About this file

This statement of work outlines requirements for a mental health second floor corridor upgrades project at the Cheyenne VA Medical Center in Wyoming. The project involves demolishing and replacing floor finishes, painting walls, installing new handrails and wall bumpers, upgrading the mental health kitchen, and other interior renovations. The selected contractor must complete all work during weekday evenings and weekends to minimize medical center disruptions. The performance period is 120 calendar days from notice to proceed. Bidders must adhere to strict safety, security, and infection control requirements and coordinate all utility shutdowns at least two weeks in advance with the contracting officer's representative.

View the file

Other files

File Type Posted
36C25923R0004 0013.docx DOCX document
Additonal RFI.docx DOCX document
Main Hospital_Asbetsos Report_November 2018.pdf PDF
36C25923R0004 0012.docx DOCX document
36C25923R0004 0011.docx DOCX document
REMODEL_2ND_FLOOR_MENTAL_HEALTH_3-23-23 Phasing.pdf PDF
36C25923R0004 0010.docx DOCX document
36C25923R0004 0009.docx DOCX document
IMG_0331.jpg JPG image
36C25923R0004 0005.docx DOCX document
IMG_0325.jpg JPG image
CW-001-5A Asbestos Report.pdf PDF
Wall Guard Detail.pdf PDF
IMG_0342.jpg JPG image
IMG_0321.jpg JPG image
IMG_0329.jpg JPG image
IMG_0322.jpg JPG image
IMG_0332.jpg JPG image
IMG_0328.jpg JPG image
IMG_0337.jpg JPG image
IMG_0339.jpg JPG image
IMG_0333.jpg JPG image
New Kitchen Cabinet Layout.pdf PDF
36C25923R0004 0006.docx DOCX document
IMG_0334.jpg JPG image
RFI answers.docx DOCX document
36C25923R0004 0004.docx DOCX document
36C25923R0004 0002.docx DOCX document
IMG_0341.jpg JPG image
HRB10-Series-Specifications-SG-HRB10SERIES.pdf PDF
IMG_0340.jpg JPG image
36C25923R0004 0007.docx DOCX document
IMG_0336.jpg JPG image
IMG_0330.jpg JPG image
36C25923R0004 0008.docx DOCX document
36C25923R0004 0003.docx DOCX document
S04 -Site Visit Meeting Doc.docx DOCX document
36C25923R0004 0001.docx DOCX document
SOW Mental Health 2nd Floor Corridor Arch Upgrades SOW. Rev 111722.docx DOCX document
Mental Health 2nd Floor Arch Upgrades Rev 112522.pdf PDF
Attendance Sheet Site Vist.pdf PDF
Aluminum Prints.pdf PDF
Exhibit for Wayfinding Sign.jpg JPG image
webbglide_roller_shade_specification_ipc2112rev2.pdf PDF
Past Performance Questionnaire.docx DOCX document
36C25923R0004_1.docx DOCX document
2nd Floor Corridor Specs.docx DOCX document
Mental Health 2nd Floor Arch Upgrades.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .