This document provides notification of an upcoming solicitation for Project 501-17-105: Upgrade Energy Plant Equipment Infrastructure. The solicitation will be issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 for renovation, new construction, equipment replacements, and utility modifications at the New Mexico VA Campus Building 43 Central Utility Plant. The project scope includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The work must be performed in accordance with applicable codes and specifications. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses listed in the VetCert database with a NAICS code of 236220 and project magnitude between $10-20 million. The Invitation for Bid is expected to be issued on or around July 15, 2023 via SAM.gov. A pre-bid site visit will be scheduled for prospective offerors. The point of contact is listed.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN DOWN
WC WATER CLOSET
FLUSH VALVEFV
YH YARD HYDRANT
TD TRENCH DRAIN
FOV
FOR
FOS
FUEL OIL VENT
FUEL OIL RETURN
FUEL OIL SUPPLY
ES
EEW
EMERGENCY SHOWER
EMERGENCY EYEWASH
CWV COMBINATION WASTE AND VENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ACID NEUTRALIZING TANK
ACID RESISTANT VENT THROUGH ROOF
BALANCING COCK
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BTU PER HOUR
CLOTHES WASHER BOX
CUBIC FEET PER HOUR
CLEANOUT
CLEANOUT TO GRADE
CIRCULATION PUMP
DOUBLE CLEANOUT
DRINKING FOUNTAIN
ELEVATION
ELECTRIC WATER HEATER
ELECTRIC WATER COOLER
DEGREES FAHRENHEIT
FLOOR CLEANOUT
FINISHED FLOOR ELEVATION
FEET
GUTTER DRAIN
GREASE INTERCEPTOR
GALLONS PER HOUR
GALLONS PER MINUTE
GAS WATER HEATER
HORSEPOWER
HEAD
INCHES
INVERT
KILOWATT
1,000 BTUH
MIXING VALVE
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NORMALLY CLOSED
NORMALLY OPEN
OUTSIDE SCREW AND YOKE
PHASE
POUNDS PER SQUARE INCH GAUGE
STATIC PRESSURE
TYPICAL
YARD BOX
WALL CLEANOUT
AFF
AFG
ANT
AVTR
B.C.
BOP
BTU
BTUH
CWB
CFH
CO
COTG
CP
DCO
DF
EL
EWH
EWC
°F
FCO
FFE
FT
GD
GI
GPH
GPM
GWH
HP
HD
IN
INV
kW MBh
MV
NA
NIC
No. # N.C.
N.O.
OS&Y
Ph
PSIG
SP
TYP
YB
WCO
DOUBLE CLEANOUT TO GRADEDCOTG
ETR EXISTING TO REMAIN
POWERS OF HARDNESS
PH
HOSE BIBBHB
DS DOWNSPOUT
DSN DOWNSPOUT NOZZLE
PLUMBING SYMBOL LEGEND
ABBREVIATIONS
POINT OF NEW CONNECTION TO EXISTING
KEYED NOTE
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
255' OF 6" @ 0.15%SLOPE
SLOPE AND LINEAL FOOTAGE
F.D.C.FIRE DEPARTMENT INLET CONNECTION F.D.C.
SAS SASSANITARY MANHOLE
M.H. M.H.(E)
GM
WM
REDUCED PRESSURE BACKFLOW PREVENTER
STORM DRAIN
IRRIGATION
F.H.(E)F.H.
LP
PP
C.O.(E)C.O.
LIGHT POLE
FENCING
POWER POLE
CLEANOUT
THRUST BLOCK
CONSTRUCTION
FIRE HYDRANT
VALVE WITH VALVE BOX
NATURAL GAS
FIRE PROTECTION
COLD WATER SUPPLY
SANITARY SEWER
SASSAS
WATER METER
NATURAL GAS METER
GATE VALVE
VALVE IN RISER
WM
GM
LP
PP
POST INDICATOR VALVE
PIV
PIV
W
F
SD
G
IRR
S EX. S
EX. W
EX. F
EX. G
EX. SD
EX. IRR
EXISTINGNEWDESCRIPTION
SITE UTILITY SYMBOLS
CARBON DIOXIDECO2
H
HE
AC
AR
CDA
LOX
LN LIQUID NITROGEN
LIQUID OXYGEN
HYDROGEN
HELIUM
ACETYLENE
ARGON
COMPRESSED DRY AIR
O OXYGEN
CDA
CO2
AR
AC
HE
H
LN
LOX
O
SYMBOL ABBREVIATION DESCRIPTION
PROCESS GASES
S
VACUUM BREAKER
ATMOSPHERIC VACUUM BREAKER
PRESSURE STYLE
FLOW SWITCH
SOLENOID VALVE
FUEL GAS PRESSURE REGULATOR
DIAPHRAGM (PROCESS SYSTEMS)
OS&Y VALVE
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
PLUG VALVE
WATER PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY MODULATING CONTROL VALVE
VALVE IN VERTICAL
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
DRAIN VALVE
BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE
OR OR
OR
OR
DESCRIPTIONSYMBOL
VALVE SYMBOLS
P##
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
LETTER REFER TO EQUIPMENT TYPE
NUMBER REFERS TO SPECIFIC EQUIPMENT
SYMBOL INDICATES FIXTURE/EQUIPMENT
IDENTIFIED IN EQUIPMENT SCHEDULE
SECTION SYMBOL
DETAIL SYMBOL
