Honolulu, HI (459) Visn 21
Bldg No Function Title Yr Built Yr Reno # Flrs Total GSF
30 Ambulatory Care Clinic 1999 0 3 92,371
32 Parking Structure 1996 0 0 0
110 Center for Aging 1997 0 1 43,305
110A Center for Aging Generator 1998 0 1 440
32A Parking Structure Generator 1999 0 1 440
EW E-Wing Admin/VBA 1999 1999 5 88,405
TOTAL 224,961
The contractor may encounter additional buildings that are not on the detailed building list during the site survey. The contractor shall expect to survey of up to a 5% deviation of square footage.
Department of Veterans Affairs Honolulu Veterans Affairs Medical Center
Honolulu, Hawaii
ELECTRICAL DISTRIBUTION
SYSTEM CONDITION ASSESSMENT
Final Submission
APPENDIX B
Available Fault Current Information
From: Raleigh D. Stewart, P.E.
To: Jarrett C. Elliott Subject: Fwd: FW: [EXTERNAL] RE: [Non-DoD Source] FW: Utility and Electrical Information (UNCLASSIFIED) Date: Monday, November 18, 2019 8:28:11 PM
Fyi
---------- Forwarded message ---------- From: "Watanabe, Chad H." <Chad.Watanabe@va.gov> Date: Nov 18, 2019 6:22 PM Subject: FW: [EXTERNAL] RE: [Non-DoD Source] FW: Utility and Electrical Information
(UNCLASSIFIED)
To: "Raleigh D. Stewart, P.E." <RDStewart@ekfox.com> Cc:
FYI. Need help with clarification on the first question so that Derek can answer. Thanks!
Sent with BlackBerry Work (www.blackberry.com)
From: Sakai, Derek K CIV USARMY IMCOM PACIFIC (USA) <derek.k.sakai2.civ@mail.mil> Date: Monday, Nov 18, 2019, 1:12 PM To: Watanabe, Chad H. <Chad.Watanabe@va.gov> Subject: RE: [EXTERNAL] RE: [Non-DoD Source] FW: Utility and Electrical Information
(UNCLASSIFIED)
Hi Chad, Sorry for the delay. I got this from HECO:
Tripler 1 Transformer (faults are on 11.5kV side) 3LG Fault : 2,740 A X/R :
16.04
1LG Fault : 3,070 A X/R : 17.77
Tripler 2 Transformer (faults are on 11.5kV side) 3LG Fault : 3,120 X/R :
18.31
1LG Fault : 3,475 X/R : 19.05
NOTE: The fault currents provided are on a symmetrical RMS basis in the sub transient time period for the normal system configuration, and are intended to be used for Arc Flash calculation purposes.
I'm not sure what they mean by question 1 below.
mailto:RDStewart@ekfox.com mailto:JCElliott@ekfox.com mailto:derek.k.sakai2.civ@mail.mil mailto:Chad.Watanabe@va.gov
Thanks, Derek Sakai Electrical Engineer Utilities Branch, DPW Hawaii
(808) 656-3066, FAX: (808) 656-8200
"We are the Army's Home" "Learn more at www.imcom.army.mil" Your comments are important to me.
Logon: Caution-https://ice.disa.mil/index.cfm?fa=card&sp=83104&s=48&dep=*DoD
-----Original Message----- From: Watanabe, Chad H. [mailto:Chad.Watanabe@va.gov] Sent: Monday, November 18, 2019 11:47 AM To: Sakai, Derek K CIV USARMY IMCOM PACIFIC (USA) <derek.k.sakai2.civ@mail.mil> Subject: RE: [EXTERNAL] RE: [Non-DoD Source] FW: Utility and Electrical Information (UNCLASSIFIED)
All active links contained in this email were disabled. Please verify the identity of the sender, and confirm the authenticity of all links contained within the message prior to copying and pasting the address to a Web browser.
Derek, Just following up on the information. We got the electrical contractor inquiring so that he can finish his study. Could you possibly give me an ETA on the information.
Mahalo, Chad
Sent with BlackBerry Work (Caution-www.blackberry.com)
From: Sakai, Derek K CIV USARMY IMCOM PACIFIC (USA) <derek.k.sakai2.civ@mail.mil < Caution-mailto:derek.k.sakai2.civ@mail.mil > Date: Tuesday, Nov 05, 2019, 8:02 AM http://www.imcom.army.mil/ mailto:Chad.Watanabe@va.gov
To: Watanabe, Chad H. <Chad.Watanabe@va.gov < Caution-mailto:Chad.Watanabe@va.gov > > Subject: [EXTERNAL] RE: [Non-DoD Source] FW: Utility and Electrical Information (UNCLASSIFIED)
Hi Chad, Let me see what I can get, I'll get back to you.
Thanks, Derek Sakai Electrical Engineer Utilities Branch, DPW Hawaii
(808) 656-3066, FAX: (808) 656-8200
"We are the Army's Home" "Learn more at Caution-www.imcom.army.mil" < Caution-http://www.imcom.army.mil" > Your comments are important to me.
Logon:
Caution-Caution-https://ice.disa.mil/index.cfm?fa=card&sp=83104&s=48&dep=*Do D
-----Original Message----- From: Watanabe, Chad H. [Caution-mailto:Chad.Watanabe@va.gov < Caution-mailto:Chad.Watanabe@va.gov > ] Sent: Monday, November 4, 2019 9:25 AM To: Sakai, Derek K CIV USARMY IMCOM PACIFIC (USA) <derek.k.sakai2.civ@mail.mil> Subject: FW: [Non-DoD Source] FW: Utility and Electrical Information
(UNCLASSIFIED)
Derek, Kevin Yasutake gave me you contact information. The VA is having an electrical study performed by an outside contractor for Arc Flash and they need some utility distribution information. See below:
1. Utility feed location and designation
2. Maximum available Fault Current: Phase-Phase
3. Maximum available Fault Current: Line - Ground
4. Maximum available Fault Current: 3 Phase
5. X0/R0 Ratio
6. X1/R1 Ratio
7. Any other readily available information that pertains to the service available fault current or impedance
The Utility supposedly feeds the Spark Matsunaga Clinic, Parking Structure, E-Wing and Center for aging.
Could you please help us get this information.
Mahalo, Chad Watanabe Facilities Engineer Veterans Affairs Pacific Islands Health Care System Facility Mgmt and Engineering Services (FMES) C (808) 940-3013
-----Original Message----- From: Yasutake, Kevin K CTR USARMY MEDCOM TAMC (USA) <kevin.k.yasutake.ctr@mail.mil> Sent: Monday, November 4, 2019 9:17 AM To: Watanabe, Chad H. <Chad.Watanabe@va.gov> Subject: [EXTERNAL] RE: [Non-DoD Source] FW: Utility and Electrical Information (UNCLASSIFIED)
CLASSIFICATION: UNCLASSIFIED
Chad, Try Derek Sakai, email: derek.k.sakai2.civ@mail.mil.
He's an electrical engineer for DPW. Thanks.
