36C25622R0094 230511 COMMON WORK RESULTS FOR HVAC.docx

DOCX document 70 KB Posted

Attached to
Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 Federal contract opportunity
Solicitation number
502-19-107
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document package includes a technical specification and related federal contract opportunity. The technical specification outlines requirements for replacing an air handling unit and associated ductwork at a Department of Veterans Affairs medical center. Key specifications include replacing AHU #104, demolishing existing equipment, installing new ductwork and insulation, providing submittals and as-built documentation, and commissioning the new HVAC systems. The related federal contract opportunity is a solicitation to obtain these replacement and construction services. The solicitation number is 502-19-107 and is being issued by the Veterans Health Administration VISN 16 for the project located at the VA Health Care System in Alexandria, Louisiana. The response due date and planned award date are not provided in this document package.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094, newest first.
File Type Posted
36C25622R0094 RFI Register 08292022.docx DOCX document
36C25622R0094 0002.docx DOCX document
36C25622R0094 Brand Name JA 502-19-107 Redacted.pdf PDF
36C25622R0094 COVID-19 Safety Protocols for Federal Contractors Rev 2.docx DOCX document
36C25622R0094 280800 Commissioning of Electronic Safety and Security Systems .docx DOCX document
36C25622R0094 000110 VHA Master Specifications Rev 2.docx DOCX document
36C25622R0094 262726 Wiring Devices .docx DOCX document
36C25622R0094 283100 Fire Detection and Alarm .doc DOC document
36C25622R0094 260923 Lighting Controls.docx DOCX document
36C25622R0094 232500 HVAC WATER TREATMENT .docx DOCX document
36C25622R0094 260511 Requirements for ELEC installation.docx DOCX document
36C25622R0094 234000 HVAC AIR CLEANING DEVICES .docx DOCX document
36C25622R0094 238100 DECENTRALIZED UNITARY HVAC EQUIPMENT.docx DOCX document
36C25622R0094 260800 Commissioning of Electrical Systems.docx DOCX document
36C25622R0094 232113 HYDRONIC PIPING .docx DOCX document
36C25622R0094 230923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC .doc DOC document
36C25622R0094 014500 Quality Control.docx DOCX document
36C25622R0094 013526 Safety Requirements .docx DOCX document
36C25622R0094 099100 Painting .docx DOCX document
36C25622R0094 095100 Acoustical Ceilings .docx DOCX document
36C25622R0094 087100 Door Hardware .docx DOCX document
36C25622R0094 092216 Non-Structural Metal Framing .docx DOCX document
36C25622R0094 096513 Resilient Base and Accessories.docx DOCX document
36C25622R0094 079200 Joint Sealants .docx DOCX document
36C25622R0094 092900 Gypsum Board .docx DOCX document
36C25622R0094 076000 Flashing and Sheet Metal .docx DOCX document
36C25622R0094 015719 Temporary Environmental Controls .doc DOC document
36C25622R0094 Revised SOW 05202022 .docx DOCX document
36C25622R0094 RFP.docx DOCX document
36C25622R0094 IFC Drawings Part 1 .pdf PDF
36C25622R0094 IFC Drawings Part 2.pdf PDF
36C25622R0094 230593 TESTING ADJUSTING AND BALANCING FOR HVAC.docx DOCX document
36C25622R0094 013323 Shop Drawings Product Data and Samples.docx DOCX document
36C25622R0094 010000 General Requirements .docx DOCX document
36C25622R0094 EXHIBIT E.docx DOCX document
36C25622R0094 323113 Chain Link Fences and Gates .docx DOCX document
36C25622R0094 EXHIBIT B.docx DOCX document
36C25622R0094 265100 Interior Lighting .docx DOCX document
36C25622R0094 262921 Enclosed Switches and Circuit Breakers.docx DOCX document
36C25622R0094 264313 Surge Protective Devices.docx DOCX document
36C25622R0094 260533 Raceways and Boxes for Electrical Systems .docx DOCX document
36C25622R0094 270511 Requirements for Communications Installations .docx DOCX document
36C25622R0094 233400 HVAC FANS.docx DOCX document
36C25622R0094 237300 INDOOR CENTRAL STATION AIR HANDLING UNITS.docx DOCX document
36C25622R0094 232123 HYDRONIC PUMPS.docx DOCX document
36C25622R0094 078400 Firestopping.docx DOCX document
36C25622R0094 081400 Interior Wood Doors .docx DOCX document
36C25622R0094 051200 Structural Steel Framing .docx DOCX document
36C25622R0094 024100 Demolition .docx DOCX document
36C25622R0094 014219 Reference Standards.docx DOCX document
Show all 50

Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE AHU #104 AND DUCTWORK BLDG. 7

DEPARTMENT OF VETERANS AFFAIRS HEALTH CARE SYSTEM-ALEXANDRIA, LA

PROJECT NO.: 502-19-107

SECTION 23 05 11

COMMON WORK RESULTS FOR HVAC

GENERAL

DESCRIPTION

The requirements of this Section apply to all sections of Division 23.

Definitions:

Exposed: Piping, ductwork, and equipment exposed to view in finished rooms.

Exterior: Piping, ductwork, and equipment exposed to weather be it temperature, humidity, precipitation, wind, or solar radiation.

Abbreviations/Acronyms:

ac: Alternating Current AC: Air Conditioning ACU: Air Conditioning Unit ACR: Air Conditioning and Refrigeration AI: Analog Input AISI: American Iron and Steel Institute AO: Analog Output ASJ: All Service Jacket AWG: American Wire Gauge BACnet: Building Automation and Control Networking Protocol BAg: Silver-Copper-Zinc Brazing Alloy BAS: Building Automation System BCuP: Silver-Copper-Phosphorus Brazing Alloy bhp: Brake Horsepower Btu: British Thermal Unit Btu/h: British Thermal Unit Per Hour CDA: Copper Development Association C: Celsius CD: Compact Disk CFM: Cubic Foot Per Minute CH: Chilled Water Supply CHR: Chilled Water Return CLR: Color CO: Carbon Monoxide COR: Contracting Officer’s Representative CPD: Condensate Pump Discharge CPM: Cycles Per Minute CPVC: Chlorinated Polyvinyl Chloride CRS: Corrosion Resistant Steel CTPD: Condensate Transfer Pump Discharge CTPS: Condensate Transfer Pump Suction CW: Cold Water CWP: Cold Working Pressure CxA: Commissioning Agent dB: Decibels dB(A): Decibels (A weighted) DDC: Direct Digital Control DI: Digital Input DO: Digital Output DVD: Digital Video Disc DN: Diameter Nominal DWV: Drainage, Waste and Vent EPDM: Ethylene Propylene Diene Monomer EPT: Ethylene Propylene Terpolymer ETO: Ethylene Oxide F: Fahrenheit FAR: Federal Acquisition Regulations FD: Floor Drain FED: Federal FG: Fiberglass FGR: Flue Gas Recirculation FOS: Fuel Oil Supply FOR: Fuel Oil Return FSK: Foil-Scrim-Kraft facing FWPD: Feedwater Pump Discharge FWPS: Feedwater Pump Suction GC: Chilled Glycol Water Supply GCR: Chilled Glycol Water Return GH: Hot Glycol Water Heating Supply GHR: Hot Glycol Water Heating Return gpm: Gallons Per Minute HDPE: High Density Polyethylene Hg: Mercury HOA: Hands-Off-Automatic hp: Horsepower HPS: High Pressure Steam (414 kPa (60 psig) and above) HPR: High Pressure Steam Condensate Return HW: Hot Water HWH: Hot Water Heating Supply HWHR: Hot Water Heating Return Hz: Hertz ID: Inside Diameter IPS: Iron Pipe Size kg: Kilogram klb: 1000 lb kPa: Kilopascal lb: Pound lb/hr: Pounds Per Hour L/s: Liters Per Second L/min: Liters Per Minute LPS: Low Pressure Steam (103 kPa (15 psig) and below) LPR: Low Pressure Steam Condensate Gravity Return MAWP: Maximum Allowable Working Pressure MAX: Maximum MBtu/h: 1000 Btu/h MBtu: 1000 Btu MED: Medical m: Meter MFG: Manufacturer mg: Milligram mg/L: Milligrams Per Liter MIN: Minimum MJ: Megajoules ml: Milliliter mm: Millimeter MPS: Medium Pressure Steam (110 kPa (16 psig) through 414 kPa (60 psig)) MPR: Medium Pressure Steam Condensate Return MW: Megawatt NC: Normally Closed NF: Oil Free Dry (Nitrogen) Nm: Newton Meter NO: Normally Open NOx: Nitrous Oxide NPT: National Pipe Thread NPS: Nominal Pipe Size OD: Outside Diameter OSD: Open Sight Drain OS&Y: Outside Stem and Yoke PC: Pumped Condensate PID: Proportional-Integral-Differential PLC: Programmable Logic Controllers PP: Polypropylene PPE: Personal Protection Equipment ppb: Parts Per Billion ppm: Parts Per Million PRV: Pressure Reducing Valve \ PSIA: Pounds Per Square Inch Absolute psig: Pounds Per Square Inch Gauge PTFE: Polytetrafluoroethylene PVC: Polyvinyl Chloride PVDC: Polyvinylidene Chloride Vapor Retarder Jacketing, White PVDF: Polyvinylidene Fluoride rad: Radians RH: Relative Humidity RO: Reverse Osmosis rms: Root Mean Square RPM: Revolutions Per Minute RS: Refrigerant Suction RTD: Resistance Temperature Detectors RTRF: Reinforced Thermosetting Resin Fittings RTRP: Reinforced Thermosetting Resin Pipe SCFM: Standard Cubic Feet Per Minute SPEC: Specification SPS: Sterile Processing Services STD: Standard SDR: Standard Dimension Ratio SUS: Saybolt Universal Second SW: Soft water SWP: Steam Working Pressure TAB: Testing, Adjusting, and Balancing TDH: Total Dynamic Head TEFC: Totally Enclosed Fan-Cooled TFE: Tetrafluoroethylene THERM: 100,000 Btu THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire THWN: Thermoplastic Heat & Water-Resistant Nylon Coated Wire T/P: Temperature and Pressure USDA: U.S. Department of Agriculture V: Volt VAC: Vacuum VA: Veterans Administration VAC: Voltage in Alternating Current VA CFM: VA Construction & Facilities Management VA CFM CSS: VA Construction & Facilities Management, Consulting Support Service VAMC: Veterans Administration Medical Center VHA OCAMES: Veterans Health Administration – Office of Capital Asset Management Engineering and Support VR: Vacuum condensate return WCB: Wrought Carbon Steel, Grade B WG: Water Gauge or Water Column WOG: Water, Oil, Gas

RELATED WORK

Section 01 00 00, GENERAL REQUIREMENTS.

Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.

Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.

Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.

Section 07 84 00, FIRESTOPPING.

Section 07 92 00, JOINT SEALANTS.

Section 09 91 00, PAINTING.

Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC and STEAM GENERATION.

Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT.

Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC.

Section 23 07 11, HVAC AND BOILER PLANT INSULATION.

Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.

Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.

Section 23 36 00, AIR TERMINAL UNITS.

Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.

Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.

Section 26 29 11, MOTOR CONTROLLERS.

APPLICABLE PUBLICATIONS

The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. Where conflicts occur these specifications and the VHA standard will govern.

Air Movement and Control Association (AMCA):

410-1996 Recommended Safety Practices for Users and Installers of Industrial and Commercial Fans American Society of Mechanical Engineers (ASME):

B31.1-2018Power Piping
B31.9-2014Building Services Piping

ASME Boiler and Pressure Vessel Code:

BPVC Section IX-2019 Welding, Brazing, and Fusing Qualifications American Society for Testing and Materials (ASTM):

A36/A36M-2014Standard Specification for Carbon Structural Steel
A575-1996(R2018)Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades

Association for Rubber Products Manufacturers (ARPM):

IP-20-2015Specifications for Drives Using Classical VBelts and Sheaves
IP-21-2016Specifications for Drives Using Double-V (Hexagonal) Belts
IP-24-2016Specifications for Drives Using Synchronous Belts
IP-27-2015Specifications for Drives Using Curvilinear Toothed Synchronous Belts

Manufacturers Standardization Society (MSS) of the Valve and Fittings Industry, Inc.:

SP-58-2018Pipe Hangers and Supports-Materials, Design, Manufacture, Selection, Application, and Installation
SP-127-2014aBracing for Piping Systems: Seismic–Wind–Dynamic Design, Selection, and Application

A. Military Specifications (MIL):

MIL-P-21035B-2013 Paint High Zinc Dust Content, Galvanizing Repair (Metric) National Fire Protection Association (NFPA):

70-2017National Electrical Code (NEC)
101-2018Life Safety Code

B. Department of Veterans Affairs (VA):

PG-18-10-2016 Physical Security and Resiliency Design Manual

SUBMITTALS

Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

Information and material submitted under this section shall be marked “SUBMITTED UNDER SECTION 23 05 11, COMMON WORK RESULTS FOR HVAC”, with applicable paragraph identification.

Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements, and all equipment that requires regular maintenance, calibration, etc are accessable from the floor or permanent work platform. It is the Contractor’s responsibility to ensure all submittals meet the VA specifications and requirements and it is assumed by the VA that all submittals do meet the VA specifications unless the Contractor has requested a variance in writing and approved by COR prior to the submittal. If at any time during the project, it is found that any item does not meet the VA specifications and there was no variance approval the Contractor shall correct at no additional cost or time to the Government even if a submittal was approved.

If equipment is submitted which differs in arrangement from that shown, provide documentation proving equivalent performance, design standards and drawings that show the rearrangement of all associated systems. Additionally, any impacts on ancillary equipment or services such as foundations, piping, and electrical shall be the Contractor’s responsibility to design, supply, and install at no additional cost or time to the Government. VA approval will be given only if all features of the equipment and associated systems, including accessibility, are equivalent to that required by the contract.

Prior to submitting shop drawings for approval, Contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed contract documents and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.

Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together. Coordinate and properly integrate materials and equipment to provide a completely compatible and efficient installation.

Coordination/Shop Drawings:

Submit complete consolidated and coordinated shop drawings for all new systems, and for existing systems that are in the same areas.

The coordination/shop drawings shall include plan views, elevations and sections of all systems and shall be on a scale of not less than 1:32 (3/8-inch equal to one foot). Clearly identify and dimension the proposed locations of the principal items of equipment. The drawings shall clearly show locations and adequate clearance for all equipment, piping, valves, control panels and other items. Show the access means for all items requiring access for operations and maintenance. Provide detailed coordination/shop drawings of all piping and duct systems. The drawings should include all lockout/tagout points for all energy/hazard sources for each piece of equipment. Coordinate lockout/tagout procedures and practices with local VA requirements.

Do not install equipment foundations, equipment or piping until coordination/shop drawings have been approved.

In addition, for HVAC systems, provide details of the following:

Mechanical equipment rooms.

Interstitial space.

Hangers, inserts, supports, and bracing.

Pipe sleeves.

Duct or equipment penetrations of floors, walls, ceilings, or roofs.

Manufacturer's Literature and Data: Include full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity. Submit under the pertinent section rather than under this section.

Submit belt drive with the driven equipment. Submit selection data for specific drives when requested by the COR.

Submit electric motor data and variable speed drive data with the driven equipment.

Equipment and materials identification.

Fire-stopping materials.

Hangers, inserts, supports and bracing. Provide complete stress analysis for variable spring and constant support hangers.

Wall, floor, and ceiling plates.

Rigging Plan: Provide documentation of the capacity and weight of the rigging and equipment intended to be used. The plan shall include the path of travel of the load, the staging area and intended access, and qualifications of the operator and signal person.

HVAC Maintenance Data and Operating Instructions:

Maintenance and operating manuals in accordance with Section 01 00 00, GENERAL REQUIREMENTS, Article, INSTRUCTIONS, for systems and equipment.

Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide:

Include complete list indicating all components of the systems.

Include complete diagrams of the internal wiring for each item of equipment.

Diagrams shall have their terminals identified to facilitate installation, operation, and maintenance.

Provide a listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment. Include in the listing belts for equipment: Belt manufacturer, model number, size, and style, and distinguished whether of multiple belt sets.

Provide copies of approved HVAC equipment submittals to the TAB and Commissioning Subcontractor.

Completed System Readiness Checklist provided by the Commissioning Agent and completed by the Contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.

Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.

QUALITY ASSURANCE

Mechanical, electrical, and associated systems shall be safe, reliable, efficient, durable, easily, and safely operable and maintainable, easily and safely accessible, and in compliance with applicable codes as specified. The systems shall be comprised of high quality institutional-class and industrial-class products of manufacturers that are experienced specialists in the required product lines. All construction firms and personnel shall be experienced and qualified specialists in industrial and institutional HVAC.

Flow Rate Tolerance for HVAC Equipment: Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC.

Equipment Vibration Tolerance:

Refer to Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT. Equipment shall be factory-balanced to this tolerance and re-balanced on site, as necessary.

