About this file
This statement of work outlines upgrades to be completed at the Cheyenne VA Medical Center's Mental Health department located on the second floor of two buildings. The project includes replacing corridor finishes that have exceeded their useful life, such as flooring, paint, signage, and casework. Asbestos abatement and lead testing will be conducted as needed. The contractor will demolish and dispose of existing flooring and install new luxury vinyl plank, paint corridor walls, replace handrails and wall bumpers, install new kitchen cabinets and fixtures, and replace window treatments. Additional requirements include quality control plans, safety training, infection control protocols, and coordination to minimize impacts to hospital operations. The work must be completed within 120 calendar days of receiving notice to proceed, scheduled for nights and weekends to avoid disrupting patient care.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .