Attachment 9.927-1026 Complete Report - Honolulu VAMC Final-5.pdf
PDF 9 MB Posted
- Solicitation number
- 36C26126Q0232
About this file
The file is a comprehensive Electrical Distribution System Condition Assessment final report for the Honolulu Veterans Affairs Medical Center (VAMC), prepared by E.K. Fox & Associates. The document is a detailed electrical systems study that includes extensive technical analysis of the facility's electrical infrastructure across multiple buildings, examining short circuit studies, protective device coordination, arc flash hazard analysis, ground resistance, voltage drop calculations, and emergency power system evaluation. The study covers Buildings 1 (E-Wing), 30 (Acute Care Clinic), 32 (ACC Parking Structure), and 110 (Center for Aging), providing one-line diagrams, equipment condition assessments, and recommendations for electrical system improvements.
Key findings include recommendations for replacing automatic transfer switches, addressing ground fault protection gaps, evaluating equipment conditions, and providing cost estimates for necessary upgrades. The report grades equipment condition from A (Excellent) to F (Critical), with specific focus on protective device settings, coordination curves, and arc flash labeling. The study was prepared in compliance with NFPA 70E standards and VA directives, utilizing SKM Power Tools software for analysis. The final submission includes color-coded one-line diagrams, equipment condition assessment sheets, ground test reports, cost estimate details, and compliance survey documentation, serving as a comprehensive technical assessment of the VAMC's electrical distribution systems.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MONTHLY
GEN TEST
CFA
4/3/19
Date: V — 3
Date:
Date:
Tech Signature:
WL or Supv. Si t34‘. r F Signature:
Center for Aging Attachment (D)
Model # 3508 Serial # 5YF02819 Start Time: 06,-c c) Stop Time: 6 -7 Oirov Pre check list:
Satisfactory Unsatisfactory . Comments -eneck fuel & fuel tank /
6_:,- E y- ,.._. 6 ),- L.., ..-1 40..„:. c s A....11 Ji ‘4,- k (141-c_ ..:k- — Check oil level /
5 4-e‘i.k to .4 zt-. •4--,11e.,4 -k-L‘t rf,0%-.... .'---.5 4, 3 Check coolant level /
%-c...c.o heks . _ Check air filter /
Check batteries & terminals / el, .c-i-kcv ( 4A4r_c itClt
Running check list: Comments Quarter:
1) Simulate power outage ,
2) Transfer life safety & critical equipment
3) Take reading every 15 minutes /
Engine Speed (rpm) 1800
Lube Oil pressure (psi) 7 I
Lube Oil Temperature (F) I ? 1
15 Minutes
Hour Meter (hours , 5Y7 3, i
Engine Temperature (F) 1 71
Frequency (Hz) 60
Operating Voltage (v) 1 480
2 480
3 480
Operating Amperage (amps) 1 ....-6) 2
3 3 3, . ti a
Be Speed (rpm)
Lube Oil pressure (psi)
1 1
Lube Oil Temperature (F) i 1 1
Hour Meter (hours)
Engine Temperature (F)
11 /
Frequency (Hz)
Operating Voltage (v) 1 480 2 480
Operating Amperage (amps) 1 t, 2... 2 .3 (4
'3 7
Shutdown check list: Comments
1) Return normal power /
2) Check oil, fuel and coolant level .
3) Log all checks & corresponding reading
4) Summarize test & list any I / , n /1 , _problems & corrective action / /
Model #3508 Serial #23207184 Hours (3-C,'' ,.44
Monthly Cheek list: Satisfactory Unsatisfactory Comments Check for moisture, dust, oils, greases, & debris on main stator, exciter, & PIVIG windings.
Check oil & coolant levels. /
Drain fuel system to remove H20 & sediment
Check for leaks: cooling, lube oil, & fuel system
Check for loose/damaged clamps, filters, brackets, fittings, hoses, & other components.
Check belts. . /
Check for restrictions of intake/exhaust system.
Check for any loose electrical convections., .InspeCt contacts for pits, burns, evidence Of arcing.
InSpect prograiriMable logic control adjustments. .. — bbgerve & verify AT,S. . ...., Ceitify that equipment has received Monthly service:, •,• :. . •
*Check battery cables..-, Check coating on terminals, lugs,' shunts, kcablp connections.
Check & record Voltagereadings of -each cell & total Cell-bank.. : .
/ - •. i. 3 '1 , Check &record battery load w/ cells on . float charge.' : . : .. .. . • .
' ).- (-,, . "4 . .
Check.electrolyte levels. / _
Check output ammeter & voltmeter.
Cheek rate of charge for float &trickle •chatging. .
'Check Ad power. . . _.
Check for cleanliness of system & area. /
Start generator 4 run on building load--' Illefei to attaelmient (D)1 , .. ,. .
Cheek eng ‘.6 ine bearingi for elf& 1420
- lealss,-miusual noise, excessive Vibration, & overheating.
--After leadtest, observe transfer & • - . .
shutdown se,quen.ee. .. :. , :.
After shutdoWn,'Wipe drawiteng,ine, Clean any sPillS, update lag. . . /
Confirm with Security that audible alarm from panel bail be heard..
Tech Signature:. Date:
Rename Recorded data 1 Voltage and Current. From 4/3/2019 6:25:25 AM To 4/3/2019 6:35:45 AM
Report Date/Time
4/3/2019 7:28:01 AM
8.8
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
7.2
5.6
2.4
0.8
3/6/19
WL or Supv. Signature:
Tech Signature: Date:
. Date:
Center for Aging UtolLiment (D)
Model # 3508 Serial # 5YF02819 Start Time: el (IO Stop Time: c) 7 -
Pre
Pre check list:
Satisfactory Unsatisfactory Comments - .
(-neck fuel & fuel tank /
T .r.e c,/ r e cuAt S - 1:e "vfr% F ..i..5.e .1 ot•-•e-e ,-+ .; .- .11-;•> •
Cui ter - 144 .,9-e. vl HI .
Check batteries & terminals ./
Quarter:
1) Simulate power outage ( .
3) Take reading every 15 minutes / •
Engine Speed (rpm)
'7 6 l CO '
15 Minutes , (L.
Engine Temperature Temperature (F)
60 .
Operating Amperage (amps)
2X 2
-S C 3
T -7
7 ie Speed (rpm)
—Lube Oil pressure (psi)
"7 é
11 C
Operating Amperage (amps) 1
Shutdown check list:
Comments
1) Return normal power level .
4) Summarize test & list any problems & corrective action / / / / / P
F Signature: Date:
Model # 3508 Serial # 23207184 Hours
Monthly Check list: Satisfactory Unsatisfactory
Check for moisture, dust, oils, greases, & debris on main stator, exciter, & PMG windings.
Drain fuel system to remove 1120 & sediment.
fuel system.
filters, brackets, fittings, hoses, & other components.
Check belts. •
Check for restrictions of intake/exhaust
Check for any loose electrical contlections.„Insped.contacts for. pits, burns, evidence Of arcing.
baSpect prograMinable logic control adjustments.
Ob§erve & v erify ATS. . .
Cel-tify that equipment has received inbnthly -service;,., : . , .
Check battery cables,. • . -
Check coating on terminals, lugs; / shunts, keable connections.
Check & record Voltageteadings of / each cell & total Cell•bank.. ; . , ti, i-; / 11,11 ( 2C. 2"t
Ch_eck &record battery load w/ cells on ( _ float charge.. • . ; .. . • S.
Checkselectrolyte levels. /,
- Check output ammeter & vOltmeter. /
Check tate of charge fot float &trickle / .chai-ging. •
Check AC power. . /
Check for cleanliness of system & area. / .
Start generator &. tun on building load -• • . / [Refer to attaelnient (1))1 .. . , Check engine .& bearings, for .oit.&1-120 . (/
• leaksoMusual noise, eicessive -"- ... ... , . , . . , . • Yibration, & overheating.
, . . f . 'After lead test, observe transfer & shutdown sequen.ce. . . , .
After shutdoWn, ' Wipe TiOwn engine, Crean any spillk. update lag. . .
Confirm with Security that audible alarm from panel tan he heard'.. .
Tech Siinatare.:. • Date:
Voltage and Current. From 3/6/2019 6:22:51 AM To 3/6/2019 7:05:26 AM
• 210
• 90
• 210 csi
▪ 90
• 210
ReponDaterrime
3/6/2019 7:48:04 AM Page 1 Filename
Recorded data 20190306.fpq
---- 200ms Period Mm ---- 200ms Period Max ---- 200ms Period Avg
1.65
1.35
1.05 2 0.75
• 0.45
0.15
JL 1
1.65
1.35
1.05
0.75
0.45
0.15
I.
1400_
55000 45000 35000 25000 15000
-5000
06 25 06 30 06 35 06 40 06 45 06 50 06 55 07 00 07 05
2/7/19 level corresponding reading •
4) Summarize test &,list any //
A IP, ft problems & corrective action/ /
Tech Signature:
tty,y JçH1ift- ,if
Center for Aging Attachment (D)
Model # 3508 Serial # 5YF02819 Start Time:461C Stop Time: 0 - 7 t6 _ • check list:
Satisfactory Unsatisfactory Comments Check fuel & fuel tank /
1"7 - -, c, L t t' -t Check oil level .., C C., k."'t "V- k- C I V) C 41 v -, eX ir .e._ ....: --f- ..-.) 0 e ---7,-0,---ek. ( •
0.- ,i. e--0-4. "t 6 =-- cA. 1--- i---r-c:t ---ti . C.--t7 -4-ro 1 i ix,-, -V Check air filter i•-% •-e_erl 'S h 6 •,e_ WO(
Quarter: Month #1 -ATS#1 Month #2- ATS#2 6 ( -5 s— Month #3 -Main Breaker
1) Simulate power outage
Note how many seconds takes to transfer
3) Take reading every 15 minutes
"7 C
1 6 0 ''
SC t , 4:., I
Operating Amperage (amps) 1 t 2
1`6
IA
—.gine Speed (rpm)
--/ C _
116,0
.1
1 G 0
0_perating Amperage (amps) 1 kl 2 swam Observe & verify ATS.
z
Check engine & bearings for oil & H20 leaks, unusual noise, excessive vibration, & overheating.
( After load test, observe transfw & shutdown sequence.
After shutdown, wipe down engine, clean any spills, update log.
Confirm with Security that audible alarm from panel can be heard.
Check for restrictions of intakFlexhaust system.
Cheek for any loose electrical connections. Inspect contacts for pits, • burns, evidence of arcing.
Inspect programmable logic control ad'ustments.
Certify that equipment has received monthly service.
Check battery cables.
Check coating on terminals, lugs, shunts, & cable connections.
Check & record voltage readings of each cell & total cell bank.
Check & record battery load w/ cells on float charge.
Check electrolyte levels, Cheek output ammeter & volnieter.
Check rate of charge for float & trickle charghig.
Check AC power.
Check for cleanliness of system & area.
Start generator & run on builrling load [Refer to attachment (D)
Comments:
z
13,1 -31 1 -5,t'l / attachment ,(A) .
Model # 3508' Serial # 23207184 • . • Hours
Monthly Cheek list: . Satisfactory Unsatisfactory Comments Check for moisture, dust, oils, greases, & debris on main stator, exciter, & PMG windings.
Drain fuel system to remove H20 & sediment. ./.
fuel system.
components. .
Check belts. / . .
Voltage and Current. From 2/7/2019 6:48:32 AM 10 2/7/2019 7:28:07 AM
Report Date/Time
2/7/2019 7:49:31 AM Page 1 Filename
HalfHourGenTestG190207..fpq
• 150
• 150
5- 210
• 150
16.5
13.5
10.5 2 7.5
4.5
1.5
1.5 Th
16.5
13.5
10.5
• 7.5
• 4.5
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
44 -f
1.5
1.5
16500
13500
10500
_J 4500
-1500
330000 270000
210000 150000
• 90000
30000 -30000
It ij
16 50 06 55 07 00 07 05 07 10 07 15 07 20 07 25
1/9/19
Center for Aging Attachment (D)
Model # 3508 Serial # 5YF02819 Start Time:04,3e Stop Time: 13 - 1 .7..."
check list:
Satisfactory Unsatisfactory Comments Check fuel & fuel tank /
Quarter: Month #1 -ATS#1 , Month #2- ATS#2 Month #3 - Main Breaker
1) Simulate power outage / Note how many seconds takes to transfer 02 5ec 's
2) Transfer life safety & critical equipment
Li -TV-Aftf 15.14-A,
3) Take reading every 15 minutes 3)
'1 (0 i CS-4
Operating Amperage (amps) 1
2 3
- 16, \ (0 6 ''
S- 6,- ( -0
Operating Amperage (amps) 1 VZ— 2 i .3 3 t 0
/ Lo 5t --i7 ?c -Fi k -V .- A -5 a"^ A ....- \ 1 1 e Nikc_es "AZ: tAur-sc.: e_6•, 11.
level
( Lc) -;\-- C ‘ 7c.e 5 ,.....c7 -
--rePN— A ...Pr
4) Summarize test 86, list any y problems & corrective actiopi i / , A
Tech Signature:
Date:
Pitt t (A)
Model # 3508 •" Serial # 23207184 • • . Hours S.-Z.:, I, .3
Monthly Check list: , Satisfactory Unsatisfactory
Comments . •
Check for moisture, dust, oils, greases, & debris on main stator, exciter, & PMG windings.
Check oil & coolant levels.
Drain fuel system to remove 1120 & sediment,.
fuel system. ' components. .
Check belts.
Check for reattictions of intake/exhaust
Check for any loose electric:al connections. Inspect contacts for pits, .
bums, evidence of arcing. •
Inspect programmable logic control adjustments. •
Observe & verify ATS. /
Certify that equipment has received monthly service. , •Check battery cables. .
Check coating on terminals, lugs, / shunts, & cable connections.
Check & record voltage readings of i each cell & total tell bank.
rs., 1., 41 ‘-s. t 3 / 2. G.
Check & record battery load w/ cells on
2 (c, 4 float charge.
Check electrolyte levels.
Check output ammeter & voltmeter.
• Check rate of charge for float & trickle charging.
Check AC power.
Check for cleanliness of system & area.
Start generator & run on building load [Refer to attachment (D)] Check engine & bearings for oil & 1120 leaks, unusual noise, excessive vibration, & overheating.
After load test, observe transfer & shutdown sequence.
After shutdown, wipe down engine, clean any spills, update log.
Confirm with Security that audible alarm from panel can be heard.
Comments:
Report Date/Time
1/9/2019 8:27:29 AM
Voltage and Current. From 1/9/2019 6:50:07 AM To 1/9/2019 7:39:37 AM Filename
HalfHourGenTestG190109..fpq
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
• 210
• 210
• 150
CNJ
-J 90
• 150
0.
0.
0.
▪ 0.
0.
0.
54 -_
42 :
1.3 :
is:
/1.0:; ,..r, r-, r- r' -' -
CP c-' •^1 Co
_r_
50 _
50 -_
50 -_
-_ 50
50 -
00 :
• 00 -
: .00
00_ - -----
00 - , )00
00:
100 z_
I
4. ....1G —.J ........—..—G--74—a
..., --- ' _....e ....r. s.... ....,
• -• .... 1--• .1-' .. ...-1 i--.14--21;.—?
...-.3.4-.J .L---7.L:.--t....-- -7'1V.r.._11- rr-.'
7%., 100 -
Li •
100 -
C")
-Sc 07 15 07 25 07 30 07 35
Department of Veterans Affairs Honolulu Veterans Affairs Medical Center
Honolulu, Hawaii
ELECTRICAL DISTRIBUTION
SYSTEM CONDITION ASSESSMENT
Final Submission
APPENDIX D
Minutes of Entrance Briefing And Baseline Review
E.K. FOX & ASSOCIATES, LTD. ▪ 4500 SOUTHGATE PLACE, SUITE 800 CHANTILLY, VA 20151 ▪ T 703.273.1112 F 703.273.2112 ▪ EKFOX.COM
Meeting Minutes
Honolulu VAMC Electrical Survey Baseline Review Meeting
Date: 3/5/2020 Attendees:
Name Organization Phone: Email:
Raleigh Stewart E.K. Fox 703-267-6783 RDStewart@ekfox.com Jarrett Elliott E.K. Fox - JCElliott@ekfox.com Gerald Mahaffee E.K. Fox 703-267-9537 GWMahaffee@ekfox.com Larry Lau VA 202-632-5263 Larry.Lau@va.gov Chad Watanabe VA General Engineer - Chad.Watanabe@va.gov Glenn Ross AES 303-841-3922 glenn.ross@aes-grp.com
1. Raleigh – Introductions
2. Raleigh – presented meeting slides
3. Slide 5 – Opened floor for questions on findings, no questions
4. Slide 7 – Explained that EKFox will send out sample AF label designs to the site in the following weeks and work directly with them to determine an acceptable label format
5. Chad acknowledged
6. Raleigh emphasized that AF labels reflect current conditions and be applied immediately
7. Slide 8 – Chad expressed concern about the proposed costs for due to contractor rates differing from those given by RS Means, also asked about breaking down the prioritization categories into individual tasks based on our recommendations. Raleigh responded that the items are listed from A to E in order of suggested priority.
8. Slide 9 – Larry Lau mentioned that James Carter from the VA may be receiving their copy of the final report. Raleigh requested James’s contact info.
9. Questions: None
10. Larry Lau emphasized that the site would be receiving the SKM model and CAD files along with the final submission, and suggested they keep these up to date to aid in future projects.
11. Chad mentioned that they should be able to get us the missing relay information soon.
12. End of Baseline Review meeting
EKFox Electrical Engineering Studies Baseline Review Meeting
March 5, 2020 Honolulu VAMC
Agenda
• Attendance / Roll Call
• The Purpose of this Study
• The Baseline Review
• Findings
• VHA Directive 1028
• Arc Flash Labels
• Recommendations
• The Final Report
• Summary & Questions
Purpose of this Study
• Improve overall electrical safety and reliability
• Ensure the electrical systems functions as intended
• Update/bring the facility in compliance with NFPA 70E (Arc Flash)
• Ensure compliance with VHA Directive 1028
• Verify/update existing electrical documentation for the facility
• Evaluate and identify equipment in need of replacement
The Baseline Review
• Review the findings and discuss any inherent risks
• Provide clarification where needed
• Provide prioritized recommendations for a path forward
• Respond to any questions
Findings
• Majority of the equipment is in good condition with approximately half of their service life remaining. Only a few pieces of equipment are in poor condition and need replacement
• All OCPD’s passed device evaluation for interrupt capacity
• Device coordination study revealed 53 OCPDs and 2 conductor sets that need adjustment or replacement, and one circuit breaker feed in E-Wing BEH1 that needs reconfiguration, for proper coordination
• Two ATS’s were identified that should be replaced with units that are 4-pole with bypass isolation to meet the VA electrical design guide
• Two circuit breakers were identified where GFP needs to be enabled or added to comply with NFPA 70 Articles 215 and 517
VHA Directive 1028
• VHA Directive 1028 Compliance Survey serves as a reminder to conduct various maintenance operations, tests, and plans for electrical systems
• Completed compliance survey has been included in the report
• EKFox will provide the Honolulu VAMC a complete set of Arc Flash labels for their facility with our Final Submission
• Arc Flash labels are in accordance with NFPA 70E (2018)
• Labels provided will reflect the system with existing conditions and can be applied immediately upon receipt
Arc Flash Labels
Prioritized Recommendations
1. Fund / correct the Priority 4 items in Section 7: $207k
a. Panel repairs and code required breaker/conductor replacements - $3,000
b. Transformer GEC installations - $9,700
c. E-Wing generator replacement - $134k
d. Transformer replacement - $37k
e. ATS replacements - $24k
2. Fund / correct the Priority 3 items in Section 7 : $48k
a. OCPD Replacements for Coordination - $48k
The Final Report
• The VAMC Chief Engineer will receive:
• A completed Final Report, including all corrected data from the 60% and 90% submissions and the coordination curves printed in color.
• Responses to the 60% and 90% submission comments from peer review, CFM, VHA and VAMC, including annotations and responses.
• Electronic copy (DVD) of the entire report including all SKM data, AutoCAD files, Excel files, and PDF of the report and arc flash labels.
• Arc Flash Boundary Signage/Labels reflecting the Flash Hazard and Incident Energy.
NOTE: Signage/labels need only to be provided to the VAMC.
• Final report with stamp and signature by a Licensed Professional Electrical Engineer.
• Copies of the abridged version of the Final Report will be sent to the VISN, VA OCAMES, and VA CFM per the SOW.
Questions?
E.K. FOX & ASSOCIATES, LTD. ▪ 4500 SOUTHGATE PLACE, SUITE 800 CHANTILLY, VA 20151 ▪ T 703.273.1112 F 703.273.2112 ▪ EKFOX.COM
Meeting Minutes
Honolulu VAMC Electrical Survey Entry Briefing Date: 10/15/2019
Attendees:
Name Org. & Position Phone: Email:
Raleigh Stewart E.K. Fox 703-267-6783 RDStewart@ekfox.com Jarrett Elliott E.K. Fox 804-337-2335 JCElliott@ekfox.com Gerald Mahaffee E.K. Fox 703-267-9537 GWMahaffee@ekfox.com Larry Lau VA CFM 202-632-5263 Larry.Lau@va.gov Gary Krupa VA OCAMES 402-599-2104 Gary.Krupa@va.gov Tyler Furukawa VA Chief Engineer 808-433-0165 Tyler.Furukawa@va.gov Chad Watanabe VA General Engineer - Chad.Watanabe@va.gov Kelly Takemoto VA General Engineer - Kellie.Takemoto@va.gov Rick Atiburcio VA FMES Maint. Supervisor 808-433-0168 Richard.Atiburcio@va.gov Darin Nakagawa VA Chief Facilities Engineer 080-940-4289 Darin.Nakagawa@va.gov Landon Castellano VA General Engineer 808-433-4993 Landon.Castellano@va.gov Ray Eggert Cache Valley Electric 808-353-1254 Ray.Eggert@CVE.com Kevin Nakada Cache Valley Electric 808-353-1311 Kevin.Nakada@CVE.com
1. Sign-in and Introductions
2. In-Briefing presentation
a. Purpose of the survey
b. Improve safety
c. Update electrical documentation
d. Provide equipment evaluation
3. Site overview was discussed
4. Schedule
a. First survey: 10/15/19 – 10/25/19
b. Follow-up survey (if needed): 11/18/19 – 11/22/19
c. Deliverable dates
5. Support needed
a. Escort for Access to Electrical Rooms (normal work hours approx. 0630-1530)
b. VA Badges. Site will look into getting temp. badges for electricians
c. Any available documentation of the electrical system – Chad to help obtain drawings, documentation, and utility information
d. Special Area Access – Data Center and IRM areas require prior notice and coordination. DPW for access to service transformers
6. Outages
a. Did not expect the need for any but would coordinate with the VA as needed.
