36C25622R0094 095100 Acoustical Ceilings .docx

DOCX document 33 KB Posted

Attached to
Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 Federal contract opportunity
Solicitation number
502-19-107
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This technical specification covers the replacement of an air handling unit and associated ductwork at a Department of Veterans Affairs health care facility. The project requires the installation of new acoustical ceiling tiles and a suspension system. Mineral fiber tiles are specified with a painted finish, square edges, and a minimum noise reduction coefficient of 0.55. The suspension system must be an intermediate-duty, exposed grid made of galvanized steel with a 7/8 inch grid width. Color-coded markers will identify concealed piping and systems. Bidders must have experience with similar projects and meet standards for recycled and biobased content, as well as volatile organic compound limits.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094, newest first.
File Type Posted
36C25622R0094 ECS Geotechnical Report.pdf PDF
36C25622R0094 0004.docx DOCX document
36C25622R0094 0002.docx DOCX document
36C25622R0094 0001.docx DOCX document
36C25622R0094 Brand Name JA 502-19-107 Redacted.pdf PDF
36C25622R0094 COVID-19 Safety Protocols for Federal Contractors Rev 2.docx DOCX document
36C25622R0094 280800 Commissioning of Electronic Safety and Security Systems .docx DOCX document
36C25622R0094 000110 VHA Master Specifications Rev 2.docx DOCX document
36C25622R0094 262726 Wiring Devices .docx DOCX document
36C25622R0094 283100 Fire Detection and Alarm .doc DOC document
36C25622R0094 260923 Lighting Controls.docx DOCX document
36C25622R0094 232500 HVAC WATER TREATMENT .docx DOCX document
36C25622R0094 260511 Requirements for ELEC installation.docx DOCX document
36C25622R0094 234000 HVAC AIR CLEANING DEVICES .docx DOCX document
36C25622R0094 238100 DECENTRALIZED UNITARY HVAC EQUIPMENT.docx DOCX document
36C25622R0094 260800 Commissioning of Electrical Systems.docx DOCX document
36C25622R0094 232113 HYDRONIC PIPING .docx DOCX document
36C25622R0094 230923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC .doc DOC document
36C25622R0094 014500 Quality Control.docx DOCX document
36C25622R0094 013526 Safety Requirements .docx DOCX document
36C25622R0094 099100 Painting .docx DOCX document
36C25622R0094 087100 Door Hardware .docx DOCX document
36C25622R0094 092216 Non-Structural Metal Framing .docx DOCX document
36C25622R0094 096513 Resilient Base and Accessories.docx DOCX document
36C25622R0094 079200 Joint Sealants .docx DOCX document
36C25622R0094 092900 Gypsum Board .docx DOCX document
36C25622R0094 076000 Flashing and Sheet Metal .docx DOCX document
36C25622R0094 015719 Temporary Environmental Controls .doc DOC document
36C25622R0094 Project Risk Assessment .pdf PDF
36C25622R0094 260526 Grounding and Bonding.docx DOCX document
36C25622R0094 260519 Low voltage conductors .docx DOCX document
36C25622R0094 312011 Earthwork .docx DOCX document
36C25622R0094 262416 Panelboards.docx DOCX document
36C25622R0094 281300 Physical Access Control System .doc DOC document
36C25622R0094 EXHIBIT A.docx DOCX document
36C25622R0094 262911 Motor Controllers .docx DOCX document
36C25622R0094 316500 Helical Piles.doc DOC document
36C25622R0094 282300 Video Surveillance .docx DOCX document
36C25622R0094 236400 PACKAGED WATER CHILLERS.docx DOCX document
36C25622R0094 233700 AIR OUTLETS AND INLETS.docx DOCX document
36C25622R0094 260541 UNDERGROUND ELEC CONSTRUCTION .docx DOCX document
36C25622R0094 230541 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT .docx DOCX document
36C25622R0094 230512 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT.docx DOCX document
36C25622R0094 233100 HVAC DUCTS AND CASINGS.docx DOCX document
36C25622R0094 233600 AIR TERMINAL UNITS .docx DOCX document
36C25622R0094 238216 AIR COILS .doc DOC document
36C25622R0094 230800 COMMISSIONING OF HVAC SYSTEMS.docx DOCX document
36C25622R0094 033000 Cast in Place Concrete.docx DOCX document
36C25622R0094 019100 General Commissioning Requirements .docx DOCX document
36C25622R0094 090600 Schedule for Finishes .docx DOCX document
Show all 50

Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE AHU #104 AND DUCTWORK BLDG. 7

DEPARTMENT OF VETERANS AFFAIRS HEALTH CARE SYSTEM-ALEXANDRIA, LA

PROJECT NO.: 502-19-107

SECTION 09 51 00

ACOUSTICAL CEILINGS

GENERAL

SUMMARY

Section Includes:

Acoustical units.

