Attachment 8.826-926 Complete Report - Honolulu VAMC Final-4.pdf
PDF 24 MB Posted
- Solicitation number
- 36C26126Q0232
About this file
This document contains a series of monthly emergency generator test reports for the Ambulatory Care Clinic and Parking Structure at a Veterans Affairs Medical Center, documenting detailed equipment maintenance and performance checks. The reports cover generator tests from January through September 2019, consistently using a standardized checklist to evaluate generator performance, including pre-check, running, and shutdown procedures for specific generator models (Model #3508, Serial #23207184 and Model #200DFAA, Serial #F960608681). Each test records critical metrics such as engine speed, oil pressure, temperature, voltage, amperage, and transfer switch performance, with technicians marking inspections as satisfactory or unsatisfactory across multiple system components including fuel systems, electrical connections, batteries, and overall generator functionality.
The related federal contract opportunity is a Request for Quote (RFQ) for an Electrical Distribution System Condition Assessment/ARC Flash study issued by the Department of Veterans Affairs Veterans Health Administration. The solicitation (Solicitation Number: 36C26126Q0232) has undergone multiple amendments, with the most recent (Amendment 003) extending the response deadline to Tuesday, January 6th, 2026 at 15:00 PST. The point of contact is Victoria Torres, and potential bidders are required to submit questions by December 9th, 2025. The procurement appears to involve a comprehensive electrical system assessment, with attachments including simplified one-line diagrams and a previous study being provided to support the solicitation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACC
Emergency Generator
Test
9/1 1/1 9
7/ 1 /
/0?
Date:
Tech Signature:
WL or Supv. Signature:
fr
Date: r
Ambulatory Care Clinic Attachment (D)
Model # 3508 Serial # 23207184 Start Time: e'Stop Time: (_,D7/ e.„ Pre checklist:
Satisfactory Unsatisfactory Comments Check fuel & fuel tank /
Check oil level /
Check coolant level 1i
Check air filter /
Check batteries & terminals /
Running check list: Comments Quarter:
1) Simulate power outage /
2) Transfer life safety & critical equipment
3) Take reading every 15 minutes
Engine Speed (rpm)
Lube Oil pressure (psi)
C, Lube Oil Temperature (F)
1 c, Hour Meter (hours) i 'Si. 3
Engine Temperature (F)
/ 9 0
Frequency (Hz)
Operating Voltage (v) 1 480
2 480 3 480 Operating Amperage (amps) 1
/42_ 2 1 I- 4 3 1 3ei
ir. I (rpm)
/ /P-7
I .
Operating Voltage (v) 1 480 2 480 3 480
Orating Amperage (amps) 1 1z-r1 2 / 3! 3 j 1r6
Shutdown check list: comments
1) Return normal power .
2) Check oil, fuel and coolant level
3) Log all checks & corresponding reading a
4) Summarize test & list any problems & corrective actiqp r). Signature: Date:
Ambulatory Care Clinic Attachment (A)
Model #3508 Serial #23207184
Hours eS i . `7
Monthly Check list: satisfactory Unsatisfactory
Comments
Check for moisture, dust, oils, greases, & debris on main stator, exciter, & PMG windings, Check oil & coolant levels.
Drain fuel system to remove H20 & sediment.
Check for leaks: cooling, lube oil, & fuel system.
Check for loose/damaged clamps, filters, brackets, fittings, hoses, & other components.
Check belts. .
Check for restrictions of intake/exhaust system.
Check for any loose electrical connections., .Tnspea'contacts for pits, burns, evidence Of arcing.
r
InSpect progiann:nable logic control adjustments bbserve.& vent/ AT.S. .
Certify that equipment has received MOnthly service:, ,• : . .
'Check batters, Cahles.,-, • . - ' / - •
Check coating on terminals, lugs;
shunts, koable connections.
Check & record Voltage:readings of each cell & total Celtbank., :' , • .. .•
CS, 14,,, i 3,i'r, Check &record battery load w/ cells on . . _ float charge.. .
e -s-
Check.electrolyte levels. .
Check output ammeter & voltmeter.
Check rate of charge for float & 'trickle . ehai-ging. . . •
Check AC power. . . _ .
Check for cleanliness of system. & area..
Start generator 4. Epn on building load-. - , [Refer to attachMent MA . ...• .
Check engine & bearingi for 'oit&II.20 leaks,•unusual noise, excessive • • ... .. . . • I . • •
& overheating.
_Vibration, -After lbadtest, ebserVe transfer & Shadow-a se 'quenie
A.fler shuttloWb_,\*Ilie .ridwengitte, Clean buy sill k update log
,CgrifirM'W'it,la Security that audible _.
alarm from panel -arr be heard.. .
Tech Sign. ato.r:. • Date:
V' II a a
Voltage and Current. From 9/11/2019 6:35:08 AM To 9/11/2019 7:18:28 AM
• 210
• 150
▪ 90
RepodDaternme 9/11/2019 7:49:12 AM Page 1 Filename HalfHourGenTestG190911..fpq
---- 200ms Period Min ---- 200ms Period Max ---- 200ms Period Avg
• 150
▪ 90
• 150 csi
• 150
- 90
• 20
-4
MUiLkJ dulj
LLd LLhLhnJItA
'LAU
LLLLIJLJL
06 40 06 45 06 50 06 55 07 Or 07 05 07 10 07 15
Generator
Load Bank Test 8/13/19
Tech Signature:
WL or Supv. Signature:
Ambulatory Care Clinic Attachment (D)
SA3
Model # 3508 Serial # 23207184 Start Time: Stop Time: N ' 2.a v i-t 'Pre check list: •
Satisfactory Unsatisfactory u..,eck fuel & fuel tank
1..."... 4" i•-• st don !edit ael iN• h iv.
Check coolant level /
Check air filter in.e Speed (rpm) _
.L.oe Oil pressure (psi)
6st. 1
Shutdown check list:
1) Return normal power corresponding reading problems & corrective action , / a ...'
F's. Signature:
Date: .cj /24/19
Date: (7/74(11
Date:
Amb latory Care Clinic Attachme t (A)
Model #3508 Serial # 23207184 Hours 4 -3 1. /
Monthly Check list: Satisfactory Unsatisfactory Comments
PMG windings.
Check oil & coolant levels. /
1 components. / connections, .Thspeet.coptacts fox. pits, bums, evidence Of arcing.
S.
InSpect progratnniable logic control adjustments. " / bbserve.& verify AT,S. . ' , inbnthly service:, :. : . .. : • .
:Check battery Cables..••5 • . • - • / '
Check coating on terminals, lugs; /
. shunts, &seal* connections.
Check & record Voltage,readings of
-each cell & total Cell-bank., : , Check &record battery load w/ cells on _ float charge.: • . .. . -
Check.elect.rolyte levels. /
Check rate of charge for float &trickle •charging • •
Check Ad power
Check for cleanliness of system. & area.
Start generator & run on building load-. - 5 IRefer to attachMent 0)1 ,L.' , , .. . . .. . . ,. ..
Check engine & bearings. for oil& 1120 , . .
lealss,•unusual noise, e*cessive :". : . .
vibration, & overheating. .
After lbadtest, observe transfer & ShUtdown- seiluenc'e. . •,..
After shutdoWn,' Wilie rldwn.engthe, Clean 'my snillk update log. .
.cop.nrul. -i:iii,th Security that Audible 55 alarm from panel (..an• be heard.., Tech Sign. ainre:. Date:
Attachment (D)
Model # 3508 Serial # 23207184
Running check list: Comments Quarter: ATS#1 Time to transfer power ATS#2 Time to transfer power Passed
Failed
2) Log all checks &
3) Summarize test & list any problems & corrective action , , /
/ i
WL or Supv. Signature: Date:
Eng. Signature: Date:
Date: 7r/zi /1 5
Generator
7/10/19
7 --to --/fr
Attachment (19)
# 3508 Serial # 23207184 jo•-? 'p'Model Start TimeeSr Stop Time:
Pre checklist:
( Satisfactory Unsatisfactory
—Check fuel & fuel tank ..-
Check oil level e'
Check coolant level ,--
Check batteries & terminals ...'"
3) Take reading every 15 minutes /
Engine Speed (rpm) 1800
Lube Oil pressure (psi) 8' 0 •
Lube Oil Temperature (F) I /a
Hour Meter (hours) 1r2-4. • 5
Engine Temperature (F) I (11(.7
Frequency (Hz) 60
Operating Amperage (amps) 1 / 1-1 1— 2 i 2_1! 3 i f 2_
Ine Speed (rpm) — 1800
Lube Oil pressure (psi) 4-e:3•• 5-17-0 f c, Hour Meter (hours) .6•;•(4. • laP
Engine Temperature (F) teg7
Operating Amperage (amps) 1 / q 2— 2 / 2 y 3 i Y /
Shutdown check list: .v Comments 1)Return normal power
4) Summarize test & list any / problems & corrective action /%11/ / / 4—/ #2
Tech Signature: Date:
WL or Supv. Signa Date:
Signature: Date:
Attaehme i t (A)
Model #3508 Serial # 23207184
Hours
Monthly Check list: Satisfactory Unsatisfactory sediment. /
Check for loose/damaged clamps, filters, brackets, fittings, hoses, & other
Check belts. , ../
•Check for any loose electrical connections., .linspeof contaets for pits, burns, evidence. cif arcing.
InSpbct progrm-rnable logic control adjustments, .. . _.
'Observe* verify AT,S. . ..r inbrithly service., .,• -• . • • . .
..,V
*Check batten', Cables,. • . . • ' .V shunts, kcable connections.
. V .
each cell & total cell-bank.,: , 13.144/
1 5
.14
.24
Check &record battery load w/ cells on . . . . -. float charge.' . .. , ., . • .
• r _ .
.2.4 . '4-
Checkelectrolyte levels. .
Check output ammeter & voltmeter. 7 .
Check rate of charge for float &trickle .cha . . •i-ging.
'Check Ad power. , Check for cleanliness of system & area.. X •
Start generator 4. hm on building loact -f • .
[Refer to attaclMient (D)1
7 '
Check engine 0 , bearings. for oil* H20 leaks •tuiusual noise, excessive •". ' Vibration, & overheating. .
After leanest, obsr.rsie transfer & Shntdown seiiilleDid. • - • ..
Aftei- shutdoWh,Vilie rkwn. engine', Clean any spilli, update log
/ r
.dorifirth.i.,7,ii,th Security that audible alarm from panel bakl: be heard..
Tech Signature:: • Date:
II
Report Date/Time
7/10/2019 7:47:11 AM Page 1
Voltage and Current. From 7/10/2019 6:34:55 AM To 7/10/2019 7:15:50 AM Filename
HalfHourGenTestG190710..fpq
• 210
• 150
▪ 90
411. — 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
WY'
CNI
• 150 cs,
▪ 90
• 210
▪ 90
210 _
16.5 13.5 10.5_
7.5
4.5 '
1.5:
1.5 -
06 ?`
1 6.11t_tfula.
oo 07 05 07 10
.411-112tWL:trualt_t_it...
06 40 06 45 06 50 06 55 07 15
Generator'
6/12/19
Attachnie It (A)
,del #3508 Serial # 23207184 Hours C 2. 5. 1
& debris on main stator, exciter, & PMG windings.
y V
Chock oil & coolant levels. t/
Drain fuel system to remove 1120 &
Check belts.
I/
Check for any loose electrical • connections., .Inspeefoputaets for pits, bums, evidence Of arcing.
Inspect progfan-iMable logic control adjustments. .. . l/V
'Observe* verify AT,S. . 1/''' nionthly service:,;. -.. . : • .
•C' -I batter Y Cables:, • . . -
C.L—ek coating on terminals, lugs;
shunts, kcable connections. LZ
Check & record VoltageJeadings of -each cell & total Cell-bank., : .
Check &record battery load w/ cells on float charge.: . ., : ., . ' •
Cheekelectrolyte levels.
Check output output ammeter & vOltmeter. v y
Check rate of charge for float & triclde . charging.
t/ j
'Check AC power. . .
Check for cleanliness of sYstern & area. +.7. •
Start generator & sun on building load: • .
'Refer to attachinent (D)1 . ‘ '
17 •
Check engine &, bearings for oil* 1120 leaks,•unusual noise, excessive : • 'vibration, & overheating, ' v r .
-After leadtest, ohserVe transfer & Shittclown- sequence. . • .
After shutdoWn,,'Witie 46ml:engine:, Crean any spine,. update log. . . . \.,/
.Coritriiii;jith Seenrity that audible ...
alarm from panel ban be heard. .
Date: 0 2- //, Ambulatory Care Clinic Attachment (D)
Model # 3508 Serial # 23207184 Start Time: 0 C2 2 Stop Time: 0 6 5 2_.
• Pre check list:
Check fuel & fuel tank tZ
Check oil level IV
Check coolant level
Check air filter i/
Check batteries & terminals
Running check list:
1) Simulate power outage V equipment I/ Al s I '. It 5 C c- A-TS ̀ • 2- a 5€
Lube Oil pressure (psi) 14
Lube Oil Temperature (F) I 1-e10
Hour Meter (hams) 425 • II
Engine Temperature (F) I fic 0
Operating Amperage (amps) 1 /0 2 i 2.;2— 3 i V f
Lube Oil pressure (psi) ly
Lube Oil Temperature (F) / `ZiO
Hour Meter (hours) .6 2 S . -7
Engine Temperature (F) i 1(0
Operating Amperage (amps) 1 11 1
2 I q g 3 2c,-1—
Shutdown check list: Comments
1) Return normal power ..."
‘7
CZ
problems & corrective action .-) /
Tech Signature:
jka
RepoaDatenlme
6/12/2019 7:21:42 AM Page 1
Voltage and Current. From 6/12/2019 6:22:42 AM To 6/12/2019 7:02:02 AM
HalfHourGenTestG190612..fpq
— 200ms Period Min
— 200ms Period Avg
- 90
30 -
330_
• 210
• 150 cs,
▪ 90
• 90 -
2.2
1.8
▪ 1.4
• 1
• 0.6_
0.2
0.2
2.75 _ 2.25
1.75
• 1.25
0.75
0.25
-0.25
• 1750
• 1250
▪ 750
165000 135000 105000
=C-- 75000
• 45000
15000:
-15000
- OW i11 A. lir a_ T2-
LL
L
LLiLLALL
06 25 06 30 06 35 06 40 06 06 50 06 55 07 00
MONTHLY'
GENT - ST
5/8/19
WL or Supv. Signature:' Date:
/1
Attachment (D)
Model # 3508 Serial # 23207184 Start Time: 06'30 Stop Time: (...1 -702 Pre check list:
Satisfactory Unsatisfactory
—Check fuel & fuel tank /
Lube Oil Temperature (F) I V
Hour Meter (hours) 6g q 0 4
Engine Temperature (F) 110
Operating Amperage (amps) 1 )2.4 2 I 1 6.. 3 / 5 7
..ae 1. 1. in 1800
Lube Oil pressure (psi) /
Lube Oil Temperature (F) J 0
Hour Meter (hours) A.2 s i I
Operating Voltage (v) 1 480 2 480
3 480 Operating Amperage (amps) 1 /4/ 2 /3 / 3 i 9 q ing reading corresponding
& corrective action /
1 / ,/ I I • •
Model #3508 Serial #23207184 Hours
Monthly Check Check list: Satisfactory Unsatisfactory
' components.
Check belts. / aonnections., .1-nspea.contacts for. pits, burns, evidence cif arcing.
Insp'ect prograrciniable logic control adjustments bbserve& verify ATS. .
Monthly service,,• -.. . • / .
'Check batter Y Cables.... • . ' - ' - -shunts, 4:cable connections.
Check & record 'voltage:readings of each cell & total Cell-bank., :. .
,1 kl,tc.), 2.(,. 2 -s
&record battery load w/ cells on Check . . . _ float charge. . .. - • .
• / _ . . ._ C. A
Checkelectrolyte levels. /
Check output ammeter & vOltmeter.
/ . V
. charging'. •
V• .V V V•
Check Ad power. . . _. . /
_ V-
Check for cloar:diness of system & area:. .i -
Start generator i.% run on building load: • iftlefei to attacinient (D)1 . .. , . .
. / V. •
Check engine& bearing for oit& 1120 . . .
1palp,uUusual p.o.ise, o*cessive : • : . . .
vibration, & oVerheating.
-After lbadtest, obserVe tMnsfer & . ..
ShUtdown sequence. . ... ,.
After shutdoWn,‘Wifve rkvvii engine, Clean ;wiy spill. update lag. . .
1 .
.cOntirM..V.;iith Security that audible _.
alarm from panel ban be herd.. .
Tech Signature:. Date:
5/8/2019 7:52:23 AM
00 6 55 07 05 07:10
Voltage and Current. From 5/8/2019 6:31:17 AM To 5/8/2019 7:10:37 AM Filename
HalfHourGenTestG190508..fpq
....1,-, .- ...- ,,,, ...,.......—.0e- -
U
....... ,.... ..t
1 0
50 _
30 :
.70
!10 _
30, !70:
!10;
90 -
30 -_
'JO
,.10
11111M111111111
11111
1 I.
I I=
...., , MN ill aill i II irmiinwilturoorm mai simr„prausimp.
ril
111111111= 41 11.1
.11. I 111111 111111. 110011. 411 1.1111 'Mlle. "'L.:111
-..MINI IIININIMIS.11.11 MM. hit IIIIM
Mel. 10.1. 11 MI
11111
INI
Mill 30 , 111 11111111
140 , /60.:
)00
DOD',
200ms Period Max
— 200ms Period Avg
Co
Co
-2
MONTHLY
GEN TEST
4/10/19
Date:
Tech Signature:
-. Signature:
Air bulatory Care Clinic Attachment (D)
Model # 3508 Serial # 23207184 Start Time: c‘i/S Stop Time: 0 1.2 1 Pre check list:
Check fuel & fuel tank
Check oil oil level ...----
Check coolant level ,...,-----
Check air filter ..-------
1) Simulate power outage V".
Engine Speed Speed (rpm) 1800
Lube Oil pressure (psi) Icf
Lube Oil Temperature (F) — N it-
Hour Meter (hours) 6ac I . 7--
Engine Temperature (F) i 4K-7--
Operating Amperage (amps) 1 1 ; if 2 / /6 3 1.3 I h_ 52 j2 n a) _ _I 1800
Lube Oil pressure (psi) 1 6r
Lube Oil Temperature (F) l 151—
Hour Meter (hours) c a Al. z(
Engine Temperature (F) 1 q -2--
Frequency (Hz) 60 -
Operating Amperage (amps) 1 I ( 2 1 /10 level / corresponding reading / problems & corrective action/) / /1 /— •
Model #3508 Serial # 23207184 Hours C., ' ..( , C.
Monthly Check list: Satisfactory Unsatisfactory Comments
& debris on main stator, exciter, & /
PMG windings, S filters, brackets, fittings, hoses, & other conttectipils, .linspe6t .contaCts for pits, burns, evidence,df arcing.
InSpect programable logic control adjustments bbserve.& verify ATS. .
7 .-
Monthly servim ,• : . .. :- .
'Check battery Cables:. • . • ' ;/-shunts, kcable cormection.s.
-each cell & total Cell-bank., :
I 1,6 5 II . 6 2- 2.3. 6y . • .
Check Sr record battery load w/ cells on float charge.. . : .. . • -
Check electrolyte levels. ..7
Check rate of charge for float Sr 'trickle •charging. • •
1. _7
. i . • ..
Check Ad power. . . _.
Check for cleriliness of system & area, .7'.
*art generator 4 run on building load-, - -Refer to attacbnient (D)i . ... •
. / S - • • - -
Check engine& bearing4 for .oit& 1120 .
lealss,unusual noise, e*cessive •" Vibration, & oVerheating..
5 - •
-After lOad.test, ob,r,rVe transfer & Shadown- sequence. . .. •,...
After shutdoWh,'Wilie rlOWA engine, Clean :any spilli, update lag. . . . •/ . .
Confirm with Security that Audible ..1 alarm from panel ban: be herd.. • S
Tech Signature.:. • Date:
4/10/2019 7:56:05 AM Page 1
Voltage and Current. From 4/10/2019 6:38:19 AM 10 4/10/2019 7:23:04 AM
Recorded data 2.fpq
— 200ms Period Avg
• 210
— J 90
▪ 90
• 210
0,
• 350
• 250
▪ 150
• 420
66000
54000 42000 30000
• 18000
-6000
--r•r tiolai.1.411„t_tt
. - PC Ir Ito • • V'
LILL JiLiLtkk
-̀ 6 40 06 45 06 50 06 55 07 00 07 10 07 15 07 20
3/22/19
Model # 3508 Serial # 23207184 Start Tim --7 i c Stop Time: oiy —7 c c,"
' pre check list:
Satisfactory Unsatisfactory i
Check oil level /-
7/5
1 $ V t( °
Frequency (Hz) 60t
Operating Amperage (amps) 1 I '16 2 i 2 7 3
1 1--r a-ine Speed (rpm)
—Lube Oil pressure (psi)
.7 .
6. d-3 , 1
60 -
Operating Amperage (amps) 1 • ', t ).% 2 t 32-f 3
1 `i- ...
comments problems & corrective action
1/ 7 i
. 1 / % i
(-/ Tech Signature: .///'
WL or Supv. Signatir‘: . Date:
ttachme t (A)
Model #3508 Serial # 23207184 Hours „ . (2 . 4-4 . 0
Monthly Check list: Satisfactory Unsatisfactory Comments Check for moisture, dust, oils, greases, & debris on main stator, exciter, &
Check for loose/damaged clamps, system, , eonnections., .InspeCt 'eon:tads for pits, bums, evidence.df arcing.
InSpect programinable logic control adjustments
'Observe* verify AT,S. :
inonthly service., ••• -- . ,: :. . .
-Check batterY 661s..... • . •
:shunts, &cable connections.
_Check & record Voltage,readings of each cell & total Cell-bank., :* , 12,c.)3 / 11,99 / 2. 4/.1k, .
float charge... • -. , ., . . • •
. • 57'
Check.electrolyte levels.
Check output ammeter & veltraeter. /
•chai-ging .
*Check Ad power. . . . _. /
Check for clefiliness of system & area.
*art generator & run on building load.: • :
-Refer to attachnient OM . : :. .
: 7 •
Check engine*, bearings for oil* 1120
. lealcs,•unusual noise, eicessive •". -' - .., .. : . . • , . • • Vibration, & overheating.
After leadtest, obserVe transfer & Sshutdown'sePuences. . -. • ..
After shutdoW•h,‘Witie ridt74 engine, Crean any spine,. update log. .
.Conftini..With 8- bilrity. that audible .
alarm from panel ban: be heard.. .
Tech Siinature:. Date: . .
A_ALLILLikuLithJILL
I. II
3/22/2019 10:08:28 AM Page 1
Voltage and Current. From 3/22/2019 7:10:57 AM To 3/22/2019 7:51:02 AM
Recorded data 1
• 150
▪ 90
330 :
270;
210;
• 150;
90;
30 -
• 150
- 90
2 20
• 12
-4
• 28
• 20 cs,
• 12
-4
35 :
• 25 0-)
- 15
3300000 2700000
—2100000 ---1‹ 500000
900000 300000
-300000
Jr • MAIL• .L=4. I - -
— 200ms Period Min
II 41—
..A.ALLILL 1.1.1tuiLiddilLILALLir-A-A
07 15 07 20 07 25 07 30 15 07 40 07 45 07 50
Model # 3508 Serial ti 23207184 Start Time: 6633 Stop Time: 0 40
P"4 check list:
Check fuel & fuel tank 7
Check oil level " /
Check batterieS & terminals /
. Running Check list: Comments Quarter: - Month #1 - ATsta 30 5ed '1 Month #2 - ATS#2 5 5 5.. 'i Month #3 -=1V1aiiiiIi•eaketr
1) Simulate power outage / Note how many seconds takes to transfer )....2_seco vl 0)
- Transfer life safety & critical
7 0
-7
.4-z_ 741)-9
1-'7g
Operating Amperage (amps) 1 g S
2 s c_D 3 S 9
_i: .s_iT_DI in 1800
Lube Oil pressure (psi) 7
Lube Oil Temperature (F) (., 2
Hour Meter (hours) 2.3.
Engine Temperature (F) / St)
Operating Amperage (amps) 1 "2 "-; 2 SO 3 sq
Shutdown check list:
v.Ze 1) Return normal power corresponding reading \.
4) Summarize test & list an/ V -problems & corrective actio
Model # 3508 Serial # 23207184 Hours C2_'3.3
Check oil & coolant levels, Drain fuel fuel system to remove H20 &
Check Check for leaks: cooling, lube oil, & fuel system. CZ
_astern.
connections., hispeet contacts for pits, burns, evidence,df arcing.
