36C25726Q0180 0002.pdf

PDF 403 KB Posted

Attached to
VAMC El Paso Electrical Equipment Service Amendment 0001 Federal contract opportunity
Solicitation number
36C25726Q0180
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs, Central Texas Veterans Healthcare System in Temple, Texas. The amendment extends the proposal due date from January 27, 2026 to January 30, 2026 at 10:00 CST for solicitation 36C25726Q0180. The amendment adds VAAR Clause 852.219-76 (VA Notice of Limitations on Subcontracting – Certificate of Compliance for Supplies and Products, November 2022) and provides answers to 36 questions submitted by potential offerors along with 18 supporting attachments including electrical one-line diagrams, equipment specifications, test reports, and inspection documents.

The solicitation covers electrical maintenance and testing services at the El Paso VA Medical Center, involving two 750kW Caterpillar diesel generators, a solar photovoltaic system located at 5001 N Piedras St in El Paso, Texas, and various electrical distribution equipment. Key requirements include annual preventive maintenance inspections and testing of low-voltage circuit breakers (secondary injection only per NETA standards), diesel generator maintenance per manufacturer recommendations, solar panel cleaning twice annually with performance evaluations, load bank testing for both generators in the second option year, and emergency response within one hour of notification using a regional dispatch model. Testing deliverables must be NETA-compliant reports in PDF format without VA-specific templates. Contractors must provide a spare Eaton TrippLite UPS (model SM1500RMXL2UTAA, 1.5kVA), furnish all equipment, and comply with 14-day advance notice requirements for after-hours shutdowns with VA escort accompaniment. The work is categorized as Services under the limitations on subcontracting requirement applicable to SDVOSB/VOSB contractors.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 10

0001 01-22-2026

36C257

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple, TX 76504

To all Offerors/Bidders

36C25726Q0180

12-19-2025

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 01-30-2026 1000 CST

See CONTINUATION Page

X 1

The purpose of this amendment is to:

a. Extend the due date for receipt of proposals. Proposal due date is changed from 01-27-2026 to 01-30-2026.

b. Add VAAR Clause 852.219-76. VA Notice of Limitations on Subcontracting - Certificate of Compliance for Supplies and Products (NOV 2022)

c. Provide answers to questions asked by the closing date and time as shown in Block 11 above.

d. Provide 18 attachments as a result of questions.

///END OF AMENDMENT///

Shawn R. Reinhart Contracting Officer

36C25726Q0180-0001 CONTINUATION PAGES

A.1 VAAR 852.219-76 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SUPPLIES AND PRODUCTS (NOV 2022)

(a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(i) [ ] In the case of a contract for supplies or products (other than from a nonmanufacturer of such supplies), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIPlisted SDVOSBs as set forth in 852.219–73 or VOSBs as set forth in 852.219–

74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(ii) [ ] In the case of a contract for supplies from a nonmanufacturer, it will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) is granted. The offeror understands that, as provided in 13 CFR 121.406(b)(7), such a waiver has no effect on requirements external to the Small Business Act, such as the Buy American Act or the Trade Agreements Act.

(2) Manufacturer or nonmanufacturer representation and certification. [Offeror fillin—check each applicable box below. The offeror must select the applicable provision below, identifying itself as either a manufacturer or nonmanufacturer]:

(i) [] Manufacturer or producer. The offeror certifies that it is the manufacturer or producer of the end item being procured, and the end item is manufactured or produced in the United States, in accordance with paragraph (a)(1)(i).

(ii) [ ] Nonmanufacturer. The offeror certifies that it qualifies as a nonmanufacturer in accordance with the requirements of 13 CFR 121.406(b) and paragraph (a)(1)(ii). The offeror further certifies it meets each element below as required in order to qualify as a nonmanufacturer.

[ ] The offeror certifies that it does not exceed 500 employees (or 150 employees for the Information Technology Value Added Reseller exception to NAICS code 541519, which is found at 13 CFR 121.201, footnote 18).

[ ] The offeror certifies that it is primarily engaged in the retail or wholesale trade and normally sells the type of item being supplied.

[ ] The offeror certifies that it will take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice.

