This statement of work outlines requirements for a mental health second floor corridor upgrades project at the Cheyenne VA Medical Center in Cheyenne, Wyoming. The scope of work includes asbestos abatement, demolition of existing finishes, installation of new flooring, casework, lighting and paint throughout approximately 4,100 square feet of corridors and common areas. Additional requirements involve upgrading the mental health kitchen and installing new artwork and signage. The contractor must complete all work between the hours of 5pm and 6:30am from Monday through Friday or on weekends to minimize disruption. The performance period is 120 calendar days from notice to proceed. The selected contractor will be responsible for quality control, safety compliance, and coordinating any necessary shutdowns or outages with the contracting officer's representative.

View the file

Other files

File Type Posted
36C25923R0004 0013.docx DOCX document
Additonal RFI.docx DOCX document
Main Hospital_Asbetsos Report_November 2018.pdf PDF
36C25923R0004 0012.docx DOCX document
36C25923R0004 0011.docx DOCX document
REMODEL_2ND_FLOOR_MENTAL_HEALTH_3-23-23 Phasing.pdf PDF
36C25923R0004 0010.docx DOCX document
36C25923R0004 0009.docx DOCX document
IMG_0331.jpg JPG image
36C25923R0004 0005.docx DOCX document
IMG_0325.jpg JPG image
CW-001-5A Asbestos Report.pdf PDF
Wall Guard Detail.pdf PDF
IMG_0342.jpg JPG image
IMG_0321.jpg JPG image
IMG_0329.jpg JPG image
IMG_0322.jpg JPG image
IMG_0332.jpg JPG image
IMG_0328.jpg JPG image
IMG_0337.jpg JPG image
IMG_0339.jpg JPG image
IMG_0333.jpg JPG image
36C25923R0004 0006.docx DOCX document
IMG_0334.jpg JPG image
RFI answers.docx DOCX document
IMG_0338.jpg JPG image
36C25923R0004 0004.docx DOCX document
36C25923R0004 0002.docx DOCX document
IMG_0341.jpg JPG image
HRB10-Series-Specifications-SG-HRB10SERIES.pdf PDF
IMG_0340.jpg JPG image
36C25923R0004 0007.docx DOCX document
IMG_0336.jpg JPG image
IMG_0330.jpg JPG image
36C25923R0004 0008.docx DOCX document
36C25923R0004 0003.docx DOCX document
S04 -Site Visit Meeting Doc.docx DOCX document
36C25923R0004 0001.docx DOCX document
SOW Mental Health 2nd Floor Corridor Arch Upgrades SOW. Rev 111722.docx DOCX document
Mental Health 2nd Floor Arch Upgrades Rev 112522.pdf PDF
Attendance Sheet Site Vist.pdf PDF
Aluminum Prints.pdf PDF
Exhibit for Wayfinding Sign.jpg JPG image
webbglide_roller_shade_specification_ipc2112rev2.pdf PDF
Past Performance Questionnaire.docx DOCX document
36C25923R0004_1.docx DOCX document
2nd Floor Corridor Specs.docx DOCX document
Mental Health 2nd Floor Arch Upgrades.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project N um ber

B uilding N um ber

D raw ing N um ber

Project Title

Location

Issue D ate

C hecked

D raw n

D raw ing Title

A pproved:

A

O ffice of

C onstruction and Facilities M anagem ent

U .S

. D ep artm en t of V eteran s A ffairs

BCDEF

Phase

R evisions:

D ate:

GH

LO

C

A L I.D

A

S-B U

ILT B

Y:

SEC

O

N D

FLO

O

R M

EN

TA

L H

EA

LTH

F5

SC

ALE: 14 " = 1'-0"

2'-0" 4'-0"

8'-0"

File details come from the government source that posted it. Updated .