Inspect programmable logic control adjustments. I./ bbserve & verify ATS.
Certify that that equipment has received monthly service,,, :
Check battery cables, - t -.
shunts, & cable connections.
..Z
I Check & record Voltage,readings of each cell & total cell bank : , V
I 3.i( 1 i 0 _6, i /3./4 2
Check & record battery load w/ cells on float charge.
Check electrolyte levels. . z -.
Check output ammeter & voltmeter. ../
Check rate of charge for float & trickle •charging
Check AC power.
Check for cleanliness of system & area.
Start generator 4 run on building load [Refer to attachineht (D)1 , Check engine & bearings for oil.& H20
• leaks, unusualnoise, excessive i vibration' , & overheating.
After loadtest, observe transfer & shutdown sequence.
After shutdoWn,'WiPe down engine;
Clean xhy spills,, update log.
Confirm with Security that audible alarm frorn_panel Can be heard. •
Tech Signature:. - Date:
du_
— 200ms Period Max
— 200ms Period Avg
War Pr'
-t
[AUL
Voltage and Current. From 2/20/2019 6:41:33 AM To 2/20/2019 7:24:28 AM
Report Date/Time
2/20/2019 7:55:04 AM
Filename
HalfHourGenTestG190220..fpq
I Page 1
06 45 06 50 06!55 07 00
5: 210
• 90
• 150_ co —J 90
1.1 _
0.9
0.7 2 0.5
0.3
0.1
0.1
• 1050
CO
--1 450
88000 72000 56000 40000
• 24000
-8000 uHi ana
1 11 kr, LU
07 05 07 10 07 15 07 20
1/23/19
Model # 3508 Serial # 23207184 Start Time:06;31 Stop Time: c, -1 I 2.-r '; check list:
Check fuel & fuel tank • /
Check oil level • i
Check coolant level . /
Check batteries & terminals '•
Running check list: `---4v-*/ w -N-- Comments Quarter: Month #1- ATS#1 rl 5,-4:s Month #2 - ATS#2 '--1 6 5, Month #3 - Main Breaker
1) Simulate power outage 7/ Note how many seconds takes to transfer /1. L-i 0
2) Transfer life safety & critical
-1 4 l 1 1 ')
& 2-2 • :).-
1 V I c
Operating Amperage (amps) 1 t tc- 2 lOt( 3 k I q
,me Speed (rpm)
72.
\ `g 2-6
(c, Z2.-
Engine Temperature Temperature (F)
5 )2'
Operating Amperage (amps) 1 t 2. '5 2 k \ -S 3
1 3 I
1) Return normal power 7 / level ( .
3) Log all checks & ( corresponding reading , A
4) Summarize test & list any/, // problems & corrective actioA // / / 7.1 i . - I - . il
Model # 3508 Serial # 23207184
Hours 6 22 , Monthly Check Check list: Satisfactory Unsatisfactory
& debris on main stator, exciter, & PMG windings.
I system. .
connections.. 'lisped contaCts for pits, bums, evidence of arcing.
Inspect programmable logic control adjustments.
Observe & verify ATS. • / --
Monthly -service:, ,- . • -
Check battery cables,. - 1 shunts, &cable connections. /
Check & record Voltagel'eadings of each cell & total cell-bank, ; .
0 .11-1 / t-1 .07i 2-6.2-4/ float charge. . -
,2 C. , +
Check electrolyte levels. /
Check output ammeter & voltmeter. /
Check rate of charge for float & 'trickle charging'
Check AC power. . . _ .
Check for cleanliness of system & area. /
Start generator 4 run on building load- - ,. -.
[Refer to attachinent (D)1
Check engine .& bearings for oii-& H20
- leaks, -unusual noise, excessive ' vibration, & overheating.
-After loads-test, observe transfer & shutdown' sequence.
After shutdoh,‘Vitie -awn engine', Clean any spillS,. update log. _ /
Confirm with sp'cUrity that audible alarm from panel Can: be heard.., /.
Tech Signature: Date:
LL1.1.L11.1.211,2L11_1_1_1.L_ r-- -1
Voltage and Current. From 1/23/2019 6:51:10 AM To 1/23/2019 7:31:45 AM a- • *S.
aa• T • - • a•--f
Report Date/Mme
1/23/2019 7:46:17 AM Page 1 Filename
HalfHourGenTestG190123..fpq
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg
• 150
• 150
• 210
• 150 -m
4.4
3.6
- 2.8 2 2
• 1.2
0.4
0.4
4.4
3.6
2.8 2 2
▪ 1.2
0.4
0.4
330000 270000
210000 150000 z 90000
30000 -30000 aa -
1.
06 55 07 00 07 05 07 10 07 - 07 20 07 25 07 30
Parking Structure
Emergency Generator Load Bank
8/21/19
Running check list:
1) SirOulate power outage
Comments Note how many seconds takes to transfer
2) Transfer life safety & critical equipment
3) Take reading everytc minutes
P riding Structure Attachment (I))
Model # 2000FAA . Serial # F960608681 •
Start Time: Stop Time:
Pre check Hsi:
check fuel & fuel tank /
G-4, rte roa..4-0 tr ti 1-.6 4- v- ..# pi 41%* ,„„cs .
Check oil level _I
Kilowatt (Kw) 1 gine Speed (rpm) _Fn e Oil pressure (psi)
C C 0.2
Operating Voltage (v) 1 480 2 480 3 . 480 check list:
tevel
' 3g all checks & ' orresponding reading
Summarize test & list any / , / blems & corrective action , /
13. Signature: / I Date:
Date; Signature:
P gt dare
Attaeltpl.FAt\k(A)
Mode/ # 2.06DFAA Serial # F960608681 Hours 66 O . 2, \
Monthly Cheek list: Satisfactory
Unsatisfactory _ Comments •
Thecic for moisture, dust, oils, grease, k debris on main stator, exciter, & )A40- windings.
:Ilea( oil & coolant levels. /
)rairt fuel system to remove H20 & edirrlent
-;heck for leaks: cooling, lube oil, & uel system-leak for loose/damaged clamps, liters, brackets, fittings, hoses, & other amp orients.
'heck belts.
heck for restrictions of intake/exhaust ?stem.
heck for any loose electrical mnections. Inspect contacts for pits, ims, evidence of arcing.
spect programmable logic control justrnents.
bserve &.venfy ATS.
;rtify that equipment has received prithly service.
leek battery cables.
ieck coating on terminals, Jugs, its, & cable connections.
eck & record voltage readings of ;h cell & total cell bank.
eck &record battery load WI cells on at charge.
eck electrolyte levels.
eck output ammeter & voltmeter.
eck rate of charge for float & trickle rging.
;ck AC power.
;ck for cleanliness of system & area.
rt generator & run on building load fer to attachment'(D)] :ck engine &bearings for oil & H20 s, unusual noise, excessive ation, & overheating.
u- load test, observe transfer & down sequence.
T shutdown, wipe down engine, n any spills, update log.
PARKING
STRUCTURE
7/1/19
Centcr for Agi Attachment
Model # 3508 Serial # 514'02819 Start Time: /W ig— Stop Time: A/M—
Pre check list:
uneck fuel & fuel tank
Check oil level
Check batteries & terminals /...
I Quarter:
, 1) Simulate power outage equipment fAl 1
3) Take reading every 15 minutes KAN.
ti c
W Pc
15 Minutes , Hour Meter (hum.)
Engine Temperature (F) * Ps ik
Operating Amperage (amps) 1 IV /A 2
'die Speed (rpm) 1800
—Lube Oil pressure (psi) WA-
15 Minutes
Hour Meter (hours) AVAA
4/1/4—
Operating Amperage (amps) 1 2
1) Return noimal power
2) Check Check oil, fuel and coolant level AVA corresponding reading reading problems & corrective action, 7,4/F?
WL or Supv. Signatur :
h1
1 Date: /?
F • Signature:
Model # 3508 Serial # 23207184 HOUTS 6_60 2—, Check for moisture, dust, oils, greases, & debris on main stator, exciter, & PNIG windings.
Check oil & coolant levels. /.
sediment. ---''' fuel-system. e----
7"
Check belts. • ./.
Connections., ,Inspeet 'contacts for pits, burns, evidence of arcing.
InSpecf progranunable logic control adjustments. ..
bbeive & verify ATS. .
Monthly servico:,,• : . . t
-Check battery eahles.:. - . -
Check coating on terminals, lugs,' .shunts, kcable connections.
Check & record Voltageq:eadings of -each cell & total Cell-bank.- , ' Check &record battery load w/ cells on 7 .
float : -. : charge. .. • c:,—; \).
Che &electrolyte levels.
Check output ammeter & WA:Meter. .
Check rate of charge for float &trickle 7 •
• charging • • . •
'Check AC power. . ---- • .
Check for cleanliness of system & area /--
Start generator & inn on buildi,.ng load-. - . ....„.._ . . . ,. .
[Refer to attacl4ent (b)1 . .. . .,.
Check engine .& bearings for oit& 1120
• lealcs,.unusual noise., excessive : • ....---. , . .. , vibration, & overheating..
-After liradtest, Qbs.erve transfer & 7 . shshutdown'sequence'. . , , After shutdoWn, ' Wipe ikwii. engine', Clean any spillk. update lag. .
ge'cUrity that Audible alarm from panel Can be heard.. .
Center for Aging
Model # 3508 Serial # 5YF02819
Running check list: Comments
Failed X a"--
OVet ilAAA i (..._ A-1-5) er problems & con-ective action A.4 /
Date: 77171/
Parking Stiucture
Emergency Generator
6/20/19
Parking Structure
Model # 200DFAA Serial # F960608681 Start Time: Stop Time:
atAtt eA14-0 r IS -pee ttse....54.1 e, a 4-i.--,e 6w-fs i x.),....;-P rP di - ri)ekir- .
1,--v ri. "'; -zs,,,, 0 A
1) Simulate power outage
Note how many seconds takes to transfer
3) Take reading every IS minutes
'-c,rine Speed (rpm)
Je Oil pressure (psi)
Operating Voltage (v) 1 480 2 480 3 480 .
1-- rel
Log all checks & orrespondi-ng reading
\ Summarize test & list any h A Oblems & corrective actioik /1 / ,/
Paridim Sttcture AttackprieAt (A) *
• t
Moclel # 2.00DFAA ' Serial # F960608681 Hours
Vlorithly Cheek list: Satisfactory Unsatisfactory Comments • :heck for moisture, dust, oils, greases, k debris on main stator, exciter, & wia windings.
heck oil & coolant levels.
)rairi fuel system to remove 1120 8c edinaent.
:heck for leaks: cooling, lube oil, 8c Liel system.
:heck for loose/damaged clamps, er , ojaelcers, nttmgs, noses, o er amp onents.
'heck belts.
heck for restrictions of intake/exhaust (stem.
heck for any loose electrical mnections. Inspect contacts for pits, ims, evidence of arcing.
spect programmable logic control ijust-rnents.
bserve 8z verify ATS.
:rtify that equipment has received DnthIy service.
leek battery cables.
ieck coating on terminals, Jugs, zits, & cable connections.
:eck & record voltage readings of ;h. cell & total cell bank.
eck &record battery load w/ cells on at charge, eck electrolyte levels.
eck output ammeter & voltmeter.
eck rate of charge for float & trickle rging.
eck AC power.
!•,ck for cleanliness of system & area.
rt generator 8c run on building load fer to attachment (D)] :ck engine &bearings for oil & I-120 -is, unusual noise, excessive ation, & overheating.
x load test, observe transfer & down sequence.
3- shutdown, wipe down engine, n any spills, update log.
i Signature: Date:
PARKING
kging 11)
Serial # 5VF02819 Start Time: 1,4- Stop Time: fil/Ak ... list:
( fuel & fuel tank /
C oil level A, c coolant level ../ c air filter / c batteries & terminals s sing check list: Comments 'I ter: ,v--nulate power outage to:•1 , msfer life safety & critical nent feal I ie reading every 15 minutes N/A
Speed (rpm) 1800
)il pressure (psi) ,,,,, )il Temperature (F)
',Teter (hours)
; Temperature (F) 4PC ncy (Hz) 60 lug Voltage (v) 1 40 2 480 ing AniRerage (amps) 1 A/A. 2
Speed (rpm) 1800
fl. pressure (psi) APC il Temperature (F) AI ,A-leter (hours)
Temperature (F) 10Ar icy (Hz) 60 ag Voltage (v) 1 480 2 480 ig Amperage (amps) 1 W/A. 2 down check list: Comments 'n normal power k oil, fuel and coolant
OS
II checks & riding reading WM-larize test & list any & corrective action
Date: (II gnature:
:upv. Signature:
nature:
Model # 3508 Serial # 23207184 Hours 4 6O. Z.
Check for moisture, dust, oils, greases, & debris on main stator, exciter, &
V---fuel-system. /".
Check belts.- .----connections., .Inspedfoontacts for pits, burns, evidence.df arcing.
InSp*ect programa. ' able logic control adjustments bberve & verify ATS. . (-- • . _ intinthly service- : . ,. s • * ..
/7
Check battery cables..-. - .
Check coating on terminals, lugs,* " V
.shunts, 4 cable connections.
Check & record Voltage%readings of each cell & total Cell-bank, : . - • float charge. .
Checkelectrolyte levels.
Check output ammeter & vOltmeter. / i
Check rate of charge for float &b.it,kle . char in : •
7-
Check AC power. /<
Check for cleanliness of sYstem & area. / 7 •
Start generator & i-un on buflding load- • .
tRefei to attachinent On : .. .
t " • • • - •
Check engine .&. bearingS for oit& 1120
• lealcs,unusualnoise, eXcessive ."
Vibration, & overheating.
-After kradtest„ observe transfer & shirtclown sequence. .. :.
After shutdoWn,IWilie rfirWri.engitte;
Crean :any spillS, update lag. . . 7 -- .
.Confirin.i0h g .ciartty that audible alarm from panel CALI: be heard.. . ../
Model # 3508 Serial # 5YF02819
Running check list: Comments
Failed X
1) Return normal power ,, Al- 5 corresponding reading ,,'
3) Summarize test & list problems & corrective ac any
G N TEST
PARKING
4/1/19 ttachment (ID)
Model # 3508 Serial # 5YF02819 Start Time: it Sto Time:
Pre cheek list:
uneck fuel & fuel tank ./
Check coolant level .--
Check batteries & terminals ,..-.
Quarter: &me veato\e- ari 4" _,L r-i L equipment T-C6 \
3) Take reading every 15 minutes WA .
Lube Oil pressure (psi) iV IA
Lube Oil Temperature (F) Ai /A
Engine Temperature (F) /1//h ne Speed (rpm) 1800
Lube Oil Oil Temperature (F) A/ /Pc
Hour Meter (hours) /V PC
Engine Temperature (F) /1/4//k
1) Return nowial power itY/A level IviA, problems & corrective action ----- , 7 tl,:, V64 -01 vvoseV- .6A-rAY-HP9 s
Tech Signature: Date:
WL or Supv. Signature: . Date:
F Signature: Date:
Model #3508 Serial # 23207184 Hours 660
Check oil & coolant levels. 7 fuel-system. 7
Check belts. • ..----''
Check fer restrictions of intake/exhaust system. /-
Connections., ohispeCt gontacts for pits, burns, evidence cif arcing.
InSpiectprograminable logic control bb§erve & verify ATS. .
Ceitify that equipment has received inonthly service:, .,- : .
'Check battery. Cables..., • . • ' / shunts, &cable connections.
Check & record Voltagel'eadings of each cell & total Celtbanic, ; .
al-6 V float charge. : - .
Check output output ammeter & voltmeter.
•charging • •
'Check AC power. . . _.
Check for cleanliness of system & area. "--
Start generator & run on building load-. •
' .. . ' '. ". . [Refer to attaclinnt (D)1. ie ; . . •, Check engine .4 bearings for (AY& H20 - — .
*lealss,*unusualneis!e, excessive Vibration, & overheating.
-After jaadtest, observe transfer & Shinclown seCruence. . . :..
After shutdoWb, ' Wilie dalmi.engine;
elean any spillg, update lag. . .
.cenfinnWith Security that audible alarm from panel eau: be heard'.. .
Eng. Signature:
Center for Aging Attachment (D)
Model # 3508 Serial # 5YF02819
Running check list: Comments
Failed )‹
1) Return normal power tv7
Pselm5 WV- Q-A-VOA (1 corresponding reading Z
..."7 i
Date: 44/
PARKING
3/13/19 h Signature:
Parking Structure Attachment (ID)
Model # 200DFAA Serial # F960608681 Start Time: 66 TOStop Time:
check list: .