Kevin Yasutake [CTR USA] Project Manager Bowers + Kubota Consulting Facility Management Division Tripler Army Medical Center Ph 808-433-4566 Pgr 808-577-2275 Email: kevin.k.yasutake.ctr@mail.mil
-----Original Message----- From: Watanabe, Chad H. [Caution-mailto:Chad.Watanabe@va.gov < Caution-mailto:Chad.Watanabe@va.gov > ] Sent: Monday, November 04, 2019 8:10 AM To: Yasutake, Kevin K CTR USARMY MEDCOM TAMC (USA) <kevin.k.yasutake.ctr@mail.mil> Subject: RE: [Non-DoD Source] FW: Utility and Electrical Information
(UNCLASSIFIED)
Ok, thanks for verifying that for me! Do you happen to have a POC for DPW that I might be able to contact?
-----Original Message----- From: Yasutake, Kevin K CTR USARMY MEDCOM TAMC (USA) <kevin.k.yasutake.ctr@mail.mil> Sent: Monday, November 4, 2019 7:38 AM To: Watanabe, Chad H. <Chad.Watanabe@va.gov> Subject: [EXTERNAL] RE: [Non-DoD Source] FW: Utility and Electrical Information (UNCLASSIFIED)
CLASSIFICATION: UNCLASSIFIED
Chad, All those areas you mentioned the power doesn't come through the hospital.
They all get their power directly through DPW's gear. Thanks.
Kevin Yasutake [CTR USA] Project Manager Bowers + Kubota Consulting Facility Management Division Tripler Army Medical Center Ph 808-433-4566 Pgr 808-577-2275 Email: kevin.k.yasutake.ctr@mail.mil
-----Original Message----- From: Watanabe, Chad H. [Caution-mailto:Chad.Watanabe@va.gov < Caution-mailto:Chad.Watanabe@va.gov > ] Sent: Monday, November 04, 2019 6:34 AM To: Yasutake, Kevin K CTR USARMY MEDCOM TAMC (USA) <kevin.k.yasutake.ctr@mail.mil> Subject: RE: [Non-DoD Source] FW: Utility and Electrical Information
(UNCLASSIFIED)
I believe that TAMC provides the power to the Spark Matsunaga (ACC), the parking structure, Center for Aging and E-Wing. Guess we need the power at the substation and any associated fault currents at each of the transformers at the buildings. Idk if that makes sense, so lmk.
- Chad
-----Original Message----- From: Yasutake, Kevin K CTR USARMY MEDCOM TAMC (USA) <kevin.k.yasutake.ctr@mail.mil> Sent: Friday, November 1, 2019 3:05 PM To: Watanabe, Chad H. <Chad.Watanabe@va.gov> Subject: [EXTERNAL] RE: [Non-DoD Source] FW: Utility and Electrical
Information (UNCLASSIFIED)
CLASSIFICATION: UNCLASSIFIED
Chad, For which areas are you looking for? Thanks.
Kevin Yasutake [CTR USA] Project Manager Bowers + Kubota Consulting Facility Management Division Tripler Army Medical Center Ph 808-433-4566 Pgr 808-577-2275 Email: kevin.k.yasutake.ctr@mail.mil
-----Original Message----- From: Watanabe, Chad H. [Caution-mailto:Chad.Watanabe@va.gov < Caution-mailto:Chad.Watanabe@va.gov > ] Sent: Friday, November 01, 2019 1:49 PM To: Yasutake, Kevin K CTR USARMY MEDCOM TAMC (USA) <kevin.k.yasutake.ctr@mail.mil> Subject: [Non-DoD Source] FW: Utility and Electrical Information
All active links contained in this email were disabled. Please verify the identity of the sender, and confirm the authenticity of all links contained within the message prior to copying and pasting the address to a Web browser.
Kevin, Hi, I'm Chad Watanabe, a Facilities Engineer for the VA. VA HQ paid for an Electrical study of our main distribution and ARC Fault Study. For our contract EKFox out of Virginia, to complete their analysis and modeling, they need the following, as referenced below:
1. Utility feed location and designation
2. Maximum available Fault Current: Phase-Phase
3. Maximum available Fault Current: Line - Ground
4. Maximum available Fault Current: 3 Phase
5. X0/R0 Ratio
6. X1/R1 Ratio
7. Any other readily available information that pertains to the service available fault current or impedance
Please feel free to contact me a your earliest convenience by email or phone (8080 9403013.
v/r, Chad Watanabe
Facilities Engineer
Veterans Affairs Pacific Islands Health Care System
Facility Mgmt and Engineering Services (FMES)
C (808) 940-3013
From: Raleigh D. Stewart, P.E. <RDStewart@ekfox.com> Sent: Friday, October 18, 2019 6:43 AM To: Watanabe, Chad H. <Chad.Watanabe@va.gov> Cc: Jarrett C. Elliott <JCElliott@ekfox.com> Subject: [EXTERNAL] Fwd: Utility and Electrical Information
---------- Forwarded message ---------- From: "Raleigh D. Stewart, P.E." <RDStewart@ekfox.com <
Caution-Caution-mailto:RDStewart@ekfox.com > > Date: Oct 17, 2019 9:42 PM Subject: Utility and Electrical Information To: "Furukawa, Tyler" <Tyler.Furukawa@va.gov < Caution-Caution-mailto:Tyler.Furukawa@va.gov > > Cc: "Jarrett C. Elliott" <JCElliott@ekfox.com < Caution-Caution-mailto:JCElliott@ekfox.com > >
Tyler, I hope you are doing well. Below is the information that we would like to obtain concerning the electrical utility service for each of the VA Buildings. If possible, the utility should provide the information in a letter format (PDF, Word Document, or similar) since it needs to be included as part our deliverables.
1. Utility feed location and designation
2. Maximum available Fault Current: Phase-Phase
3. Maximum available Fault Current: Line - Ground
4. Maximum available Fault Current: 3 Phase
5. X0/R0 Ratio
6. X1/R1 Ratio
7. Any other readily available information that pertains to the service available fault current or impedance
Additionally, we will need the utility usage and demand information.
Sometimes we can get the usage and demand information from the utility as well. Otherwise, we can get the information from utility bills. The past 12 months of utility bills would be adequate.
Finally, as mentioned in the entry briefing, we would also like to obtain any grounding system test reports, generator load test logs, and a copy of your most recent survey responses to the VHA Directive 1028 Survey.
These will be used as part of the electrical studies reports.
Let us know if you have any questions.
Thanks.
-Raleigh
Department of Veterans Affairs Honolulu Veterans Affairs Medical Center
Honolulu, Hawaii
ELECTRICAL DISTRIBUTION
SYSTEM CONDITION ASSESSMENT
Final Submission
APPENDIX C
Honolulu VAMC Electrical Load Data
Date Read E Wing ACC Parking Garage CFA
Days
Between E Wing ACC
Parking
Garage CFA E Wing ACC Parking Garage CFA
12/1/2019 614,505.00 18,888,938 994,210 9.7140472 30 174,362.00 213,986 8,302 84,168 5,812 7,133 277 2,806
11/1/2019 440,143.00 18,674,952 985,908 9.6298792 31 187,774.73 230,682 8,848 95,303 6,057 7,441 285 3,074
10/1/2019 252,368.27 18,444,270 977,060 9.5345760 30 157,922.99 226,077 8,347 87,888 5,264 7,536 278 2,930
9/1/2019 1,094,445.28 18,218,193 968,713 9.4466880 31 203,331.28 214,807 8,087 108,683 6,559 6,929 261 3,506
8/1/2019 891,114.00 18,003,386 960,626 9.3380048 31 183,411.31 219,574 8,318 97,734 5,916 7,083 268 3,153
7/1/2019 707,702.69 17,783,812 952,308 9.2402712 30 173,110.65 212,463 8,263 90,657 5,770 7,082 275 3,022
6/1/2019 534,592.04 17,571,349 944,045 9.1496144 31 163,533.62 203,905 8,050 81,938 5,275 6,578 260 2,643
5/1/2019 371,058.42 17,367,444 935,995 9.0676760 30 159,833.20 195,376 7,794 75,026 5,328 6,513 260 2,501
4/1/2019 211,225.22 17,172,068 928,201 8.9926504 31 153,127.24 186,612 8,138 64,256 4,940 6,020 263 2,073
3/1/2019 1,058,097.98 16,985,456 920,063 8.9283944 28 123,558.42 147,843 7,002 56,254 4,413 5,280 250 2,009
2/1/2019 934,539.56 16,837,613 913,061 8.8721400 31 158,438.97 183,913 8,218 64,777 5,111 5,933 265 2,090
1/1/2019 776,100.59 16,653,700 904,843 8.8073632 31 169,198.18 193,422 7,996 84,058 5,458 6,239 258 2,712
12/1/2018 606,902.41 16,460,278 896,847 8.7233048 30 151,024.11 172,473 6,892 66,442 5,034 5,749 230 2,215
11/1/2018 455,878.30 16,287,805 889,955 8.6568624
Kwh/DayMeter Readings Monthly Consumption KwH
Maximum in past 12 Months
Minimum in past 12 Months
147,843
230,682
123,558.42
203,331.28
56,254
108,683
7,002 8,848
50,000
100,000
150,000
200,000
250,000
Power Consumption (kWh)
E‐Wing ACC Garage CFA
Read Date Meter Days Between Kwh kwh/day Read Date Meter Days Between Kwh kwh/day Read Date Meter Days Between Kwh kwh/day
12/1/2019 930,000 30 15,500.00 516.67 12/1/2019 651,827 30 1,122.00 37.40 12/1/2019 189015 30 6,719.00 223.97
11/1/2019 914,500 31 15,500.00 500.00 11/1/2019 650,705 31 3,967.00 127.97 11/1/2019 182,296 31 8,376.00 270.19
10/1/2019 899,000 30 14,600.00 486.67 10/1/2019 646,738 30 4,497.00 149.90 10/1/2019 173,920 30 8,070.00 269.00
9/1/2019 884,400 31 21,100.00 680.65 9/1/2019 642,241 31 4,435.00 143.06 9/1/2019 165,850 31 11,378.00 367.03
8/1/2019 863,300 31 20,000.00 645.16 8/1/2019 637,806 31 4,793.00 154.61 8/1/2019 154,472 31 10,920.00 352.26
7/1/2019 843,300 30 18,800.00 626.67 7/1/2019 633,013 30 4,446.00 148.20 7/1/2019 143,552 30 9,945.00 331.50
6/1/2019 824,500 31 17,800.00 574.19 6/1/2019 628,567 31 905.00 29.19 6/1/2019 133,607 31 9,567.00 308.61
5/1/2019 806,700 30 19,100.00 636.67 5/1/2019 627,662 30 4,775.00 159.17 5/1/2019 124,040 30 10,248.00 341.60
4/1/2019 787,600 31 18,300.00 590.32 4/1/2019 622,887 31 4,713.00 152.03 4/1/2019 113,792 31 9,335.00 301.13
3/1/2019 769,300 28 13,300.00 475.00 3/1/2019 618,174 28 4,169.00 148.89 3/1/2019 104,457 28 7,092.00 253.29
2/1/2019 756,000 31 13,900.00 448.39 2/1/2019 614,005 31 3,050.00 98.39 2/1/2019 97,365 31 5,866.00 189.23
1/1/2019 742,100 31 14,100.00 454.84 1/1/2019 610,955 31 3,231.00 104.23 1/1/2019 91,499 31 7,459.00 240.61
12/1/2018 728,000 30 12,500.00 416.67 12/1/2018 607,724 30 ‐ 0 12/2/2018 84040 30 5,573.00 185.77
11/1/2018 715,500 11/1/2018 607,724 11/1/2018 78467
Photovoltaic (PV) Energy Production CFA BLDG 110 PV ProductionACC PV ProductionE‐Wing PV Production
Maximum in past 12 Months
Minimum in past 12 Months
13,300.00
21,100.00
5,866.00
11,378.00
905.00
4,793.00
5,000.00
10,000.00
15,000.00
20,000.00
25,000.00
PV Energy Production (kWh)
E‐Wing ACC CFA
E‐Wing ‐ Building 1 Generator Specifications: 480VAC, 250kVA, 200kW, 0.8pf
Test Date Voltage Start L1 Amps Start L2 Amps Start L3 Amps Stop L1 Amps Stop L2 Amps Stop L3 Amps Average Amps Avg. kVA % of Capacity
1/30/2019 480 120 96 98 113 101 105.60 87.79 35.1
2/27/2019 480 114 105 106 115 134 113 114.50 95.19 38.1
3/27/2019 480 148 114 107 118 113 112 118.67 98.65 39.5
4/17/2019 480 120 109 103 120 111 109 112.00 93.11 37.2
5/15/2019 480 274 275 276 274 275 274 274.67 228.35 91.3
6/19/2019 480 117 113 115 124 120 116 117.50 97.68 39.1
7/17/2019 480 116 121 108 122 113 112 115.33 95.88 38.4
8/12/2019 480 * * * * * * ‐ ‐ ‐
9/18/2019 480 116 104 107 115 113 129 114.00 94.78 37.9
10/16/2019 480 135 104 103 112 93 95 107.00 88.96 35.6
11/20/2019 480 106 89 86 107 93 91 95.33 79.26 31.7
12/18/2019 480 122 110 102 104 82 89 101.50 84.38 33.8
* ‐ No amperage readings taken due to load bank test MAX: 228.35 91.34
MIN: 79.26 31.70
Average: 104.00 41.60
ACC ‐ Building 30 Generator Specifications: 480VAC, 937kVA, 750kW, 0.8pf
Test Date Voltage Start L1 Amps Start L2 Amps Start L3 Amps Stop L1 Amps Stop L2 Amps Stop L3 Amps Average Amps Avg. kVA % of Capacity
1/23/2019 480 115 108 119 123 113 131 118.17 98.24 10.5
2/20/2019 480 53 50 59 33 50 59 50.67 42.12 4.5
3/22/2019 480 146 127 142 152 134 152 142.17 118.19 12.6
