31 EXISTING CONCRETE FLOOR SLAB TO REMAIN
32 KALWALL PYRAMID, OR APPROVED EQUAL
33 WALL MOUNTED MONITORS, REFER TO A-401 FOR ADDITIONAL INFORMATION
1/2" = 1'-0" F1
WALL SECTION AT NEW CORRIDOR
1/2" = 1'-0"
F3
WALL SECTION AT NEW CONTROL ROOM
1/2" = 1'-0" E5
WALL SECTION AT SOUTH
1/2" = 1'-0" F7
WALL SECTION AT TUNNEL
Revisions: Date:
0 1'-0" 2'-0" 4'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
S
FCR
F
CR
4 4
C R
A-401C
C4
'-4
2'-7"
2' -7
1'-3"
CHEMICAL
TESTING
ROOM
110110
P8
CT020
C A
1M
C A
1M
CA041MCA041M
A-509
B1
S-1
P
A-509
B3
1'-10"
U0005
MR6: SOLID WASTE
MANAGEMENT - ONGOING
PROVIDE STORAGE FOR
RECYCLABLES OF GLASS &
PLASTIC
C
4.13 HCS PROGRAM
4.13.1 MSDSRWS
RWS
CS040
P1965 F2300
3.1 FACILITIES FOR
STORING & HANDLING
RECYCLABLE MATERIALS
3.1.2.3 GLASS
3.1.2.5 PLASTIC
R4000
A-401
D6
HOUSEKEEPING
AIDS
CLOSET
112112
JANC1
9'-0"
6' -0
F0500 F0505
A5077 P2000
A5107A5075
P4700
WFT-6
A5135
U0001
F2300
4.13 HCS PROGRAM
4.13.1 MSDS
4.5 WASTE WATER EFFLUENTS
4.5.1 PROTECT FLOOR DRAINS
4.14 HEALTH & SAFETY &
MANAGEMENT OF
HAZARDOUS PRODUCT
4.14.1 CHEMICAL IN SECURE
LOCATIONS W/ VENTILATION
SEE SHEET AC101
D
F2017 M3073
MR-1:
COLLECTION FOR HAZARDOUS WASTE,
BATTERIES AND LAMPS
MR-6:
SOLID WASTE
MANAGEMENT-
ONGOING PROVIDE
STORAGE FOR
RECYCLABLES
EQ-10:
STORAGE CABINET FOR
GREEN CLEANING CHEMICALS
EQ-11: GREEN
CLEANING -
EQUIPMENT
EQ-10 CREDIT:
GREEN CLEANING-
PRODUCTS AND
MATERIALS
U0003
U0004
A5082
2.2 WATER CONSERVING
FEATURES 2.2.1.9 HAND
SANITIZERS/RUBS
3.1 FACILITIES FOR STORING &
HANDLING RECYCLABLE MATERIALS
3.1.2.9 ELECTRONIC AND BATTERIES
P8
P
A-401
E2
F0275
E0117M
F0275
E0117M
E0117M
F0275
M2055M2055
323232
E6
E
E
RWS
A-509
B5
5.8 LIGHTING
FEATURES
5.8.2 CONTROLLABLE
SHADING DEVICE
P
P
P8
GREEN GLOBES
1.2 LIGHTING
1.2.1.6 TASK LIGHTING
LEED EQ-7
INTERIOR LIGHTING
M2055M2055
F0225
F0225
F0795M
F0225
U0005
MR-6: SOLID WASTE
MANAGEMENT-ONGOING
PROVIDE STORAGE FOR
RECYCLABLES
F2000
U0002
U0002 U0002
ENGINEERING
CONTROL
CENTER
111111
'-0
22'-0 3/8"
3.1 FACILITIES FOR STORING &
HANDLING RECYCLABLE MATERIALS
3.1.2.3 GLASS
3.1.2.5 PLASTIC
P8
P8
1' -8
/4
U0006U0006
E0117M
U0006
U0006
2' -6
1'
-6
2' -1
0"
9' -0
8' -0
C05F0
C05F0
CA041M
CA041M
CT020
2'-9" 3'-4" 2'-9" 3'-4"
35 35
OPEN OPEN
PL-1 RB-1
C04F0M
CA041M
D5
A-541
B9
A-541
PL-1
PL-1
PL-1
S-1
PL-1
1'-3"
6"
10 10
RWS RWS
E7
IN601
TYP.
CA041M
C04P0M
2'-9" 3'-0"
2' -6
1'
-6
2' -1
0"
6' -1
0"
9' -0
CT020
3'-0"3'-0"
9'-2"RB-1
PL-1
S-1
PL-1
D5
A-541
B7
A-541
B9
A-541
4"
P1965
1'-10"
10"
8' -0
2'-0"
" 2'
-0 " 3'
-6
2' -1
0"3' -6
W F
T -6
4' -1
P4700 A5075
A5107
P2000
A5077
P2451M
A5135
6' -0
4' -4
1'-3"
U0001
RB-1
WFT-6
3'-0" 1'-9" 11" 1'-11"
1'-0"
EQ-10:
STORAGE CABINET FOR
GREEN CLEANING
CHEMICALS
EQ-11: GREEN
CLEANING -
EQUIPMENT
U0003
U0004
A5082
2.2 WATER CONSERVING
FEATURES 2.2.1.9 HAND
SANITIZERS/RUBS
9' -0
7' -4
E0117ME0117MF0275 F0275
A1015
SKYLIGHT
F0275RB-1
5 6
U0007 U0007 U0007 U0007U0007
GREEN GLOBES
1.2 LIGHTING
1.2.1.6 TASK LIGHTING
LEED EQ-7
INTERIOR
LIGHTING,TYP.
U0002
U0002
U0002
A1015
2'-0 3/8"4'-0"4'-0"4'-0"4'-0"4'-0"
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
32 32 32
8' -0
"9' -0
M2055
SKYLIGHT
6' -0
2'-0"4'-0"4'-0"4'-0"
E Q
E Q
E
Q
RWS-1 RWS-1
RB-1
5.8 LIGHTING FEATURES
5.8.2 CONTROLLABLE
SHADING DEVICE
M2055 M2055 M2055 U0005 MR-6: SOLID
WASTE
MANAGEMENT-
ONGOING
PROVIDE
STORAGE FOR
RECYCLABLES
3.1 FACILITIES FOR STORING &
HANDLING RECYCLABLE MATERIALS
3.1.2.3 GLASS
3.1.2.5 PLASTIC
F0225
F0795M E0117M5
RB-1
A-531
E4
U0002
A1015
F0275F0225
F0225
M2055
U0005
9' -0
6' -9
6' -6
U0006
M2055
E0117M
E0117M
F0275
RB-1
A-531
E4
GREEN GLOBES
1.2 LIGHTING
1.2.1.6 TASK
LIGHTING
LEED EQ-7
INTERIOR
LIGHTING
U0002 U0002 A1015
F2000
9' -0
6' -2
E7
IN601 TYP.
PATTERN OR COLOR CHANGE
MATERIAL FLOOR CHANGE (REFER TO IN601
FOR TRANSITION DETAILS)
DIRECTION OF FINISH
INTERIOR FINISH SYMBOLS
P-_ PAINT COLOR / WALL FINISHES
EXTENT OF WALL FINISH TYPE
CORNER GUARD LOCATIONCG
GRAIN
REFER TO SHEET IN601 FOR ROOM FINISH SCHEDULE & FINISH LEGEND
FINISHES LISTED ARE THE OVERALL FINISHES SPECIFIED FOR EACH SPACE.
REFER TO PLANS FOR ADDITIONAL WALL FINISHES REQUIRED FOR EACH SPACE.
RB-1
F0500
A5135
F0505
P4700
EQ-11: GREEN
CLEANING - EQUIPMENT
WFT-6 7
U0004
W F
T -6
4' -1
2' -0
6' -0
8' -0
E7
IN601
6"
4'-1"
U0005
F2300 C04P0M
CT020
CS040
P1965
RB-1
S-1
PL-1
4.13 HCS PROGRAM
4.13.1 MSDS
MR6: SOLID WASTE
MANAGEMENT -
ONGOING
6' -1
0"
9' -0
2' -1
0"
3.1 FACILITIES FOR STORING &
HANDLING RECYCLABLE MATERIALS
3.1.2.3 GLASS
3.1.2.5 PLASTIC
R4000
E7
IN601
TYP.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
B
C
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:3
P M
A-401
ARCHITECTURAL ENLARGED VIEWS
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K.
MCDERMOTT
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" C8
CHEMICAL TESTING ROOM - 110
1/4" = 1'-0" D8
HAC - 112
1/4" = 1'-0" E8
ENGINEERING CONTROL CENTER -
1/4" = 1'-0" C2
CHEMICAL TESTING 110 - NORTH
ELEVATION
1/4" = 1'-0" C4
CHEMICAL TESTING 110 - EAST
ELEVATION
1/4" = 1'-0" D6
HAC - WEST ELEVATION
1/4" = 1'-0" E2
ENGINEERING CONTROL CENTER 111
- WEST ELEVATION
INTERIOR FINISH ABBREVIATIONS
ABBREVIATION FINISH TYPE
AT ACOUSTICAL CEILING TILE
C SEALED CONCRETE
CG CORNER GUARD
CMU CONCRETE MASONRY UNIT BLOCK
EPY EPOXY FLOORING
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RWC RIGID WALL COVERING
RWS WINDOW SHADES
S SOLID SURFACE
SS STAINLESS STEEL
TR TILE TRIM
WD PLYWOOD
WFT WALL FINISH TYPE
JSN Schedule
JSN Nomenclature Furn. By/
Installed By R4000 Ice Maker, Freestanding, SS VV
R7250M Refrigerator/Freezer, 20 Cubic Feet, SS VV
U0001 Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top, w/ trays for chemical spillage CC
U0002 Task Light, Freestanding VV
U0003 Power Washer VV
U0004 Chemical Cleaning Solution Dispenser VV
U0005 Container, Combination, Trash/Recycling, Small VV
U0006 Monitor Arm, Quad monitors CC
U0007 Single Wall Mount Monitor Arm CC
X1060M Cabinet, base, 1 door CC
JSN Schedule
JSN Nomenclature Furn. By/
Installed By F2017M Waste Receptacle, SS, 12 GAL VV
F2300 Rack, Information, Wall Mounted VV
F3065 Whiteboard/Bulletin Board, Combination VC
F3200 Clock, Battery, 12in Dia CC
K1552 Brewer, Coffee, Auto, Elect, 3 Burner, Front/Back VV
K2515 Dishwasher, Household CC
K4500M Stove, Household, 4 Burner, w/Oven, Electric, SS VC
K4665 Oven, Microwave, Consumer, SS CC
M2055 Shelving, Storage, Wire, CRS, w/Adjustable Shelves VV
M3073 Basket, Infectious Waste, Step-on VV
P1965 Eyewash, Eye-Face, Sink Mounted, Hands-free CC
P2000 Eyewash, Wall Mounted, Hands-Free CC
P2100 Disposal, Garbage, 2 HP Motor CC
P2451M Valve, Mixing, Thermostatic, serving double eyewash stations CC
P4700 Sink, Mop, Molded Stone CC
P5210M Shower, Single, Hand-Held CC
R2200M Fountain, Water, SS CC
JSN Schedule
JSN Nomenclature Furn. By/
Installed By C03P0 Cabinet, Sink, U/C/B, 2 Door CC
C04F0M Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC
C04P0M Cabinet, Sink, U/C/B, 2 Door CC
C05F0 Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC
CA041M Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top CC
CS040 Sink, SS, Single Compartment CC
CS230 Sink, SS, Double Compartment CC
CT020 Countertop, Solid Surface CC
E0117M Workstation, Straight, Free Standing sit to stand CC
F0225 Chair, Stacking VV
F0275 Chair, Swivel, High Back VV
F0500 Cart, Janitor's VV
F0505 Bucket, Mop, With Wringer, 26 Quart VV
F0795M Table, Dining VV
F2000 Basket, Wastepaper, Fire Resistant VV
F2015 Basket, Wastepaper, SS, 2 Swinging Doors VV
F2017 Waste Receptacle, 24 Gal VV
JSN Schedule
JSN Nomenclature Furn. By/
Installed By A1012 Telephone, Wall Mounted, 1 Line VV
A1015 Telephone, Desk, Multiple Line 12 x 12 VV
A1035 Locker, Single Tier CC
A1067 Mirror, Float Glass, ADA Accessible CC
A1080 Mirror, Posture, Wall Mtd 28" x 6" CC
A1145 Shelving, Mobile, Manual CC
A5075 Dispenser, Soap, Disposable CC
A5077 Dispenser, Hand Sanitizer, Hands-Free VC
A5082 Dispenser, Paper Towel, Sensor, Hands Free VC
A5090 Disposal, Sanitary Napkin, SS, Surface Mounted VC
A5107 Dispenser, Glove, Surgical/Examination, Wall Mntd CC
A5109M Corner Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible CC
A5135 Shelf, Utility W/ Mop/Broom Holders, SS, Surf Mntd CC
A5170 Rod, Shower Curtain, 1"Diameter, W/Curtain & Hooks CC
A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd VC
A5215 Bracket, Television, Wall-Mounted, Tilt/Angle CC
C02D0 Cabinet, U/C/B,4 Drawer CC
NOTE:
1. JSN NUMBERS THAT END WITH AN "M" SUFFIX INDICATE THAT THE ITEM IS A
MODIFIED VERSION OF THE VA'S EQUIPMENT LIST
2. JSN NUMBERS THAT START WITH A "U" PREFIX INDICATE THAT THE ITEM
DOES NOT HAVE A NUMBER IN THE VA EQUIPMENT LIST
1/4" = 1'-0" E6
ENGINEERING CONTROL CENTER 111
- EAST ELEVATION
1/4" = 1'-0" E4
ENGINEERING CONTROL CENTER 111
- SOUTH ELEVATION
1/4" = 1'-0" E1
ENGINEERING CONTROL CENTER 111
- NORTH ELEVATION
1 SLOPE FLOOR TO DRAIN, INSTALL PROTECTION FOR FLOOR DRAINS WHERE
CHEMICALS ARE USED; REFER TO PLUMBING SHEETS FOR ADDITIONAL
INFORMATION
2 TRENCH DRAIN, SLOPE FLOOR TO DRAIN AT CORNERS. REFER TO PLUMBING
SHEETS FOR ADDITIONAL INFORMATION
3 OCCUPANCY SENSOR, REFER TO ELECTRICAL SHEETS FOR ADDITIONAL
INFORMATION
4 APPROX 50 LINEAR FEET OF STORAGE FOR OWNER MANUALS
5 OPEN SHELVING BELOW PENINSULA
6 SIT TO STAND WORK STATION, WITH GROMMETS OR INTEGRAL CABLE
MANAGEMENT
7 EXTENT OF WALL PROTECTION, REFER TO INTERIOR FINISH SHEETS FOR
ADDITIONAL INFORMATION
8 NEW RECESSED FLOOR SLAB IN THIS SPACE, REFER TO STRUCTURAL FOR
ADDITIONAL INFORMATION
9 INDIRECT LIGHT COVE, 6" HOLD BACK OF ACOUSTICAL TILE FOR INDIRECT COVE
LIGHT TRIM, SEE SHEET A-531
10 UNDERCABINET TASK LIGHTING, REFER TO D5/A-541
11 ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL SHEETS FOR ADDITIONAL
INFORMATION.
12 NEW BOX AND SURFACE MOUNTED MIXING VALVE
13 WALL MOUNTED MONITORS ARE PROVIDED BY VA, TYP.
1/4" = 1'-0" D4
HAC - NORTH ELEVATION
1/4" = 1'-0" C6
CHEMICAL TESTING 110 - SOUTH
ELEVATION
Revisions: Date:
0 2'-0" 4'-0" 8'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
O
F
S
W
C R
CR
2' -1
0"4 1/
2"
1' -3
"1 '-4
/2
1'
-4
7' -2
2'-9"
2'-9"
CT020
K4665
C02D0
K4500M R7250M
S-1
PL-1
PL-1
RB-1
D3
A-541
D9
A-541
B5
A-541
B3
A-541
X1060M PL-1
3'-0"
CA041M
CA041M
1'-3" 1'-3" 3"
CA041M
CG-1
CG-1
FILLER
PL-1
A-402B
A-402
B6
8'-0"
STORAGE
MA-121MA-121
'-6
4'-0" MIN.
4'-4 3/4"
1'-4 3/4"
5'-10"
6' -0
8'-0"
A1145
MR-6: SOLID WASTE
MANAGEMENT - ONGOING
U0005
A-509
D3
A-509
D5
WL-6
GENERAL NOTES
A. CONTRACTOR TO AVOID ALL PLANT SHUT DOWNS.
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
EQUIPMENT / FURNITURE LEGEND
LOUNGE
116116
SL001
A-402D
12'-9 1/4"
A-402
E4
E
F2015
K1552
R7250M
F3065
A1080
WFT-4
D6
1' -1
1"
3B
1'-2"
A-509
B9
K4500M
A-402 D
F0795MF0225
F0225 F0225
F0225
F0795M
F0225
F0225
F0225
CT020
K2515
CA041M
CA041M
2.2 WATER
CONSERVING
FEATURES
2.2.1.11 WATER
SAVING DISWHASER
U0005
CT020
K4665
CA041M
MR-6: SOLID WASTE
MANAGEMENT - ONGOING
STORAGE FOR RECYCLABLE
MATERIALS
A5077
2'-1"
RWS-1
RWS-1
RWS-1
A5082
A5075
CG-1
A4
L4
A
LI
G N
ALIGN
D
VESTIBULE
103103
103C
W F
T -3
5' -0
WFT-3
4'-4 1/2"
6'-3 3/8"
W F
T -2
6' -4
/8
SLOPE
GG 2.2.1.7
P5210M
A5170
A5077
6"
CORRIDOR
MA-133
66 SF
SHOWER/CHANGE
66 SF
2.2 WATER CONSERVING
FEATURES 2.2.1.9 HAND
SANITIZERS/RUBS
3.1 FACILITIES FOR STORING
& HANDLING RECYCLABLE
MATERIALS
3.1.2.1 PAPER PRODUCTS
3.1.2.2 CARDBOARD
3.1.2.3 GLASS
3.1.2.4 METAL
3.1.2.5 PLASTIC
A4
A
A
E4
L4
A
SS-1
/-2
'-9
/8
5' -3
/2
8' -0
/8
4'-1 1/8"
CS230
B1
IN601
WFT-2
6'-9 1/4"
F3200
6' -0
CORRIDOR
BEYOND
RB-1
CA041M
CA041M
K1552 S-1
2' -1
0" 2'
-4
2' -0
2'-0" 2'-10"
8'-0 5/8"
D9
A-541
B1
A-541
K2515
A5082 A1012
3' -6
CT020
PL-1
A5075
1'-10 1/2"
PL-1
2.2 WATER CONSERVING FEATURES
2.2.1.11 WATER SAVING DISWHASER
2'-10 1/2"
3'-2"
C03P0
2'-1 1/2"
E7
IN601
8' -0
8'-0"
'-5
/2
EPY-1
A1145
U0005
E4
A-301
E4
A-301
'-5
/2
8' -0
11'-6"
EPY-1
E3
IN601
TYP.