Metal ceiling suspension system for acoustical ceilings.

Adhesive application.

RELATED REQUIREMENTS

Adhesive VOC Limits: Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.

Color, pattern, and location of each type of acoustical unit: Section 09 06 00, SCHEDULE FOR FINISHES.

APPLICABLE PUBLICATIONS

Comply with references to extent specified in this section.

ASTM International (ASTM):

A641/A641M09a(2014) - Zinccoated (Galvanized) Carbon Steel Wire.

A653/A653M15e1 - Steel Sheet, ZincCoated (Galvanized) or ZincIron Alloycoated (Galvannealed) by the HotDip Process.

C42309a - Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method.

C63413 - Terminology Relating to Environmental Acoustics.

C635/C635M13a - Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Layin Panel Ceilings.

C636/C636M13 - Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Layin Panels.

D177998(2011) - Adhesive for Acoustical Materials.

E8415b - Surface Burning Characteristics of Building Materials.

E11916 - Fire Tests of Building Construction and Materials.

E41316 - Classification for Rating Sound Insulation.

E580/E580M14 - Installation of Ceiling Suspension Systems for Acoustical Tile and Layin Panels in Areas Subject to Earthquake Ground Motions.

E126414 - Classification for Acoustical Ceiling Products.

International Organization for Standardization (ISO):

ISO 146441 - Classification of Air Cleanliness.

PREINSTALLATION MEETINGS

Conduct preinstallation meeting at project site minimum 30 days before beginning Work of this section.

Required Participants:

Contracting Officer's Representative.

Contractor.

Installer.

Other installers responsible for adjacent and intersecting work, including sprinkler, HVAC and lighting installers.

Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

Installation schedule.

Installation sequence.

Preparatory work.

Protection before, during, and after installation.

Installation.

Terminations.

Transitions and connections to other work.

Inspecting and testing.

Other items affecting successful completion.

Document and distribute meeting minutes to participants to record decisions affecting installation.

SUBMITTALS

Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

Submittal Drawings:

Show size, configuration, and fabrication and installation details.

Manufacturer's Literature and Data:

Description of each product.

Ceiling suspension system indicating manufacturer recommendation for each application.

Installation instructions.

Warranty.

Samples:

Acoustical units, 150 mm (6 inches) in size, each type, including units specified to match existing.

Submit quantity required to show full color and texture range.

Suspension system, trim and molding, 300 mm (12 inches) long.

Colored markers for access service.

Approved samples may be incorporated into work.

Sustainable Construction Submittals:

Recycled Content: Identify postconsumer and preconsumer recycled content percentage by weight.

Biobased Content:

Show type and quantity for each product.

Show volatile organic compound types and quantities.

Certificates: Certify each product complies with specifications.

Acoustical units, each type.

Qualifications: Substantiate qualifications comply with specifications.

Manufacturer with project experience list.

Operation and Maintenance Data:

Care instructions for each exposed finish product.

QUALITY ASSURANCE

Manufacturer Qualifications:

Regularly manufactures specified products.

Manufactured specified products with satisfactory service on five similar installations for minimum five years.

Project Experience List: Provide contact names and addresses for completed projects.

DELIVERY

Deliver products in manufacturer's original sealed packaging.

Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.

Before installation, return or dispose of products within distorted, damaged, or opened packaging.

STORAGE AND HANDLING

Store products indoors in dry, weathertight conditioned facility.

Protect products from damage during handling and construction operations.

FIELD CONDITIONS

Environment:

Product Temperature: Minimum 21 degrees C (70 degrees F) for minimum 48 hours before installation.

Work Area Ambient Conditions: HVAC systems are complete, operational, and maintaining facility design operating conditions continuously, beginning 48 hours before installation until Government occupancy.

Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.

WARRANTY

Construction Warranty: FAR clause 52.24621, "Warranty of Construction."

PRODUCTS

SYSTEM DESCRIPTION

Ceiling System: Acoustical ceilings units on exposed grid suspension systems.

SYSTEM PERFORMANCE

Design product complying with specified performance:

Maximum Deflection: 1/360of span, maximum.

Surface Burning Characteristics: When tested according to ASTM E84.

Flame Spread Rating: 25 maximum.

Smoke Developed Rating: 450 maximum.

PRODUCTS - GENERAL

Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.

Provide acoustical units from one manufacturer.

Provide each product exposed to view from one production run.

Provide suspension system from same manufacturer.

Sustainable Construction Requirements:

Mineral Base Recycled Content: 43 percent, postconsumer recycled content, minimum.

Steel Recycled Content: 30 percent total recycled content, minimum.

Aluminum Recycled Content: 80 percent total recycled content, minimum.

Biobased Content: 37 percent by weight biobased material, minimum.

Low PollutantEmitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:

Nonflooring adhesives and sealants.

ACOUSTICAL UNITS

General:

Ceiling Panel and Tile: ASTM E1264, biobased content according to USDA BioPreferred Product requirements.

Mineral Fiber: 3.6 kg/sq. m (3/4 psf) weight, minimum.

Classification: Provide type and form as follows:

Type III Units - Mineral base with waterbased painted finish maximum 10 g/l VOC; Form 2 - Water felted, minimum 16 mm (5/8 inch) thick.

NRC (Noise Reduction Coefficient): ASTM C423, minimum 0.55 unless specified otherwise.

CAC (Ceiling Attenuation Class): ASTM E413, 4044 range unless specified otherwise.

LR (Light Reflectance): Minimum 0.75.

Layin panels: Sizes as indicated on Drawings, with square edges.

Sizes:

Edge and Joint Detail: Square edges and joints as required to suit suspension and access system.

METAL SUSPENSION SYSTEM

General: ASTM C635, intermediateduty system, except as otherwise specified.

Suspension System: Provide the following:

Galvanized coldrolled steel, bonderized.

Main and Cross Runner: Use same construction Do not use lighterduty sections for cross runners.

Exposed Grid Suspension System: Support of layin panels.

Grid Width: 22 mm (7/8 inch) minimum with8 mm (5/16 inch) minimum panel bearing surface.

Molding: Fabricate from the same material with same exposed width and finish.

Finish: Bakedon enamel flat texture finish.

Color: To match adjacent acoustical units unless specified otherwise in Section 09 06 00, SCHEDULE FOR FINISHES.

Carrying Channels Secondary Framing: Coldrolled or hotrolled steel, black asphaltic paint finish, rust free.

Weight per 300 m (per thousand linear feet), minimum:

Size
Coldrolled
Hotrolled
mm
inches
kg
pound
kg
pound
38
11/2
215.4
475
508
1120
50
2
267.6
590
571.5
1260

Anchors and Inserts: Provide anchors or inserts to support twice the loads imposed by hangers.

Hanger Inserts: Steel, zinccoated (galvanized after fabrication).

Nailing type option for wood forms:

Upper portion designed for anchorage in concrete and positioning lower portion below surface of concrete approximately 25 mm (one inch).

Lower portion provided with minimum 8 mm (5/16 inch) hole to permit attachment of hangers.

Flush ceiling insert type:

Designed to provide a shell covered opening over a wire loop to permit attachment of hangers and keep concrete out of insert recess.

Insert opening inside shell approximately 16 mm (5/8 inch) wide by 9 mm (3/8 inch) high over top of wire.

Wire 5 mm (3/16 inch) diameter with length to provide positive hooked anchorage in concrete.

Clips: Galvanized steel, designed to secure framing member in place.

Tile Splines: ASTM C635.

Wire: ASTM A641.

Size:

Wire Hangers: Minimum diameter 2.68 mm (0.1055 inch).

Bracing Wires: Minimum diameter 3.43 mm (0.1350 inch).

ACCESSORIES

Adhesives: Low pollutant-emitting, water based type recommended by adhered product manufacturer for each application.

Access Identification Markers: Colored markers with pressure sensitive adhesive on one side, paper or plastic, 6 to 9 mm (1/4 to 3/8 inch) diameter.

Color Code: Provide the following color markers for service identification:

Color
Service
Red
Sprinkler System: Valves and Controls
Green
Domestic Water: Valves and Controls
Yellow
Chilled Water and Heating Water
Orange
Ductwork: Fire Dampers
Blue
Ductwork: Dampers and Controls
Black
Gas: Laboratory, Medical, Air and Vacuum

EXECUTION

PREPARATION

Examine and verify substrate suitability for product installation.