SECTION, ELEVATION, AND DETAIL TITLES
FIXTURE & EQUIPMENT SYMBOL
P-100
A
P-500
P-200
A
P-500
P-300
A
SCALE
ELEVATION
SCALE
DETAIL
SCALE
SECTION
IRR
INDIRECT WASTEIW
TW
TWR
SAN
V
DHWR
DCW
DHW
LA
IA
INW
IHWR
IHW
ICW
PD
SCW
IRR
NGH
NGM
G
LPG
ORD
RD
DIR
DIS
NPW
MU
ROR
ROS
CD
CA
AW
AV
PUMPED DISCHARGE LINE
IRRIGATION
SOFT COLD WATER
TEMPERED WATER (TEMP °F)
TEMPERED WATER RETURN (TEMP °F)
NATURAL GAS-HIGH PRESSURE
NATURAL GAS-MEDIUM PRESSURE
LAB COMPRESSED AIR
INSTRUMENT COMPRESSED AIR
INDUSTRIAL WASTE
REVERSE OSMOSIS RETURN
INDUSTRIAL HOT WATER RETURN
INDUSTRIAL HOT WATER
INDUSTRIAL COLD WATER
NATURAL GAS-LOW PRESSURE
LIQUIFIED PETROLEUM GAS
OVERFLOW ROOF DRAIN
STORM/ROOF DRAIN
SANITARY SEWER
DEIONIZED WATER RETURN
DEIONIZED WATER SUPPLY
VENT
NON-POTABLE WATER
MAKE-UP WATER
REVERSE OSMOSIS SUPPLY
140° DOMESTIC HOT WATER
140° DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
CONDENSATE DRAIN
COMPRESSED AIR
ACID WASTE
ACID VENT
SHW SOFT HOT WATER
SAN
AV
AW
CA
CD
ROS
ROR
NPW
V
DIS
DIR
RD
ORD
LPG
G
NGM
NGH
SCW
PD
INW
IA
IW
LA
SHW
GW GREASE WASTEGW
GV GREASE VENT
ABBREVIATIONSYMBOL DESCRIPTION
PIPING SYMBOLS
ICW
IHW
IHWR
TWR (_ _ _)
TW (_ _ _)
GV
DCW
DHW
DHWR
DHW 140ºF
DHWR 140ºF
MU
DHW 140ºF
DHWR 140ºF
CONTINUOUS BLOWDOWNCBD
GENERAL NOTES:
CONTRACTOR SHALL PROVIDE NEW PIPING IDENTIFICATION LABELS PER SPECIFICATION SECTION 09 91 00 FOR ALL MECHANICAL AND PLUMBING PIPING (NEW AND EXISTING TO REMAIN) IN BUILDING 43 AND 43A.
CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS FOR VA AND A/E REVIEW AND APPROVAL PRIOR TO
THE START OF WORK.
CONTRACTOR SHALL INSULATE ALL NEW PLUMBING PIPING AND EXISTING PIPING IDENTIFIED IN PLAN PER SPECIFICATION SECTION 22 07 11, NO ASBESTOS CONTAINING MATERIALS ARE PERMISSIBLE.
ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR SUSPENDED
CEILINGS, UNLESS OTHERWISE NOTED.
PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, COILS, FANS, CONTROLS, ETC. THEY SHALL BE FURNISHED UNDER DIVISION 22 AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING SHALL MATCH
CLASSIFICATION OF WALL AND CEILING FIRE RATING..
REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. ALL PIPE PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL.
CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND FIRE PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS, SLEEVES, AND HANGING DEVICES
FOR INSTALLATION OF MECHANICAL AND PLUMBING EQUIPMENT, DUCTWORK AND PIPING, ETC.
CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID
CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT IN A MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD
THE BUILDING STRUCTURAL SYSTEM.
IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTS AND MARKED AS "REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE.COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE
DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT
CLEARANCES. PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE
PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.
1.
2.
3.
6.
7.
8.
9.
THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION, ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE
EXISTING BUILDING MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.
THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING SERVICES FOR
REMOVALS WITH OWNER AUTHORIZED REPRESENTATIVE AND SHALL CONFORM TO THEIR
REQUIREMENTS.
DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY WHICH ARE OUTSIDE THE AREA OF WORK. COORDINATE WITH
THE ARCHITECT AND THE OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE
CONDUCTED OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE FACILITY. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK ZONE AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC. FOR ALL WORK AREAS
AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST AND FUMES.
THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE FOR APPROVAL PRIOR TO BEGINNING WORK. THE
WORK PLAN SHALL INCLUDE AN OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE
CONTRACTOR SHALL COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH
ACCEPTABLE ROUTING AND ACCESS FOR MATERIALS REQUIRED FOR THE NEW INSTALLATION.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES INCLUDING
MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL. ANY DISCREPANCIES SHALL
BE REPORTED IMMEDIATELY TO THE ARCHITECT PRIOR TO START OF WORK.
ALL NEW TO EXISTING PIPE CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO ORDERING AND
FABRICATING NEW PIPING SYSTEMS.
A
B
C
D
E
F
GENERAL DEMOLITION NOTES:
ESEW EMERGENCY SHOWER EYE WASH
D DRAIND
MAKE-UP WATERMU MU
DRAINAGE FIXTURE UNITDFU
WSFU WATER SUPPLY FIXTURE UNITS
DOMESTIC COLD WATER FIXTURE UNITDCWFU
DOMESTIC HOT WATER FIXTURE UNITDHWFU
FROM FLOOR ABOVEFFA
FROM FLOOR BELOWFFB
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
EXTENT OF DEMO PIPING TO EXISTING PIPING
STRAINER WITH BLOWDOWN VALVE & HOSE BIBB
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
EXTENT OF DEMO TO EXISTING
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT
A
PENETRATION
TEST PLUG (PRESS/TEMP)
(WH) (HB)
RD/OD/DD
DCOTG
FCO/COTG
FS/FD/AD
VTR
ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN
TWO WAY OR DOUBLE CLEANOUT TO GRADE
FLOOR CLEANOUT/CLEANOUT TO GRADE
FLOOR SINK , FLOOR DRAIN , AREA DRAIN
WATER HAMMER ARREST0R
FITTING (PETE'S PLUG)
AQUASTAT
PRESSURE GAUGE AND GAUGE COCK
THERMOMETER
FLEXIBLE CONNECTION
UNIVERSAL TEMPERATURE-PRESSURE
ORIFICE UNION
FLANGED UNION
UNION
RISE IN PIPE
DROP IN PIPE
CAPPED OUTLET
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
REDUCER OR INCREASER
PIPE GUIDE
DIRECTION OF FLOW
MAV MANUAL AIR VENT (MAV)
AAV AUTOMATIC AIR VENT (AAV)
TRAP PRIMER WITH ACCESS PANELTP
SLOPE OF PIPE
VENT THROUGH ROOF
AG AIR GAP FITTING
WALL HYDRANT, HOSE BIBB
OR
CBD CONTINUOUS BLOWDOWNCBD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
NOT FOR
CONSTRUCTION
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:4
:5
A M
P-001
PLUMBING NOTES, SYMBOLS &
ABBREVIATIONS
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS K. LUKE
100% CONSTRUCTION
DOCUMENTS
Revisions: Date: 7/20/2022 07/20/2022
DN
BFP
BFP
2 3
E
D
FD-0-4"
FD-0-4"
FD-C-3"
4" SAN
4" SAN
1" DCW
2" CBD4" SAN
4" SAN
CRU-43-BB (E)
E9
G-905
F9
G-905
4" SAN
4" SAN 4" SAN
1 2 3 4
E
D
C
B
A
1" DCW
2" DCW
2" SAN
3/4" DHW
P-528
CO
4" SAN
4" SAN
1 1/4" DCW
4" SAN
5" SAN
4" SAN
4" SAN
CO
3" SAN
4" SAN
6" SAN
8" SAN
4" SAN
4" SAN
4" SAN
4" SAN
8" SAN
5" SAN
4" SAN
4" SAN
4" SAN
8" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" CBD
2" CBD
2" SAN
2" CBD
FD-0-4"
CO
FD-B-3"
CO
FD-0-4"
CO
FD-0-4"
FD-0-4"
CO
CO
FD-B-3"
CO
FD-B-3"
FD-B-3"
FD-0-4"
FD-B-3"
FD-B-3"
FD-B-3"
4" SAN
CO
1" DCW
F
P
D B
BFD-43-ML (E)
CST-43-ML (E)
INSTRUMENT
PANEL (E)
5" RD
4" RD
3" RD
4" ORD
5" RD
4" RD
3" RD
4" RD
2" DCW
1" DCW
3/4" DHW
2 1/2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
3" SAN
4" SAN
2" SAN 2" SAN
F7
G-903 F5
G-903
E6
G-905
F6
G-905
4" ORD
2 1/2" SAN
1/2" DCW
3" RD
4" RD
5" SAN
4" SAN
3" SAN
3/4" DCW
3/4" DCW
43-DT-1 (E)
STB-433ML (E)
STB-432ML (E)
STB-431ML (E)
WATER
TREATMENT
(E)
3" SAN
LPG TANK (E)
EG-1 (E)T-1 (E)
1 1/2" SAN
4" V
4" ORD
ELECTRICAL ROOM
MA-107
GENERATOR ROOM
MA-106
SUPPLY ROOM
MA-105
STAIR
MA-110
CHEMICAL TESTING
ROOM
MA-111
BOILER PLANT
MA-108
CONTROL ROOM
MA-104
MECH AREA-2
MA-100-2
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
A
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:4
:5
A M
PD101A
PLUMBING DEMOLITION PLAN - LEVEL 1 AND
BASEMENT LEVEL - AREA A
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS G. WEAVER
100% CONSTRUCTION
DOCUMENTS
1 REMOVE BRANCH PIPING BACK TO MAIN PIPING AND CAP AT TEE. BRANCH PIPING LENGTH SHALL BE A
MAXIMUM OF 1.5 TIMES THE DIAMETER OF THE PIPE.