After HVAC air balance work is completed and permanent drive sheaves are in place, perform field mechanical balancing and adjustments required to meet the specified vibration tolerance.

Products Criteria:

Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 3 years (or longer as specified elsewhere). The design, model and size of each item shall have been in satisfactory and efficient operation on at least three installations for approximately three years. However, digital electronics devices, software, and systems such as controls, instruments, computer workstation, shall be the current generation of technology and basic design that has a proven satisfactory service record of at least three years. See other specification sections for any exceptions and/or additional requirements.

Refer to all other sections for quality assurance requirements for systems and equipment specified therein.

All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly.

The products and execution of work specified in Division 33 shall conform to the referenced codes and standards as required by the specifications. Local codes and amendments shall be enforced, along with requirements of local utility companies. The most stringent requirements of these specifications, local codes, or utility company requirements shall always apply. Any conflicts shall be brought to the attention of the COR.

Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be of the same manufacturer and model number, or if different models are required, they shall be of the same manufacturer and identical to the greatest extent possible (i.e., same model series).

Assembled Units: Performance and warranty of all components that make up an assembled unit shall be the responsibility of the manufacturer of the completed assembly.

Nameplates: Nameplate bearing manufacturer's name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped, or otherwise permanently marked on each item of equipment.

Use of asbestos products or equipment or materials containing asbestos is prohibited.

HVAC Equipment Service Providers: Service providers shall be authorized and trained by the manufacturers of the equipment supplied. These providers shall be capable of responding onsite and provide acceptable service to restore equipment operations within 4 hours of receipt of notification by phone, e-mail or fax in event of an emergency, such as the shutdown of equipment; or within 24 hours in a non-emergency. Submit names, mail and e-mail addresses and phone numbers of service personnel and companies providing service under these conditions for (as applicable to the project): fans, air handling units, chillers, cooling towers, control systems, pumps, critical instrumentation, computer workstation and programming.

HVAC Mechanical Systems Welding: Before any welding is performed, Contractor shall submit a certificate certifying that welders comply with the following requirements:

Qualify welding processes and operators for piping according to ASME BPVC Section IX. Provide proof of current certification.

Comply with provisions of ASME B31 series "Code for Pressure Piping".

Certify that each welder and welding operator has passed American Welding Society (AWS) qualification tests for the welding processes involved, and that certification is current.

All welds shall be stamped according to the provisions of the AWS or ASME as required herein and by the associated code.

Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the COR with submittals. Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations can be cause for rejection of the material and removal by the Contractor and no additional cost or time to the Government.

Execution (Installation, Construction) Quality:

Apply and install all items in accordance with manufacturer's written instructions. Refer conflicts between the manufacturer's instructions and the contract documents to the COR for resolution. Provide written hard copies and computer files on CD or DVD of manufacturer’s installation instructions to the COR with submittals prior to commencing installation of any item. Installation of the item will not be allowed to proceed until the recommendations are received and approved by the VA. Failure to furnish these recommendations is a cause for rejection of the material.

All items that require access, such as for operating, cleaning, servicing, maintenance, and calibration, shall be easily and safely accessible by persons standing at floor level, or standing on permanent platforms, without the use of portable ladders. Examples of these items include, but are not limited to, all types of valves, filters and strainers, transmitters, control devices. Prior to commencing installation work, refer conflicts between this requirement and contract documents to the COR for resolution. Failure of the Contractor to resolve or point out any issues will result in the Contractor correcting at no additional cost or time to the Government.

Complete coordination/shop drawings shall be required in accordance with Article, SUBMITTALS. Construction work shall not start on any system until the coordination/shop drawings have been approved by VA.

Workmanship/craftsmanship will be of the highest quality and standards. The VA reserves the right to reject any work based on poor quality of workmanship this work shall be removed and done again at no additional cost or time to the Government.

Upon request by Government, provide lists of previous installations for selected items of equipment. Include contact persons who will serve as references, with current telephone numbers and e-mail addresses.

Guaranty: Warranty of Construction, FAR Clause 52.246-21.

DELIVERY, STORAGE AND HANDLING

Protection of Equipment:

Equipment and material placed on the job site shall remain in the custody of the Contractor until phased acceptance, whether or not the Government has reimbursed the Contractor for the equipment and material. The Contractor is solely responsible for the protection of such equipment and material against any damage or theft.

Large equipment such as boilers, chillers, cooling towers, fans, and air handling units if shipped on open trailer trucks shall be covered with shrink on plastics or waterproof tarpaulins that provide protection from exposure to rain, road salts and other transit hazards. Protection shall be kept in place until equipment is moved into a building or installed as designed.

Repair damaged equipment in first class, new operating condition and appearance; or replace same as determined and directed by the COR. Such repair or replacement shall be at no additional cost or time to the Government.

Protect interiors of new equipment and piping systems against entry of foreign matter. Clean both inside and outside before painting or placing equipment in operation.

Existing equipment and piping being worked on by the Contractor shall be under the custody and responsibility of the Contractor and shall be protected as required for new work.

Protect plastic piping and tanks from ultraviolet light (sunlight).

Cleanliness of Piping and Equipment Systems:

Exercise care in storage and handling of equipment and piping material to be incorporated in the work. Remove debris arising from cutting, threading, and welding of piping.

Piping systems shall be flushed, blown, or pigged as necessary to deliver clean systems.

Clean interior of all tanks prior to delivery for beneficial use by the Government.

Boilers shall be left clean following final internal inspection by Government insurance representative or inspector.

Contractor shall be fully responsible for all costs, damage, and delay arising from failure to provide clean systems.

AS-BUILT DOCUMENTATION

Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.

Submit operation and maintenance data updated to include submittal review comments, VA approved substitutions and construction revisions shall be in electronic version on CD or DVD inserted into a three-ring binder. All aspects of system operation and maintenance procedures, including applicable piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations. Notes on all special systems or devices shall be included. A List of recommended spare parts (manufacturer, model number, and quantity) shall be furnished. Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the As-Built documentation.

The installing Contractor shall maintain as-built drawings of each completed phase for verification; and shall provide the complete set at the time of final systems certification testing. Should the installing Contractor engage the testing company to provide as built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement. Provide record drawings as follows:

As-built drawings are to be provided, with a copy of them on AutoCAD provided on CD or DVD. The CAD drawings shall use multiple line layers with a separate individual layer for each system.

The as-built drawings shall indicate the location and type of all lockout/tagout points for all energy sources for all equipment and pumps to include breaker location and numbers, valve tag numbers, etc. Coordinate lockout/tagout procedures and practices with local VA requirements.

Certification documentation shall be provided to COR 21 working days prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and provide documentation/certification that all results of tests were within limits specified. Test results shall contain written sequence of test procedure with written test results annotated at each step along with the expected outcome or setpoint. The results shall include all readings, including but not limited to data on device (make, model and performance characteristics_), normal pressures, switch ranges, trip points, amp readings, and calibration data to include equipment serial numbers or individual identifications, etc.

JOB CONDITIONS – WORK IN EXISTING BUILDING

Building Operations: Government employees will be continuously operating and managing all facilities, including temporary facilities that serve the VAMC.

Maintenance of Service: Schedule all work to permit continuous service as required by the VAMC.

Steam and Condensate Service Interruptions: Limited steam and condensate service interruptions, as required for interconnections of new and existing systems, will be permitted by the COR during periods when the demands are not critical to the operation of the VAMC. These non-critical periods are limited to between 8 pm and 5 am in the appropriate off-season (if applicable). Provide at least 10 working days advance notice to the COR. The request shall include a detailed plan on the proposed shutdown and the intended work to be done along with manpower levels. All equipment and materials must be onsite and verified with plan 5 days prior to the shutdown or it will need to be rescheduled.

Building Working Environment: Maintain the architectural and structural integrity of the building and the working environment at all times. Maintain the interior of building at 18 degrees C (65 degrees F) minimum. Limit the opening of doors, windows or other access openings to brief periods as necessary for rigging purposes. Storm water or ground water leakage is prohibited. Provide daily clean-up of construction and demolition debris on all floor surfaces and on all equipment being operated by VA. Maintain all egress routes and safety systems/devices.

Acceptance of Work for Government Operation: As new equipment, systems and facilities are made available for operation and these items are deemed of beneficial use to the Government, inspections will be made, and tests will be performed. Based on the inspections, a list of contract deficiencies will be issued to the Contractor. After correction of deficiencies as necessary for beneficial use, the Contracting Officer will process necessary acceptance and the equipment will then be under the control and operation of Government personnel.

Temporary Facilities: Refer to Article, TEMPORARY PIPING AND EQUIPMENT in this section.

PRODUCTS

FACTORY-ASSEMBLED PRODUCTS

Provide maximum standardization of components to reduce spare part requirements.

Performance and warranty of all components that make up an assembled unit shall be the responsibility of the manufacturer of the completed assembly.

All components of an assembled unit need not be products of same manufacturer.

Constituent parts that are alike shall be products of a single manufacturer.

Components shall be compatible with each other and with the total assembly for intended service.

Contractor shall guarantee performance of assemblies of components and shall repair or replace elements of the assemblies as required to deliver specified performance of the complete assembly.

Equipment and components of equipment shall bear manufacturer's name and trademark, model number, serial number and performance data on a nameplate securely affixed in a conspicuous place, or cast integral with, stamped or otherwise permanently marked upon the components of the equipment.

Major items of equipment, which serve the same function, must be the same make and model. Exceptions must be approved by the VA but may be permitted if performance requirements cannot be met.

COMPATIBILITY OF RELATED EQUIPMENT

Equipment and materials installed shall be compatible in all respects with other items being furnished and with existing items so that the result will be a complete and fully operational plant that conforms to contract requirements.

DRIVE GUARDS

For machinery and equipment, provide guards as shown in AMCA 410 for belts, chains, couplings, pulleys, sheaves, shafts, gears and other moving parts regardless of height above the floor to prevent damage to equipment and injury to personnel. Drive guards may be excluded where motors and drives are inside factory-fabricated air handling unit casings.

Pump shafts and couplings shall be fully guarded by a sheet steel guard, covering coupling and shaft but not bearings. Material shall be minimum 16-gauge sheet steel; all edges shall be hemmed, and ends shall be bent into flanges and the flanges shall be drilled and attached to pump base with minimum of four 6 mm (1/4 inch) bolts. Reinforce guard as necessary to prevent side play forcing guard onto couplings.

V-belt and sheave assemblies shall be totally enclosed, firmly mounted, non-resonant. Guard shall be an assembly of minimum 22-gauge sheet steel and expanded or perforated metal to permit observation of belts. 25 mm (1 inch) diameter hole shall be provided at each shaft centerline to permit speed measurement.

Materials: Sheet steel, expanded metal or wire mesh rigidly secured so as to be removable without disassembling pipe, duct, or electrical connections to equipment.

Access for Speed Measurement: 25 mm (1 inch) diameter hole at each shaft center.

LIFTING ATTACHMENTS

Provide equipment with suitable lifting attachments to enable equipment to be lifted in its normal position. Lifting attachments shall withstand any handling conditions that might be encountered, without bending or distortion of shape, such as rapid lowering and braking of load.

ELECTRIC MOTORS

All material and equipment furnished, and installation methods shall conform to the requirements of Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT; Section 26 29 11, MOTOR CONTROLLERS; and, Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES. Provide all electrical wiring, conduit, and devices necessary for the proper connection, protection, and operation of the systems. Provide special energy efficient premium efficiency type motors as scheduled.