Protect existing construction and completed work from damage.

Remove existing acoustical panels & suspension system to permit new installation.

Dispose of removed materials.

INSTALLATION - GENERAL

Install products according to manufacturer's instructions and approved submittal drawings.

When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

ACOUSTICAL UNIT INSTALLATION

Applications:

Cut acoustic units for perimeter borders and penetrations to fit tight against penetration for joint not concealed by molding.

Layout acoustical unit as indicated in the construction documents.

Installation:

Install acoustic tiles after wet finishes have been installed and solvents have cured.

Install layin acoustic panels in exposed grid with minimum 6 mm (1/4 inch) bearing at edges on supports.

Install tile to lay level and in full contact with exposed grid.

Replace cracked, broken, stained, dirty, or tile.

Tile in concealed grid upward access suspension system:

Install acoustical tile with joints close, straight and true to line, and with exposed surfaces level and flush at joints.

Make corners and arises full, and without worn or broken places.

Locate acoustical units providing access to service systems.

Adhesive applied tile:

Condition of surface according to ASTM D1779, Note 1, Cleanliness of Surface, and Note 4, Rigidity of Base Surface.

Size or seal surface as recommended by manufacturer of adhesive and allow to dry before installing units.

Markers:

Install color coded markers to identify the various concealed piping, mechanical, and plumbing systems.

Attach colored markers to exposed grid on opposite sides of the units providing access.

Attach marker on exposed ceiling surface of upward access acoustical unit.

Touch up damaged factory finishes.

Repair painted surfaces with touch up primer.

CEILING SUSPENSION SYSTEM INSTALLATION

General: Install according to ASTM C636.

Use direct or indirect hung suspension system or combination of both.

Support a maximum area of 1.48 sq. m (16 sq. ft.) of ceiling per hanger.

Prevent deflection in excess of 1/360 of span of cross runner and main runner.

Provide additional hangers located at each corner of support components.

Provide minimum 100 mm (4 inch) clearance from the exposed face of the acoustical units to the underside of ducts, pipe, conduit, secondary suspension channels, concrete beams or joists; and steel beam or bar joist unless furred system is shown.

Provide main runners minimum 1200 mm (48 inches) in length.

Install hanger wires vertically. Angled wires are not acceptable except for seismic restraint bracing wires.

Direct Hung Suspension System: ASTM C635.

Support main runners by hanger wires attached directly to the structure overhead.

Maximum spacing of hangers, 1200 mm (4 feet) on centers unless interference occurs by mechanical systems. Use indirect hung suspension system where not possible to maintain hanger spacing.

Anchorage to Structure:

Concrete:

Install hanger inserts and wire loops required for support of hanger and bracing wire. Install hanger wires with looped ends through steel deck when steel deck does not have attachment device.

Use eye pins or threaded studs with screwon eyes in existing or already placed concrete structures to support hanger and bracing wire. Install in sides of concrete beams or joists at mid height.

Steel:

Install carrying channels for attachment of hanger wires.

Size and space carrying channels to support load within performance limit.

Attach hangers to steel carrying channels, spaced four feet on center, unless area supported or deflection exceeds the amount specified.

Attach carrying channels to the bottom flange of steel beams spaced not 1200 mm (4 feet) on center before fireproofing is installed. Weld or use steel clips for beam attachment.

Attach hangers to bottom chord of bar joists or to carrying channels installed between the bar joists when hanger spacing prevents anchorage to joist. Rest carrying channels on top of the bottom chord of the bar joists, and securely wire tie or clip to joist.

Indirect Hung Suspension System: ASTM C635.

Space carrying channels for indirect hung suspension system maximum 1200 mm (4 feet) on center. Space hangers for carrying channels maximum 2400 mm (8 feet) on center or for carrying channels less than 1200 mm (4 feet) or center so as to insure that specified requirements are not exceeded.

Support main runners by specially designed clips attached to carrying channels.

CEILING TREATMENT

Moldings:

Install metal wall molding at perimeter of room, column, or edge at vertical surfaces.

Install special shaped molding at changes in ceiling heights and at other breaks in ceiling construction to support acoustical units and to conceal their edges.

CLEANING

Remove excess adhesive before adhesive sets.

Clean exposed surfaces. Remove contaminants and stains.

- - - E N D - - - 09 51 00 - 3