36C25622R0094 264313 Surge Protective Devices.docx

DOCX document 28 KB Posted

Attached to
Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 Federal contract opportunity
Solicitation number
502-19-107
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This solicitation package includes specifications for surge protective devices and related installation services. The Department of Veterans Affairs is seeking these products and services for Project #502-19-107 to replace Air Handling Unit 104 at their Veterans Health Administration facility in Alexandria, Louisiana. The specifications call for Type 2 surge protective devices rated for a minimum surge current of 120kA per phase to be installed at panelboards and other key locations in compliance with NFPA 70. Submittals are due two weeks prior to the final inspection, which must include certifications of product compliance, proper installation, and maintenance manuals. The selected contractor must also provide a two-hour training session upon project completion.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094, newest first.
File Type Posted
36C25622R0094 ECS Geotechnical Report.pdf PDF
36C25622R0094 0004.docx DOCX document
36C25622R0094 RFI Register 08292022.docx DOCX document
36C25622R0094 0001.docx DOCX document
36C25622R0094 Revised SOW 05202022 .docx DOCX document
36C25622R0094 RFP.docx DOCX document
36C25622R0094 IFC Drawings Part 1 .pdf PDF
36C25622R0094 IFC Drawings Part 2.pdf PDF
36C25622R0094 230593 TESTING ADJUSTING AND BALANCING FOR HVAC.docx DOCX document
36C25622R0094 013323 Shop Drawings Product Data and Samples.docx DOCX document
36C25622R0094 010000 General Requirements .docx DOCX document
36C25622R0094 EXHIBIT E.docx DOCX document
36C25622R0094 323113 Chain Link Fences and Gates .docx DOCX document
36C25622R0094 EXHIBIT B.docx DOCX document
36C25622R0094 265100 Interior Lighting .docx DOCX document
36C25622R0094 262921 Enclosed Switches and Circuit Breakers.docx DOCX document
36C25622R0094 260533 Raceways and Boxes for Electrical Systems .docx DOCX document
36C25622R0094 270511 Requirements for Communications Installations .docx DOCX document
36C25622R0094 233400 HVAC FANS.docx DOCX document
36C25622R0094 237300 INDOOR CENTRAL STATION AIR HANDLING UNITS.docx DOCX document
36C25622R0094 232123 HYDRONIC PUMPS.docx DOCX document
36C25622R0094 230511 COMMON WORK RESULTS FOR HVAC.docx DOCX document
36C25622R0094 078400 Firestopping.docx DOCX document
36C25622R0094 081400 Interior Wood Doors .docx DOCX document
36C25622R0094 051200 Structural Steel Framing .docx DOCX document
36C25622R0094 024100 Demolition .docx DOCX document
36C25622R0094 014219 Reference Standards.docx DOCX document
36C25622R0094 Project Risk Assessment .pdf PDF
36C25622R0094 260526 Grounding and Bonding.docx DOCX document
36C25622R0094 260519 Low voltage conductors .docx DOCX document
36C25622R0094 312011 Earthwork .docx DOCX document
36C25622R0094 262416 Panelboards.docx DOCX document
36C25622R0094 281300 Physical Access Control System .doc DOC document
36C25622R0094 EXHIBIT A.docx DOCX document
36C25622R0094 262911 Motor Controllers .docx DOCX document
36C25622R0094 316500 Helical Piles.doc DOC document
36C25622R0094 282300 Video Surveillance .docx DOCX document
36C25622R0094 236400 PACKAGED WATER CHILLERS.docx DOCX document
36C25622R0094 233700 AIR OUTLETS AND INLETS.docx DOCX document
36C25622R0094 260541 UNDERGROUND ELEC CONSTRUCTION .docx DOCX document
36C25622R0094 230541 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT .docx DOCX document
36C25622R0094 230512 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT.docx DOCX document
36C25622R0094 233100 HVAC DUCTS AND CASINGS.docx DOCX document
36C25622R0094 233600 AIR TERMINAL UNITS .docx DOCX document
36C25622R0094 238216 AIR COILS .doc DOC document
36C25622R0094 230800 COMMISSIONING OF HVAC SYSTEMS.docx DOCX document
36C25622R0094 033000 Cast in Place Concrete.docx DOCX document
36C25622R0094 019100 General Commissioning Requirements .docx DOCX document
36C25622R0094 090600 Schedule for Finishes .docx DOCX document
36C25622R0094 IFC Drawings Part 3 .pdf PDF
Show all 50

Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE AHU #104 AND DUCTWORK BLDG. 7

DEPARTMENT OF VETERANS AFFAIRS HEALTH CARE SYSTEM-ALEXANDRIA, LA

PROJECT NO.: 502-19-107

SECTION 26 43 13

surge protective deviceS

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the furnishing, installation, and connection of Type 2 Surge Protective Devices, as defined in NFPA 70, and indicated as SPD in this section.

1.2 RELATED WORK

A.Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26.
B.Section 26 24 16, PANELBOARDS: For factory-installed or external SPD.

1.3 QUALITY ASSURANCE

A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.

1.4 SUBMITTALS

A.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:
1.Shop Drawings:
a.Submit sufficient information to demonstrate compliance with drawings and specifications.
b.Include electrical ratings and device nameplate data.
2.Manuals:
a.Submit, simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals including technical data sheets, wiring diagrams, and information for ordering replacement parts.
b.If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection.
3.Certifications: Two weeks prior to final inspection, submit the following.
a.Certification by the manufacturer that the SPD conforms to the requirements of the drawings and specifications.
b.Certification by the Contractor that the SPD has been properly installed.

1.5 APPLICABLE PUBLICATIONS

A.Publications listed below (including amendments, addenda, revisions, supplement and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B.Institute of Engineering and Electronic Engineers (IEEE):
IEEE C62.41.2-02Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE C62.45-08Surge Testing for Equipment Connected to Low-Voltage (1000 V and Less) AC Power Circuits
C.National Fire Protection Association (NFPA):
70-17National Electrical Code (NEC)
D.Underwriters Laboratories, Inc. (UL):
UL 1283-15Electromagnetic Interference Filters
UL 1449-14Surge Protective Devices

PART 2 - PRODUCTS

2.1 PANELBOARD SPD

A.General Requirements:
1.Comply with UL 1449 and IEEE C62.41.2.
2.Modular design with field-replaceable modules, or non-modular design.
3.Fuses rated at 200 kA interrupting capacity.
4.Bolted compression lugs for internal wiring.
5.Integral disconnect switch.
6.Redundant suppression circuits.
7.LED indicator lights for power and protection status.
8.Audible alarm, with silencing switch, to indicate when protection has failed.
9.Form-C contacts rated at 5 A and 250-V ac, one normally open and one normally closed, for remote monitoring of protection status. Contacts shall reverse on failure of any surge diversion module or on opening of any current-limiting device.
10.Four-digit transient-event counter.
B.Surge Current per Phase: Minimum 120kA per phase.

2.2 ENCLOSURES

A. Enclosures: NEMA 1 and 3R.

PART 3 - EXECUTION

3.1 INSTALLATION

A.Installation shall be in accordance with the NEC, as shown on the drawings, and manufacturer’s instructions.
B.Factory-installed SPD: panelboard manufacturer shall install SPD at the factory.
C.Field-installed SPD: Contractor shall install SPD with conductors or buses between SPD and points of attachment as short and straight as possible. Do not exceed manufacturer's recommended lead length. Do not bond neutral and ground.
1.Provide a circuit breaker as a dedicated disconnecting means for SPD as shown on drawings.
D.Do not perform insulation resistance tests on panelboards, or feeders with the SPD connected. Disconnect SPD before conducting insulation resistance tests and reconnect SPD immediately after insulation resistance tests are complete.

3.2 Acceptance Checks and Tests

A.Perform in accordance with the manufacturer's recommendations. In addition, include the following:
1.Visual Inspection and Tests:
a.Compare equipment nameplate data with specifications and approved shop drawings.
b.Inspect physical, electrical, and mechanical condition.
c.Verify that disconnecting means and feeder size and maximum length to SPD corresponds to approved shop drawings.
d.Verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method.
e.Vacuum-clean enclosure interior. Clean enclosure exterior.
f.Verify the correct operation of all sensing devices, alarms, and indicating devices.

3.3 Follow-Up Verification

A. After completion of acceptance checks and tests, the Contractor shall show by demonstration in service that SPD are in good operating condition and properly performing the intended function.

3.4 INSTRUCTION

A. Provide the services of a factorytrained technician for one 2hour training period for instructing personnel in the maintenance and operation of the SPD, on the date requested by the COR.

`---END---