IMG_0332.jpg
JPG image 2 MB Posted
- Solicitation number
- 36C25923R0004
About this file
This statement of work outlines the scope of a mental health second floor corridor upgrades project at the Cheyenne VA Medical Center in Cheyenne, Wyoming. The project involves demolishing and replacing floor finishes, painting walls, installing new handrails and wall bumpers, upgrading the mental health kitchen, replacing casework and windowsills, installing new window blinds and signage. Key work includes abating asbestos and lead-based materials, testing suspect materials, preparing surfaces, and installing new resilient flooring, cabinets, sinks and countertops. The contractor must complete all work between 5pm and 6:30am Monday through Friday to minimize medical center disruptions. The performance period is 120 calendar days from notice to proceed. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 19.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .