About this file

This statement of work outlines a project to update common area finishes in the mental health department located on the second floor of two buildings at the Cheyenne VA Medical Center in Cheyenne, Wyoming. The scope of work includes asbestos abatement, demolition of existing flooring and casework, installation of new flooring, painting, new kitchen cabinets and countertops, window treatments, signage, and other finishes. The contractor will be responsible for quality control, safety protocols, infection control measures, and completing all work between the hours of 5pm and 6:30am from Monday through Friday to minimize impacts to medical center operations. The project is to be completed within 120 calendar days from notice to proceed.

View the file

Other files

File Type Posted
36C25923R0004 0013.docx DOCX document
Additonal RFI.docx DOCX document
Main Hospital_Asbetsos Report_November 2018.pdf PDF
36C25923R0004 0012.docx DOCX document
36C25923R0004 0011.docx DOCX document
REMODEL_2ND_FLOOR_MENTAL_HEALTH_3-23-23 Phasing.pdf PDF
36C25923R0004 0010.docx DOCX document
36C25923R0004 0009.docx DOCX document
IMG_0331.jpg JPG image
36C25923R0004 0005.docx DOCX document
IMG_0325.jpg JPG image
CW-001-5A Asbestos Report.pdf PDF
Wall Guard Detail.pdf PDF
IMG_0342.jpg JPG image
IMG_0321.jpg JPG image
IMG_0329.jpg JPG image
IMG_0322.jpg JPG image
IMG_0332.jpg JPG image
IMG_0328.jpg JPG image
IMG_0337.jpg JPG image
IMG_0339.jpg JPG image
IMG_0333.jpg JPG image
New Kitchen Cabinet Layout.pdf PDF
36C25923R0004 0006.docx DOCX document
IMG_0334.jpg JPG image
RFI answers.docx DOCX document
IMG_0338.jpg JPG image
36C25923R0004 0004.docx DOCX document
36C25923R0004 0002.docx DOCX document
IMG_0341.jpg JPG image
HRB10-Series-Specifications-SG-HRB10SERIES.pdf PDF
36C25923R0004 0007.docx DOCX document
IMG_0336.jpg JPG image
IMG_0330.jpg JPG image
36C25923R0004 0008.docx DOCX document
36C25923R0004 0003.docx DOCX document
S04 -Site Visit Meeting Doc.docx DOCX document
36C25923R0004 0001.docx DOCX document
SOW Mental Health 2nd Floor Corridor Arch Upgrades SOW. Rev 111722.docx DOCX document
Mental Health 2nd Floor Arch Upgrades Rev 112522.pdf PDF
Attendance Sheet Site Vist.pdf PDF
Aluminum Prints.pdf PDF
Exhibit for Wayfinding Sign.jpg JPG image
webbglide_roller_shade_specification_ipc2112rev2.pdf PDF
Past Performance Questionnaire.docx DOCX document
36C25923R0004_1.docx DOCX document
2nd Floor Corridor Specs.docx DOCX document
Mental Health 2nd Floor Arch Upgrades.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .