This is Amendment 0006 to solicitation 36C25926R0082, issued by the Department of Veterans Affairs Network Contracting Office (NCO 19) on October 15, 2026. The amendment extends the proposal submission deadline to October 22, 2026 at 11:30 AM CDT and posts responses to questions, updated contract documents, and supporting materials.
The solicitation seeks construction services for Project 635-21-139: Repair Parking Garage 1 Deficiencies at the Oklahoma City VA Medical Center (921 NE 13th Street, Oklahoma City, Oklahoma 73104). The scope encompasses repairs to the existing parking structure including parking striping and signage, ADA sidewalk repairs, suicide prevention installation, and a new stairwell on the south side. The work includes civil, architectural, electrical, lighting, wayfinding, low-voltage, and structural systems, with the contractor responsible for third-party commissioning and Level 1 ICRA precautions for areas adjacent to patient care zones. The period of performance is 270 calendar days after Notice to Proceed. Construction must occur Monday through Friday, 7:30 AM to 3:30 PM, excluding federal holidays, with 14-day notice required for any exceptions. The contractor must maintain a site superintendent with a 30-hour OSHA card on site at all times, ensure all employees receive minimum 10-hour OSHA construction safety training, provide storage and security at the project site, and comply with all VA directives, design manuals, and applicable codes including NFPA, IBC, OSHA, NEC, and ASHRAE standards. Proposals must be submitted electronically to Christina.beelerblackburn@va.gov, and all payment information must match Contract Registration and SAM.gov records to avoid invoice rejection.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25926R0082 Amendment 0006
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 7
0006 10-15-2026
635-21-139
36C259
Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
36C259
Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
To all Offerors/Bidders
36C25926R0082
07-23-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 10-22-2026 11:30 AM CDT
See CONTINUATION Page
See attached page 2.
CONTINUATION PAGE
AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON OCTOBER 15, 2026.
The purpose of this amendment is as follows:
A) Post responses to questions and supporting documents.
B) Post updated Statement of Work (changes in BLUE font).
C) Extend proposal due date. Proposal is extended to Oct 22, 2026 @ 11:30 AM CT.
D) All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov.
All other terms and conditions remain the same.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Base Line item: Repair Parking Garage 1 Deficiencies
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries POP: 270 calendar days after NTP
GRAND TOTAL __________________
A.2 Statement of Work Project 635-21-139, Repair Parking Garage 1 Deficiencies
OBJECTIVE:
The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104.
SCOPE OF WORK:
This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings.
• Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI’s on any conflicts between drawings and specifications immediately that may impact bids.
• Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications.
• Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage.
• Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project.
• Contractor will provide 3rd party commissioning for the project.
• Contractor will ensure level 1 ICRA precautions are in place as they work in the first-floor hallway as the adjacent areas will remain in use for patients and staff.
• The parking count system is not to be included in bid packages and bidders are to ignore specification section 28 23 19 unless otherwise noted by the veteran administration.
The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements.
The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC.
The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC’s mission to care for the Veterans.
The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses.
Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station.
Period of Performance:
• 270 calendar days after Notice to Proceed (NTP).
Task Management:
Engineering shall identify a Contracting Officer’s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment.
The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a “Competent Person” known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. The “Site Superintendent” will be the responsibility of the Prime contractor and cannot be further delegated.
Storage and Security:
Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment.
Parking:
Contractor’s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor’s personnel under any circumstances.
Work Hours:
Construction shall be performed during normal working hours Monday – Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include:
New Year's Day January 1st
Martin Luther King's Birthday Third Monday in January
President's Day Third Monday in February
Memorial Day Last Monday in May
Juneteenth June 19th
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11th
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25th
When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday.
When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S.
Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday.
Delivery Location:
All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104
Payment Information:
The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor’s company or individual representative’s registration) as well as with the information under the contractor’s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice.
a. Company Name – Legal Business Name and DBA (Doing Business As) Name
b. Mailing Address – Contact and Address Information
c. Remittance Address – Remit To Address Information
d. Employer’s Identification Number – Federal Tax ID
e. DUNS (Data Universal Numbering System)
CODES, STANDARDS AND EXECUTIVE ORDERS:
VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects:
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
PG-18-1 Master Construction Specifications
PG-18-3 Design and Construction Procedures
PG-18-4 Standard Details and CAD Standards
VA BIM Manual V2.2
PG-18-5 Equipment Guide List
H-18-8 VA Seismic Design Handbook
PG-18-9 Space Planning Criteria
PG-18-10 Design Manuals (by discipline) http://www.sam.gov/ http://www.cfm.va.gov/til/
PG-18-12 Design Guides (graphical, by function)
PG-18-13 Barrier Free Design Guides
PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards)
PG-18-15 Minimum Requirements for A/E Submissions
PG-18-17 Environmental Compliance Manual
H-7545 VA Cultural Resource Management
VA Handbook 0056, Sustainable Building Program
VA Directive 0056, Sustainable Building Program
VA Directive 0055, VA Energy and Water Management Program
NFPA 101 Life Safety Code
NFPA National Fire Codes
International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides.
Occupational, Safety and Health Administration (OSHA) Standards.
National Electrical Code (NEC)
Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
ASME Boiler and Pressure Vessel Code
ASME Code for Pressure Piping
Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
Energy policy Act of 2007 (EPAct)
DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)
Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification.
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2013.
Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.
**END OF STATEMENT OF WORK**
A.3 List of Attachments
See attached document: 635-21-139 Questions and Responses 3.
See attached document: 019100-2022-04 general comissioning requirements.
See attached document: 280800-2016-11 comissioning of electronic and security systems.