7. Safety
a. PPE for electricians to pull panel covers
8. Summary & Questions
9. Out-Brief -Schedule for Thursday 10/24/2019
EKFox Electrical Engineering Survey October 15 – October 25, 2019
Agenda
• Introductions
• Purpose of the Survey
• Site Overview
• Schedule
• Statement of Work
• Onsite Assistance from VA Staff
• Outages
• Safety
• The Final Report
• Summary & Questions
Purpose of this Study
• Improve the overall safety and reliability of the electrical system
• Ensure the electrical systems function as intended
• Update/bring the facility in compliance with NFPA 70E (Arc Flash)
• Ensure compliance with VHA Directive 1028
• Verify/update existing electrical documentation for the facility
• Evaluate and identify equipment in need of replacement
Honolulu VAMC- Site Overview
Honolulu VAMC- Site Overview
Schedule
• Notice to Proceed: 06/28/2019
• First Survey: 10/15/2019 - 10/25/2019
• Follow-up Survey (if needed): 11/18/2019 - 11/22/2019
• 60% Submission: 12/20/2019
• 90% Submission: 02/14/2020
• Final Submission: 04/03/2020
Note: Both the VAMC staff and the VISN will receive 60% and 90% Submissions (for review) as well as the Final Submission. This can be soft copy only, if preferred.
Statement of Work
• Short Circuit and Coordination Study and Voltage Drop Calculations on the entire electrical system (both normal and emergency systems).
• Ground Resistance Analysis: Review report and visibly inspect ground system components.
Interview staff and any other data provided.
• Arc Flash Hazard Analysis: EKFox will provide labels with the Final Submission.
• Emergency Power System Analysis: Narrative of existing condition. VAMC will provide average loading based on past readings. Conduct interviews with staff to determine projected future loads.
Provide qualitative narrative on suitability of existing systems to meet future loads. If not adequate, make recommendations.
• Determine if adequate code clearances exist for all electrical equipment.
• Determine if existing ground fault protection is adequate.
• Determine if the existing ATS’s are either 3 or 4 pole and that they are correctly wired.
• Note any use of cable limiters and analyze any single phasing conditions.
• On medium voltage switchgear determine phase monitoring conditions.
• Assess equipment conditions using provided grading method (A, B, C, D, or F).
• Provide a cost estimate for recommended upgrades or replacements
Equipment Assessment
• Grade A - Like New Condition. Majority of useful life span remains.
“Excellent”
• Grade B - Good Condition. Over half of useful life span remains. “Good”
• Grade C - Average Condition. Less than half of useful life span remains.
“Average” or “Fair” or C+ “Above Average”
• Grade C- - Workable Condition. May be past assigned useful life, but still working. “Keep an eye on it”
• Grade D - Poor Condition. Past assigned useful life. Failure is not critical.
“Poor” or “Problematic”
• Grade F - Critical Condition. Needs immediate attention. “Failing” or “Critical”
VAMC Staff Assistance
• Site access and badging
• Small conference room or work area with internet access, telephone, and copier
• VAMC personnel knowledgeable of the electrical system
• Obtaining special permissions (pictures, roof access, etc.)
• Existing data (drawings, maintenance records, testing procedures, etc.). It is critical this information is current.
• Facility Ground Resistance Test Reports (required every 36 months per VHA Directive 1028)
• Outages
Outages
• Outages may be required to obtain specific data – especially on the medium voltage system
• Lock-out / Tag-out procedures
• We can advise early in the survey if an outage is required
• We can plan accordingly to minimize outage duration
• Can be performed during off hours
• VAMC personnel must operate equipment and perform any power transfer
Safety
Electricians will wear appropriate PPE to open panels
Personnel with minimal PPE will stay outside of limited approach boundary until panels are open. After panels are open, they may enter the limited approach boundary but cannot encroach on the restricted approach boundary per NFPA 70E.
• NFPA 70E Table 130.5C
• Allows for examination of insulated cable without manipulation
• Allows for non-contact inspections outside the restricted approach boundary
Safety
• Local or VAMC safety procedures
• Please advise on site-specific safety procedures
• Example: Two-man rule required to enter substation building
• General safety procedures
• Personal Protective Equipment (PPE)
• Lock-Out / Tag-Out
• Urgent safety issues (signs of arcing in a panel) will be conveyed to the VAMC staff immediately (will not wait for the out-brief)
• Non-urgent safety issues (a box stored in front of a panel) will be discussed in the out-brief.
The Final Report
• The VAMC Chief Engineer will receive:
• A completed Final Report, including all corrected data from the 60% and 90% submittals and the coordination curves shall be printed in color.
• Responses to the 60% and 90% submission comments from CFM, VHA and VAMC, including annotations and response.
• Electronic copy (CD) of the entire report including all SKM data, AutoCad, Excel files and PDF.
• Color photos that show devices listed on the deficiency report.
• Arc Flash Boundary Labels reflecting the Electrical Hazard information.
NOTE: Labels need to only be provided to the VAMC.
• Final report will have a stamp and signature from a Licensed Professional Electrical Engineer.
• Copies also provided to the VISN, VA OCAMES, and VA CFM
Summary and Questions?
We would like to schedule the Survey Out-brief for ___________________
Company Proprietary
APPENDIX E
Equipment Condition Assessment Sheets
E.K. FOX & ASSOCIATES, LTD. ▪ 4500 SOUTHGATE PLACE, SUITE 800 CHANTILLY, VA 20151 ▪ T 703.273.1112 F 703.273.2112 ▪ EKFOX.COM
Electrical Distribution System Assessment
Equipment Condition Assessment Sheets
Color Code Description
Yellow Item that was given a grade of “D” Red Item that was given a grade of “F”
Building Location Equipment Make/Model Assessment Comments Voltage
1 BA‐105 BNH1 GE, SPECTRA C 480
1 BA‐105 B. MECH GE, SPECTRA C 480
1 BA‐105 BEH1 GE, SPECTRA C 480
1 CHILLER PLANT MH (1) GE, SPECTRA C 480
1 CHILLER PLANT MH (2) GE, SPECTRA C 480
1 BA‐105 BNL1 GE, AQ C 208
1 BA‐105 BNL1A GE, AQ C 208
1 BA‐105 BEL1 GE, AQ C 208
1 BA‐105 ATS‐1 EMER DISC SIEMENS, ‐ C 480
1 1C‐108 1EH1 GE, AD C 480
1 1C‐108 1EL1 GE, AQ C 208
1 1C‐108 1NH1 (1) GE, AD C 480
1 1C‐108 1NH1 (2) GE, AD C 480
1 1C‐108 1NL1 GE, AQ C 208
1 1C‐108 1NL1A GE, AQ D Needs a Main Circuit Breaker 208
1 1C‐119 1WNL1 GE, AQ C 208
1 1B‐103 1EH2 GE, AD C 480
1 1B‐103 1EL2 GE, AQ C 208
1 1B‐103 1NH2 GE, AD C 480
1 1B‐103 1NL2 GE, AQ C 208
1 1B‐103 1NL2A GE, AQ C 208
1 1B‐103 1NL2B GE, AQ C 208
1 CHILLER PLANT ML GE, AQ C 208
1 2C‐100D 2EH1 GE, AD C 480
1 2C‐100D 2EL1 GE, AQ C 208
1 2C‐100D 2NH1 (1) GE, AD C 480
1 2C‐100D 2NH1 (2) GE, AD C 480
1 2C‐100D 2NL1 GE, AQ C 208
1 2C‐100D 2NL1A GE, AQ C 208
1 2B‐103 2EH2 GE, AD C/D Damaged Deadfront mount. Needs fixed 480
1 2B‐103 2EL2 GE, AQ C 208
1 2B‐103 2NH2 (1) GE, AD C 480
1 2B‐103 2NH2 (2) GE, AD C 480
1 2B‐103 2NL2 GE, AQ C 208
1 2B‐103 2NL2A GE, AQ C 208
1 2B‐103 2NL2B GE, AQ C 208
1 3C‐106 3EH1 GE, AD C 480
1 3C‐106 3EL1 GE, AQ C 208
1 3C‐106 3NH1 (1) GE, AD C 480
1 3C‐106 3NH1 (2) GE, AD C 480
1 3C‐106 3NL1 GE, AQ C 208
1 3C‐106 3NL1A GE, AQ C 208
1 3C‐108F PANEL A CH, PRL1A A 208
1 3C‐108F PANEL B CH, PRL1A A 208
1 3C‐108F PANEL C CH, PRL1A A 208
1 3C‐108F PANEL D CH, PRL1A A 208
1 3C‐108F IRM 208 DISC CH, ‐ A 208
1 3C‐108F IRM 480 DISC CH, ‐ A 480
1 3C‐108F SPARE DISC CH, ‐ A 208
1 3C‐108F UPS DISC CH, ‐ A 208
1 3B‐105B 3EH2 GE, AD C 480
1 3B‐105B 3EL2 GE, AQ C 208
1 3B‐105B 3NH2 GE, AD C 480
1 3B‐105B 3NL2 GE, AQ C 208
1 3B‐105B 3NL2A GE, AQ C 208
1 3B‐105B 3NL2B GE, AQ C 208
1 3C‐108D 3CP1 GE, AD C 480
1 3C‐108D 3CP2 GE, AQ C 208
1 3C‐108D 3CP2A EATON, PRL1A C 208
1 3C‐108D 3CP2A DISC CH, ‐ B 208
1 4C‐104 4EH1 GE, AD C 480
1 4C‐105 4EL1 GE, AQ C 208
1 4C‐105 4NH1 (1) GE, AD C 480
1 4C‐105 4NH1 (2) GE, AD C 480
1 4C‐105 4NL1 GE, AQ C 208
1 4C‐105 4NL1A GE, AQ C 208
1 4B‐107 4EH2 GE, AD C 480
1 4B‐107 4EL2 GE, AQ C 208
1 4B‐107 4NH2 (1) GE, AD C 480
Equipment Condition Assessment
* EQUIPMENT CONDITION:
(A) Like New Condition ‐ Majority of useful life span remains. "Excellent"
(B) Good Condition ‐ Over half of useful life span remains. "Good"
(C+) Above Average Condition ‐ Less than half of useful life span remains, but in good condition. "Above Average"
(C) Average Condition ‐ Less than half of useful life span remains. "Average"
(C‐) Workable Condition ‐ May be past assigned useful life, but still working. "Keep an eye on it"
(D) Poor Condition ‐ Past assigned useful life. Failure is not critical. "Poor"
(F) Critical Condition ‐ Needs immediate attention. "Failing"
PANELBOARDS
1 4B‐107 4NH2 (2) GE, AD C 480
1 4B‐107 4NL2 GE, AQ C 208
1 4B‐107 4NL2A GE, AQ C 208
1 4B‐107 4NL2B GE, AQ C 208
1 PENTHOUSE REH1 GE, AD C 480
1 PENTHOUSE REL1 GE, AQ C 208
1 ELEV ROOM ELEV 1 DISC GE, ‐ C 480
1 ELEV ROOM ELEV 2 DISC GE, ‐ C 480
1 4C‐103B UPS PNL DISC GE, ‐ B 208
1 4C‐103B UPS PNL GE, AQ B 208
30 1B05 B1NL1 DISC SQD, ‐ C 208
30 1B05 B1NL1 SQD, NQ C 208
30 1B05 FIRE PUMP DISC SQD, ‐ C 480
30 1B05 B1NL2 SQD, NQ C 208
30 1B04 B1NACH1 SQD, NF C 480
30 1B09 B1NH1 SQD, NF C 480
30 1B09 B1NL3 DISC SQD, ‐ C 208
30 1B09 B1NL3 SQD, NQ C 208
30 1B09 B1NL4 SQD, NQ C 208
30 1B09 B1NL5 SQD, NQ C 208
30 1B09 B1EH1 SQD, NF C 480
30 1B09 B1EL1 SQD, NQ C 208
30 1B09 B1EL1 (2) SQD, NQ C 208
30 1B09 B1EL2 SQD, NQ B 208
30 1C10 A1EACH1 SQD, NF B 480
30 1A27 ELEV 1 DISC SQD, ‐ C 480
30 1A27 ELEV 2 DISC SQD, ‐ C 480
30 2B43 B2EH1 SQD, NF C 480
30 2B43 B2EL1 SQD, NQ C 208
30 2B43 B2EL2 SQD, NQ B 208
30 2B43 B2NH1 SQD, NF C 480
30 2B43 B2NL1 DISC SQD, ‐ C 208
30 2B43 B2NL1 SQD, NQ C 208
30 2B43 B2NL2 SQD, NQ C 208
30 2B43 B2NL3 SQD, NQ C 208
30 2D17 A2NH1 SQD, NF C 480
30 2D17 A2NL1 DISC SQD, ‐ C 208
30 2D17 A2NL1 SQD, NQ C 208
30 2D17 A2NL2 SQD, NQ C 208
30 2D17 A2NL3 SQD, NQ C 208
30 2D17 A2EH1 SQD, NF C 480
30 2D17 A2EL1 SQD, NQ C 208
30 2D17 A2EL2 SQD, NQ B 208
30 3B13 B3EH1 SQD, NF C 480
30 3B13 B3EL1 SQD, NQ C 208
30 3B13 B3EL2 SQD, NQ B 208
30 3B13 B3NH1 SQD, NF C 480
30 3B13 B3NL1 DISC SQD, ‐ C 208
30 3B13 B3NL1 SQD, NQ C 208
30 3B13 B3NL2 SQD, NQ C 208
30 3B13 B3NL3 SQD, NQ C 208
30 3D27 A3NH1 SQD, NF C 480
30 3D27 A3NL1 DISC SQD, ‐ C 208
30 3D27 A3NL1 SQD, NQ C 208
30 3D27 A3NL2 SQD, NQ C 208
30 3D27 A3NL3 SQD, NQ C 208
30 3D27 A3EH1 SQD, NF C 480
30 3D27 A3EL1 SQD, NQ C 208
30 3D27 A3EL2 SQD, NQ B 208
30 ROOF BRNACH1 SQD, NF C 480
30 ROOF BREL1 SQD, NQ B 208
30 ROOF BRENL1 SQD, NQ C 208
30 ROOF BREH1 SQD, NF C 480
30 ROOF PV DISC SQD, ‐ B 480
30 ROOF MCC RNAC SQD, MODEL 5 C 480
30 2B01 CT SCAN DISC SIEMENS, ‐ A 480
30 2B04 XRAY DISC GE, ‐ A 480
32 PB‐102 ELEV‐1 DISC CH, ‐ C 480
32 PB‐102 ELEV‐2 DISC CH, ‐ C 480
32 P1‐101 P1NH1 CH, PRL2 C 480
32 P1‐101 ATS DISC SQD, ‐ C 480
32 P1‐101 P1NL1 CH, PRL1 C 208
32 P1‐101 P1SH1 CH, PRL2 C 480
32 P1‐101 P1LSL1 CH, PRL1 C 208
32 P1‐101 P1EH1 CH, PRL2 C 480
32 P1‐101 P1EL1 CH, PRL1 C 208
110 A102A NH1 SIEMENS, S4 C 480
110 A102A DPNH SIEMENS, S4 C 480
110 A102A NL1 (1) SIEMENS, S3 C 208
110 A102A NL1 (2) SIEMENS, S3 C 208
110 A102A NL1 (3) SIEMENS, S3 C 208
110 A102A NKL1 SIEMENS, S1 C 208
110 A102A NDL1 SIEMENS, S1 C 208
110 A102A DPLSH SIEMENS, S2 C 480
110 A102A LSL1 SIEMENS, S1 C 208
110 A102A CRL1 SIEMENS, S1 C 208
110 A102A DPCRH SIEMENS, S2 C 480
110 A102A COFFEE URN DISC SIEMENS, ‐ C 240
110 GEN BLDG GEN CB ABB, ‐ C 480
110 GEN BLDG ATS‐1 DISC GE, ‐ C 480
110 GEN BLDG ATS‐2 DISC GE, ‐ C 480
110 GEN BLDG ERNH SIEMENS, S2 C 480
110 GEN BLDG ERNL SIEMENS, S1 C 208
110 GEN BLDG T‐2 DISC SIEMENS, ‐ C 480
110 GEN BLDG CRL4 SIEMENS, S1 C 208
110 GEN BLDG PV COMBINER SIEMENS, P1 B 480
110 GEN BLDG PV DISC SIEMENS, ‐ B 480
110 GEN BLDG T‐12 DISC SIEMENS, ‐ B 480
110 GEN BLDG NL4 SIEMENS, P1 B 208
110 C119 NH3 SIEMENS, S2 C 480
110 C119 NL3 (1) SIEMENS, S1 C 208
110 C119 NL3 (2) SIEMENS, S1 C 208
110 C119 CRH3 SIEMENS, S2 C 480
110 C119 CRL3 SIEMENS, S1 C 208
110 C119 LSH3 SIEMENS, S2 C 480
110 C119 LSL3 SIEMENS, S1 C 208
110 B122 CRH2 SIEMENS, S2 C 480
110 B122 CRL2 SIEMENS, S1 C 208
110 B122 NH2 SIEMENS, S3 C 480
110 B122 NL2 (1) SIEMENS, S3 C 208
110 B122 NL2 (2) SIEMENS, S3 C 208
110 B122 NL2 (3) SIEMENS, S3 C 208
110 B122 NL2A SIEMENS, S1 C 208
110 B122 NL2B SIEMENS, S1 C 208
110 B122 LSH2 SIEMENS, S2 C 480
110 B122 LSL2 SIEMENS, S1 C 208
110 MEDITATION NL3‐A GE, AQ B 208
Building Location Equipment Voltage Size kVA Assessment Comments
1 BA‐105 T‐12 480/208 75 C
1 BA‐105 T2‐EM 480/208 30 C
1 1C‐108 T18‐EM 480/208 30 C
1 1C‐108 T‐3 480/208 75 C
1 1C‐108 T‐13 480/208 75 C
1 1B‐103 T14‐EM 480/208 15 C
1 1B‐103 T‐4 480/208 75 C
1 OUTSIDE T‐1 MAIN 12000/480 1500 C
1 CHILLER PLANT T‐1 480/208 30 C
1 2C‐100D T19‐EM 480/208 15 C
1 2C‐100D T‐5 480/208 75 C
1 2B‐103 T15‐EM 480/208 15 C
1 2B‐103 T‐8 480/208 75 C
1 3C‐106 T20‐EM 480/208 15 C
1 3C‐106 T‐6 480/208 75 C
1 3C‐108F IRM 480/208 225 A
1 3B‐105B T16‐EM 480/208 15 C
1 3B‐105B T‐9 480/208 75 C
1 3C‐108D T‐22 480/208 30 C
1 3C‐108D MGE UPS 480/208 40 C
1 4C‐105 T21‐EM 480/208 15 C
1 4C‐105 T‐7 480/208 75 C
1 4B‐107 T17‐EM 480/208 15 C
1 4B‐107 T‐10 480/208 75 C
1 4B‐107 XF‐UPS 480/240 25 B
1 PENTHOUSE T11‐EM 480/208 15 C
1 ELEV ROOM XF‐ELEV 1 460/460 51 C
1 ELEV ROOM XF‐ELEV 2 460/460 51 C
30 1B05 XF‐B30 12000/480 1500 C
30 1B05 TB1‐1 480/208 75 C
30 1B09 TB1‐2 480/208 75 C
30 1B09 TB1‐3 480/208 45 C
30 1B09 T‐3 480/208 45 B
30 2B43 T‐B2EL2 480/208 45 B
30 2B43 TB2‐1 480/208 75 C
30 2B43 TB2‐2 480/208 30 C
30 2D17 T‐A2EL2 480/208 45 B
30 2D17 TA2‐1 480/208 75 C
30 2D17 TA2‐2 480/208 30 C
30 3B13 T‐B3EL2 480/208 45 B
30 3B13 TB3‐1 480/208 75 C
30 3B13 TB3‐2 480/208 45 C
30 3D27 T‐A3EL2 480/208 45 B
30 3D27 TA3‐1 480/208 75 C
30 3D27 TA3‐2 480/208 30 C
30 ROOF T‐BREL1 480/208 30 B
30 ROOF TBR‐1 480/208 15 C
32 P1‐101 X1NH1 480/208 30 C
32 P1‐101 X1LSH1 480/208 30 C
32 P1‐101 X1EH1 480/208 15 C
32 OUTSIDE XF‐32 11500/480 225 B
110 A102A T‐3 480/208 112.5 C/D Missing GEC
110 A102A T‐4 480/208 15 C/D Missing GEC
110 A102A T‐9 480/208 30 C/D Missing GEC
110 A102A T‐12 480/240 10 C/D Missing GEC
110 GEN BLDG T‐1 480/208 9 C
110 GEN BLDG T‐2 480/240 3 B
110 GEN BLDG T‐12 480/208 75 B
110 C119 T‐7 480/208 45 C/D Missing GEC
110 C119 T‐11 480/208 15 ? C/D Missing GEC
110 C119 T‐8 480/208 9 C/D Missing GEC
110 B122 T‐10 480/208 15 C/D Missing GEC
110 B122 T‐5 480/208 112.5 C/D Missing GEC and Very Loud
110 B122 T‐6 480/208 15 C/D Missing GEC
110 GEN BLDG XF‐110 11500/480 500 B
Equipment Condition Assessment
* EQUIPMENT CONDITION:
(A) Like New Condition ‐ Majority of useful life span remains. "Excellent"
(B) Good Condition ‐ Over half of useful life span remains. "Good"
(C+) Above Average Condition ‐ Less than half of useful life span remains, but in good condition. "Above Average"
(C) Average Condition ‐ Less than half of useful life span remains. "Average"
(C‐) Workable Condition ‐ May be past assigned useful life, but still working. "Keep an eye on it"
(D) Poor Condition ‐ Past assigned useful life. Failure is not critical. "Poor"
(F) Critical Condition ‐ Needs immediate attention. "Failing"
TRANSFORMERS
Building Location Equipment Voltage Assessment Comments
OUTSIDE NEAR
CHILLER PLANT MAIN SWGR 480 B
1 BA‐105 MSB 480 C
30 1B05 MV SWITCH 15KV C
30 1B05 MSB 480 C
30 1B05 N 480 C
30 1B05 E 480 C
30 1A28 GEN SWBD 480 D MISSING DEADFRONT SCREWS
110 GEN BLDG MSB 480 C
Equipment Condition Assessment
* EQUIPMENT CONDITION:
(A) Like New Condition ‐ Majority of useful life span remains. "Excellent"
(B) Good Condition ‐ Over half of useful life span remains. "Good"
(C+) Above Average Condition ‐ Less than half of useful life span remains, but in good condition. "Above Average"
(C) Average Condition ‐ Less than half of useful life span remains. "Average"
(C‐) Workable Condition ‐ May be past assigned useful life, but still working. "Keep an eye on it"
(D) Poor Condition ‐ Past assigned useful life. Failure is not critical. "Poor"
(F) Critical Condition ‐ Needs immediate attention. "Failing"
SUBSTATIONS / SWITCHBOARDS
Building Location Equipment Voltage Amps / Poles Assessment Comments
30 1B06 ATS‐1 480 4‐400 B
30 1B06 ATS‐2 480 4‐400 B
30 1A29 FP ATS 480 3‐240 B
32 PB‐101 GARAGE ATS 480 4‐260 B
110 GEN BLDG ATS‐1 480 3‐150 B / D Needs to be 4‐pole
110 GEN BLDG ATS‐2 480 3‐200 B / D Needs to be 4‐pole
1 BA105 ATS‐1 480 4‐400 A
Equipment Condition Assessment
* EQUIPMENT CONDITION:
(A) Like New Condition ‐ Majority of useful life span remains. "Excellent"
(B) Good Condition ‐ Over half of useful life span remains. "Good"
(C+) Above Average Condition ‐ Less than half of useful life span remains, but in good condition. "Above Average"
(C) Average Condition ‐ Less than half of useful life span remains. "Average"
(C‐) Workable Condition ‐ May be past assigned useful life, but still working. "Keep an eye on it"
(D) Poor Condition ‐ Past assigned useful life. Failure is not critical. "Poor"
(F) Critical Condition ‐ Needs immediate attention. "Failing"
ATS'S
Building Location Equipment Voltage Size kVA Assessment Comments
1 OUTSIDE GEN 1 480 250 D POOR CONDITION
30 1A28 GEN 30 480 937 C
32 GEN BLDG GEN‐32 480 250 C
110 GEN BLDG GEN‐110 480 250 C
Equipment Condition Assessment
* EQUIPMENT CONDITION:
(A) Like New Condition ‐ Majority of useful life span remains. "Excellent"