—Check fuel & fuel tank / a ---em er -40 v" t...Jac_i (ci v, , -1 4, --.(--, Note how many seconds takes to transfer
2) Transfer life safety & critical .
equipment
3) Take reading every 45- minutes
Engine Speed (rpm) •
— 9,ine Speed (rpm)
Je Oil pressure (psi)
Operating Voltage (v) 1 480 2 480 3 480 .
Log all checks & .
rresponding reading
Summarize test & list any
//://; blems & corrective action , heck belts.
rz, 2_ ' • / hers , brackets, fittings, hoses, & other impcnients.
'neck for restrictions of intake/exhaust stem.
leek for any loose electrical nnoctions. Inspect contacts for pits, ms, evidence of arcing.
ipect programmable logic control justrnents, iserve & verify ATS.
rtify that equipment has received ,nthly service.
eck battery cables.
eck coating on terminals, lugs, nts, & cable connections.
;ck & record voltage readings of 4 cell & total cell bank.
Date: Signature:
Paridim gt eture AttachlnapAtifA) t
Wociel # 2.06DFAA ' Serial # F960608631 Hours
Vloutthly Cheek list: Satisfactory Unsatisfactory Comments • :heck for moisture, dust, oils, greases, debris on main stator, exciter, & MG windings.
:heck oil & coolant levels. i
)rairt fuel system to remove H20 & cdirri.ent.
'heck for leaks: cooling, lube oil, & lel system.
heck for loose/damaged clamps.
;ck &,.record battery load w/ cells on o t charge.
;ck electrolyte levels.
ek output ammeter & voltmeter.
ck rate of charge for float & trickle ak AC power.
ek for cleanliness of system & area.
: generator & run on building load er to attachment (1))) :lc engine &bearings for oil & H20 ;, unusual noise, excessive don, & overheating.
- load test, observe transfer & lown sequence.
• shutdown, wipe down engine, any spills, update log.
PARKING
2/13/19
) Return normal power ) Check oil, fuel and coolant wel ) all checics &
.......ponding reading
) Summarize test & list any :oblems & corrective actio
,ch Signature: Date:
Parking Structure
Model # 200DFAA Serial # F960608681 ' i Start Time: `s -'s Stop Time: Ci---idc —
_deck fuel & fuel tank /
Grs_ —............6 ----
4+1, Check batteries & terminals ,/
1) Simulate power outage / Note how many seconds takes to transfer i 5- 5„
.2) Transfer life safety & critical equipment
3) Take reading every if minutes /
Engine Speed (rpm) • t Cc'
Operating Amperage (amps) 1 / L 2
1 cl 3 ci
I 1 Oil pressure (psi)
Lu.—e Oil Temperature (F)
VW
( lc .c'.
Kilo-watt (Kw) 1
3 ' 480 .
Operating Amperage (amps) 1 / (..e, 2 i cl 3 cf ithutdown check list:
heaE Delis.
heck for restrictions of intake/exhaust (stern.
heck for any loose electrical amections. Inspect contacts for pits, ims, evidence of arcing.
lack battery cables.
leek coating on terminals, lugs, wits, & cable connections.
VS 1,3 1 2C
spect programmable logic control jus-trnents.
bserve & verify ATS.
:rtify that equipment has received withly service.
teck & record voltage readings of cell & total cell bank.
2(0 Lek &Jecord battery load w/ cells on at charge.
eck electrolyte levels.
eck output ammeter & voltmeter.
eck rate of charge for float & trickle aging.
eck AC power.
3ck for cleanliness of system & area.
rt generator & rim on building load far to attachment (D)] ;ck engine &bearings for oil & H20
is. unusual noise, excessive ation, & overheating.
:1- load test, observe transfer & tdown sequence.
:i- shutdown, wipe down engine, n any spills, update log.
h Signature: Date:
Parithm gt cture Att.achla-eAt IA) •
VlocieJ # AUU.D.FAA Serial # F96060868I HQurs C. 0 wouithly Cheek list: Satisfactory Unsatisfactory Comments • -...leok for moisture, dust, oils, greases, k debris on main stator, exciter, & )A4G- -windings.
:heck oil & coolant levels. .
}rjn. fuel system to remove 1120 & edko.ent. /
;heck for leaks: cooling, lube oil, & uel s ystem.
lea( for loose/damaged clamps, lter, brackets, fittings, hoses, & other DMponents.
Voltage and Current. From 2/13/2019 6:32:58 AM To 2/13/2019 7:13:53 AM
2/13/2019 7:28:57 AM Page 1 Filename
HalfHourGenTestG190213..fpq
• 150
• 150
• 210
• 150 co
- 90
2.2
1.8
1.4 2 1
0.6
0.2
0.2
2.2
1.8
<7 1.4 2 1
0.6
0.2
0.2
1400 Ze.
co
- 600
165000 135000
105000 :!-C- 75000
45000 15000
-15000
9 r4 if fir r
— 200ms Period Min
— 200ms Period Max
— 200ms Period Avg r r r r . r
b. ff I -r- r r r
LI 1
Ii Ii LU
06 35 06 40 06 45 06 50 06 55 07 00 07 05 07 10
PARKING
1/16/19
) Return normal power
Check oil, fuel and coolant vel
; all checks & npsponding reading Simamarize test & list any oblerna & corrective actio ch Signature: Date:
Parking Structure Attachment (1))
114o del # 200DFAA Serial # F960608681 Start Time:4-6'5,C, Stop Time:
Pre check list: '
—heck fuel & fuel tank /
Rimini' g check list: Comments
1) SiMulate power outage
Note how many seconds takes to transfer i .2) Transfer life safety & critical equipment ' ' / .
3) Take reading every t5 minutes /
C.5" : ( t -1
Operating Voltage (v) 1 480 . 2 480
I `1
3 - 7
Engine Speed (wm) a Oil pressure (psi)
3 6
Luoe Oil Temperature (F)
61`I'
6.cal
11 Ce
.2 hutdown checklist:
Date: Signature:
Paridim StPictore Attochlyi0t fik) godel #2.00DFAA Serial # F960608681
VlorAthly Check list:
:helc for MOiStUre, dust, oils, greases, delpris on main stator, exciter, & qvIG- windings.
3hea( oil & coolant levels.
Satisfactory Unsatisfactory Comments
)rairt. fuel system to remove 1120 & edirowat ;heck for leaks: cooling, lube oil, & uel s ystem.
;heck for loose/damaged clamps, ,her., brackets, fittings, hosts, & other ompOTIents.
heck belts.
heck for restrictions of intakdexhaust rstern.
heck for any loose electrical amections. Inspect contacts for pits, mcs, evidence of arcing.
spect programmable logie control justrnents, nerve & verify ATS.
atify that equipment has received niftily service.
teck battery cables.
teck coating on terminals, Jugs, vats, ic cable connections.
eck & record voltage readings of cell & total cell bank.
eck &yecord battery load w/ cells on it charge sek electrolyte levels.
:ck output ammeter & voltmeter.
ick rate of charge for float & trickle
:ck AC power.
a for cleanliness of system & area.
t generator & run on building load Fer to attachment (D)) ck engine &bearings fru oil &H20 s, unusual noise, excessive ation, & overheating.
r load test, observe transfer & iown sequence.
r shutdown, wipe down engine, 1 any spills, update log.
lb
1/16/2019 7:38:50 AM Page 1
Voltage and Current. From 1/16/2019 6:38:59 AM To 1/16/2019 7:20:24 AM
HalfHourGenTestG190116..fpq
• 210
• 150 w".
• B r n a ao 9
— 200ms Period Mn
Ir• r B.
• 150 0.1
• 150
2.2
1.8
▪ 1.4 2 1
• 0.6
0.2
0.2
2.2
1.8
▪ 1.4
• 1
0.6
0.2
0.2
• 1400
165000 135000 105000
S 75000 45000 j
Uk
Uu
• rr tjLj 'F
LULl
15000 -15000
00 ^0 06 45 06 50 06 55 07 00 07 05 07 10 07 15 07 20
GEN TES
CFA
12/4/19
Date: zAt
. Date:
Tech Signature:
WL or Supv. Signa
CerAer ,for Aging Attachment (D)
Model # 3508 Serial # 517F02819 Start Time: ObA Stop Time: 6 (-,- c'S' Pre check list:
_ Satisfactory Unsatisfactory Comments
(-neck fuel & fuel tank /
Check oil level 7
Check air filter 7
Running check list: Comments .
equipment /
' Engine Speed (rpm) 1800
Lube Oil pressure (psi) 75
1 Lube Oil Temperature (F) i k 2
Hour Meter (hours) Li z... If
Engine Temperature (F) /‘ 0
Operating Amperage (amps) 1 3 i, 2
5 C
3 /...7
*lie Speed (rpm)
—Luoe Oil pressure (psi)
1 t i 6, C°
S'-1.:2 i G
1 6 r'
Operating Amperage (amps) 1 L.( 6 2
1)Return normal power level .
3) Log all checks & /
4) Summarize test & list any j/ j / problems & corrective actioVI / .cl / A
Hours
Month! Check list: Satisfactory
Unsatisfactory
PMG -windirt,:s.
fuel-s stem.
cora • onents.
Check belts..
s !stem.
burns, evidence cif arcin:.
connectioAs., .Inspea.contacts for pits, In'spectprogramniable logic control adjustments. .. _.
bbserve & verify ATS. .
Certi—fy that equipment has received babrithl service-,., :. . Ina
Check battery cables,. • . MEI
Check coating on terminals, lugs; l' shunts, &cable connections.
Check & record Voltageleadings of -each cell & total Cell:bank., : .
0--'1'd 7
12 . '7 2
., C-
Check &record battery load w/ cells on . , float char:e. . . -
;26. ̀ -f
Checkelectrolyte levels. IMMIIII
Check output ammeter & vOltnIeter. MEI
.ehat: 11 :, Check AC power. =MI
Check for cleanliness of system& area.
Start generator & run on building load, - : • ..
[Refer to attachinent (D)
Check engine &bearin:gs for oir& 1120 leaks -unusual noise, eXcessive --.
Vibration, & overheatin•
.After lhadtest, observe transfer 8c §hadown: seuen.c:d. .. •,..
Alter shuldoWWilie &WA:engine, 61ean an Sii11.6„. u• date lo• .
c:(2 .:VAttl. Security that audible alarm from panel t an:be heard..
Tech Signablre.:. Date:
12/4/2019 7:43:36 AM Page 1
Voltage and Current. From 12/4/2019 6:25:43 AM To 12/4/2019 7:02:03 AM
HalfHourGenTestG191204..fpq
.7'
.7
— 200ms Period Avg
1.65
1.35
1.05
3.
r., 2 0.75
0.45
"0
0.15
1.65
1.35
1.05
2 E.
0.75
.11
0.45
0.15
55000
45000
35000
25000
15000
-5000
06 30 06 35 06 40 06 45 06 50 06 55 07 00
1 1/6/1 9
Tech Signature:
WL or Supv. Si ature:
Centei for Aging Attachment (D)
Model # 3508 Serial # 5YF02819 Start Time: a 4. VT Stop Time: 0 -1_ I 2_ Pre check list:
-Lueck fuel & fuel tank /
1 1) Simulate power outage v
--1 (..
/--.-( c, I L..i d s-/ .c..---- , s'" 7 ( . 1(
A-10 - f- Ci0 47'b,-) <
Operating Amperage (amps) 1 ;Z 4 2
02 6 3 j ‘ '13§..pe_L(ail m
Luoe Oil pressure (psi)
7 6
IC C.- 4 a ,...) 'ff-Lku a e k Cb, ---.7 cJ • k , I (., C )(.1
Operating Amperage (amps) 1 J c.- 2
"5 problems & corrective acti i i i / 1 / n /2
7. Signature: Date:
Hours 5 7 2
, Monthly Check list: Satisfactory Unsatisfactory
PMG windings. / fuel-system.
components.
Check belts. / system, conneetions.„Inspedfcontaets for pits, InSpiect prograrnin— able logic control adjustments.
Observe & verify A,T,S. " intuathly serviccs,,,- -• . • - .
Check battery cables,. -shunts, 4:cable co-nnections. /
Check & record Voltage•feadings of each cell & total Cell-bank.,;
vs
IS'
' 't-
0_,L,,, ...._ci
Check &record battery load Iv/ cells on float charge. • . , _ .. . *V-6,1- .
Check.electrolyte levels. /
Check output ammeter & vOltineter.
•cha:rging.
Check AC power. , Check for cleanliness of system& area. .
Start generator 4 run on building load-. • : , [Refer to attachnient (D)1
Check engiric e,6 bearings for oil I-120 • . .
leaks -miusual noise excessive vibration, & overheating.
After lbadtest, observe transfer & shadow:I sOuence. .
After shutdoWn,'WiPe ridwri.eng,ffie, 61'eart 'any spillS,• update log. . . . . - . • ..
Confirm with Security that audible alarm from panel Can be heard. .
0 .
Tech Signature. Date:
— 200ms Period Avg
.7
0645 06 50 06 55 07 00 07 05 07 10 07 15
11/6/2019 7:50:23 AM Page 1
Voltage and Current. From 11/6/2019 6:39:36 AM To 11/6/2019 7:17:56 AM
HalfHourGenTestG191106..fpq
• 210
• 150
• 150
• 150
▪ 90
▪ 500 csi
▪ 300
r. 500
▪ 300
33000 27000 21000
• 15000
• 9000
-3000
OF 4r)
E.
E.
fr
Generator
10/2/19 t b - Tech Signature:
Attachment (D)
Model # 3508 Serial # 5YF02819 Start Timeq lio Stop Time: 0 7 1 Pe check list:
Satisfactory Unsatisfactory Comments ___, Check fuel & fuel tank --/
Check oil level ../
Check coolant level
Check batteries batteries & terminals
1) Simulate power outage i .
Engine Speed Speed (rpm) 1800
Lube Oil pressure (psi) hiol Vli c)1, k:i L/n
Lube Oil Temperature (F) nat I.A..).)y- le..\‘'
Hour Meter (hours) 5.7 / • 1—*
Engine Temperature (F) Ac9"\- Itiovv....`oi
Frequency (Hz) 60 .
Operating Amperage (amps) 1 21 2 Xi_h
3 1 /0 me Speed 2021. 1800
—Lube Oil pressure (psi) vix.er JO 'f
Lube Oil Temperature (F) Oval. Lvov Wt./
Hour Meter (hours) 5 1 1 AS
Engine Temperature (F) Ptil. k.00v ke-A
Operating Amperage an__ 2,6 2
3) Log all checics &
4 l
WL or Supv. Signature: . Date: AO
-. Signature:
Model # 3508 Serial #23207184 Hours 51 / .;
PlVIG windings.
Check oil & coolant levels. ,---fuel-system. ../.
filters, brackets, fittings, hoses, & other
Check belts. - ..".
connections, °hasped contacts for pits, InSriectprograrnMable logic control adjustments, .. ... V bbserve & verify AS. .
MOnthly service:, ., : . ,. :- *
- 0 ----.)
'Check battert Cibles.-:. . . ' -
;shunts, keable connections.
Check & record Voltage-readings of -each cell & total Cell-bank, ; .
.. . . 13. "IV) 13- i ti1, ,--C, w 01.1 V . . V V . .
Check &record battery load w/ cells on float charge. . . .. . • v - .,..--
Checkelectrolyte levels.
Check output output ammeter & vOltmeter. t' charging VVVVVVV
V ' V V
V V . .
Check Ad power. . . ,...----
Check for cleanliness of SSt11 & area L'''''.
_Start generator 4 i-pi: on building load-. v .
[Refer to attachinent (D)-I, . : .. .
17 - . v
Check engin..9 V& bearing for oily& 1120 • . .
leaks,.unusual poise, excessive :".
V Vi7VVVV
Vibration, & overheating..
V V V . -
-After lbadtest, ebsenie transfer & V Vt/ shadown- se *quelled. . ; .
After shutdoWh, \WiPe rioWn engine;
Clean 'any sPilli„. update lag. . .
i -
. VVV V .
cOrifinn.With Security that audible alarm from panel 6an: be heard-. . .
re-tmwte..( 1300.4.91
Report DateMme
10/2/2019 7:37:16 AM Page 1
Voltage and Current. From 10/2/2019 6:43:11 AM To 10/2/2019 7:21:01 AM Rename
HalfHourGenTestG191002..fpq
— 200ms Period Min
— 200ms Period Max
360 =
200 :
280:
120 =
40:
40 -
- 200
120 =
200 =
- 120
40 _
105 =
75:
45:
15 -
. ' 15 -
135 =
105:
75:
45;
180 =
140:
- 100
60 =
- 20
6.6 =
,,,,..____IL..,,,--.—•
r
3:
.-, .I—'
0.6
0.6 =
Ut lb 07 Ob '6:45 06 50
Emeigency Generator
9/4/19
Ceni.er for Aging Attachment OD)
Model # 3508 Serial # 5YF02819 . Start Time: At 2S—Stop Time: 0-7 o 6 Pre check list: -uneck fuel & fuel tank /
Lube Oil pressure (psi) 1 S
Lube Oil Temperature (F) IV D1 worlAbn
Hour Meter (hours) S. 75, Co.