2 REMOVE EXISTING EYE WASH STATION, REMOVE DCW LINE BACK TO MAIN PIPING AND CAP AT TEE.
BRANCH PIPING LENGTH SHALL BE A MAXIMUM OF TWO TIMES THE DIAMETER OF THE PIPE.
3 REMOVE BELOW GRADE SANITARY PIPING AS NECESSARY TO CONNECT NEW SANITARY LINE.
4 DISCONNECT EXISTING BELOW SLAB SANITARY AS SHOWN, CAP PIPING AS NEEDED AND PREPARE FOR
CONNECTION OF NEW PIPING. PATCH FLOOR AS REQUIRED TO MATCH EXISTING.
5 REMOVE EXISITNG 3/4" DHW LINE UP TO WATER HEATER.
6 REMOVE EXISTING 3/4" DHWR LINE UP TO WATER HEATER.
7 REMOVE EXISTING 1" DCW LINE UP TO WATER HEATER.
8 REMOVE EXISTING SANITARY LINE SERVING MEZZANINE LEVEL FLOOR DRAIN.
9 REMOVE 4” VENT PIPE PENETRATING LEVEL 2 AS NECESSARY TO REROUTE AROUND NEW
CONSTRUCTION, SEE PLUMBING PIPING PLANS FOR NEW WORK.
10 REMOVE EXISTING PIPING ROUTED TO SUMP PIT WITHIN THE BASEMENT LEVEL
11 REMOVE 1-1/2” SAN LINE FROM EXISTING SIDE STEAM FILTER THROUGH FLOOR TO LEVEL 1 FLOOR
DRAIN.
12 EXISTING OVERFLOW ROOF DRAIN PIPING TO BE REMOVED AND REROUTED OUTSIDE OF THE NEW
LEVEL 2 ELECTRICAL ROOM.
1/4" = 1'-0" F1
PLUMBING DEMO PLAN - BASEMENT LEVEL - AREA A
1/4" = 1'-0"
F3
PLUMBING DEMO PLAN - LEVEL 1 - AREA A
GENERAL SHEET NOTES
KEYNOTES
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND APPROVED
BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE WORK.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 22 05 11 FOR
APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
G. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
H. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
I. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
J. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
K. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
L. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
M. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS,
PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE
IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT
STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND
INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE
PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY
PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE SHALL BE
CLEARLY IDENTIFIED ON THE DRAWINGS.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
4 5 6
E
D
C
B
A
3/4" DHWR
3/4" DHW
1" DCW
2" DCW
2" SAN
3/4" DHW
1" DCW
3/4" DHWR
3/4" DHW
1 1/2" V 3/4" DCW
P-401
P-608
P-201
P-103
P-528
P-702
CO
CO
CO
3/4" DHW
2" V
1" DCW
2" DCW
3/4" DCW
2" SAN
4" SAN
4" SAN
2" SAN
4" SAN
4" SAN
1 1/4" DCW
4" SAN
5" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
CO
CO
FD-B-3"
FD-B-3"
FD-B-3"
CO
FD-B-3"
FD-B-3"
2" DCW
3" DCW
CO
FD-0-4"
4" SAN
5" SAN
5" SAN
5" SAN
4" SAN
4" SAN
FD-0-4"
FD-0-4"
FD-0-4"
FD-0-4"
4" CO TO GRADE
4" SAN
INSTRUMENT
PANEL (E)
F
P
D A
43-WCCH-1 (E)
43-WCCH-2 (E)
43-WCCH-3 (E)
3" RD
2" V
43-P6 (E)
43-P7 (E)
43-P8 (E)
43-P12 (E)
43-P11 (E)
43-P10 (E)
43-P9 (E)
HE-2 (E)
43-P14 (E)
43-P13 (E)
HE-1 (E)
WATER
TREATMENT
(E)
43A-P2 (E)
43A-P1 (E)
64" ORD
1/2" DCW
3" SAN
BLDG 43A
43A
VESTIBULE
CHILLER ROOM
MA-109
RESTROOM/LOCKER
ROOM
MA-103
CONTROL ROOM
MA-104
CHEMICAL TESTING
ROOM
MA-111
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:5
:0
A M
PD101B
PLUMBING DEMOLITION PLAN - LEVEL 1 -
AREA B
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS G. WEAVER
100% CONSTRUCTION
DOCUMENTS
1 REMOVE BRANCH PIPING BACK TO MAIN PIPING AND CAP AT TEE. BRANCH PIPING LENGTH SHALL BE A
MAXIMUM OF 1.5 TIMES THE DIAMETER OF THE PIPE.
2 CAP SANITARY SEWER PIPING FLUSH WITH FINISH FLOOR ELEVATION. COORDINATE WITH
ARCHITECTURE AND INTERIORS.
3 EXISTING EYE WASH STATION TO BE REMOVED, REMOVE DCW LINE BACK TO MAIN PIPING AND CAP AT TEE. BRANCH PIPING LENGTH SHALL BE A MAXIMUM OF TWO TIMES THE DIAMETER OF THE PIPE.
4 REMOVE EXISTING 3/4" DHWR LINE UP TO WATER HEATER.
5 REMOVE EXISITNG 3/4" DHW LINE UP TO WATER HEATER.
6 REMOVE EXISTING PIPING AS NECESSARY TO INSTALL NEW STRUCTURAL FRAMING AND KALWAL, SEE
STRUCTURAL AND ARCHITECTURAL SHEETS FOR ADDITIONAL INFORMATION.
7 REMOVE EXISTING 2" VENT THROUGH ROOF AND ASSOCIATED PIPING SUPPORTS.
8 REMOVE EXISTING SANITARY LINE SERVING MEZZANINE LEVEL FLOOR DRAIN.
1/4" = 1'-0" F4
PLUMBING DEMO PLAN - LEVEL 1 - AREA B
GENERAL SHEET NOTES
KEYNOTES
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND APPROVED
BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE WORK.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 22 05 11 FOR
APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
G. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
H. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
I. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
J. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
K. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
L. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
M. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS,
PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE
IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT
STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND
INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE
PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY
PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE SHALL BE
CLEARLY IDENTIFIED ON THE DRAWINGS.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
WH
1 2 3 4
E
D
C
B
A
3/4" DHW
1" SCW
3/4" DHW
3/4" DHWR
F
P
D B
BFD-43-ML (E)
CST-43-ML (E)
3" DCW
3" DCW
43-DWH-1
1" SCW
43-DWBP-1
43-UH-3
43-UH-4
43-UH-5
43-UH-6
4" ORD
3" RD
4" ORD
4" ORD
3" RD
3" RD
3" DCW
3" DCW
4" ORD
4" ORD
3" RD
4" LPS
1" LPG
1" LPG
4" LPS
1" LPG
4" LPS
3" V
3/4" DHW
3/4" DHW
3/4" DHW
F6
G-903
4" ORD
43-UH-7
STB-433ML (E)
STB-432ML (E)
STB-431ML (E)
C2
G-902
C1
G-902
E1
G-902
FD-0-3"
FD-0-3"
3/4" DCW
3/4" DCW
1 1/4" DCW
1 1/4" DCW
1 1/4" DCW
1" SCW1" DCW
4" V 7
1 1/2" SAN
43-SS-1 (E)
1" SCW
3" ORD
3" ORD
ELECTRICAL ROOM
MA-107
SUPPLY ROOM
MA-105
NEW GENERATOR
ROOM
MA-106
BOILER PLANT
MA-108
BOILER ROOM -
MEZZANINE
MA-200
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:5
:1
A M
PD102A
PLUMBING DEMOLITION PLAN - LEVEL 2 -
AREA A
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS G. WEAVER
100% CONSTRUCTION
DOCUMENTS
1 EXISTING DOMESTIC WATER BOOSTER PUMP SKID TO BE RELOCATED.
2 REMOVE EXISTING DOMESTIC WATER HEATER AND RECIRCULATION PUMP.
3 REMOVE 4” VENT PENETRATING LEVEL 2 AS NECESSARY TO REROUTE AROUND NEW CONSTRUCTION, SEE PLUMBING PIPING PLANS FOR NEW WORK.
4 REMOVE 3/4” DCW PENETRATING LEVEL 2 AS NECESSARY TO REROUTE AROUND NEW CONSTRUCTION, SEE PLUMBING PIPING PLANS FOR NEW WORK.
5 REMOVE 1-1/4” DCW AND FITTING AS NECESSARY TO INSTALL NEW REDUNDANT VALVE ASSEMBLY, SEE
PLUMBING PIPING PLANS FOR NEW WORK.
6 REMOVE PIPING AS NECESSARY TO INSTALL NEW STRUCTURAL FRAMING AND KALWAL, SEE
STRUCTURAL AND ARCHITECTURAL SHEETS FOR ADDITIONAL INFORMATION.