(B) Good Condition ‐ Over half of useful life span remains. "Good"
(C+) Above Average Condition ‐ Less than half of useful life span remains, but in good condition. "Above Average"
(C) Average Condition ‐ Less than half of useful life span remains. "Average"
(C‐) Workable Condition ‐ May be past assigned useful life, but still working. "Keep an eye on it"
(D) Poor Condition ‐ Past assigned useful life. Failure is not critical. "Poor"
(F) Critical Condition ‐ Needs immediate attention. "Failing"
Generators
APPENDIX F
Comments and Responses
Review Comments - 100% Submittal Honolulu Electrical System Study
Proj No. VA101F-17-D-380
Wiley|Wilson
Reviewer (Last Name)
Type of Document Section
Page # in PDF (of 1025)
Comment Number Comment Action Changes
Bowman Study 2.8.1 10 1
Protective relay for E-Wing transformer is noted as "still pending." Since this is the Final submission, how will this lack of information be corrected? This affects both the report narrative and TCC sheet 59.
The relay information was obtained after submission for peer review. The relay has been included in the current submission.
Removed sentence in 2.8.1 stating that the relay information was not available. Updated model and analyses to include the effects of the relay.
Bowman Study 4.4 365 2
The recommended reconfiguration described for the feeder originating in Panel BEH1 should be listed in the FCA table in Section 7.6 so that this cost is captured and this recommendation is not missed.
The estimated costs for reconfiguration of the feeder have been added to Section 7.6 and cost estimate detail
Updated costs summary table, FCA table, and cost estimate details in Appendix J.
Bowman Study 4.7 634-637 3
In regard to 90% comment #6 (suggesting consideration for a legend for these sheets), your response indicated that a legend is provided on the "appendix title sheet", presumably indicating Appendix E. When reading through Section 4.7 of the report, it seems unlikely that a reader would know to skip to Appendix E to find the legend describing the meaning of the yellow highlights.
This response was in error as a different comment had been made concerning the highlighting used in Appendix E. The cover sheet for the breaker settings table in Section 4.7 has been updated to state that the highlighting has been used to bring attention to the settings that are recommended to be changed. The highlighting in the tables in Appendix E has been used to bring attention to items that are graded "D".
Added statement to cover sheet of recommended circuit breaker settings table in Section 4.7 to state that the highlighting is used to draw attention to the settings that are recommended to be changed.
Bowman Study 6.4 726 4
Related to comment #1, the transformer for Building 1 should not be labeled as 152 calories/cm2 which is certainly inaccurate. This value is a function of not having protective relay information modeled rather than the true operation of the system.
The 152 calories/cm2 was evaluated before the relay information was obtained.
However, even with the relay in the analysis, the incident energy is at 146 cal/cm2. This is primarily due to the fact that the trip time is close to 2 seconds, and that the transformer secondary is being evaluated with horizontal conductors in metallic box (HCB) correction factor.
Model and arc flash analysis/table had been updated once the relay information had been obtained.
Page 1 of 2 3/30/2020
Review Comments - 100% Submittal
Proj No. VA101F-17-D-380
Wiley|Wilson
Bowman Study 7.5 744 5
In relation to 90% comment #2, you responded that (along with the replacement of 3 pole ATS with 4 pole) no modifications to the generator at Building 110 are required since the generator is already a separately derived system. This seems unlikely since a generator currently equipped with 3 pole ATS should not have been designed or constructed that way. Also, your response that the neutrals from the utility, the generator, and the load are bonded does not mean that the neutral and ground at the generator location are bonded, or there is adequate grounding at the generator location, as is required to create a separately derived system. Suggest you revisit this issue.
The grounding plan for the CFA generator building shows a ground rod at each of the 4 building corners, and a ground loop that connects each of these ground rods. The generator is bonded to this ground loop. The service transformer has its own ground rod, located outside the building, that is bonded to both the service transformer and the building ground loop. Grounding at the generator appears to be adequate. Ground resistance and presence of neutral-ground bonds would be verified and corrected as part of the ATS replacement.
No changes
Page 2 of 2 3/30/2020
Review Comments
90% Submittal
Reviewer (Last Name)
Type of Document
Discipline of
Comment Sheet # or Page # Comment Number Comment Action Changes
Watanabe Drawing E701- E703 1
For assemblies/systems, such as Elevators, with transformers/disconnect/panel (E701 Zone D8) and fire pump systems (E702 Zone L9), which have equipment co-located with each other, please dotted line around to denote them
We will put a dotted line box around the elevator motors, fire pumps, and the equipment that is located in the same room
Drawings updated with bounding boxes
Drawing E701 2
For Circuit 1-BUS-1EH2, could you put a note next to the BUS or dotted line around that whole branch - Veterans Benefits
Administration (VBA). A text box has been added to the One-Line Drawing updated with text note
Watanabe Drawing E702 3
Based on our ACC drawings sheet E.8.3 Zone B7, branch circuits with 30-CT-1 and 30-CT-2, with VFDs connected to them are not shown on the one-line. Could you verify to why?
Out of scope?
These are 10 HP motors, which are typically excluded from the one-line. We have all of the breaker and conductor information, so we've added them to the model.