Engine Temperature (F) Vat (A.XV let
Frequency (Hz) 60 .
Operating Amperage (amps) 1 -2, 2.... 2 1 47
3 9 2.., ..
,ine Speed (rpm) _ 1800
Lube Oil pressure (psi) V4,01- touv V2L tA\
Lube Oil Temperature (F) 1010 - L,ODY14-;‘,5-) .
Hour Meter (hours) 5 70 .1
Engine Temperature (F) OVNICTI (A.) -in
Operating Amperage (amps) 1 **2—C7 2 --3 5
3 9 7 level .
3) Log all checics & problems & corrective action , ; / , i ,\
,---7
WL or Supv. Signature:
Date:
Date:
Hours $.---t 1. 0
—Drain fuel system to remove 1120 & fuel -system.
Check belts. • / system, con-n.ections., .Inspedtcontacts for, pits, bums, evidence Of 4cing.
InSpiectprograininable logic control adjustments
Observe & verify AT,S. .
Certify that equipment has received / inbrithly service.,:- : . . . :. _
'Check batter Y Cahles.:, • . /
Check coating on terminals, lugs,' .shunts, kcable connections. /
Check & record Voltagetreadings of each cell & total cell-bank..: ,
13.13 /
1 ./ 4,r`C. 1:1 -float charge. • . .. . •
/1 . '
Chec.kelectrolyte levels. /
Check rate of charge for float Ktiiukle •charging .
'Check Ad power
Check for cleanliness of system- & area. : / "
Start generator k rim on building load-. - , : • , [Refer to attachinent (D)1 . . . . ., . . , Check engine & bearings- for oil & 1120 lea,Issoniusual noise, excessive :".
After leadtest, obrzlie tr & ansfer s hadown sequence. . . ... , After shutdoWh,‘Phie'Tidlvii engine, Clean 'any 8j3i114 update log
Confirm with gebiaritin that audible alarm from panel 6am:be heard. .
Z. . 1 ..• 1 •
'tech Signature.: Date:
1-1 1"—m—ft
• 105
• 45
06 30 06 35 06 40 06 45 ".̀9 50 06 55 07 00 07 05 I I
.k iota .Mi TPlimPuk u. I J.• PrOTROPP0.01.4. IL 1PFAV IPPEW 110.491*IN .Juia2L14=2 ' Lr!1.32:4.:%*
• 100 co
5.5 4.5 3.5
• 2.5 1.5 0.5
9/4/2019 8:32:57 AM Page 1
Voltage and Current. From 9/4/2019 6:25:38 AM To 9/4/2019 7:05:13 AM gHalfHourGenTestG190904.fpq
• 210
▪ 90
270 .
• 210 cNi
.1
270 a.
• 210
• 75
▪ 45
Etin_ergency Generator
. Test
8/7/19
Date: *gt 1/ 11
Tech Signature':
WL or Supv. Signa
(:ent,-)r for Aging Attachment (ID) .
Model # 3508 Serial # 5YF02819 Start Time: 4(.'31 Stop Time: 07 0 t P.re check list: ' T, ( Satisfactory Unsatisfactory Comments _
1)Simulate power outage / • equipment /
3) Take reading every 15 minutes / \
Lube Oil pressure (psi) 1.1.4- worki, Lube Oil Temperature (F) lloPA L4) OVV2i1dA
Hour Meter (hours) '
Engine Temperature (F) IN, ok c.4) Dv' V:tion
Operating Amperage (amps) 1 a_
3__c,_____ 3_0.—.6 ne Speed (rpm) 1800
Lube Oil pressure (psi) lio-i- %.)-ov
Lube Oil Temperature (F) Ko+-2. 1410v .V. %.6 •
Hour Meter (hours) s*G5'. 1 '
Engine Temperature (F) n o + k....frov- te._ i , • , 2 480
Operating Amperage (amps) 1 ,9 S"
3 3 c
1)Return normal power / problems & corrective actni/ /'
Model #3508 Serial #23207184 Hours 5-C.C. ct)
Monthly Cheek list: Satisfactory Unsatisfactory Comments fuel-system.
s 'stem. / con-rtections.„InspeCt contacts for pits, InSpecfprograniniable logic control adjustments. _.
bberve & verify ATS.
inonthly service:, ,- : .
I -Check battery Cables...-. • -
Check coating on terminals, lugs,' / shunts, &.cable connections.
Check & record Voltageleadings of -each cell k total Cell.bank. - •
11.14 l%. 12/1 .4#X1 i float charge. ' :
2. C • 4
.chatging • -
'Check Ad power.
Check for cleanliness of stn & area. / -
Start generator & run on buil.ding load-. - 1-Riefei to attachnient 0)1 , " •
Check engine& bearingS for oil. & H20 ' lealcs,•miusualnoise., eXcessive :".
Vibration, & ov. erheating.
--After lbadtest, observe transfer & shUtdown-sequen.ce. . _
After shutdoWn:ViPelftrwit engiflo;
MI Clean an s sill6 sate a.. .
.cOnifum With Security that audible 1. / ..
alarm from panel On be heard..
Tech Signature:. Date:
330 _ if
R.
1.
E.
0-- '
5.5
4.5
3.5
2.5
1.5
Pk it
L a ea .1.11,41 •••• 1
14,4
4-1
41, fig maim 4, a
'6 35 061.40 06 45
06 50
06 55
07 00
— 200ms Period Max
— 200ms Period Avg
07 05 07 10
Voltage and Current. From 8/7/2019 6:33:37 AM To 8/7/2019 7:11:32 AM
Report Date/Time
8/7/2019 7:39:11 AM Page 1
HalfHourGenTestG190807..fpq
G N TEST
LOAD BANK
8/12/19
Attachaient (D) g/tz.
Model # 3508 Serial # 5YF02819 Start Time: Stop Time: ( .%'S T rri Pre check lisf:, Satisfactory Unsatisfactory Comments ___ Cneck fuel & fuel tank /
Check batteries & tem inals /
1 Running check list: Comments I Quarter:
' equipment
3) Take reading every 15 minutes i ne Speed (rpm)
5-1 d •
Engine Temperature Temperature (F) problems & corrective action , ,'/ , / n /9
Date: avfl
WL or Supv. Signature: . Date:
Model #3508 Serial # 23207184 Hours S-70.4/
Check for moisture, dust, oils, greases, & debris on main stator, exciter, &
Drain fuel system to remove IMO & fuel-system. /
I •
Check belts. • connectiorts., .Inspeet contacts for pits, InSpectprogramniable logic control bbgerve & verify 17',',TS.
inbnthly service:, .,- :.
Cheek battery cables,. . •
Cheek coating on terminals, lugs; / shunts, &..eable connections.
Check & record Voltage:readings of • /.
each cell & total Cellhank., : -, ' float charge. * • . . .. * •
Check output ammeter & vOltmeter.
Check rate of charge for float &trickle / .chatging: -
*Check AC power.
Check for cleanliness of system- & area.
Start generator 4. inn on buil.ding load-.
[Refer to attaehMent (D)1, . • •
Check engine & bearingS for oif& 1120
• l9alcs,•uriusualnoise, .4cessive ".
--After ltracrtest, observe transfer & ShUtclown sequence. . . • .
After shutdo-4,‘Wilie.; ritilNii.engthe, Clean any spfflk. update lag.
.c.Onfirin*With Security that audible alarm from panel Can be heard.. .
-Tech Signature: Date:
Model # 3508 Serial # 5YF02819
Running check list: Comments Quarter: Time to transfer power ATS#2 Time to transfer power z
,,ATS#1
Failed
1) Return normal power 7 -problems & corrective action, „
, 1 4 _...?
Date: 372
Generator
7/3/19
Model # 3508 Serial # 5YF02819 . Start TimerArl Stop Time: crtz 7 Pre check list:
IQuarter:
1 1) Simulate power…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .