S04 -Site Visit Meeting Doc.docx

DOCX document 18 KB Posted

Attached to
Z2DA--T4 700K Mental Health Second Floor Arch Upgrades Project 442-22-009
Solicitation number
36C25923R0004
Issued by

About this file

This document outlines the scope of work for a construction project to update common area finishes at the Mental Health Department of the Cheyenne VA Medical Center. The contractor will be responsible for demolishing and disposing of existing flooring and finishes, testing for asbestos and lead paint, conducting abatement as needed, installing new flooring, painting walls and doors, replacing handrails and wall bumpers, installing new cabinets and countertops in the kitchen, and hanging new artwork. Bids are due by December 19, 2022 and the project must be completed within 120 calendar days of the notice to proceed. The selected contractor will be responsible for complying with all applicable codes and regulations, submitting for approval a quality control plan and schedule, and coordinating any necessary facility shutdowns or outages with the contracting officer's representative.

View the file

Other files

File Type Posted
36C25923R0004 0013.docx DOCX document
Additonal RFI.docx DOCX document
Main Hospital_Asbetsos Report_November 2018.pdf PDF
36C25923R0004 0012.docx DOCX document
36C25923R0004 0011.docx DOCX document
REMODEL_2ND_FLOOR_MENTAL_HEALTH_3-23-23 Phasing.pdf PDF
36C25923R0004 0010.docx DOCX document
36C25923R0004 0009.docx DOCX document
IMG_0331.jpg JPG image
36C25923R0004 0005.docx DOCX document
IMG_0325.jpg JPG image
CW-001-5A Asbestos Report.pdf PDF
Wall Guard Detail.pdf PDF
IMG_0342.jpg JPG image
IMG_0321.jpg JPG image
IMG_0329.jpg JPG image
IMG_0322.jpg JPG image
IMG_0332.jpg JPG image
IMG_0328.jpg JPG image
IMG_0337.jpg JPG image
IMG_0339.jpg JPG image
IMG_0333.jpg JPG image
New Kitchen Cabinet Layout.pdf PDF
36C25923R0004 0006.docx DOCX document
IMG_0334.jpg JPG image
RFI answers.docx DOCX document
IMG_0338.jpg JPG image
36C25923R0004 0004.docx DOCX document
36C25923R0004 0002.docx DOCX document
IMG_0341.jpg JPG image
HRB10-Series-Specifications-SG-HRB10SERIES.pdf PDF
IMG_0340.jpg JPG image
36C25923R0004 0007.docx DOCX document
IMG_0336.jpg JPG image
IMG_0330.jpg JPG image
36C25923R0004 0008.docx DOCX document
36C25923R0004 0003.docx DOCX document
36C25923R0004 0001.docx DOCX document
SOW Mental Health 2nd Floor Corridor Arch Upgrades SOW. Rev 111722.docx DOCX document
Mental Health 2nd Floor Arch Upgrades Rev 112522.pdf PDF
Attendance Sheet Site Vist.pdf PDF
Aluminum Prints.pdf PDF
Exhibit for Wayfinding Sign.jpg JPG image
webbglide_roller_shade_specification_ipc2112rev2.pdf PDF
Past Performance Questionnaire.docx DOCX document
36C25923R0004_1.docx DOCX document
2nd Floor Corridor Specs.docx DOCX document
Mental Health 2nd Floor Arch Upgrades.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Meeting

FOR

The contractor is to provide all labor, tools, materials, equipment and supervision required to update the common area finishes of the Mental Health Department at the Cheyenne VA Medical Center.

Location: Cheyenne VA Medical Center

AGENDA:

· Introduction of Christina Beeler-Blackburn CO, Lela Gibson COR, and Sylwia Zak CS

· The pre-bid meeting/site walk is not mandatory

· QUESTIONS During site visit MUST BE WRITTEN DOWN

· Address where to send Quote:

· Electronic submissions to sylwia.zak@va.gov

· Pertinent Dates:

· Questions due on 12/1/2022 at 1 PM MT via email

· Quotes due on 12/19/2022 at 11 AM MT via email

· Prospective bidders are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.

· Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer.

· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded

· Masks are required at all times while on VA property. Entrance screenings will be conducted each day.

· Confirmation of construction range is between $500,000.00 and $1,000,000.00

· Bid Guarantee & Payment/Performance Bonds: Are required at 20% of bid price of $3,000,000.00 whichever is less.

· Contractor shall begin performance within 10 days after Notice To Proceed (NTP) and complete within 120 calendar days.

· Post Award Compliance:

· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.