SKM model updated and SKM outputs (reports, one-lines, analyses) that include these feeds have also been updated
Watanabe Drawing E702 4
Zone I8, 30-VFD-CHLR-1 and 30-VFD-CHLR-2, could you verify that the items are identified correctly, in reference to the ACC As-builts E8.2, E8.3 provided. I could not identify or locate in reference to as-builts.
Each Chiller has a retrofit kit with a Trane TR200 VFD installed. None
Watanabe Drawing E702 5
Some of the pump equipment on roof is not captured, is that because they were are out of scope of the analysis? ACC drawing E8.3. B.9
Smaller motors are not captured in the One-line per the SOW. The larger AHU's have been added.
SKM model updated and SKM outputs (reports, one-lines, analyses) that include these feeds have also been updated
Watanabe Drawing E702 6
Zone G14 - 30-EF1 and 30-Jockey-Pump, can you add the room locations. Also, 30-EF2 is missing, it is on the ACC drawings but not located within this study.
Room numbers for EF1 and the Jockey Pump have been added.
The drawing you referenced in comment 4 (E8.2) shows EF2 being fed from Panel E. There are only 6 breakers on Panel E with conductors landed on them, none of which are labeled EF2. Are you sure this Exhaust Fan is still connected? If so, can you confirm where it is fed from?
SKM model and one-lines updated with room labels
Watanabe Drawing E702 7
Zone H9 - 30 Bus-DL 1 DISC, 30 Bus-SL-1 DISC, 30 BUS-DL DISC, could you denote what equipment these were for? I don't believe the disconnects on the loading dock were labelled. We can label them correctly to match the one-line
These disconnects are located on the loading dock, just outside of the main electrical room. We're assuming that DL stands for Dock Leveler, and SL stands for Scissor Lift. From our photos these disconnects do have labels, SL 1, DL 1, and DL 2. The name for DL 2 has been updated to match.
SKM model updated and SKM outputs (reports, one-lines, analyses) that include these feeds have also been updated
Watanabe study Para 7.6 8
Please note, actual cost may differ in comparison with RS MEANS COSTWORK due to the RSMEAN being an average of all cost within the area. Area cost factor for Honolulu are typically higher than what is published by RSMeans, typically actual contractor bids for award are reflective of the industry economics and extra administrative cost of federal contracts.
We will add a note to Section 7.6 to bring attention to the possible cost differences
Updated Section 7.6 with statement concerning costs
Page 1 of 2 3/9/2020
90% Submittal
Watanabe Comments Appendix
F 9
Could you add another column to the comments, if the action was rolled into the study, could you denote where possibly. I know there are a lot of "we can". For the comments for the 60%, if you can update to show which "we can" actions were implemented. I feel like I would like them added if they weren't addressed.
There were only 2 comments on the 60% where the response was a "we can" - 1. to add a scenario for the alternative feed 2. to add a column to the table of recommended adjustments to include the corresponding TCC's. In hindsight, we should have used "we will" as we were intending to incorporate changes from these comments. Both of these comments were incorporated into the 90% submission.
A column has been added to the comment sheets to briefly describe any changes resulting from the comment.
Updated comments sheets with a "changes" column
Watanabe Appendix Appendix
I 10
For the Ground Test Reports- Please put a sheet in the submittal that denotes either section left blanks due to "xyz" reason, reference portion that says that why it is blank.
We will add a note to the appendix referencing section
2.7 and 7.4 that no ground system test reports were provided for inclusion.
Appendix I updated with note as to why the ground test reports are missing
Watanabe Study 11
Just as a general note - ACC - should be denoted as "Acute Care Clinic". Officially, the space for occupancy purposes is by definition in NFPA101/99, the spaces are considered business occupancy, NOT ambulatory care or heatlhcare,since the clinic or areas DO NOT provides anesthesia or other treatments that leaves the patient unable to care for himself without assistance in an emergency situation. Consequently, could you update/denote to ensure that if Joint Commission reviews our documentation that they do not make the same mistake due to compliance requirements being vastly different.
We will update Section 2 with a note stating the desire to refer to the Ambulatory Care Clinic as the Acute Care Clinic. The subsequent references in Section 2 will also be updated. Please note that this building is referred to as the Ambulatory Care Clinic on documents provided by the VA CFM, the previous set of one-lines, and also the VAPIHCS "About" website.
Updated section 2 with note concerning reference name change and subsequent uses
Page 2 of 2 3/9/2020
Review Comments - 90% Submittal
Proj No. VA101F-17-D-380
Wiley|Wilson
Reviewer (Last Name)
Type of Document Section
Page # in PDF (of 994)
Comment Number Comment Action Change
Bowman Study 2.5 9 1
Based on the extreme oversizing of three of the existing generators, was any consideration given to replacing them with more appropriately sized units?
The risk of wet stacking is currently being mitigated by annual load banking. The VA could investigate replacing their generators with smaller units, but would have to investigate the projected load that might be added by any expansion for the next 10- 20 years to ensure the new, smaller generator is not undersized. None
Bowman Study 2.5 9 2
You indicate a deficiency related to the 3-pole ATS in the Generator 110 system and reference it to the feeding of non-motor loads. The related recommendation in Section 7 (page 728 of the pdf) is to replace the ATS with 4-pole switches in order to meet the VA design guide. Two comments here: 1) On re-reading the current Electrical Design Manual, I think there are two possible interpretations related to the need for 4-pole ATS, and the feeding of non-motor loads does not require the use of 4-pole switches. I would suggest reviewing the Design Manual again. 2) If your interpretation remains that 4-pole switches are required, your recommendation needs to take into account the modifications that must be made to convert the generator installation to a separately derived system, to ensure proper operation of the overall system once the VA replaces the 3-pole switches with 4-pole switches.
The generator for building 110 is already a separately derived system. It is a wye connected generator and the neutrals from the utility, generator, and load are all bonded to a bus bar in the ATS's. None
Bowman Study 2.8.1 10 3
OCFM typically expects outages to be taken to definitively determine transformer fusing. Assumptions taken on protective devices can result in flawed results, both for protective device coordination and for incident energy calculations. We recommend taking outages to obtain this data.
Understood. We opted to obtain the fuse information from manufacturer/site documentation.
None
Bowman Study 2.8.2 10 4
Using similar protective devices as substitutes for unknown devices carries some risk as even similar products can have quite different time-current characteristics and produce dissimilar results, especially as it relates to incident energy. A better approach may be to simply label the device unknown and use the SKM feature where you can exclude a device from consideration and force the upstream device to act.
Understood. We will look into if certain devices need to be excluded to allow an upstream device to act.
None. No unknown devices were found where the upstream device should be allowed to act.
Page 1 of 2 3/6/2020
Review Comments - 90% Submittal
Proj No. VA101F-17-D-380
Wiley|Wilson
Bowman Study TCC sheet 59 267 5
In Section 2.8.1, you stated that service transformer primary fuses were assumed. An upstream breaker and relay is now shown, but there are no upstream fuses in the model one line diagram or in the TCC graph. On the one line diagram, there is a note indicating that relay information is still to be added to the model. Does the Section 2.8.1 statement need to be revised?
Are there no transformer primary fuses? Or are they just missing from the model? Likewise, it should be stated earlier in the report that the relay information is not included.
Section 2.8.1 needs to be revised.
The one-lines and TCCs were updated with the current fuse information for the transformers that have fused primaries. Only the relay protection for the one transformer is still pending. We will add a statement concerning the relay information if it is not to be included.
Updated Section 2.8.1
Bowman Study 4.7 622-625 6
Consider some form of legend for these sheets to more clearly call attention to changes and/or indicate the meaning of the yellow highlighting.
The appendix title sheet has a key that shows yellow…