7 REMOVE EXISTING 4” VENT THROUGH ROOF AS NECESSARY TO REROUTE AROUND NEW EXHAUST FAN
43-EF-4, SEE PLUMBING PLANS FOR NEW WORK.
8 REMOVE 1-1/2” SAN LINE FROM EXISTING SIDE STEAM FILTER THROUGH FLOOR TO LEVEL 1 FLOOR
DRAIN.
9 EXISTING OVERFLOW ROOF DRAIN PIPING TO BE REMOVED AND REROUTED OUTSIDE OF THE NEW
LEVEL 2 ELECTRICAL ROOM.
1/4" = 1'-0" F3
PLUMBING DEMO PLAN - LEVEL 2 - AREA A
GENERAL SHEET NOTES
KEYNOTES
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND APPROVED
BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE WORK.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 22 05 11 FOR
APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
G. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
H. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
I. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
J. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
K. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
L. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
M. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS,
PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE
IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT
STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND
INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE
PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY
PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE SHALL BE
CLEARLY IDENTIFIED ON THE DRAWINGS.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
WH
E
D
C
B
A
1" SCW
3/4" DHW
3/4" DHWR
F
P
D A
43-FCU-1
43-DWH-1
3" RD
3" DCW
3" DCW
4" ORD
3" RD
4" ORD
4" ORD
4" ORD
2" V
2" MU
2" MU
2" MU
4" ORD
4" V
4" V4
E1
G-902
FD-0-3"
2" MU 5
4" D
4" D
3" D
CHILLER ROOM
MA-109
CORRIDOR
MA-202
OFFICE
MA-203
OFFICE
MA-205
NEW OFFICE
MA-204
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:5
:2
A M
PD102B
PLUMBING DEMOLITION PLAN - LEVEL 2 -
AREA B
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS G. WEAVER
100% CONSTRUCTION
DOCUMENTS
1 REMOVE EXISTING DOMESTIC WATER HEATER AND RECIRCULATION PUMP.
2 REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED PIPING.
3 REMOVE EXISTING 2" VENT THROUGH ROOF AND ASSOCIATED PIPING SUPPORTS.
4 REMOVE PIPING AS NECESSARY TO INSTALL NEW STRUCTURAL FRAMING AND KALWAL, SEE
STRUCTURAL AND ARCHITECTURAL SHEETS FOR ADDITIONAL INFORMATION.
5 REMOVE 2” MAKE-UP WATER AND 3” DRAIN RISERS THROUGH ROOF FOR REPLACMENT, SEE PLUMBING
PIPING PLANS FOR NEW WORK.
6 REMOVE 4” DRAIN PIPE AND FITTING AS NECESSARY TO INSTALL NEW, SEE PLUMBING PLANS FOR NEW
WORK.
1/4" = 1'-0" F4
PLUMBING DEMO PLAN - LEVEL 2 - AREA B
GENERAL SHEET NOTES
KEYNOTES
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND APPROVED
BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE WORK.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 22 05 11 FOR
APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
G. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
H. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
I. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
J. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
K. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
L. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
M. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS,
PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE
IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT
STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND
INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE
PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY
PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE SHALL BE
CLEARLY IDENTIFIED ON THE DRAWINGS.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
D
C
B
A
1" CD1
F
P
D B
43-RTU-1
43-GH-6(E)
43-GH-7(E)
FGE-433RF(E)
FGE-432RF(E)
43-EF-4
43-EF-5
43-BIH-2(E)
43-BIH-3(E)
43-EAC-1
43-REF-4(E)
43-REF-5(E)
43-EAC-2
43-EAC-343-EF-3
FGE-431RF(E)
43-BIH-1(E)
43-EF-7
43-EF-8
43-EF-9
43-EF-10
43-EF-6
3" V
43-GH-3
43-GH-4
43-GH-5
ORD-1RD-1
RD-1 ORD-1
RD-1ORD-1
RD-1
ORD-1
2" V
1" V
3/4" SAN
1" V
2" V
3/4" SAN
1" V
3/4" SAN
1" V
2" VTR
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:5
:2
A M
PD103A
PLUMBING DEMOLITION PLAN - ROOF LEVEL -
AREA A
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS G. WEAVER
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" F3
PLUMBING DEMO PLAN - ROOF LEVEL - AREA A
1 REMOVE EXISTING 1" CONDENSATE DRAIN LINE.
2 REMOVE EXISTING 4” VENT THROUGH ROOF AS NECESSARY TO REROUTE AROUND NEW EXHAUST FAN
43-EF-4, SEE PLUMBING PIPING PLANS FOR NEW WORK.
3 REMOVE EXISTING 4" VENT THROUGH ROOF.
GENERAL SHEET NOTES
KEYNOTES
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND APPROVED
BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE WORK.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 22 05 11 FOR
APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
G. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
H. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
I. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
J. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
K. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
L. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
M. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS,
PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE
IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT
STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND
INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE
PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY
PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE SHALL BE
CLEARLY IDENTIFIED ON THE DRAWINGS.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
D
C
B
A
43-CT-1 (E)
43-CT-2 (E)
43-CT-3 (E)
43-GH-2(E)
43-GH-1(E)
43-OAH-6
43-EAC-3
43-EAC-2
43-EAC-1
2" V
3" D
2" MU
2" MU
3" D
3" D
2" MU
ORD-1RD-1
RD-1 ORD-1
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
B
B
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:5
:3
A M
PD103B
PLUMBING DEMOLITION PLAN - ROOF LEVEL -
AREA B
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS G. WEAVER
100% CONSTRUCTION
DOCUMENTS
1 REMOVE 2” MU AND 3” D RISERS THROUGH ROOF FOR REPLACMENT, SEE PLUMBING PIPING PLANS FOR
NEW WORK.
2 REMOVE EXISTING CONDENSATE DRAIN LINE.
3 REMOVE EXISTING 2" VENT THROUGH ROOF.
1/4" = 1'-0" F5
PLUMBING DEMO PLAN - ROOF LEVEL - AREA B
GENERAL SHEET NOTES
KEYNOTES
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR SHALL ENSURE CONTINUED UNINTERRUPTED FACILITY SERVICES
AND OPERATIONS DURING CONSTRUCTION AND RENOVATION. CONTRACTOR
SHALL PROVIDE TEMPORARY SERVICES FOR ANY DETERMINED INTERRUPTIONS.
A DETAILED SCHEDULE, INCLUDING PROJECTED DATES WITH DURATIONS, AND
DETAILED PHASING PLANS ARE TO BE PROVIDED, COORDINATED AND APPROVED
BY THE VA PRIOR TO THE START OF ANY TEMPORARY SERVICE WORK.
C. CONTRACTOR SHALL SUBMIT COMPLETE LAYOUT DRAWINGS COORDINATED
WITH ALL TRADES REQUIRED BY SPECIFICATION SECTION 22 05 11 FOR
APPROVAL BY THE VA. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
G. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
H. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
I. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
J. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
K. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
L. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
M. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS,
PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE
IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT
STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND
INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE
PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY
PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE SHALL BE
CLEARLY IDENTIFIED ON THE DRAWINGS.
Revisions: Date: 7/20/2022
MATHEW PERKINS
NO.005843
BFP
BFP
E
D
MECH AREA-1
MA-100-1
1" DCW
FD-0-4"
FD-0-4"
FD-C-3"
CRU-43-BB (E)
3/4" D
FCU-100
4" SAN
2" SAN
2" SAN
4" SAN
2" CBD
4" SAN
3" SAN
3" SAN4" SAN
1 2 3 4
E
D
C
B
A
3/4" DHW
3/4" DHW
3/4" DHW
STORAGE
MA-121
ELECTRICAL ROOM
MA-107
VESTIBULE
MA-120
CHEMICAL TESTING
ROOM
CORRIDOR
GENERATOR ROOM
MA-106
BOILER PLANT
MA-108
STAIRS
MA-209
SUPPLY ROOM
MA-105
ENGINEERING
CONTROL CENTER
4" SAN
5" SAN
4" SAN
4" SAN
CO
4" SAN
4" SAN
6" SAN
8" SAN
4" SAN
4" SAN
4" SAN
4" SAN
8" SAN
5" SAN
5" SAN
4" SAN
4" SAN
4" SAN
8" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" CBD
2" CBD
2" SAN
2" CBD
FD-0-4"
CO
FD-B-3"
CO
FD-0-4"
CO
FD-0-4"
FD-0-4"
CO
CO
FD-B-3"
CO
FD-B-3"
FD-B-3"
FD-0-4"
FD-B-3"
FD-B-3"
FD-B-3"
CO
F
P
P B
/F3 PP101C
BFD-43-ML (E)
CST-43-ML (E)
2" DCW
1" DCW
43-SWHX-1
WATER
TREATMENT
(E)
5" RD
4" RD
3" RD
4" RD
FCU-1103
5" RD
4" RD
3" RD
3" RD
4" SAN
1" FOS
1" FOR
3/4" DHW
3/4" DCW
3/4" DHWR
3/4" DHWR
3/4" DHWR
1/2" DCW
2" DCW
FD-S-TP"3" SAN
3" SAN
3/4" DCW
3/4" DHW
3/4" DHW
4" SAN
4" SAN
4" SAN
FD-B-4"
3" SAN2" DCW
1 1/4" SCW
2" DCW
1 1/4" SCW
4" SAN
1 1/4" DCW
1 1/4" DCW
1 1/4" DCW
1" FOS
1" FOR
1" FOR
1" FOR
1" FOR
4" ORD
3" DCW 6
43-DT-1 (E)
4" SAN
3/4" D
1 1/2" DCW
1 1/2" DHW
3/4" DHWR 3" SAN
3/4" DCW
2" DCW
1 1/2" DHW
1 1/2" DCW
2" DCW
LPG TANK (E)
T-1 (E)
EG-1 (E)
G
4" LPS
3/4" D
CONNECT
4"SAN
TO EXISTING
8"SAN
CONNECT 3/4"DCW
INTO EXISTING
2"DCW
CONNECT 4"V TO
EXISTING 4"V
CONNECT 3"SAN TO
3"SAN. CAP PIPING AT
SAN-TEE
CONNECT 3"SAN TO
EXISTING 3"SAN
CONNECT 1-1/2"DCW
TO EXISTING 2"DCW
EG-1 (E)
4" V
CO
4" RD
D C
W
D C
W
P-417
FCU-121
3/4" D
3/4" D
4" V
4" RD
4" SAN
3" SAN
4" SAN
4" SAN
3" V
3" V
3" SAN
3" SAN
2" V
2" V
1/2" DCW
3" SAN
4" ORD
4" ORD
3" SAN
3/4" SCW
3/4" SCW
4" RD
3/4" DCW
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural and Subconsultants:
KEY PLAN
NOT FOR
CONSTRUCTION
A
A
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
B
IM
/5
-1
-1
O p ti m iz e
B
E n e rg y P la n t
/5
-1
-1
.4
.M
P .r v t
/2 /2
:5
:1
A M
PP101A
PLUMBING PLAN - LEVEL 1 & BASEMENT
LEVEL - AREA A
TRIPLE C THE A/E GROUP
2266 S. Dobson Road, Suite 200
Mesa, AZ 85202
(928) 499-3225
Mat Perkins
P2S ENGINEERING, INC.
5000 E. Spring Street
8th Floor
Long Beach, CA 90815-5218
Contact: Mikhail Fuks
UPGRADE ENERGY PLANT
EQUIPMENT INFRASTRUCTURE
(BLDG. 43 & 43A)
1501 SAN PEDRO SE ALBUQUERQUE, NM 87108
501-17-105
11/25/2019 M. PERKINS G. WEAVER
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" F1
PLUMBING PLAN - BASEMENT LEVEL - AREA A
1/4" = 1'-0"
F4
PLUMBING PLAN - LEVEL 1- AREA A
1 PROVIDE NEW CIRCUIT SOLVER, SEE DETAIL ON SHEET P-501.
2 CAP DCW LINE AT MAIN PIPING. BRANCH PIPING LENGTH SHALL BE A MAXIMUM OF TWO TIMES THE
DIAMETER OF THE PIPE.
3 FAN COIL UNIT CONDENSATE DRAIN PIPING, SLOPE PIPING 1/8”/FT MINIMUM. DROP DOWN ON WALL
TO DISCHARGE OVER FLOOR DRAIN BELOW WITH A MINIMUM OF TWO PIPE DIAMETERS AIR GAP
ABOVE FLOOR DRAIN RIM. SECURE PIPING TO WALL WITH UNI-STRUT CHANNEL.
4 NEW STEAM TO HOT WATER HEAT EXCHANGER, SEE SHEETS M-501 AND M-701 FOR ADDITIONAL
INFORMATION.
5 NEW REDUNDANT DCW AND SCW MAKEUP VALVE ASSEMBLIES, SEE SHEET P-601 FOR ADDITIONAL
INFORMATION.
6 PROVIDE 4” FLOOR CLEANOUT FLUSH WITH FINISH FLOOR ELEVATION, COORDINATE WITH
STRUCTURAL AND ARCHITECTURE.
7 FAN COIL UNIT CONDENSATE DRAIN PIPING, SLOPE PIPING 1/8”/FT MINIMUM. DROP DOWN AND
STRAP PIPING TO STAIRS TO DISCHARGE OVER SUMP PIT BELOW.
8 NEW SANITARY LINE UP TO LEVEL 1 FLOOR DRAIN.
9 NEW SANITARY LINE UP TO LEVEL 2 FLOOR DRAIN.
10 EXISTING UNDERGROUND FUEL OIL TANK TO REMAIN.
11 CONTRACTOR SHALL REPLACE EXISTING VEEDER ROOT FUEL MONITORING SYSTEM AND PROVIDE
NEW CONTROL PANEL IN THE NEW CONTROL ROOM. THE EXISTING SYSTEM SHALL REMAIN
OPERATIONAL UNTIL SWITCHOVER TO THE NEW CONTROL ROOM TAKES PLACE.
12 NEW 4” VENT UP TO SECOND FLOOR, SEE SHEET PP102A FOR CONTINUATION.
13 NEW 2” VENT PENETRATING LEVEL 1 FLOOR UP THROUGH ROOF, SEE SHEET PP102A FOR
CONTINUATION. COORDINATE PENETRATION WITH ROOF REPLACEMENT.
14 NEW VENT ARM OVER ROUTED WITHIN EXISTING TRENCH, CUT…