This statement of work outlines requirements for an asbestos abatement and renovation project at the Cheyenne VA Medical Center in Cheyenne, Wyoming. The project scope involves asbestos abatement of flooring materials, pipe insulation, and plaster in various buildings on the medical center campus. Renovation work includes demolishing and replacing flooring, painting walls, upgrading restrooms, installing new casework and countertops, and replacing ceiling tiles and light fixtures. The contractor must schedule work to minimize disruption to medical center operations, complete all work within 120 calendar days of the notice to proceed, and adhere to strict safety and infection control requirements. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 19 for an asbestos abatement and renovation project at the Cheyenne VA Medical Center.

View the file

Other files

File Type Posted
36C25923R0004 0013.docx DOCX document
Additonal RFI.docx DOCX document
36C25923R0004 0012.docx DOCX document
36C25923R0004 0011.docx DOCX document
REMODEL_2ND_FLOOR_MENTAL_HEALTH_3-23-23 Phasing.pdf PDF
36C25923R0004 0010.docx DOCX document
36C25923R0004 0009.docx DOCX document
IMG_0331.jpg JPG image
36C25923R0004 0005.docx DOCX document
IMG_0325.jpg JPG image
CW-001-5A Asbestos Report.pdf PDF
Wall Guard Detail.pdf PDF
IMG_0342.jpg JPG image
IMG_0321.jpg JPG image
IMG_0329.jpg JPG image
IMG_0322.jpg JPG image
IMG_0332.jpg JPG image
IMG_0328.jpg JPG image
IMG_0337.jpg JPG image
IMG_0339.jpg JPG image
IMG_0333.jpg JPG image
New Kitchen Cabinet Layout.pdf PDF
36C25923R0004 0006.docx DOCX document
IMG_0334.jpg JPG image
RFI answers.docx DOCX document
IMG_0338.jpg JPG image
36C25923R0004 0004.docx DOCX document
36C25923R0004 0002.docx DOCX document
IMG_0341.jpg JPG image
HRB10-Series-Specifications-SG-HRB10SERIES.pdf PDF
IMG_0340.jpg JPG image
36C25923R0004 0007.docx DOCX document
IMG_0336.jpg JPG image
IMG_0330.jpg JPG image
36C25923R0004 0008.docx DOCX document
36C25923R0004 0003.docx DOCX document
S04 -Site Visit Meeting Doc.docx DOCX document
36C25923R0004 0001.docx DOCX document
SOW Mental Health 2nd Floor Corridor Arch Upgrades SOW. Rev 111722.docx DOCX document
Mental Health 2nd Floor Arch Upgrades Rev 112522.pdf PDF
Attendance Sheet Site Vist.pdf PDF
Aluminum Prints.pdf PDF
Exhibit for Wayfinding Sign.jpg JPG image
webbglide_roller_shade_specification_ipc2112rev2.pdf PDF
Past Performance Questionnaire.docx DOCX document
36C25923R0004_1.docx DOCX document
2nd Floor Corridor Specs.docx DOCX document
Mental Health 2nd Floor Arch Upgrades.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHEYENNE VA MEDICAL CENTER - CHEYENNE, VA

ASBESTOS REINSPECTION REPORT

NOVEMBER 2018

4.0 SUMMARY OF FINDINGS

4.1 Asbestos-Containing Building Materials

The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:

Building 1 Main Hospital

Asbestos Containing Materials Locations Quantity Contaminated soil from pipe insulation debris Crawl Spaces 40,700 sf

Pipe insulation CL-02C hallway, pipe chases by CL-04 and CL-17, C1-102, D1-36 closet, 60 lf

Hard ceiling plaster C1-92 Entry 1,440 sf D1-36 closet, D1-15 storage 80 sf

Ebony cement countertops & shelves D1-53 Dental Lab 90 sf Drywall joint compound Attic 4-OL & 4-OK divider wall 628 sf

Building 1-CA Clinical Addition

No asbestos containing materials identified in building.

Building 1-CX Physical Therapy Addition

No asbestos containing materials identified in building.

Building 4 Offices (Fiscal and AM&M)

Asbestos Containing Materials Locations Quantity Contaminated soil under concrete cap Crawl Spaces 2,860 sf Pipe insulation Basement Storage Rooms B1, B2, and B4 415 lf Skim coating on concrete walls Basement rooms B1, B1A, B2, B3, B4 and 108 1,440 sf

Hard ceiling & wall plaster 1st & 2nd floor rooms 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, S1F1, 200, 201, 203, S1F2

11,220 sf

Building 5 Offices (Human Resources)

Asbestos Containing Materials Locations Quantity Transite cement sheets Basement furnace room B1 16 sf

Drywall joint compound First floor rooms 101, 102, 103, 104, 105, 106, 107, 108, C1, C2, S1F1

4,160 sf