VARIABLE SPEED MOTOR CONTROLLERS

Refer to Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS and Section 26 29 11, MOTOR CONTROLLERS for specifications.

Coordinate variable speed motor controller communication protocol with Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.

Provide variable speed motor controllers with or without a bypass contactor as indicated in contract drawings.

The combination of controller and motor shall be provided by the manufacturer of the driven equipment, such as pumps and fans, and shall be rated for 100 percent output performance. Multiple units of the same class of equipment, i.e. air handlers, fans, pumps, shall be product of a single manufacturer.

Motors shall be premium efficiency type and be approved by the motor controller manufacturer. The controller-motor combination shall be guaranteed to provide full motor nameplate horsepower in variable frequency operation. Both driving and driven motor/fan sheaves shall be fixed pitch.

Controller shall not add any current or voltage transients to the input ac power distribution system, DDC controls, sensitive medical equipment, etc., nor shall be affected from other devices on the ac power system.

EQUIPMENT AND MATERIALS IDENTIFICATION

1. Use symbols, nomenclature and equipment numbers specified, shown on the contract documents, and shown in the maintenance manuals. Identification for piping is specified in Section 09 91 00, PAINTING.

Interior (Indoor) Equipment: Engraved nameplates, with letters not less than 5 mm (3/16 inch) high of brass with black-filled letters, or rigid black plastic with white letters specified in Section 09 91 00, PAINTING permanently fastened to the equipment. Identify unit components such as coils, filters, fans, etc.

Exterior (Outdoor) Equipment: Brass nameplates, with engraved black filled letters, not less than 5 mm (3/16 inch) high riveted or bolted to the equipment.

Control Items: Label all instrumentation, temperature and humidity sensors, controllers, and control dampers. Identify and label each item as they appear on the control diagrams.

Valve Tags and Lists:

HVAC and Mechanical Rooms: Provide for all valves other than for equipment in Section 23 82 00, CONVECTION HEATING AND COOLING UNITS and Section 23 36 00, AIR TERMNAL UNITS.

Valve tags: Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less than 6 mm (1/4 inch) for service designation on 19-gauge 40 mm (11/2 inches) round brass disc, attached with brass "S" hook or brass chain.

Valve lists: Typed or printed plastic coated card(s), sized 215 mm (81/2 inches) by 275 mm (11 inches) showing tag number, valve function and area of control, for each service or system. Punch sheets for a 3-ring notebook.

Provide detailed plan for each floor of the building indicating the location and valve number for each valve. Identify location of each valve with a color-coded thumb tack in ceiling.

Ceiling Grid Labels:

50 mm (2 inch) long by 15 mm (1/2 inch) wide by 0.025 mm (1 mil) thick UV resistant metalized polyester label with red border color and black custom lettering on white background interior. Peel and stick adhesive backing. Label and adhesive manufactured specifically for use in equipment inventory tagging.

Custom print labels with above ceiling HVAC equipment numbers.

FIRESTOPPING

Section 07 84 00, FIRESTOPPING specifies an effective barrier against the spread of fire, smoke and gases where penetrations occur for piping and ductwork. Refer to Section 23 07 11, HVAC AND BOILER PLANT INSULATION, for firestop pipe and duct insulation.

GALVANIZED REPAIR COMPOUND

Mil-P-21035B, paint form.

HVAC PIPE AND EQUIPMENT SUPPORTS AND RESTRAINTS

Vibration Isolators: Refer to Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.

Supports for Roof Mounted Items:

Equipment: Equipment rails shall be galvanized steel, minimum 1.3 mm (18 gauge), with integral baseplate, continuous welded corner seams, factory installed 50 by 100 mm (2 by 4 inches) treated wood nailer, 1.3 mm (18 gauge) galvanized steel counter flashing cap with screws, built-in cant strip, (except for gypsum or tectum deck), minimum height 275 mm (11 inches). For surface insulated roof deck, provide raised cant strip to start at the upper surface of the insulation.

Pipe/duct pedestals: Provide a galvanized Unistrut channel welded to U-shaped mounting brackets which are secured to side of rail with galvanized lag bolts.

Pipe Supports: Comply with MSS SP-58. Type Numbers specified refer to this standard. For selection and application comply with MSS SP-58. Refer to Section 05 50 00, METAL FABRICATIONS, for miscellaneous metal support materials and prime coat painting requirements.

Attachment to Concrete Building Construction:

Concrete insert: MSS SP-58, Type 18.

Self-drilling expansion shields and machine bolt expansion anchors: Permitted in concrete not less than 100 mm (4 inches) thick when approved by the COR for each job condition.

Power-driven fasteners: Permitted in existing concrete or masonry not less than 100 mm (4 inches) thick when approved by the COR for each job condition.

Attachment to Steel Building Construction:

Welded attachment: MSS SP-58, Type 22.

Beam clamps: MSS SP-58, Types 20, 21, 28 or 29. Type 23 C-clamp may be used for individual copper tubing up to 23 mm (7/8 inch) outside diameter.

Attachment to existing structure: Support from existing floor/roof frame.

Hanger Rods: Hot-rolled steel, ASTM A36/A36M or ASTM A575 for allowable load listed in MSS SP-58. For piping, provide adjustment means for controlling level or slope. Types 13 or 15 turn-buckles shall provide 40 mm (11/2 inches) minimum of adjustment and incorporate locknuts. All-thread rods are acceptable.

Hangers Supporting Multiple Pipes (Trapeze Hangers): Galvanized, cold formed, lipped steel channel horizontal member, not less than 41 mm by 41 mm (15/8 inches by 15/8 inches), 2.7 mm (12 gauge), designed to accept special spring held, hardened steel nuts. Trapeze hangers are prohibited for use for steam supply and condensate piping.