(iii) [ ] The offeror certifies that it will supply the end item of a small business manufacturer, processor, or producer made in the United States, unless a waiver as provided in 13 CFR 121.406(b)(5) has been issued by SBA. [Contracting Officer fill-in or removal (see 13 CFR 121.1205). This requirement must be included for a single end item. However, if SBA has issued an applicable waiver of the nonmanufacturer rule for the end item, this requirement must be removed in the final solicitation or contract.] or [Contracting officer tailor clause to remove one or other block under subparagraph (iii).] b If this is a multiple item acquisition, the offeror certifies that at least 50% of the estimated contract value is composed of items that are manufactured by small business concerns. [Contracting Officer fill-in or removal. See 13 CFR 121.406(d) for multiple end items. If SBA has issued an applicable nonmanufacturer rule waiver, this requirement must be removed in the final solicitation or contract.]

(3) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(4) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and (iii) Prosecution for violating section 1001 of title 18. (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract or to determine whether the offeror qualifies as a manufacturer or nonmanufacturer in compliance with the limitations on subcontracting requirement. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee: ___________ Printed Title of Signee: _____________ Signature: ____________ Date: ______________ Company Name and Address: _______________

(End of Clause)

QUESTIONS WITH ANSWERS

QUESTION 1: What category is the Limits of Subcontracting? IE Services, Construction by Special Trade.

ANSWER: Services. VAAR Clause 852.219-76 added.

QUESTION 2: Will the single line drawings be provided?

ANSWER: Yes, they will be provided.

QUESTION 3: Will the historical test reports be provided?

ANSWER: All previous test data and reports are attached.

QUESTION 4: Is the Arc Flash Study current and will it be provided?

ANSWER: Arc Flash study was conducted June 2025 and can be provided once a contractor is selected and after award.

QUESTION 5: Does the one-hour dispatch time relate to the contractor calling the facility back within the hour? Or does the facility require a technician onsite within one hour? Onsite within one hour seems impractical for a contractor or subcontractor to agree to with any honest ability to guarantee it.

ANSWER: Contractor shall provide a 24-hour contact that can be dispatched to arrive at the facility within 1 hour of notification of the emergency. Repairs to commence at the earliest reasonable opportunity.

QUESTION 6: Solar PV Scope Clarification. Please clarify the required scope for the solar PV systems listed in Appendix A. Is the scope limited to electrical inspection and testing, or does it also include panel cleaning or mechanical maintenance?

ANSWER: The Contractor shall inspect all solar panels, inverters, and wiring for damage or signs of extreme wear. Perform visual inspection of all components, performance evaluations to determine if areas are not producing solar power, and inspection of mounting equipment to ensure panel stability. The contractor shall clean the solar panels twice annually. Any maintenance necessary for the solar PV system that is separate from routine maintenance as part of this scope of work will be subject to repair in accordance with section 5 of the SOW.

QUESTION 7: Solar PV Scope Clarification. Please clarify the required scope for the solar PV systems listed in Appendix A. Are OEM-specific solar testing procedures required, or is NETA/OEM-recommended electrical inspection sufficient?

ANSWER: All maintenance, inspection, and repairs shall be as per manufacturer’s recommendations.

QUESTION 8: Diesel Generator (DEDG) Scope. Please clarify whether the diesel generator scope includes:

• Electrical testing and inspection only, or

• Mechanical engine maintenance (fuel systems, oil, coolant, filters, etc.).

If mechanical maintenance is required, please confirm the expected level of service.

ANSWER: Refer to section 8.3.3 of SOW for specified scope related to Diesel Generator (DEDG). As noted, contractors shall follow each manufacturer’s recommended maintenance schedule where there are inconsistencies.

QUESTION 9: Load Bank Testing Requirements. Please confirm whether load bank testing is required for any generators. If so:

• Which generators require load testing?

• Required duration and frequency?

• Whether load banks are Government-furnished or contractor-furnished.

ANSWER: Load bank testing is required by section 8.4 of the SOW for the 2nd option year.

