New Kitchen Cabinet Layout.pdf
PDF 133 KB Posted
- Solicitation number
- 36C25923R0004
About this file
This statement of work outlines requirements for a mental health second floor corridor upgrades project at the Cheyenne VA Medical Center in Cheyenne, Wyoming. The scope of work includes asbestos abatement, demolition of existing finishes, installation of new flooring, casework, lighting and paint throughout approximately 4,100 square feet of corridors and common areas. Additional requirements involve upgrading the mental health kitchen and installing new artwork and signage. The contractor must complete all work between the hours of 5pm and 6:30am from Monday through Friday or on weekends to minimize disruption. The performance period is 120 calendar days from notice to proceed. The selected contractor will be responsible for quality control, safety compliance, and coordinating any necessary shutdowns or outages with the contracting officer's representative.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project N um ber
B uilding N um ber
D raw ing N um ber
Project Title
Location
Issue D ate
C hecked
D raw n
D raw ing Title
A pproved:
A
O ffice of
C onstruction and Facilities M anagem ent
U .S
. D ep artm en t of V eteran s A ffairs
BCDEF
Phase
R evisions:
D ate:
GH
LO
C
A L I.D
A
S-B U
ILT B
Y:
SEC
O
N D
FLO
O
R M
EN
TA
L H
EA
LTH
F5
SC
ALE: 14 " = 1'-0"
2'-0" 4'-0"
8'-0"
File details come from the government source that posted it. Updated .