36C26118B0042-026.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C26118B0042
About this file
36C26118B0042 015100 TEMPORARY UTILITIES_20170717_adden.docx
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 51 00
TEMPORARY UTILITIES
PART 1 GENERAL
1.1 RELATED SECTIONS
00 73 19 HEALTH AND SAFETY REQUIREMENTS, 29 CFR 1926, Subpart K
1.2 REFERENCES
NFPA 241: Standard for Safeguarding Construction, Alteration, and Demolition Operations NFPA 70, Article 305-6(b): Assured Equipment Grounding Conductor Program
1.3 REGULATORY REQUIREMENTS
Temporary wiring shall be in accordance with NFPA 241 and NFPA 70, Article 305-6(b).
| PART 2 | PRODUCTS |
| (Not Used.) |
PART 3 EXECUTION
3.1 AVAILABILITY AND USE OF UTILITY SERVICES
A. On-site electrical services will be made available at the prevailing rates.
1. Construction related energy needs are chargeable and shall be metered and paid for by the Contractor.
2. Provide necessary temporary connections, distribution lines, and meters.
3. Ensure no disruption of power to VA services.
4. Provide monthly record of electricity usage.
B. Water will be made available for construction and testing.
1. Provide reduced pressure backflow preventer at each connection.
2. Maintain connections, pipe, fittings, and fixtures.
3. Conserve use.
3.2 HEAT
A. Furnish temporary heat to prevent damage to work and materials.
---End of Section--- SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES Page 1 of 1
File details come from the government source that posted it.