36C25622R0094 000110 VHA Master Specifications Rev 2.docx

DOCX document 38 KB Posted

Attached to
Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 Federal contract opportunity
Solicitation number
502-19-107
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document is a master specifications file for a federal construction project to replace an air handling unit and ductwork at a Department of Veterans Affairs healthcare facility in Alexandria, Louisiana. The project number is 502-19-107, with a solicitation number of 502-19-107. The specifications cover requirements for demolition, various construction materials and systems, HVAC, electrical, communications, security and earthwork. Bidders are required to provide all labor, materials, equipment and supervision to complete the replacement of air handling unit 104 and associated ductwork at the specified VA facility, in accordance with the detailed division specifications provided. The solicitation is open for response as of the date of this master specifications file.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094, newest first.
File Type Posted
36C25622R0094 ECS Geotechnical Report.pdf PDF
36C25622R0094 0004.docx DOCX document
36C25622R0094 0002.docx DOCX document
36C25622R0094 0001.docx DOCX document
36C25622R0094 Project Risk Assessment .pdf PDF
36C25622R0094 260526 Grounding and Bonding.docx DOCX document
36C25622R0094 260519 Low voltage conductors .docx DOCX document
36C25622R0094 312011 Earthwork .docx DOCX document
36C25622R0094 262416 Panelboards.docx DOCX document
36C25622R0094 281300 Physical Access Control System .doc DOC document
36C25622R0094 EXHIBIT A.docx DOCX document
36C25622R0094 262911 Motor Controllers .docx DOCX document
36C25622R0094 316500 Helical Piles.doc DOC document
36C25622R0094 282300 Video Surveillance .docx DOCX document
36C25622R0094 236400 PACKAGED WATER CHILLERS.docx DOCX document
36C25622R0094 233700 AIR OUTLETS AND INLETS.docx DOCX document
36C25622R0094 260541 UNDERGROUND ELEC CONSTRUCTION .docx DOCX document
36C25622R0094 230541 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT .docx DOCX document
36C25622R0094 230512 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT.docx DOCX document
36C25622R0094 233100 HVAC DUCTS AND CASINGS.docx DOCX document
36C25622R0094 233600 AIR TERMINAL UNITS .docx DOCX document
36C25622R0094 238216 AIR COILS .doc DOC document
36C25622R0094 230800 COMMISSIONING OF HVAC SYSTEMS.docx DOCX document
36C25622R0094 033000 Cast in Place Concrete.docx DOCX document
36C25622R0094 019100 General Commissioning Requirements .docx DOCX document
36C25622R0094 090600 Schedule for Finishes .docx DOCX document
36C25622R0094 Brand Name JA 502-19-107 Redacted.pdf PDF
36C25622R0094 COVID-19 Safety Protocols for Federal Contractors Rev 2.docx DOCX document
36C25622R0094 280800 Commissioning of Electronic Safety and Security Systems .docx DOCX document
36C25622R0094 262726 Wiring Devices .docx DOCX document
36C25622R0094 283100 Fire Detection and Alarm .doc DOC document
36C25622R0094 260923 Lighting Controls.docx DOCX document
36C25622R0094 232500 HVAC WATER TREATMENT .docx DOCX document
36C25622R0094 260511 Requirements for ELEC installation.docx DOCX document
36C25622R0094 234000 HVAC AIR CLEANING DEVICES .docx DOCX document
36C25622R0094 238100 DECENTRALIZED UNITARY HVAC EQUIPMENT.docx DOCX document
36C25622R0094 260800 Commissioning of Electrical Systems.docx DOCX document
36C25622R0094 232113 HYDRONIC PIPING .docx DOCX document
36C25622R0094 230923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC .doc DOC document
36C25622R0094 014500 Quality Control.docx DOCX document
36C25622R0094 013526 Safety Requirements .docx DOCX document
36C25622R0094 099100 Painting .docx DOCX document
36C25622R0094 095100 Acoustical Ceilings .docx DOCX document
36C25622R0094 087100 Door Hardware .docx DOCX document
36C25622R0094 092216 Non-Structural Metal Framing .docx DOCX document
36C25622R0094 096513 Resilient Base and Accessories.docx DOCX document
36C25622R0094 079200 Joint Sealants .docx DOCX document
36C25622R0094 092900 Gypsum Board .docx DOCX document
36C25622R0094 076000 Flashing and Sheet Metal .docx DOCX document
36C25622R0094 015719 Temporary Environmental Controls .doc DOC document
Show all 50

Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14

REPLACE AHU #104 AND DUCTWORK BLDG. 7

DEPARTMENT OF VETERANS AFFAIRS HEALTH CARE SYSTEM-ALEXANDRIA, LA

PROJECT NO.: 502-19-107

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 SPECIAL SECTIONS
DATE
00 01 10
Table of Contents
00 01 15
List of Drawing Sheets
11-19

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
10-17
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build
04-13
01 33 23
Shop Drawings, Product Data, and Samples
05-17
01 35 26
Safety Requirements
02-17
01 42 19
Reference Standards
05-16
01 45 00
Quality Control
01 57 19
Temporary Environmental Controls
01-11
01 74 19
Construction Waste Management
09-13
01 81 13
Sustainable Construction Requirements
01 91 00
General Commissioning Requirements
10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00
Demolition
08-17

DIVISION 03 - CONCRETE

03 30 00
Cast-In-Place Concrete
01-21

DIVISION 05 - METALS

05 12 00
Structural Steel Framing
11-18
05 40 00
Cold Formed Metal Framing
1-21

DIVISION 06 – WOOD AND PLASTIC

06 16 63
Cementitous Sheathing
1-21

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 60 00
Flashing and Sheet Metal
07 84 00
Firestopping
02-16
07 92 00
Joint Sealants
10-17

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
01-21
08 14 00
Interior Wood Doors
01-21
08 71 00
Door Hardware
01-21
08 90 00
Louvers and Vents
01-21

DIVISION 09 – FINISHES

09 06 00
Schedule for Finishes
01-21
09 22 16
Non-Structural Metal Framing
01-21
09 24 00
Portland Cement Plastering
01-21
09 29 00
Gypsum Board
04-20
09 51 00
Acoustical Ceilings
12-18
09 65 13
Resilient Base and Accessories
01-21
09 91 00
Painting
01-21

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11
Common Work Results for HVAC
02-20
23 05 12
General Motor Requirements for HVAC & Steam Gen Equip
02-20
23 05 41
Noise and Vibration Control for HVAC Piping & Equip
02-20
23 05 93
Testing Adjusting and Balancing for HVAC
02-20
23 07 11
HVAC and Boiler Plant Insulation
02-20
23 08 00
Commissioning of HVAC Systems
02-20
23 09 23
Direct-Digital Control System for HVAC
08-20
23 21 13
Hydronic Piping
02-20
23 21 23
Hydronic Pumps
02-20
23 25 00
HVAC Water Treatment
02-20
23 31 00
HVAC Ducts and Casings
02-20
23 34 00
HVAC Fans
02-20
23 36 00
Air Terminal Units
02-20
23 37 00
Air Outlets and Inlets
02-20
23 40 00
HVAC Air Cleaning Devices
03-20
23 64 00
Packaged Water Chillers
03-20
23 73 00
Indoor Central-Station Air-Handling Units
03-20
23 81 00
Decentralized Unitary HVAC Equipment
03-20
23 82 16
Air Coils
03-20

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
01-16
26 05 19
Low-Voltage Electrical Power Conductors and Cables
01-17
26 05 26
Grounding and Bonding for Electrical Systems
01-17
26 05 33
Raceways and Boxes for Electrical Systems
01-18
26 05 41
Underground Electrical Construction
01-17
26 08 00
Commissioning of Electrical Systems
01-18
26 09 23
Lighting Controls
01-18
26 24 16
Panelboards
01-18
26 27 26
Wiring Devices
01-18
26 29 11
Motor Controllers
01-18
26 29 21
Enclosed Switches and Circuit Breakers
01-17
26 43 13
Surge Protective Devices
01-17
26 51 00
Interior Lighting
01-18

DIVISION 27 - COMMUNICATIONS

27 05 11
Requirements for Communications Installations
06-15
27 10 00
Control, Communications and Signal Wiring
06-15

DIVISION 28 – ELECTRONIC SAFTEY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
04-18
28 08 00
Commissioning of Electronic Safety and Security Systems
11-16
28 13 00
Physical Access Control System
28 23 00
Video Surveillance
28 31 00
Fire Detection and Alarm

DIVISION 31 - EARTHWORK

31 20 11
Earthwork
31 65 00
Helical Piles

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 31 13
Chain Link Fences and Gates
05-18

00 01 10-1