C
CG-1CG-1
8' -0
W F
T -5
4' -0
EPY-1
4' -4
4"
E3
IN601
TYP.
A1035
6' -4
TYP
1'-0".
PATTERN OR COLOR CHANGE
MATERIAL FLOOR CHANGE (REFER TO IN601
FOR TRANSITION DETAILS)
DIRECTION OF FINISH
INTERIOR FINISH SYMBOLS
P-_ PAINT COLOR / WALL FINISHES
EXTENT OF WALL FINISH TYPE
CORNER GUARD LOCATIONCG
GRAIN
REFER TO SHEET IN601 FOR ROOM FINISH SCHEDULE & FINISH LEGEND
FINISHES LISTED ARE THE OVERALL FINISHES SPECIFIED FOR EACH SPACE.
REFER TO PLANS FOR ADDITIONAL WALL FINISHES REQUIRED FOR EACH SPACE.
1' -6
"2' -1
1"
3'-0" 1'-0"
2'-9"2 1/2"
4' -0
W F
T -3
8' -0
P5210M
W F
T -2
5' -0
WFT-3
5'-0"
A5170
1' -6
"2' -1
1"
3' -4
4" 1'
-6
1'-6"10"
P5210M
2'-6"
W F
T -3
8' -0
A5170
4'-0" W
F T
-2 3'
-6
WFT-2
WFT-3
TR-1
6' -0
WFT-3
4'-4 1/2"
WFT-2
6'-8"
E5
IN601
TYP.
TOILET,
STAFF
114114
TNPG1
A-402
B3
A
6' -7
/8
8'-4"
A5090
A5200
A5082
A5075 A1067
A5109M
WFT-2
B
1'-6"
F2017M
A5077
10"
GG 2.2.1.3
GG 2.2.1.4
2.2 WATER CONSERVING
FEATURES
2.2.1.9 HAND
SANITIZERS/RUBS
E
P8
A4
A
B1
IN601
2'-0"
A5082
A1067
A5075
F2017M
WFT-2
E5
IN601
TYPW
F
T -2
3' -6
8' -0
3' -4
3' -6
2' -1
0"
2'-0"
1' -6
2' -4
2' -9
W F
T -2
3' -6
2' -1
C L
A5090
A5200
A5109M
A5075
A5082
F2017M
A1067
2'-0" 1'-0" 6"
1'-6"2'-0"
WFT-2
1' -6
2' -1
2' -4
2' -9
W F
T -2
3' -6
8' -0
1'-0"
3'-4"
A5090
A5200
A5109M
1'-0" 3'-6"
WFT-2
2'-0"
2' -1
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
C
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:5
:4
P M
A-402
ARCHITECTURAL ENLARGED VIEWS
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS N.
BLANCHARD
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" D6
LOUNGE 116 - WEST ELEVATION
1/4" = 1'-0" B7
STORAGE - MA-121
INTERIOR FINISH ABBREVIATIONS
ABBREVIATION FINISH TYPE
AT ACOUSTICAL CEILING TILE
C SEALED CONCRETE
CG CORNER GUARD
CMU CONCRETE MASONRY UNIT BLOCK
EPY EPOXY FLOORING
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RWC RIGID WALL COVERING
RWS WINDOW SHADES
S SOLID SURFACE
SS STAINLESS STEEL
TR TILE TRIM
WD PLYWOOD
WFT WALL FINISH TYPE
JSN Schedule
JSN Nomenclature Furn. By/
Installed By R4000 Ice Maker, Freestanding, SS VV
R7250M Refrigerator/Freezer, 20 Cubic Feet, SS VV
U0001 Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top, w/ trays for chemical spillage CC
U0002 Task Light, Freestanding VV
U0003 Power Washer VV
U0004 Chemical Cleaning Solution Dispenser VV
U0005 Container, Combination, Trash/Recycling, Small VV
U0006 Monitor Arm, Quad monitors CC
U0007 Single Wall Mount Monitor Arm CC
X1060M Cabinet, base, 1 door CC
JSN Schedule
JSN Nomenclature Furn. By/
Installed By F2017M Waste Receptacle, SS, 12 GAL VV
F2300 Rack, Information, Wall Mounted VV
F3065 Whiteboard/Bulletin Board, Combination VC
F3200 Clock, Battery, 12in Dia CC
K1552 Brewer, Coffee, Auto, Elect, 3 Burner, Front/Back VV
K2515 Dishwasher, Household CC
K4500M Stove, Household, 4 Burner, w/Oven, Electric, SS VC
K4665 Oven, Microwave, Consumer, SS CC
M2055 Shelving, Storage, Wire, CRS, w/Adjustable Shelves VV
M3073 Basket, Infectious Waste, Step-on VV
P1965 Eyewash, Eye-Face, Sink Mounted, Hands-free CC
P2000 Eyewash, Wall Mounted, Hands-Free CC
P2100 Disposal, Garbage, 2 HP Motor CC