Allowable hanger load: Manufacturers rating less 91 kg (200 pounds).

Guide individual pipes on the horizontal member of every other trapeze hanger with 6 mm (1/4 inch) U-bolt fabricated from steel rod. Provide Type 40 insulation shield, secured by two 15 mm (1/2 inch) galvanized steel bands, or preinsulated calcium silicate shield for insulated piping at each hanger.

Supports for Piping Systems:

Select hangers sized to encircle insulation on insulated piping. Refer to Section 23 07 11, HVAC, AND BOILER PLANT INSULATION for insulation thickness. To protect insulation, provide Type 39 saddles for roller type supports or preinsulated calcium silicate shields. Provide Type 40 insulation shield or preinsulated calcium silicate shield at all other types of supports and hangers including those for preinsulated piping.

Piping Systems except High and Medium Pressure Steam (MSS SP-58):

Standard clevis hanger: Type 1; provide locknut.

Riser clamps: Type 8.

Wall brackets: Types 31, 32 or 33.

Roller supports: Type 41, 43, 44 and 46.

Saddle support: Type 36, 37 or 38.

Turnbuckle: Types 13 or 15. Preinsulate.

U-bolt clamp: Type 24.

Copper Tube:

Hangers, clamps, and other support material in contact with tubing shall be painted with copper colored epoxy paint, plastic coated or taped with non-adhesive isolation tape to prevent electrolysis.

For vertical runs use epoxy painted or plastic-coated riser clamps.

For supporting tube to strut: Provide epoxy painted pipe straps for copper tube or plastic inserted vibration isolation clamps.

Insulated Lines: Provide pre-insulated calcium silicate shields sized for copper tube.

Supports for plastic piping: As recommended by the pipe manufacturer with black rubber tape extending one inch beyond steel support or clamp.

High and Medium Pressure Steam (MSS SP-58):

Provide eye rod or Type 17 eye nut near the upper attachment.

Piping 50 mm (2 inches) and larger: Type 43 roller hanger. For roller hangers requiring seismic bracing provide a Type 1 clevis hanger with Type 41 roller attached by flat side bars.

Piping with Vertical Expansion and Contraction:

Movement up to 20 mm (3/4 inch): Type 51 or 52 variable spring unit with integral turn buckle and load indicator.

Movement more than 20 mm (3/4 inch): Type 54 or 55 constant support unit with integral adjusting nut, turn buckle and travel position indicator.

Shields may be used on steel clevis hanger type supports, roller supports or flat surfaces.

PIPE PENETRATIONS

Install sleeves during construction for other than blocked out floor openings for risers in mechanical bays.

To prevent accidental liquid spills from passing to a lower level, provide the following:

For sleeves: Extend sleeve 25 mm (1 inch) above finished floor and provide sealant for watertight joint.

For blocked out floor openings: Provide 40 mm (11/2 inch) angle set in silicone adhesive around opening.

For drilled penetrations: Provide 40 mm (11/2 inch) angle ring or square set-in silicone adhesive around penetration.

Penetrations through beams or ribs are prohibited but may be installed in concrete beam flanges. Any deviation from these requirements must receive prior approval of COR.

Sheet Metal, Plastic, or Moisture-resistant Fiber Sleeves: Provide for pipe passing through floors, interior walls, and partitions, unless brass or steel pipe sleeves are specifically called for below.

Cast Iron or Zinc Coated Pipe Sleeves: Provide for pipe passing through exterior walls below grade. Make space between sleeve and pipe watertight with a modular or link rubber seal. Seal shall be applied at both ends of sleeve.

Galvanized Steel or an alternate Black Iron Pipe with asphalt coating Sleeves: Provide for pipe passing through concrete beam flanges, except where brass pipe sleeves are called for. Provide sleeve for pipe passing through floor of mechanical rooms, laundry work rooms, and animal rooms above basement. Except in mechanical rooms, connect sleeve with floor plate.

Brass Pipe Sleeves: Provide for pipe passing through quarry tile, terrazzo, or ceramic tile floors. Connect sleeve with floor plate.

Sleeves are not required for wall hydrants for fire department connections or in drywall construction.

Sleeve Clearance: Sleeve through floors, walls, partitions, and beam flanges shall be one inch greater in diameter than external diameter of pipe. Sleeve for pipe with insulation shall be large enough to accommodate the insulation. Interior openings shall be caulked tight with fire stopping material and sealant to prevent the spread of fire, smoke, and gases.

Sealant and Adhesives: Shall be as specified in Section 07 92 00, JOINT SEALANTS.

DUCT PENETRATIONS

Provide curbs for roof mounted piping, ductwork, and equipment. Curbs shall be 450 mm (18 inches) high with continuously welded seams, built-in cant strip, interior baffle with acoustic insulation, curb bottom, hinged curb adapter.

Provide firestopping for openings through fire and smoke barriers, maintaining minimum required rating of floor, ceiling, or wall assembly. See section 07 84 00, FIRESTOPPING.

SPECIAL TOOLS AND LUBRICANTS

Furnish, and turn over to the COR, tools not readily available commercially, that are required for disassembly or adjustment of equipment and machinery furnished.

Grease Guns with Attachments for Applicable Fittings: One for each type of grease required for each motor or other equipment.

Refrigerant Tools: Provide system charging/Evacuation equipment, gauges, fittings, and tools required for maintenance of furnished equipment.

Tool Containers: Hardwood or metal, permanently identified for intended service and mounted, or located, where directed by the COR.

Lubricants: A minimum of 0.95 L (1 quart) of oil, and 0.45 kg (1 pound) of grease, of equipment manufacturer's recommended grade and type, in unopened containers and properly identified as to use for each different application.

