07-01-14
REPLACE AHU #104 AND DUCTWORK BLDG. 7
DEPARTMENT OF VETERANS AFFAIRS HEALTH CARE SYSTEM-ALEXANDRIA, LA
PROJECT NO.: 502-19-107
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
| DIVISION 00 SPECIAL SECTIONS |
| DATE |
| 00 01 10 |
| Table of Contents |
| 00 01 15 |
| List of Drawing Sheets |
| 11-19 |
DIVISION 01 GENERAL REQUIREMENTS
| 01 00 00 |
| General Requirements |
| 10-17 |
| 01 32 16.15 |
| Project Schedules (Small Projects – Design/Bid/Build |
| 04-13 |
| 01 33 23 |
| Shop Drawings, Product Data, and Samples |
| 05-17 |
| 01 35 26 |
| Safety Requirements |
| 02-17 |
| 01 42 19 |
| Reference Standards |
| 05-16 |
| 01 57 19 |
| Temporary Environmental Controls |
| 01-11 |
| 01 74 19 |
| Construction Waste Management |
| 09-13 |
| 01 81 13 |
| Sustainable Construction Requirements |
| 01 91 00 |
| General Commissioning Requirements |
| 10-15 |
DIVISION 02 – EXISTING CONDITIONS
| 02 41 00 |
| Demolition |
| 08-17 |
DIVISION 03 - CONCRETE
| 03 30 00 |
| Cast-In-Place Concrete |
| 01-21 |
DIVISION 05 - METALS
| 05 12 00 |
| Structural Steel Framing |
| 11-18 |
| 05 40 00 |
| Cold Formed Metal Framing |
| 1-21 |
DIVISION 06 – WOOD AND PLASTIC
| 06 16 63 |
| Cementitous Sheathing |
| 1-21 |
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
| 07 60 00 |
| Flashing and Sheet Metal |
| 07 84 00 |
| Firestopping |
| 02-16 |
| 07 92 00 |
| Joint Sealants |
| 10-17 |
DIVISION 08 OPENINGS
| 08 11 13 |
| Hollow Metal Doors and Frames |
| 01-21 |
| 08 14 00 |
| Interior Wood Doors |
| 01-21 |
| 08 71 00 |
| Door Hardware |
| 01-21 |
| 08 90 00 |
| Louvers and Vents |
| 01-21 |
DIVISION 09 – FINISHES
| 09 06 00 |
| Schedule for Finishes |
| 01-21 |
| 09 22 16 |
| Non-Structural Metal Framing |
| 01-21 |
| 09 24 00 |
| Portland Cement Plastering |
| 01-21 |
| 09 29 00 |
| Gypsum Board |
| 04-20 |
| 09 51 00 |
| Acoustical Ceilings |
| 12-18 |
| 09 65 13 |
| Resilient Base and Accessories |
| 01-21 |
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
| 23 05 11 |
| Common Work Results for HVAC |
| 02-20 |
| 23 05 12 |
| General Motor Requirements for HVAC & Steam Gen Equip |
| 02-20 |
| 23 05 41 |
| Noise and Vibration Control for HVAC Piping & Equip |
| 02-20 |
| 23 05 93 |
| Testing Adjusting and Balancing for HVAC |
| 02-20 |
| 23 07 11 |
| HVAC and Boiler Plant Insulation |
| 02-20 |
| 23 08 00 |
| Commissioning of HVAC Systems |
| 02-20 |
| 23 09 23 |
| Direct-Digital Control System for HVAC |
| 08-20 |
| 23 21 13 |
| Hydronic Piping |
| 02-20 |
| 23 21 23 |
| Hydronic Pumps |
| 02-20 |
| 23 25 00 |
| HVAC Water Treatment |
| 02-20 |
| 23 31 00 |
| HVAC Ducts and Casings |
| 02-20 |
| 23 36 00 |
| Air Terminal Units |
| 02-20 |
| 23 37 00 |
| Air Outlets and Inlets |
| 02-20 |
| 23 40 00 |
| HVAC Air Cleaning Devices |
| 03-20 |
| 23 64 00 |
| Packaged Water Chillers |
| 03-20 |
| 23 73 00 |
| Indoor Central-Station Air-Handling Units |
| 03-20 |
| 23 81 00 |
| Decentralized Unitary HVAC Equipment |
| 03-20 |
DIVISION 26 – ELECTRICAL
| 26 05 11 |
| Requirements for Electrical Installations |
| 01-16 |
| 26 05 19 |
| Low-Voltage Electrical Power Conductors and Cables |
| 01-17 |
| 26 05 26 |
| Grounding and Bonding for Electrical Systems |
| 01-17 |
| 26 05 33 |
| Raceways and Boxes for Electrical Systems |
| 01-18 |
| 26 05 41 |
| Underground Electrical Construction |
| 01-17 |
| 26 08 00 |
| Commissioning of Electrical Systems |
| 01-18 |
| 26 09 23 |
| Lighting Controls |
| 01-18 |
| 26 24 16 |
| Panelboards |
| 01-18 |
| 26 27 26 |
| Wiring Devices |
| 01-18 |
| 26 29 11 |
| Motor Controllers |
| 01-18 |
| 26 29 21 |
| Enclosed Switches and Circuit Breakers |
| 01-17 |
| 26 43 13 |
| Surge Protective Devices |
| 01-17 |
| 26 51 00 |
| Interior Lighting |
| 01-18 |
DIVISION 27 - COMMUNICATIONS
| 27 05 11 |
| Requirements for Communications Installations |
| 06-15 |
| 27 10 00 |
| Control, Communications and Signal Wiring |
| 06-15 |
DIVISION 28 – ELECTRONIC SAFTEY AND SECURITY
| 28 05 00 |
| Common Work Results for Electronic Safety and Security |
| 04-18 |
| 28 08 00 |
| Commissioning of Electronic Safety and Security Systems |
| 11-16 |
| 28 13 00 |
| Physical Access Control System |
| 28 23 00 |
| Video Surveillance |
| 28 31 00 |
| Fire Detection and Alarm |
DIVISION 31 - EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
| 32 31 13 |
| Chain Link Fences and Gates |
| 05-18 |
00 01 10-1