4/10/2019 480 134 116 131 198 180 160 153.17 127.34 13.6
5/8/2019 480 129 116 132 141 131 199 141.33 117.50 12.5
6/12/2019 480 106 122 141 111 185 202 144.50 120.13 12.8
7/10/2019 480 142 128 142 142 124 149.00 137.83 114.59 12.2
8/13/2019 480 * * * * * * ‐ ‐ ‐
9/11/2019 480 142 124 139 147 131 186 144.83 120.41 12.9
10/9/2019 480 137 110 131 154 131 200 143.83 119.58 12.8
11/13/2019 480 140 124 137 189 130 171 148.50 123.46 13.2
12/1/2019 480 144 122 135 194 172 171 156.33 129.97 13.9
* ‐ No amperage readings taken due to load bank test MAX: 129.97 13.87
MIN: 42.12 4.50
Average: 111.96 11.95
Parking Structure ‐ Building 32 Generator Specifications: 480VAC, 250kVA, 200kW, 0.8pf
Test Date Voltage Start L1 Amps Start L2 Amps Start L3 Amps Stop L1 Amps Stop L2 Amps Stop L3 Amps Average Amps Avg. kVA % of Capacity
1/16/2019 480 17 19 7 14 18 9 14.00 11.64 4.7
2/13/2019 480 16 19 9 16 19 9 14.67 12.19 4.9
3/13/2019 480 ^ ^ ^ ^ ^ ^ ‐ ‐ ‐
4/1/2019 480 ^ ^ ^ ^ ^ ^ ‐ ‐ ‐
5/1/2019 480 ^ ^ ^ ^ ^ ^ ‐ ‐ ‐
6/20/2019 480 ^ ^ ^ ^ ^ ^ ‐ ‐ ‐
7/1/2019 480 ^ ^ ^ ^ ^ ^ ‐ ‐ ‐
8/21/2019 480 ^ ^ ^ ^ ^ ^ ‐ ‐ ‐
^ ‐ No amperage readings recorded due to generator not operating MAX: 12.19 4.9
MIN: 11.64 4.7
Average: 11.92 4.8
CFA ‐ Building 110 Generator Specifications: 480VAC, 250kVA, 200kW, 0.8pf
Test Date Voltage Start L1 Amps Start L2 Amps Start L3 Amps Stop L1 Amps Stop L2 Amps Stop L3 Amps Average Amps Avg. kVA % of Capacity
1/9/2019 480 13 13 8 12 13 10 11.50 9.56 3.8
2/7/2019 480 18 18 19 18 17 17 17.83 14.83 5.9
3/6/2019 480 25 35 37 ^ ^ ^ 32.33 26.88 10.8
4/3/2019 480 29 33 43 32 34 32 33.83 28.13 11.3
5/1/2019 480 26 34 35 35 35 30 32.50 27.02 10.8
6/5/2019 480 28 32 30 27 35 37 31.50 26.19 10.5
7/3/2019 480 42 53 45 ^ ^ ^ 46.67 38.80 15.5
8/7/2019 480 26 30 26 25 35 35 29.50 24.53 9.8
8/12/2019 480 * * * * * * ‐ ‐ ‐
9/4/2019 480 32 39 42 29 35 32 34.83 28.96 11.6
10/2/2019 480 29 40 40 26 30 26 31.83 26.46 10.6
11/6/2019 480 24 26 25 29 33 28 27.50 22.86 9.1
12/4/2019 480 26 30 27 46 36 55 36.67 30.48 12.2
^ ‐ No amperage readings recorded MAX: 38.80 15.5
* ‐ No amperage readings taken due to load bank test MIN: 9.56 3.8
Average: 25.39 10.16
0.00
50.00
100.00
150.00
200.00
250.00 A vg . k V A
Average kVA Load from Generator Test Data
E‐Wing Avg. kVA ACC Avg. kVA Parking Avg. kVA CFA Avg. kVA
MONTHLY
GEN TEST
E.W1NG
12/18/19
Fech Signature:
rech Signature:
Date: a (
Date:
E Wing Attachment (D)
Model # 1306-9 Serial # E13148 S -1--6N r-1- - TF,Att 0C if I ev,a % A 1,-. kr. 6 --7 IC Pre check list:
Satisfactory Unsatisfactory Comments heck fuel & fuel tank 7
Check oil level /
Check coolant level /
Check air filter /
Check batteries & terminals /
Runriing check list:
1) Simulate power failure
Note how many seconds takes to transfer S.< c. .3
2) .Transfer life safety & critical equipment / •
3) Take reading every 15 minutes /
Engine Speed (rpm)
Lube Oil pressure (psi)
Lube Oil Temperature (F)
I'S ct ,ct
.15 Minutes
Hour Meter (hours)
L-fi 6i , ct '
Engine Temperature (F)
Exhaust Stack Temperature (F)
Frequency (Hz)
Operating Voltage (v) 1 480 2 480
3 480
Operating Amperage (amps) 1 I 22- 2
( 10 3
1 og
. T *e Oil pressure (psi)
&Q_
.,e Oil Temperature (F)
V5R,c)
`CI C). (
15 Minutes
I S 9 , (-3
3 480 .
Operating Amperage (amps) 1 l 6 (-I 2
5 .2- 3
'5 9_
Shutdown check list:
Comments , 1)Return normal power /
2) Check oil, fuel and coolant level /
3) Log all checks & corresponding reading /
4) Summarize test & list any /X
/ problems & corrective actio/1// 4 , -
E Wing Attachment (A)
Model # 1306-9 Serial # E13148 Hours LI 9 0 . 2_
Monthly Check list: Satisfactory Unsatisfactory
Comments
Check for moisture, dust, oils, greases, & debris on main stator, exciter, & PMG windings.
Check oil & coolant levels. /
Drain fuel system to remove H20 & sediment.
Check for leaks: cooling, lube oil, & fuel system.
Check for loose/damaged clamps, filters, brackets, fittings, hoses, & other components.
Check belts. 7
Check for restrictions of intake/exhaust system.
Check for any loose electrical connections. Inspect contacts for pits, burns, evidence of arcing.
Inspect programmable logic control adjustments.
Observe & verify ATS. /
Certify that equipment has received monthly service.:
Check battery cables. /
Check coating on terminals, lugs, shunts, & cable connections.
Check & record voltage readings of each cell & total cell bank.
13 .21', 13 -Z.-6i Zd
Check & record battery load w/ cells on float charge.
A- 6. 6 .
Check electrolyte levels.
Check output ammeter & voltmeter, /
Check rate of charge for float & trickle charging.
Check AC power. /
Check for cleanliness of system & area. /
Start generator & run on building load [Refer to attachment (D)J
Check engine & bearings for oil & 1120 leaks, wansoal noise, excessive vibration, & overheating.
After load test, observe transfer & shutdown sequence.
After shutdown, wipe down engine, clean any spills, update log.
Comments:
o:
• 21
330:
270:
210:
150:
— 1 90;
30:
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
Report Date/Time
12/18/2019 7:32:10 AM Page 1 Filename
Voltage and Current. From 12/18/2019 6:44:29 AM To 12/18/2019 7:23:04 AM HalfHourGenTest G191218..fpq
720:
560:
240:
80:
880 _
720'
80:
itet IA kWh
-80"
165000 135000 105000 =
75000!
45000:
15000:
-15000" '5
•11. •••
06 50 06 55 07!00 07 05 07 10 07 15 07 20 csi
•Te
E-WING
Emergency Generator
Test
11/20/19
Running check list:
Note how many seconds takes to transfer tl 5-e <_'s
2) Transfer life safety & critical equipment
3) Take reading every 15 minutes
E "Wing Attachment (D)
Model # 1306-9 . Serial # E13148 S -6. et - 7-17444. 0 -7 00 iff- tr , A- -TI r.-. e 0 7 "S t Pre check list:
Satisfactory Unsatisfactory Comifients heck fuel & fuel tank /
Luhe Oil pre,ssure (psi)
6 1
Luhe Oil Temperature (F) t TS'
'4'69 ..c
I Srgg
Exhaust Stick Temperature (F)
Operating Amperage (amps) 1 ( 6 ( 2
<1 3
S 6
Engine Speed (rpm) . 1800
T --Ile Oil pressure (psi) b, S e Oil Temperature (F)
L-4 c.X1 ,S-
Operating Voltage (v) 1 480
2 480
Operating Amperage (amps) 1 0 7 2 cl -5 3
9 I
1) Return normal power / problems & corrective activn
Date:
Date:
4A.2209 ii/ze/f/
Attac i ent (A)
Model # 1306-9 Serial # E13148
Hours L-i .$ c/ _ (>
& debris on main stator, exciter, &
- Drain fuel system to remove H20 &
7 /
Check belts. /
Check for any loose electrical.
Observe & verify ATS.
monthly service..
Check coaling on terminals, lugs, shunts, & cable connections. / each cell & total cell bank..
12 .z .4, (( ,91 / ,,,2_ (, , S-7
Check output ammeter & voltmeter. /
Check for cleanliness of system & area, [Refer to attachment (D)]
Check engine & bearings for oil & H20 leaks, unusual noise, excessive
Voltage and Current. From 11/20/2019 7:04:19 AM To 11/20/2019 7:41:14 AM
270--
• 210
= 90
Report Date/Time
11/20/2019 7:58:05 AM Page 1 Filename
HalfHourGenTest G191120.fpq
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
• 90
270:-
0.)
• 90
L
5 1
LL
n5 07 10 07 15 07 20 07 25 07 30 07 35 07:40
E.WING
10/16/19
Attachment (D)
Model # 1306-9 . Serial # E13148 .S 4-1-11-- -Takt.t. ci, (,.' 9 I ev.ti % "A Yv-• e 6 ---/ ( C -
Pre check list:
Satisfactory Unsatisfactory • Comments heck fuel & fuel tank /
—1--km-c._ A TS q+.3 --,1 .-1 - 1 , I y -- . r c-e A
-NA--
check oil level 7 k-,----- k --k vi c) r- 1-, z-.- 1 . Tc-7. ,------v-,, 121--e 1-r--) lk, ,,--<_ --.6... r. J, .- et, i ' Z..*• en.. kek rt-r, .1 s' s Check battekes & terminals / . a. pic e_rieLe
Riuming check list:
1) Simulate power failure Note how many seconds takes to transfer '
2) Transfer life safety & critical equipment
1 eS9'
' 15 Minutes .
4 - Irc7( 1
Operating Amperage (amps) 1
1 5.-- 2
1 6 4{-
T --1-)e Oil pressure (psi) _
,e Oil Temperature (F)
—Hour Meter (hours)
4 Clf ,'(
1 9 ( 0
Operating Amperage (amps) 1 ( (a. 2 g ----- 3
9 s— hutdown check list:
Comments •
1) Return normal power V
.2) Check oil, fuel and coolant level corresponding reading
4) Summarize test & list any /// problems & corrective action,// zi 1 n fech Signature:
reela Signature:
Date: / 0 /4 /7
Date: /0/i6if
Model # 1306-9 Serial # E13148 Hours f'et
Monthly Check list: Satisfactory Unsatisfactory Comments
Check oil & coolant levels,
- Drain fuel system to remove 1120 &
Check for leaks; cooling, lube oil, &
Check belts.
Observe & verify ATS. , Check battery cables.
Rhunts, & cable connections, Check output ammeter & voltmeter, Cheek for cleanliness of system & area. /
[Refer to attachment (D)}
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
Report Date/Time 10/16/2019 9:15:16 AM Page 1
Filename Voltage and Current. From 10/16/2019 6:42:54 AM To 10/16/2019 7:22:39 AM Fluke 1735.fpq
5-• 210
- 1 90
(NI
ei)
▪ 140:
100:
20 -
180 :
140:
• 100:
C•1
▪ 60
20 -
• 100
▪ 60
27.5
22.5 17.5
• 12.5
• 7.5 2.5 2.5
.1 I II
- 1.-TrA111111,10:tilMilillirrgeLlril,"crtffipurrrertnw s „
Loi1
06 45 06 50 06 55 07 00
1 lii 1 11. !.. I ...11
07 05 07 10 07 15 07 20
Erfiergency Generator
9/18/19
Note how many seconds takes to transfer -7 7 Siec_.
2) Transfer life safety & critical equipment
3) Take reading every 15 minutes lb Date:
( 1?
Pech Signature: Date:
rech Signature:
E Wing Attachment (D)
Mo del # 1306-9 Serial # E13148 S -1--a.rt- -14-e 676 14 3 e• trtilk % ire-se 07 fic, Pre check list:
Satisfactory Unsatisfactory . Comments Ile& fuel & fuel tank 7;
Check coolant level
Check air filter
Check batteiie,s & terminals /
Lube Oil pre,ssure (psi)
Labe Oil Temperature (F)
1 9 0
15 Minutes , # 61. (9
Exhaust Stack ).. Temperature (F
/ $0
Operating Voltage (v) 1 480 2 480 3 480 . .
Operating Amperage (amps) 1 1161 2 /0/-1 3 i 0 7
T ithe Oil pressure (psi) —6 12-•
)e Oil Temperature (F) f 1-
Hour Meter (hos) - (hours) 7/
' 3
Exhaust Stack Temperature (F) ;! 7---
Frequency (Hz) 60
Operating Amperage (amps) 1 1 ), c 2 i i .-- 3 4 0 7 /2-4'
1)Return normal power
4) Summarize test & list any
///7 problems & corrective action ..• ,z7
Attu tent (A)
Model # 1306-9 _ Serial # E13148
Hours t--i
Monthly Cheek list: Satisfactory Unsatisfactory
& debris on main stator, exciter, & PMG windings, Check oil & coolant levels. /:,_
Check for any loose electrical' burns, evidence of arcing.
r
I . 2 7/ 15 :7- 7 2( . 5—(=
Check electrolyte levels. /
Check output ammeter & voltmeter, /
Check rate of charge for float & tickle charging. .
Check AC power. ,/
I len ks, unusual noise, excessive shutdown sequence. /
Report Date/Time
9/18/2019 7:38:22 AM Page 1 Filename
HalfHourGenTest G191819..fpq
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
Voltage and Current. From 9/18/2019 6:46:03 AM To 9/18/2019 7:21:08 AM
• 210
• 90
• 210
• 210
• 150
▪ 140
7.1
180:
140 -
▪ 60
20 -
220_
180:
140 :
100 -
60_
-20 - ,
27.5 22.5
— 17.5
• 12.5
• 7.5
2.5 2.5
06 50 06 55 07 00 07 05 07 10 07 15 07 20
11.
LOAD BANK
8/12/19
Model # 1306-9 . Serial # E13148 S 4--,\ r`t- —11--i.tt
I ev,a ‘ 4,--Ne t 62:1 Pre check list:
Satisfactory Unsatisfactory
• Comments 7-heck fuel & fuel tank /
L.-54- +es 4--
1 0 .....1 1›.....ic.
1) Simulate power failure Note how many seconds takes to transfer
2) Transfer life safety & critical equipment
Labe Oil Temperature (F)
, 15 Minutes
- )e Oil Temperature (F)
1.1 our Meter (hours)
4111 . 1 problems & corrective action .
. / ii "---7 -
Date: 72- t
Ceeh Signature: Date:
Model # 1306-9 Serial # E131.48 Hours . LI 'ir 1. V .
Monthly Cheek Pit:
Satisfactory Unsatisfactory Comments
Check for moisture, dust, oils, greases, & debris on main stator, exciter, &
Check oil & coolant levels, / sediment. /
-filters, brackets, fittings, hoses, & other system. / bums, evidence of arcing.
i •
Check coating on terminals, lugs, / float charge. /
Check AC power.
[Refer to attachment (D)J / clean any spills, update log:
7/17/19
Model # 1306-9 Serial # E13148 s 4-,. ri— .716,44 Og i(z. etr.a ‘ ir,--,t, 0 C "( 7 Pre check list:
Satisfactoly
Unsatisfactory Comments _heck fuel & fuel tank
Check oil level
Check batteries & terminals
1) Simulate power failure / Note how many seconds takes to transfer 5- ( S.•,_'s
6, I
1 Vt -
Operating Amperage (amps) 1 1 1 Co 2
/ Z I 3
: e Oil pressure (psi)
6 0
1......Je Oil Temperature (F) i RI'
'I SI . C.
l 'I 3 - •
Operating Amperage (amps) 1 I 2.2._ 2
I 17
1) Return normal power
3) Log all checks & 7
/ 4) Summarize test & list any /7 ' problems & corrective acti9Z/ . -
14 Fech Signature: Date:
-tr(cis. Date: Pech Signature:
Model # 1306-9 Serial # E13148 Hours tf 13 .1
Monthly Check list: _ Satisfactory Unsatisfactory Comments Check for moisture, dust, oils, greases, & debris on main stator, exciter, &
Drain fuel system to remove 1120 &
11.10/ VI .2,1 i 2 G. s- r a C. • 4'
Check output ammeter & voltmeter, Check for cleanliness of system & area.
clean any spills, update log. / z
• 150
90:
330:
• 150
- 90
270_
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg a
06 25 n6 20
20" ,
27.5 22.5 17.5
• 12.5 7.5 2.5 2.5
06 45 06 50 06 30 06 35 06 40
Report Date/Time
7/17/2019 6:59:39 AM Page 1 Filename
Voltage and Current. From 7/17/2019 6:18:32 AM To 7/17/2019 6:51:42 AM HalfHourGenTest G190717..fpq
• 210
• 150
- 90
• 140
• 60
20"
180.
140:
100 :
60:
20"
E.
11+•- •
Generator
6/19/19
1E Wing
Model # 1306-9 Serial # E13148 S 4.-eA r-1 -- —11..-A-4. 062.6 Pre check list:
_neck fuel & fuel tank /
1) Simulate power failure / Note how many seconds takes to transfer 6 -7 5 e ..'s
6.0 l'1.Z° if '62 • & t (1 2
V t 3 3
1( C
'le Oil pressure (psi)
4 I
—..,.oe Oil Temperature (F) t1.44
482 • 1
Operating Amperage (amps) 1 k-zi4 2
‘ 2 -e3 3
I I L problems & corrective actio9/
/ , I)
Fech Signature:
Date:
-CF,ch Signature: Date:
Hours i--/ 1a.ci, Check for moisture, dust, oils, greases, & debris on main stator, exciter, &
Inspect programmable logic control /
1.V1 I 11 . 2' 2 C , 'Cle
2 C. • C.
[Refer to attachment (D)] /
286.5
283.5 -
• 280.5
• 277.5
▪ 274.5
271.5
268.5
286.5
283.5
• 280.5
• 277.5 (.1
274.5
271.5
268.5
286.5
283.5
• 280.5
277.5
▪ 274.5
271.5
268.5
1.2
0.8
0.4
0.4
0.8
1.2
0.8
0.4
- 200ms Period Min
- 200ms Period Max
- 200ms Period Avg r -
_rr
21'
Report Date/Time
(.2.0 6/19/2019 7:01:17 AM Page 1 Filename
Voltage and Current. From 6/19/20196:11:66.AM To 6/19/2019 6:56:31 AM HalfHourGenTest G190619.fpq
0.4
0.8
1.2
0.8
0.4
Co 0.4
0.8
1 I I
1.2 0.8 0.4
0.4 0.8
06 46 06 47 06 48 06 49 06 50 06 51 06 52 06 53 06 54 06 55 06 56
Generator
5/15/19
ACCEfte4 :
1/ 5eC-
1—Ven4541,t4 .
Model # 1306-9 Serial # E13148 S 4-akr-t- —17-i-mt 041.0 Pre check list:
Satisfactory Unsatisfactory Comments -neck fuel & fuel tank Vi t iz
Check oil level
Check air filter V/
Cheek batteries & terminals V
Note how many seconds takes to transfer Arcx-effeef 1/ 6ec-• rivemsfeitED Sec_
CP
1 Wei
15 Minutes .
Li -7..
1 40
Operating Amperage (amps) 1 21 1/ 2 .2_7
3 7 i
Engine Speed (rpm) 1800
: e Oil pressure (psi) P
L. Je Oil Temperature (F) /4
Engine Tempera-tut(F)
Lifivi-i "
Operating Amperage (amps) 1 .-2 7 q 2 .0 1 c -- 3 c-,7 7q problems & corrective acti
Tech Signature:
Date: S . - / 5 -
A7-10 /4471---ql(1j 11C114t
'1
Cech Signature: Date:
Model # 1306-9 Serial # E13148 Hours
Monthly Check list: satisfactory Unsatisfactory Comments
& debris on main stator, exciter, & /
Check oil & coolant levels. Z v /
Check belts. k/
Inspect programmable logic control t/ monthly service.. /.
V
Check battery cables. t/'
.7
Check output ammeter & voltmeter.
Check for cleanliness of system & area. ‘Z
[Refer to attachment MA
V
I/ clean any spills, update log. 7
5/15/2019 7:10:07 AM Page 1
Filename
HalfHourGenTest G190515.fpq
— 200ms Period Min
— 200ms Period Max
— 200ms Period Av g z
Voltage and Current. From 5/15/2019 6:21:35 AM To 5/15/2019 6:56:55 AM
• 210
• 150
• 90
• 210
CN1
▪ 90
• 210
• 150
• 90
1.2
0.8
0.4
- 0.4
0.8 _
F.
Co
1.2
0.8
0.4
0.4
0.8
1.2
0.8
0.4
0.4
0.8
1.2
0.8
0.4
0.4
06 25 06 30 06 35 06 40 06 45 06 50 06 55
Generator
4/17/19
Attachment (II)
Model # 1306-9 Serial # E13148 S rt - - TiTAA-t 0 4,A 0 Ia. wok -171 r.-, e 0 C ---1( Pre check list:
Satisfactory Unsatisfactory • Comments -heck fuel & fuel tank (
Check air filter (
Note how many seconds takes to transfer 9 7
Lube Oil pressure (psi) 0 2-
Labe Oil Temperature (F) 1 461 .15 Minutes
Hour Meter (hours) 11 1/1 ' 3
Engine Temperature (F) ) 44/
Operating Amperage (amps) 1 ) ‘),0 2
. 1 04 3 1 C) .-)..,
- be Oil pressure (psi)
CO
oe Oil Temperature (F) i Di/
4i/C ir.; 5
I fiLt
Operating Amperage (amps) 1 I 2:D 2 I i
3 i ()ti
4) Summarize test & list any i/--2 jt problems & corrective action/ / zx A 7)
Cech Signature:
Model # 1306-9 _ Serial # E13148
Hours 4.45 1
& debris on main stator, exciter, &
Check oil & coolant levels.
each cell & total cell bank
\z(, 1 7-5 2/-2 C,c(t.., [Refer to attachment (D)] /
Filename
Recorded data 1
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
Report Date/Time
4/17/2019 7:09:20 AM Page 1
Voltage and Current. From 4/17/2019 6:18:06 AM To 4/17/2019 6:55:26 AM
5- 210
2.75
2.25 ;
1.75-
2 1.25
= 0.75;
0.25 -
0.25 -
2.75
2.25
1.75 2 1.25 csi
0.75
0.25 0.25
440000 360000
— 280000 :5-- 200000
120000 40000
-40000 06 20 06 25 06 30 06 35 0 • 06 45 06 50 06 55
3/27/19
Date: -3 Tech Signature:
Cenh Signature: Date:
E Wing Attachment (D)
Model #1306-9 Serial # E13148 S +a& ri— iiTA4-t 7.6,:).7 e tr..4 ", -11-,-, e 916 CS Pre check list:
2heck fuel & fuel tank /
1) Simulate power failure / Note how many seconds takes to transfer L-1-0 S, „J s equipment 7 .
Ko i eil
44,O .. 4'6 ' i C 4.1
Operating Amperage (amps) 1 i Li 1 2 1 I Li
3 I 01
'le Oil pressure (psi) C2
--oe Oil Temperature (F) 1 4S
Hour Meter (hours) LI i: i g
Operating Amperage (amps) 1 I 1 46 2 ) / 3 3 1 ( '2— problems & corrective action/ /
/ n /2 -
Model # 1306-9 Serial # E13148 Hours 141 i , 0
Monthly Check list: Satisfactory Unsatisfactory Comments components, monthly service...
...'-ic.., 21% q i
ReportDMe/Time
3/27/2019 7:22:07 AM Page 1 Filename
Recorded data 1.fpq
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
Voltage and Current. From 3/27/2019 6:25:54 AM To 3/27/2019 6:59:04 AM
▪ 90:
270-cv
▪ 90
• 150 _
• 90
1.2
0.8
:Je 0.4 z
0.4
0.8
1.2
0.8
0.4 z 0.4
0.8
1.2
0.8
0.4
0.4
0.8
1.2
0.8
0.4
0.4
06 30 06 35 06 40 06.4 06 50 06 55
2/27/19
Model # 1306-9 Serial # E13148 S 4a,• r't —17 414 r‘(, SO e. INA - ror,e 0 '1. a C Pre check list:
_heck fuel & fuel tank /
Check air filter 7
7/
Check batteries & terminals
1) Simulate power failure / Note how many seconds takes to transfer 6-1(
2) Transfer life safety & critical
Labe Oil pressure (psi) • 65 i i q
1-/ iO ' if
/ 41 f - 1
Operating Voltage (v)
1 480 44-4-- 2 480 460-- 3 480 Operating Amperage (amps)
1 / / 1( 2
1,95 3 1 0.6 e Oil pressure (psi) _
,CO
J__e Oil Temperature (F)
Igq
4' V, .1(
Iftl
Operating Amperage (amps) 1 115 2 1 3 (/ 3 i /3
Shutdown check list:
4) Summarize test & list any i problems & corrective action%
/ f i 4 •
Tech Signature:
Cecil Signature:
Date: -r/7
27 - //
Hours
& debris on main stator, exciter, & i
1-4-,, CI '1 , 12- . 0-7/
Check output ammeter & voltmeter.
[Refer to attachment (DA / shutdown sequence. / clean any spills, update log. /
Ai C .!.0 54 r ....-14 '1,--, /:,' Report Date/Time
2/27/20197:20:47 AM Page 1
'1
Voltage and Current. From 2/27/2019 6:40:39 AM To 2/27/2019 7:16:04/AM
HalfHourGenTestG190227..fpq
— 200ms Period Min
210- —
— 200ms Period Avg z 150-
90:
30 „ , 330:
270:—
- 210 -z 150:
CV
—, 90:
30:
330 _
210 ,— z 15 cr)
—, 90 -
30:
1.65_
1.35 -z 1.05
.... 0.75:
7-3- 0.45:_
0.15
1.65
1.35:
csi
I I i
1350:
100:
550- .1' 7 — cn
150 :
150 - , ' '
220000 180000
140000
— - —a_,-- _ _
— 10000
• z
60000_ 20000!
-20000- , „
50 06
55 07. 00
07 05 07
10 07 15
E-Wing
1/30/19
Note how many seconds takes to transfer g2 s
2) Transfer life safety & critical equipment
3) Take reading every 15 minutes
Tech Signature:
reef) Signature:
Date:
1 / 10/11 Date:
E Wing Attachment (D)
Model # 1306-9 Serial # E13148 S -1-as. ri— —Tam.t. pre. i-t 'I I -' v—A "TA r.—, e 9 .--r 7-- -- '
Pre check list:
_neck fuel & fuel tank i
Luhe Oil pressure (psi)
60(
Luhe Oil Temperature (F)
( 1 l c' k 7z) 2
9 .' (-) 3 ck
- e Oil pressure (psi) _
6. 0
.L.,_Je Oil Temperature (F)
1 1 V el--7 .i. . --7
-.1 l e
Operating Amperage (amps) 1 k \-5 2
1 0 i corresponding reading , ( /7 problems & corrective acti / / 4
Hours chl
& debris on main stator, exciter, & burns, evidence of arcing.
i f each cell & total cell bank / i 1 . 2 '3 , i 5 i ;Z 6-*/ 2 C, • 5-1
Check electrolyte levels. --
[Refer to attachment (D)]
1/30/2019 7:51:16 AM Page 1 Filename
HalfHourGenTestG190130..fpq
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
Voltage and Current. From 1/30/2019 7:01:39 AM To 1/30/2019 7:35:39 AM
▪ 210
• 150
▪ 90
• 150 Cs1
• 210
• 150
1.65
1.35 -=
• 1.05
• 0.75:
• 0.45 -
0.15 -
1.65
1.35:
• 1.05
• 0.75-
0.45
0.15
1650:
1350:
▪ 750:
• 450:
150•
165000 135000 105000
• 75000 45000 15000
-15000 07 05 07 10 07 15 07 20 07 25 07 30 07 35
Generator
2/1 1/1 9
Date: /7
Date: / 2 -4/f
Date:
Tech Signature:
WL or Supv. Signa
T. Signature:
Ambulatory Care Clinic Attachment (D)
Model # 3508 Serial # 23207184 Start Time: g/s- Stop Time: C., 7.10 Pre check list:
( Satisfa yy Unsatisfactory Comments
Check fuel & fuel tank
Running check list: Comments Quarter:
1) Simulate power outage
F (7 t la
3'3. 7— t IP
Operating Voltage (v) 1 480 2 480 3 480 Operating Amperage (amps) 1 L L(( 2 1 "1-1— 3 13.5 n.e Speed (rpm) 1800
Lube Oil pressure (psi) /1
Lube Oil Temperature (F) I t Z.
Hour Meter (hours) cp3D.If
Engine Temperature (F) Itt -
Operating Voltage (v) 1 480 2 480 3 480 Orating Amperage (amps) 1 lqU 2 •
11 I
1)Return normal power / problems & corrective actionz i i ,
i) Z
Ambulatory Care Clinic
Model # 3508 Serial # 23207184 Hours 6:, 53 . c, Monthly Check list: Satisfactory Unsatisfactory Comments Check for moisture, dust, oils, greases, & debris on main stator, exciter, &
(7 components.
burns, evidence of arcing. -monthly service.
' Check battery cables. / shunts, & cable connections. /
Vs - 17— ) 3 , r3 Z 6-, . a 7 float charge. float i.2.-- 6- .
[Refer to attachment (D)1
Confirm with Security that audible alarm from panel can be heard.
Tech Signature: Date:
WL or Supervisor Signature: Date:
12/11/2019 8:25:59 AM Page 1
Voltage and Current. From 12/11/20196:41:23 AM To 12/11/20196:50:03 AM Filename HalfHourGenTestB191211.fpq
200ms Period Min 200ms Period Max
— 200ms Period Avg
0642 061.43 0644 0645 0646 06':47 06!48 0649 0650
CC
Generator
11/13/19
WL or Supv. Sign re*/
Date: ii
Model # 3508 Serial # 23207184 Start Time: &) Stop Time: 0 7 , Pre check list:
(-neck fuel & fuel tank /
I) Simulate power outage / l 1
Ili 0 2
1 2..4 3 t 3 1 ne Speed (rpm)
Lune Oil pressure (psi)
-71 l'q' t7., 3), .C., \ ."-C'
Operating Amperage (amps) 1 I (61 2
\3 c-, 3
1 7 1 problems & corrective action / // , ,/ (*) .72
F -. Signature: Date:
it//3//p
3/1 Date:
Date:
Tech Signature:
WL or Supervisor Signiture:
Ambtdatory Care Clinic
Model # 3508 Serial #23207184
Hours (,-53 ,a I
& debris on main stator, exciter, & monthly service.
1/
13.1 2- / 13, \3 , 2(0.2-.7
02(0 . .---
[Refer to attachment (D)1
Confirm with Security that audible / alarm from panel can be heard./
11/13/2019 7:28:43 AM Page 1
Voltage and Current. From 11/13/2019 6:40:33 AM 10 11/13/2019 7:14:58 AM
HalfHourGenTestG191113.fpq
AP' • ▪ • rgr. Jr...• • S. — 200ms Period Min
— 200ms Period Avg
:Te
• 150 Cs1
- 90
• 210
• 150 en
225 .-
16.5 13.5
10.5 7.5
4.5 1.5 1.5
• I
ALtatiLLUtit
II
06 45 06 50 06 55 07 00 07 05 07 10 07 15
ACC
Generator
10/9/19
1Vg/11
/0/s/17 Date:
Ambulatory Care Clinic Attachment (D)
Model # 3508 Serial # 23207184 Start Time: 06-51-- 'Stop Time: ) I I ( P— c; check list:
Check fuel & fuel tank /
1) Simulate power outage /
/f C7 •
I i54:7
A/3 2—
115 0
Operating Amperage (amps) 1 1 3 1 2
11C, 3 13 I
. Speed (rpm) _,Ine
7g
Lube Oil Temperature (F) . i 'VI, k 3 2_, Engine Temperature Temperature (F)
1 f"1.— t
Operating Amperage (amps) 1 i c Li 2
I 3 ( 3 2,=.::.
Shutdown check list: Comments level (
3) Log all checks & /
4) Summarize test & list any / it/ problems & corrective action i / I)
Tech Signature:
WL or Supv. Signa r
;. Signature: Date:
Model # 3508 Serial # 23207184 Hours '2 4
Monthly Check list: Satisfactory Unsatisfactory Comments sediment. .-.1 system. /
Colanectioris., .InspeefoontaCts for pits, burns, evidence Of arcing.
aspect programniable logic control bbserve & verify ATS.
monthly service:, .,. : .
Check battery Cables.... . 0-
Check coating on terminals, lugs;
shunts, &cable connections.
Check & record Voltagereadings of each cell & total Cellhank., :
P. 1 n'- ( CS . 1 z-i i 2-C. Z.9
Check &record battery load w/ cells on float charge. , 02 C. • C.
Checkelectrolyte levels. . /
Check rate of charge for float & 'trickle
• chai-ging. .
Check for cleanliness of system & area.
Start generator & rim on building load
:[Refer to attachinent .1 Check engine &bearings- for oit& H20
- leaks,.uriusualnoise, eXcessive Vibration, & ovorheatin_g.
.. / • 1 .
-.After leadtest, observe transfer & Shadow-a sequence. .
After shutdoWn,'Wilie .6tfivn engine;
Clean 'any spill,. update log. .
Confirm with Security that audible alarm from panel ban be heard 0 .
Tech Signature:. Date:
10/9/2019 7:33:02 AM Page 1 Filename
HalfHourGenTestG191009..fpq
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
I.
LILL
06 40 06 45 06 50 06 55 07 r - 07 05 07 10
Voltage and Current. From 10/9/2019 6:35:32 AM To 10/9/2019 7:16:47 AM
47.
, 270
• IIT•
I -. r • r • 111- ), • !SI • Il• , 270
330_
150:
90:
150_
- 90
27.5
22.5
17.5
• 12.5
7.5
I 2.5
2.5
II
07 15