P2451M Valve, Mixing, Thermostatic, serving double eyewash stations CC
P4700 Sink, Mop, Molded Stone CC
P5210M Shower, Single, Hand-Held CC
R2200M Fountain, Water, SS CC
JSN Schedule
JSN Nomenclature Furn. By/
Installed By C03P0 Cabinet, Sink, U/C/B, 2 Door CC
C04F0M Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC
C04P0M Cabinet, Sink, U/C/B, 2 Door CC
C05F0 Cabinet, U/C/B, 1 Shelf, 2 Half DR, 2 DO CC
CA041M Cabinet, W/H, 2 Shelf, 2 DO, non-sloping top CC
CS040 Sink, SS, Single Compartment CC
CS230 Sink, SS, Double Compartment CC
CT020 Countertop, Solid Surface CC
E0117M Workstation, Straight, Free Standing sit to stand CC
F0225 Chair, Stacking VV
F0275 Chair, Swivel, High Back VV
F0500 Cart, Janitor's VV
F0505 Bucket, Mop, With Wringer, 26 Quart VV
F0795M Table, Dining VV
F2000 Basket, Wastepaper, Fire Resistant VV
F2015 Basket, Wastepaper, SS, 2 Swinging Doors VV
F2017 Waste Receptacle, 24 Gal VV
JSN Schedule
JSN Nomenclature Furn. By/
Installed By A1012 Telephone, Wall Mounted, 1 Line VV
A1015 Telephone, Desk, Multiple Line 12 x 12 VV
A1035 Locker, Single Tier CC
A1067 Mirror, Float Glass, ADA Accessible CC
A1080 Mirror, Posture, Wall Mtd 28" x 6" CC
A1145 Shelving, Mobile, Manual CC
A5075 Dispenser, Soap, Disposable CC
A5077 Dispenser, Hand Sanitizer, Hands-Free VC
A5082 Dispenser, Paper Towel, Sensor, Hands Free VC
A5090 Disposal, Sanitary Napkin, SS, Surface Mounted VC
A5107 Dispenser, Glove, Surgical/Examination, Wall Mntd CC
A5109M Corner Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible CC
A5135 Shelf, Utility W/ Mop/Broom Holders, SS, Surf Mntd CC
A5170 Rod, Shower Curtain, 1"Diameter, W/Curtain & Hooks CC
A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd VC
A5215 Bracket, Television, Wall-Mounted, Tilt/Angle CC
C02D0 Cabinet, U/C/B,4 Drawer CC
NOTE:
1. JSN NUMBERS THAT END WITH AN "M" SUFFIX INDICATE THAT
THE ITEM IS A MODIFIED VERSION OF THE VA'S EQUIPMENT LIST
2. JSN NUMBERS THAT START WITH A "U" PREFIX INDICATE THAT
THE ITEM DOES NOT HAVE A NUMBER IN THE VA EQUIPMENT
LIST
1/4" = 1'-0" E7
LOUNGE/ SHOWER/ VESTIBULE
1/4" = 1'-0" D4
LOUNGE 116 - NORTH ELEVATION
1/4" = 1'-0" B6
STORAGE - EAST ELEVATION
1/4" = 1'-0"
B4
STORAGE - NORTH ELEVATION
1 GARBAGE DISPOSAL, SEE PLUMBING AND ELECTRICAL FOR ADDITIONAL
INFORMATION
2 NEW STOVE HOOD WITH INTEGRAL BACK SPLASH AND SIDE SPLASH REFER TO
MECHANICAL FOR ADDITIONAL INFORMATION
3 HIGH DENSITY STORAGE UNIT, MECHANICAL ASSIT MOBILE SYSTEM
4 HIGH DENSITY STORAGE TRACK SYSTEM MOUNTED ON EXISTING FLOOR
5 SINGLE SIDED SHELF DEPTH
6 DOUBLE SIDED SHELF DEPTH
7 APPROX. 460 LINEAR FEET OF SHELF STORAGE, REFERENCE JSN ID A1445
8 HIGH DENSITY STORAGE UNIT HIGH PRESSURE LAMINATE END PANELS, TYPICAL
9 CARD HOLDERS FOR LABELING, TYPICAL
10 CENTER STOP AT EACH DOUBLE SIDED CARRIAGE, TYPICAL
11 GYPSUM WALLBOARD SOFFIT, REFER TO CEILING PLANS
12 ELECTRIC WATER COOLER, REFER TO G-050 FOR ADDITIONAL INFORMATION
13 NEW METAL PANEL WALL SYSTEM TO MATCH EXISTING INSULATED METAL PANEL
AT REMOVED LOUVER
14 EXISTING STEEL CHANNEL
15 MILLWORK FILLER PIECE
16 ADA COMPLIANT P-TRAP COVER, REFER TO PLUMBING SHEETS FOR ADDITIONAL
INFORMATION
17 EXTENT OF WALL TILE; TILE BEHIND WALL MOUNTED FIXTURES
18 NEW WALL MOUNTED TYPE C - 10 LB FIRE EXTINGUISHER
19 NEW RECESSED FLOOR SLAB IN THIS SPACE, REFER TO STRUCTURAL FOR
ADDITIONAL INFORMATION
20 SLOPE FLOOR TO DRAIN, INSTALL PROTECTION FOR FLOOR DRAINS WHERE
CHEMICALS ARE USED; REFER TO PLUMBING SHEETS FOR ADDITIONAL
INFORMATION
21 TRENCH DRAIN, SLOPE FLOOR TO DRAIN AT CORNERS. REFER TO PLUMBING
SHEETS FOR ADDITIONAL INFORMATION
22 NEW RECESSED FLOOR SLAB IN THIS SPACE, REFER TO STRUCTURAL FOR
ADDITIONAL INFORMATION
23 OWNER'S EXISTING ELECTRIC STOVE
24 NEW MICROWAVE, CONTRACTOR PURCHASED AND INSTALLED
25 NEW DISHWASHER, CONTRACTOR PURCHASED AND INSTALLED
26 NEW LOCKERS, CONTRACTOR PURCHASED AND INSTALLED
1/4" = 1'-0" D3
VESTIBULE - SOUTH ELEVATION
1/4" = 1'-0" E6
SHOWER/CHANGE 115 - NORTH
ELEVATION
1/4" = 1'-0" E4
SHOWER/CHANGE 115 - WEST
ELEVATION
1/4" = 1'-0" A3
TOILET - 114
1/4" = 1'-0" B1
TOILET 114- SOUTH ELEVATION
1/4" = 1'-0"
B3
TOILET 114 - WEST ELEVATION
1/4" = 1'-0" A1
TOILET 114 - NORTH ELEVATION
Revisions: Date:
0 2'-0" 4'-0" 8'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
0 2'-0" 4'-0" 8'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
B. CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY UTILITIES.
C. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION
WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE
REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL
BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
D. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
E. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND FIRE
PROTECTION PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
F. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
G. COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO
INSTALLATION.
H. GALVANIC PROTECTION REQUIRED AT CONNECTIONS BETWEEN ALL
DISSIMILAR METALS.
I. ANY FLOOR, WALL, OR CEILING CUTTING THAT IS REQUIRED TO COMPLETE
THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN
TO MATCH EXISTING CONDITIONS AND FINISHES.
KEYNOTES
ROOF LEVEL
26' - 6"
CT_FRAME
30' - 6"
1'-0"
(6 TREADS AT 11")
5'-6"
6' -8
(7
R
IS
E R
S A
T
.1
3'
-0
/8
T Y
P
1/ 8"
H A
N D
R A
IL
2'
-9
/8
A-511
D4
ROOF LEVEL
26' - 6"
CT_FRAME
30' - 6"
B7
A-511
3' -3
/2
1/
2"
'-3
/2
'-0
VERIFY
6'-0"6'-6 1/2"6'-5 5/8"4'-6"4'-6"3'-6 1/2"
VERIFY
33'-0"
L39
D4
A-501
ROOF LEVEL
26' - 6"
CT_FRAME
30' - 6"
B7
A-511
23'-0"
3' -3
/2
'-0
'-3
/2
1/ 2"
L39
6' -8
8" 5'-0" 5'-0" 5'-0" 6'-8" 8"
3'-0" 2'-4 1/2"
F7
A-411
D4
A-501
ROOF LEVEL
26' - 6"
CT_FRAME
30' - 6"
B7
A-511
23'-7"
3' -3
/2
'-0
L39
1'-3" 6'-8" 5'-0" 5'-0" 5'-0" 8"
D4
A-501
LEVEL_02
12' - 0"
6' -0
" 7' -0
4'-0" 6'-0" 6'-0"
L115
D4
A-501
16'-0"
LEVEL_02
12' - 0"
7' -0
6' -0
8'-0"8'-0"8'-0"8'-0"
32'-0"
L115
LEVEL_02
12' - 0"
4'-0"
6' -0
"7' -0
L115
NEW PREFABRICATED
ROOFTOP SCREEN WALL
SYSTEM, BASIS OF DESIGN:
ARCHITECTURAL LOUVERS,
STURDISTRUCT WITH V4JS
EXTRUDED ALUMINUM
LOUVERED EQUIPMENT
SCREEN
4 5 6
C4
A-301
C4
A-301
F7
A-411
A-411
E1
A-411
B1
F5
A-512
D4
A-511
B4
A-512
9 3/4" 6'-0" 6'-6 1/2" 6'-5 5/8" 4'-6" 4'-6" 3'-6 1/2" 6'-5 1/2"