WALL, FLOOR AND CEILING PLATES

Material and Type: Chrome plated brass or chrome plated steel, one piece or split type with concealed hinge, with set screw for fastening to pipe, or sleeve. Use plates that fit tight around pipes, cover openings around pipes and cover the entire pipe sleeve projection.

Thickness: Not less than 2.4 mm (3/32 inch) for floor plates. For wall and ceiling plates, not less than 0.64 mm (0.025 inch) for up to 80 mm (3-inch pipe), 0.89 mm (0.035 inch) for larger pipe.

Locations: Use where pipe penetrates floors, walls and ceilings in exposed locations, in finished areas only. Provide a watertight joint in spaces where brass or steel pipe sleeves are specified.

ASBESTOS

Materials containing asbestos are prohibited.

EXECUTION

GENERAL

If an installation is unsatisfactory to the COR, the Contractor shall correct the installation at no additional cost or time to the Government.

ARRANGEMENT AND INSTALLATION OF EQUIPMENT AND PIPING

Location of piping, sleeves, inserts, hangers, and equipment, access provisions shall be coordinated with the work of all trades. The coordination/shop drawings shall be submitted for review. Locate piping, sleeves, inserts, hangers, ductwork, and equipment clear of windows, doors, openings, light outlets, and other services and utilities. Equipment coordination/shop drawings shall be prepared to coordinate proper location and personnel access of all facilities. The drawings shall be submitted for review. Follow manufacturer's published recommendations for installation methods not otherwise specified.

Operating Personnel Access and Observation Provisions: Select and arrange all equipment and systems to provide clear view and easy access, without use of portable ladders, for maintenance and operation of all devices including, but not limited to: all equipment items, valves, filters, strainers, transmitters, sensors, control devices. All gauges and indicators shall be clearly visible by personnel standing on the floor or on permanent platforms. Do not reduce or change maintenance and operating space and access provisions that are shown on the contract documents.

Equipment and Piping Support: Coordinate structural systems necessary for pipe and equipment support with pipe and equipment locations to permit proper installation.

Location of pipe sleeves, trenches and chases shall be accurately coordinated with equipment and piping locations.

Cutting Holes:

Cut holes through concrete and masonry by rotary core drill. Pneumatic hammer, impact electric, and hand or manual hammer type drill is prohibited, except as permitted by COR where working area space is limited.

Locate holes to avoid interference with structural members such as slabs, columns, ribs, beams or reinforcing. Holes shall be laid out in advance and drilling done only after approval by COR. If the Contractor considers it necessary to drill through structural members, this matter shall be referred to COR for approval.

Do not penetrate membrane waterproofing.

Minor Piping: Generally, small diameter pipe runs from drips and drains, water cooling, and other service are not shown but must be provided.

Electrical Interconnection of Instrumentation or Controls: This generally not shown but must be provided. This includes interconnections of sensors, transmitters, transducers, control devices, control and instrumentation panels, instruments, and computer workstations. Devices shall be located so they are easily accessible for testing, maintenance, calibration, etc. The COR has the final determination on what is accessible and what is not. Comply with NFPA 70.

Protection and Cleaning:

Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations and as approved by the COR. Damaged or defective items in the opinion of the COR, shall be replaced.

Protect all finished parts of equipment, such as shafts and bearings where accessible, from rust prior to operation by means of protective grease coating and wrapping. Close pipe openings with caps or plugs during installation. Tightly cover and protect fixtures and equipment against dirt, water chemical, or mechanical injury. At completion of all work thoroughly clean fixtures, exposed materials, and equipment.

Concrete and Grout: Use concrete and non-shrink grout 20 MPa (3000 psig) minimum, specified in Section 03 30 00, CAST-IN-PLACE CONCRETE.

Install gauges, thermometers, valves, and other devices with due regard for ease in reading or operating and maintaining said devices. Locate and position thermometers and gauges to be easily read by operator or staff standing on floor or walkway provided. Servicing shall not require dismantling adjacent equipment or pipe work.

Install steam piping expansion joints as per manufacturer’s recommendations.

Work in Existing Building:

Perform as specified in Article, OPERATIONS AND STORAGE AREAS, Article, ALTERATIONS, and Article, RESTORATION of the Section 01 00 00, GENERAL REQUIREMENTS for relocation of existing equipment, alterations, and restoration of existing building(s).

As specified in Section 01 00 00, GENERAL REQUIREMENTS, Article, OPERATIONS AND STORAGE AREAS, make alterations to existing service piping at times that will least interfere with normal operation of the facility.

Work in Animal Research Areas: Seal all pipe and duct penetrations with silicone sealant to prevent entrance of insects.

Switchgear/Electrical Equipment Drip Protection: Every effort shall be made to eliminate the installation of pipe above electrical and data/telephone switchgear. If this is not possible, encase pipe in a second pipe with a minimum of joints. Installation of piping, ductwork, leak protection apparatus or other installations foreign to the electrical installation shall not be located in the space equal to the width and depth of the equipment and extending from to a height of 1.8 m (6 feet) above the equipment or to ceiling structure, whichever is lower (NFPA 70).

Inaccessible Equipment:

Where the Government determines that the Contractor has installed equipment not conveniently accessible for operation and maintenance or inspections, equipment shall be removed, and reinstalled or remedial action performed as directed at no additional cost or time to the Government.

The term "conveniently accessible" is defined as capable of being reached without the use of ladders, or without climbing or crawling under or over obstacles such as, but not limited to motors, fans, pumps, belt guards, transformers, high voltage lines, conduit and raceways, piping, hot surfaces, and ductwork. The COR has final determination on whether an installation meets this requirement or not.

TEMPORARY PIPING AND EQUIPMENT

Contin…

This is the start of the file's text. The full file is on GovTribe.