This solicitation package from the Department of Veterans Affairs includes specifications for replacing an air handling unit and associated ductwork at a VA health care facility in Alexandria, Louisiana. The project requires furnishing and installing enclosed switches, circuit breakers, motor-rated switches, and cartridge fuses. Low voltage drawout circuit breakers must also be removed and sent for refurbishment by an approved facility. Submittals are due within two weeks of award, including shop drawings, manuals, and certifications. Installation shall comply with NEC and manufacturer requirements. Two weeks before final inspection, the contractor must provide one set of spare fuses for each installed disconnect switch.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE AHU #104 AND DUCTWORK BLDG. 7
DEPARTMENT OF VETERANS AFFAIRS HEALTH CARE SYSTEM-ALEXANDRIA, LA
PROJECT NO.: 502-19-107
SECTION 26 29 21
ENCLOSED SWITCHES AND CIRCUIT BREAKERS
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the furnishing, installation, and connection of fused and unfused disconnect switches (indicated as switches in this section), and separately enclosed circuit breakers for use in electrical systems rated 600 V and below.
1.2 RELATED WORK
| A. | Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26. |
| B. | Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES: Low-voltage conductors. |
| C. | Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground faults. |
| D. | Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits. |
| E. | Section 26 24 16, PANELBOARDS: Molded-case circuit breakers. |
1.3 qualITY ASSURANCE A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
1.4 SUBMITTALS
| A. | Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: |
| 1. | Shop Drawings: |
| a. | Submit sufficient information to demonstrate compliance with drawings and specifications. |
| b. | Submit the following data for approval: |
| 1) | Electrical ratings, dimensions, mounting details, materials, required clearances, terminations, weight, fuses, circuit breakers, wiring and connection diagrams, accessories, and device nameplate data. |
| 2. | Manuals: |
| a. | Submit complete maintenance and operating manuals including technical data sheets, wiring diagrams, and information for ordering fuses, circuit breakers, and replacement parts. |
| 1) | Include schematic diagrams, with all terminals identified, matching terminal identification in the enclosed switches and circuit breakers. |
| 2) | Include information for testing, repair, troubleshooting, assembly, and disassembly. |
| b. | If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection. |
| 3. | Certifications: Two weeks prior to final inspection, submit the following. |
| a. | Certification by the manufacturer that the enclosed switches and circuit breakers conform to the requirements of the drawings and specifications. |
| b. | Certification by the Contractor that the enclosed switches and circuit breakers have been properly installed, adjusted, and tested. |
1.5 APPLICABLE PUBLICATIONS
| A. | Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only. |
| B. | International Code Council (ICC): |
| IBC-15 | International Building Code |
| C. | National Electrical Manufacturers Association (NEMA): |
| FU l-12 | Low Voltage Cartridge Fuses |
| KS l-13 | Heavy Duty Enclosed and Dead-Front Switches (600 Volts Maximum) |
| D. | National Fire Protection Association (NFPA): |
| 70-17 | National Electrical Code (NEC) |
| E. | Underwriters Laboratories, Inc. (UL): |
| 98-16 | Enclosed and Dead-Front Switches |
| 248 1-11 | Low Voltage Fuses |
| 489-13 | Molded Case Circuit Breakers and Circuit Breaker Enclosures |
PART 2 - PRODUCTS
2.1 FUSed SWITCHES RATED 600 AMPERES AND LESS
| A. | Switches shall be in accordance with NEMA, NEC, UL, as specified, and as shown on the drawings. |
| B. | Shall be NEMA classified General Duty (GD) for 240 V switches, and NEMA classified Heavy Duty (HD) for 480 V switches. |
| C. | Shall be horsepower (HP) rated. |
| D. | Shall have the following features: |
| 1. | Switch mechanism shall be the quick-make, quick-break type. |
| 2. | Copper blades, visible in the open position. |
| 3. | An arc chute for each pole. |
| 4. | External operating handle shall indicate open and closed positions and have lockopen padlocking provisions. |
| 5. | Mechanical interlock shall permit opening of the door only when the switch is in the open position, defeatable to permit inspection. |
| 6. | Fuse holders for the sizes and types of fuses specified. |
| 7. | Solid neutral for each switch being installed in a circuit which includes a neutral conductor. |
| 8. | Ground lugs for each ground conductor. |
| 9. | Enclosures: |
| a. | Shall be the NEMA types shown on the drawings. |
| b. | Where the types of switch enclosures are not shown, they shall be the NEMA types most suitable for the ambient environmental conditions. |
| c. | Shall be finished with manufacturer’s standard gray baked enamel paint over pretreated steel. |
2.2 UNFUSED SWITCHES RATED 600 AMPERES AND LESS
A. Shall be the same as fused switches, but without provisions for fuses.
2.3 FUSed SWITCHES RATED OVER 600 AMPERES TO 1200 AMPERES
A. Shall be the same as fused switches and shall be NEMA classified Heavy Duty (HD).
2.4 MOTOR RATED TOGGLE SWITCHES
| A. | Type 1, general purpose for single-phase motors rated up to 1 horsepower. |
| B. | Quick-make, quick-break toggle switch with external reset button and thermal overload protection matched to nameplate full-load current of actual protected motor. |
2.5 cartridge fuses
| A. | Shall be in accordance with NEMA FU 1. |
| B. | Motor Branch Circuits: Class RK1 Class RK5, and time delay as specified on the drawings. |
2.6 SEPARATELY ENCLOSED CIRCUIT BREAKERS
| A. | Provide circuit breakers in accordance with the applicable requirements in Section 26 24 16, PANELBOARDS. |
| B. | Enclosures shall be the NEMA types shown on the drawings. Where the types are not shown, they shall be the NEMA type most suitable for the ambient environmental conditions. |
2.7 LOW VOLTAGE DRAWOUT CIRCUIT BREAKERS
A. An existing low voltage drawout circuit breaker is to be removed and shipped to an approved breaker refurbishing facility. Coordinate with the existing manufacturer for an approved facility for this purpose. The circuit breaker shall be repaired to an operating state as per the original manufacturer’s specifications, reinstalled, commissioned and placed In operation.
PART 3 - EXECUTION
3.1 INSTALLATION
| A. | Installation shall be in accordance with the NEC, as shown on the drawings, and manufacturer’s instructions. |
| B. | Fused switches shall be furnished complete with fuses. Arrange fuses such that rating information is readable without removing the fuses. |
3.2 Acceptance Checks and Tests
| A. | Perform in accordance with the manufacturer's recommendations. In addition, include the following: |
| 1. | Visual Inspection and Tests: |
| a. | Compare equipment nameplate data with specifications and approved shop drawings. |
| b. | Inspect physical, electrical, and mechanical condition. |
| c. | Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method. |
| d. | Vacuum-clean enclosure interior. Clean enclosure exterior. |
3.3 SPARE PARTS
A. Two weeks prior to the final inspection, furnish one complete set of spare fuses for each fused disconnect switch installed on the project. Deliver the spare fuses to the COR.
---END---
26 29 21 - 4