5' -0
5'
-0
6' -8
1'
-3
A-411
D1
L
L
L
L
L39
L39 L39 L39 L39 L39 L39
L
L
L
L
'-7
33'-0"
8"
VERIFY
6'-7 3/8"
VERIFY
5'-6"
6 TREADS AT 11" 9 3/4"
1 7/8" 2"
2' -7
/8
3'
-1
1/ 2"
1/
2" 5'
-0
5' -0
5'
-0
8" V
E R
IF
Y
6'-5 5/8" 4'-6"
8"
2'
-4
/2
3' -0
A-411
E4
'-0
ROOF LEVEL
26' - 6"
CT_FRAME
30' - 6"
L39
6'-7 1/2"
5'-9 3/4"
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.A
R C
H .r v t
/2 /2
:0
:1
P M
A-411
ARCHITECTURAL ENLARGED VIEWS AT ROOF
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS D. YOUNG
100% CONSTRUCTION
DOCUMENTS
3/8" = 1'-0" F7
STEPS AT COOLING TOWER ENCLOSURE
1 EXISTING ROOF DRAINS TO REMAIN
2 EXISTING MECHANICAL PIPE PENETRATIONS TO REMAIN
3 EXISTING COOLING TOWERS TO REMAIN, REFER TO MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION
4 NEW COOLING TOWER PLATFORM
5 EXISTING GUY WIRE SUPPORT TO REMAIN
6 NEW STEEL STEPS WITH GRATING, PLATFORM ACCESS
7 NEW TIE BACK
8 NEW ROOF, TPO SINGLE PLY
9 MECHANICAL EQUIPMENT, REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION
1/4" = 1'-0" D1
UPPER ROOF SCREEN WALL ELEVATION - EAST
1/4" = 1'-0" B1
UPPER ROOF SCREEN WALL ELEVATION - NORTH
1/4" = 1'-0" E1
UPPER ROOF SCREEN WALL ELEVATION - SOUTH
1/4" = 1'-0" F1
SCREEN WALL ELEVATION - NORTH
1/4" = 1'-0"
F3
SCREEN WALL ELEVATION - EAST
1/4" = 1'-0" F5
SCREEN WALL ELEVATION - SOUTH
3/8" = 1'-0" D5
ENLARGED ROOF PLAN AT ROOF SCREEN
Revisions: Date:
1/4" = 1'-0" E4
UPPER ROOF SCREEN WALL
ELEVATION - WEST
0 2'-0" 4'-0" 8'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
0 2'-0" 4'-0" 6'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
7/20/2022
MATHEW PERKINS
A-501
B7
A-501
B1
6"
A-501
B4
CANT STRIP
NEW ROOF
SYSTEM
NEW ROOF
STRUCTURE
NEW CONTINUOUS
TERMINATION BAR,
MAINTAIN CONSTANT
HEIGHT AT MINIMUM 8"
CLEAR FROM ROOF
SURFACE
MASONRY WALL & LINTEL,
SEE STRUCTURAL
DRAWINGS
8" M
IN
IM
U M
EXTEND ROOFING TO TOP OF
WALL, BENEATH CAP
ROOF SYSTEM CAP SHEET
EXTENDED OVER PARAPETVERIFY WITH MANUFACTURER
CONTINUOUS CANT STRIP OR BACKER
ROD
MIN. 60 MIL, TPO ROOFING
MEMBRANE,
FULLY ADHERED (TYP.)
MIN. 1/2" DENSDECK OR EQUAL
COVERBOARD, ADHERED
POLYISOCYANURATE INSULATION BOARD
(MIN. R-30 CONTINUOUS INSULATION AS REQUIRED
PER SPECS), ADHERED. PROVIDE TAPERED
INSULATION BOARD AS REQUIRED TO MAINTAIN A MIN.
1/4" PER 1'-0 SLOPE TO DRAIN AT ALL LOCATIONS.
EXISTING LIGHTWEIGHT CONCRETE TO
REMAIN AT EXISTING ROOF,
NEW CONCRETE PLANK AT NEW ROOF
VAPOR BARRIER
NOTES:
1. VAPOR BARRIER TO BE PART OF
THE OVERALL TESTED ROOFING
ASSEMBLY.
2. VAPOR BARRIER TO BE FLASHED
AND SEALED TO ALL
PENETRATIONS, DRAINS, CURBS,
ADJACENT WALLS, ETC.
3. SOLAR REFLECTIVITY INDEX TO
MEET ASHRAE 90.1 AND ENERGY
STAR REQUIREMENTS, MIN. SRI 82.
4. EXISTING LIGHTWEIGHT
CONCRETE TAPERS FROM 2" AT
LOW POINT TO 7" AT HIGH POINT
A-513
B4
1/2" FIRE-TREATED PLYWOOD
SHEATHING
MECHANICAL EQUIPMENT
LAP VERTICAL MIN. 60 MIL, TPO ROOFING
MEMBRANE LAYERS OVER CURB
OVERLAP HORIZONTAL MIN. 60 MIL, TPO
ROOFING MEMBRANE LAYERS AT VERTICAL
TRANSITION PER MANUFACTURER
RECOMMENDATIONS
SECURE LEVELED ROOF CURB TO
FIRE…
This is the start of the file's text. The full file is on GovTribe.