Both generators require the load bank test. Load banks as well as all other equipment to perform the duties of this contract shall be furnished by the contractor. Government shall NOT furnish any equipment for use by contractors. Please refer to section 8.4 of the SOW for load bank requirements.

QUESTION 10: Electrical One-Line Diagrams. Please confirm whether current electrical one-line diagrams are available for the applicable buildings and systems.

• If available, please advise whether they will be provided.

• If not available, please confirm whether contractors should price field verification or development of one-lines, or assume testing based on existing conditions.

ANSWER: One-line diagrams will be provided by the Government.

QUESTION 11: Primary vs. Secondary Injection Testing. Please clarify which equipment requires primary injection testing versus secondary injection testing, including:

• Low-voltage power circuit breakers

• Molded case circuit breakers

• Protective relays If this determination is contractor-defined, please confirm that bidders may base pricing on NETA and OEM-standard testing assumptions.

ANSWER: Only secondary injection of low voltage circuit breakers is required by section 8.1.1 of the SOW. Testing assumptions shall be as recommended by NETA and appropriate for the equipment being tested.

QUESTION 12: Emergency Response Requirement (1-Hour). The solicitation references a one-hour on-site emergency response requirement. Please clarify:

• Whether this requires a technician staged locally, or if a regional dispatch model is acceptable.

• Whether the one-hour response applies to all systems or only life-safety / mission-critical systems.

ANSWER: Regional dispatch model is acceptable if the requirements of section 9 of the SOW is met. The one-hour response applies to all Electrical Distribution System failure under the authority of this contract.

QUESTION 13: After-Hours vs Normal Hours Work. Please confirm whether testing and maintenance activities are expected to be performed:

• During normal business hours

• After hours, or

• As coordinated per system criticality.

Please also confirm whether bidders should assume after-hours labor premiums in pricing.

ANSWER: Maintenance/testing shall be performed during normal business hours provided the maintenance/testing will not interrupt service to electrical distribution systems for the facility.

Shutdown of energized equipment for routine maintenance shall be scheduled during off hours or on weekends at no additional cost to the Government and shall be coordinated with the COR prior to maintenance.

QUESTION 14: Documentation & Deliverables. Please confirm whether NETA-compliant test reports are sufficient for contract deliverables, or if VA-specific templates or formats are required. Additionally, please clarify expectations regarding draft/final submissions and review cycles.

ANSWER: NETA-compliant test reports are sufficient provided they abide by section 7.2 of the SOW for reporting requirements. No VA-specific templates or formats will be provided. Reports shall be provided to the VA once maintenance/testing has been completed.

QUESTION 15: Please provide the total number of generators and the generator data (manufacturer, size in kW, & engine serial number) for the section 8.3 of the SOW.

ANSWER: 2 Generators, 750kW each, Manufacturer: Caterpillar, SN: CAT00C27KGDS00522

& CAT00C27PGDS00521

QUESTION 16: Can you please provide a list of the generators that need service that includes at which campus they are located, engine make and model, generator make, model, and size (Output KW)?

ANSWER: 2 Generators, 750kW each, Manufacturer: Caterpillar, SN: CAT00C27KGDS00522 & CAT00C27PGDS00521. Engine SN: MJE03998 & MJE04009. All generators located at main campus.

QUESTION 17: Can you please provide the location of the solar panel array, at which facility is it located or is it multiple arrays at more than one location?

ANSWER: Solar panel array is located on the roof of the main facility located at 5001 N Piedras St El Paso, TX 79930.

QUESTION 18: Request for Existing Drawings & Documentation.

• Please provide the most current electrical one‑line diagrams for all EPVAHCS facilities listed in the SOW.

• Please provide as‑built drawings, including:

• Electrical distribution systems

• Emergency power systems (DEDG, ATS, paralleling gear)

• Photovoltaic solar system

• Medium‑voltage distribution

• UPS systems and battery systems

• Please provide any arc‑flash studies, coordination studies, or short‑circuit studies currently on file.

ANSWER: Provided.

QUESTION 19: Equipment Inventory Clarification

• Appendix A is referenced in the SOW. Please confirm whether a complete and current equipment list is available, including:

• Manufacturer

• Model numbers

• Serial numbers

• Ratings

• Installation dates

• Maintenance history (if available) ANSWER: The information provided in Appendix A is all the information available regarding the equipment list.

QUESTION 20: Solar System Documentation.

• Please provide PV system design drawings, including:

• Inverter layout

• Combiner boxes

• AC/DC disconnects

• Panel layout and string configuration

• Monitoring system details

• Please confirm whether the REC Solar PV System includes any proprietary software or monitoring access requirements.

ANSWER: Drawings provided.

QUESTION 21: Generator & Emergency Power System Clarifications.

• Please provide generator as‑builts, including:

• Paralleling switchgear drawings

• Day tank and fuel system schematics

• Radiator and cooling system layouts

• Please confirm the number of generators, their kW ratings, and locations across all campuses.

ANSWER: Generator as-builts not available. 2 Generators, 750kW each, Manufacturer:

Caterpillar, SN: CAT00C27KGDS00522 & CAT00C27PGDS00521. Engine SN: MJE03998 & MJE04009. All generators located at main campus.

QUESTION 22: Access & Scheduling Requirements

• Please confirm whether after‑hours shutdowns require:

• A minimum notice period

• VA escort

• Special access badges or background checks

• Please confirm whether weekend work is permitted without additional approvals.

ANSWER: After hour shutdowns will require a prior notice of 14 days. A VA escort will be needed. Contractor will need to check in with security to receive a contractor badge for the day if VA escort finds it necessary. Weekend work is permitted but must be coordinated with COR so that a VA escort can be provided. No contractor is allowed at the facility at any time without a VA escort. There are times when the VA escort will be called to perform duties at another section of the facility and leave the contractor in the specified area, but these situations are rare and the escort shall have knowledge of the contractor’s location beforehand.

QUESTION 23: Testing Standards & Reporting

• Please confirm whether the VA requires:

• NETA‑certified test forms

• Digital reporting format (PDF, Excel, or VA‑specific template)

• Color‑coded labeling format (White/Yellow/Red) beyond what is listed in the SOW ANSWER: NETA-compliant test reports are sufficient provided they abide by section 7.2 of the SOW for reporting requirements. No VA-specific templates or formats will be provided. Reports shall be provided to the VA once maintenance/testing has been completed. A PDF is acceptable.

Section 7.1 of the SOW shall be followed regarding the color-coding of the affixed labels.

QUESTION 24: UPS Replacement Requirement.

• The SOW requires the contractor to maintain one replacement UPS on hand.

• Please confirm the make, model, and kVA rating of the required spare UPS.

ANSWER: Spare UPS shall be Eaton TrippLite series model number: SM1500RMXL2UTAA, 1.5kVA.

QUESTION 25: Site Visit Clarifications.

• Please confirm whether additional site visits can be scheduled beyond the January 13th date.

• Please confirm whether all off‑campus CBOCs will be scheduled as needed for a walkthrough.

ANSWER: There will be no additional site visits conducted. All off-campus CBOCs will not require a walkthrough as there will be no routine maintenance being done at the off-campus CBOCs. Work related to the CBOCs will be limited to repair work as stated in section 5.4 as needed. Once a repair is deemed necessary, a site visit will be scheduled with the contractor so that information can be gathered regarding the repair needed.

QUESTION 26: Can you provide the previous test report? I'm referring to the test report for:

Circuit breakers, Transformers, etc... Not the thermographic inspection report or the Arc Flash study.

ANSWER: All previous test data and reports attached.

QUESTION 27: Regarding the photovoltaic system maintenance: What is the total number of Photovoltaic Solar Panels that need to be cleaned/IR scanned?

ANSWER: Please refer to As-builts provided.

QUESTION 28: Regarding the photovoltaic system maintenance: Which devices, in addition to inspection, require electrical testing?

ANSWER: Please refer to section 8.2 of the SOW for solar PV requirements.

QUESTION 29: Does only CLIN 2004 require a Load Bank test?

ANSWER: Correct.

QUESTION 30: In the “B.4 STATEMENT OF WORK” in section 8.5 located on page 16, electrical maintenance is requested for CLINs 0005 and 3005. The scope requested for 0005 and 3005 is the same as the work that will be performed under CLINs 0001 and 3001 of the same years. Is this correct? Please explain.

ANSWER: CLINs 0005 and 3005 are only needed on a 3-year basis, to receive a 3-year testing sticker. These are additional preventive maintenance requirements. CLINs 0001 and 3001 are needed on an annual basis for Electrical Distribution Equipment which is the equipment referenced in section 6.1 Electrical Distribution Equipment. The work requested in CLINs 0001 and 3001 are not the same as CLINs 0005 and 3005. Please read the SOW carefully to determine the difference between them.

QUESTION 31: What is the difference between the work that needs to be done in CLINs 0005 and 0001?

ANSWER: CLIN 0005 is only needed on a 3-year basis, to receive a 3-year testing sticker.

These are additional preventive maintenance requirements. CLIN 0001 is needed on an annual basis for Electrical Distribution Equipment, which is the equipment referenced in section 6.1 Electrical Distribution Equipment. The SOW outlines what equipment and what additional maintenance is needed as part of CLIN 0005.

QUESTION 32: In section 8.5 of the “B.4 STATEMENT OF WORK” on page 16, a complete ARC Flash study is apparently requested for CLIN 4005, but detailed specifications for the ARC Flash were not provided. Will the contractor be responsible for affixing labels to the equipment after the study, or will the VA team be responsible for this?

ANSWER: The arc flash, shock hazard, and full electrical load study are outlined in section 8.6 of SOW as part of CLIN 4006. Contractor will be responsible for affixing labels as part of this

CLIN.

QUESTION 33: Could you please provide the report of the last Arc Flash study?

ANSWER: All previous test data and reports will be shared with selected contractor after award.

QUESTION 34: Regarding the scope of CLINs 0001, 1001, 2001, 3001, and 4001: Only (7) LV Breakers were listed in the provided “Appendix A”. Do only 7 circuit breakers need to be tested?

ANSWER: The 7 breakers listed in Appendix A are main breakers for transformers or emergency disconnects. There are also various distribution panels throughout the facility that contain circuit breakers as well which are subject to maintenance and testing as required by the SOW. Those will need to be maintained in accordance with Joint Commission, NFPA, NETA, and other applicable requirements.

QUESTION 35: Regarding the scope of CLINs 0001, 1001, 2001, 3001, and 4001: Not a single MV Breaker, Relay, or MV Transformer was listed in “Appendix A”. Is this correct?

ANSWER: Excuse the confusion. At this facility the electricians consider medium voltage to be any of the equipment over 120/208V. So, for this environment, medium voltage equipment would be the 480/277V equipment.

QUESTION 36: No IR scan was mentioned in the scope of CLINs 0001, 1001, 2001, 3001, and 4001. Is an IR scan only required for photovoltaic system maintenance?

ANSWER: IR scans will be necessary as recommended by NFPA or NETA requirements for the appropriate equipment being tested. Please refer to section 6.1 Electrical Distribution Equipment which is the reference for the equipment as part of CLINs 0001, 1001, 2001, 3001, and 4001.

Attachments:

Attachment 1 - ONE LINE 1 Layout1 Attachment 2 - ONE LINE 2 Layout1 Attachment 3 - ONE LINE 3 Layout1 Attachment 4 - El Paso VAMC Elec Upgrade As-Built NEW Attachment 5 - ECM-09 Renewables PV- As Built Drawings R Attachment 6 - VA log 1 Attachment 7 - VA log 2 Attachment 8 - VA log 3 Attachment 9 - Generator 1 Inspection Sheets Attachment 10 - Generator Load Bank Test Attachment 11 - Generator 2 Inspection Sheets Attachment 12 - Generator 2 Load Bank Test Attachment 13 - Load Bank Generator 1 VA Attachment 14 - Grounding Facility Shutdown Attachment 15 - Solar Inspections PV logs Attachment 16 - Electrical work studies complete OCT

Attachment 17 - VA Med Center El Paso Power Analysis RPT Attachment 18 VA UPS Inspection

(END OF QUESTIONS AND ANSWERS)

(END OF AMENDMENT 0002)