36C25619R0072-009.pdf
PDF 6 MB Posted
- Attached to
- NRM 580-17-101 Expand - Renovate ER
- Solicitation number
- 36C25619R0072
About this file
36C25619R0072 580-17-101 Project Drawings - Mechanical.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25619C0088-000.docx | DOCX document | |
| 36C25619R0072-0003002.pdf | ||
| 36C25619R0072-0003000.docx | DOCX document | |
| 36C25619R0072-0003001.pdf | ||
| 36C25619R0072-0002000.docx | DOCX document | |
| 36C25619R0072-0002001.docx | DOCX document | |
| 36C25619R0072-0001003.pdf | ||
| 36C25619R0072-0001002.pdf | ||
| 36C25619R0072-0001004.pdf | ||
| 36C25619R0072-0001001.pdf | ||
| 36C25619R0072-0001000.docx | DOCX document | |
| 36C25619R0072-003.pdf | ||
| 36C25619R0072-004.pdf | ||
| 36C25619R0072-013.pdf | ||
| 36C25619R0072-011.pdf | ||
| 36C25619R0072-006.pdf | ||
| 36C25619R0072-008.pdf | ||
| 36C25619R0072-005.pdf | ||
| 36C25619R0072-001.docx | DOCX document | |
| 36C25619R0072-010.pdf | ||
| 36C25619R0072-002.docx | DOCX document | |
| 36C25619R0072-012.docx | DOCX document | |
| 36C25619R0072-007.pdf | ||
| 36C25619R0072-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR (CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
T
CO2 CARBON DIOXIDE
THERMOSTAT
SUPPLY DIFFUSER
RETURN DIFFUSER/GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
2000EG-B DIFFUSER TAG | DIFFUSER CFM
LINEAR SLOT DIFFUSER
BALANCING DAMPER
(RECTANGULAR)
BALANCING DAMPER
(ROUND)
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
SIDE MOUNTED GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
MECHANICAL LEGEND
HPS
LPS
LPR
CHS
CHR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OUTLET
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MOTORIZED CONTROL VALVE
STEAM TRAPCOND CONDENSATE DRAIN LINE
HPR HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMITS OF DEMOLITION
INLINE CENTRIFUGAL PUMP
TANGENTIAL AIR SEPARATOR
EXPANSION TANK
WALL-MOUNTED INDOOR
SPLIT-SYSTEM
SPLIT-SYSTEM CONDENSING UNIT
UTILITY SET EXHAUST FAN
STEAM PRESSURE
REDUCING STATION
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
TERMINAL UNIT
CHECK VALVE
10x8
10x8
FAN POWERED TERMINAL UNIT
HEPA FILTER BOX
EXISTING EQUIPMENT
TO BE DEMOLISHED
MECHANICAL GENERAL NOTES
1 WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2 INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3 OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4 PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5 WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
6 EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7 PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8 INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9 INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10 COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11 PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
12 PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13 PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
14 DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND PIPING IN
THE FIELD.
15 FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16 NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17 SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18 INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
19 PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
20 SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21 INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22 MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.
23 DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
24 INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE NOT
ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
25 INSTALL PIPING FREE OF SAGS AND BENDS.
26 INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
27 PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
28 PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
a. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
b. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
c. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN.
d. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
e. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST.
HVAC DESIGN DATA
Key Name
SUMMER WINTER LOWEST AVERAGE
ANNUAL DEWPOINTDRY BULB WET BULB % HUMIDITY TEMP DEWPOINT % HUMIDITY
1 97.4 °F 77.8 °F 42.1 15.9 °F 9.0 °F 10 3
2 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
2 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
3 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
4 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
5 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
6 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
7 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
8 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
10 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
12 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
13 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
14 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
15 66.0 °F 57.8 °F 60 75.0 °F 53.2 °F 20 31.5
16 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
17 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
18 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
19 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
20 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
NOTES:
1. ELECTRICAL EQUIPMENT ROOMS WITHOUT INTERNAL HEAT GAIN HAVE NO TEMPERATURE REQUIREMENTS. ELECTRICAL EQUIPMENT
ROOMS WITH HEAT GAIN ARE REQUIRED TO BE 86 SUMMER/40 WINTER, BUT HAVE BEEN DESIGNED TO ADJACENT SPACE TEMPERATURES
DUE TO THEIR SMALL SIZE.
2. SOILED ROOMS HAVE NO TEMPERATURE REQUIREMENTS, BUT HAVE BEEN DESIGNED TO THE TEMPERATURES INDICATED.
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:1
:5
P
M
M-001
MECHANICAL LEGEND,
ABBREVIATIONS, AND GENERAL
NOTES
1 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
DocuSign Envelope ID: 7F0BDB62-5146-4079-B1A0-D12C70ECAC76
3/14/2019
J
20.5 1515.816171818.9
E
G
H
I
G.3
F.7
F.5
E.8
E.5
(TYP. 31)(TYP. 20)
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:1
P
M
MD101
FIRST FLOOR CEILING HVAC
DEMOLITION PLAN
2 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
0 4 8 16 N O R
TH
TRUE
SCALE: 1/8" = 1'-0"1
FIRST FLOOR CEILING HVAC DEMOLITION PLAN
1 DEMOLISH SUPPLY AIR DIFFUSER AND
ASSOCIATED DUCTWORK TO LIMITS OF
DEMOLITION ON FIRST FLOOR INTERSTITIAL. SEE
MD102.
2 DEMOLISH RETURN AIR GRILLE AND ASSOCIATED
DUCTWORK TO LIMITS OF DEMOLITION ON FIRST
FLOOR INTERSTITIAL. SEE MD102.
3 DEMOLISH EXHAUST GRILL AND ASSOCIATED
DUCTWORK TO LIMITS OF DEMOLITION.
4 DEMOLISH SUPPLY AIR DIFFUSER AND
ASSOCIATED DUCTWORK TO LIMITS OF
DEMOLITION.
5 DEMOLISH RETURN AIR GRILLE AND ASSOCIATED
DUCTWORK TO LIMITS OF DEMOLITION.
1 COORDINATE ALL WORK WITH OTHER TRADES AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE PROJECT
LIMITS OF WORK.
2 ALL DEMOLISHED EQUIPMENT SHALL BECOME THE PROPERTY
OF THE CONTRACTOR UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL DISPOSE OF EQUIPMENT IN ACCORDANCE
WITH ALL VAMC REQUIREMENTS AND ENVIRONMENTAL
REGULATIONS.
3 CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS.
PRESERVE ANY EXISTING DUCTWORK, PIPING OR EQUIPMENT
THAT IS NOT INDICATED FOR DEMOLITION OR IS DISCOVERED IN
THE DEMOLITION PROCESS.
4 CAP EXISTING DUCTWORK AND PIPING AT THE LIMITS OF
DEMOLITION.
5 UNLESS OTHERWISE NOTED, WORK IS TO BE COMPLETED AS A
PART OF PHASE 1. REFER TO SHEET GI103 FOR PHASING AREA
DETAILS.
6 REFER TO SHEET GI104 FOR DEDUCT ALTERNATE DETAILS.
20.5 1515.816171818.9
E
G
H
I
G.3
F.7
F.5
E.8
E.5 ø
S A
45/14 SA 38/14 SA 17/14 SA
/1
S
A
/1
S A 10 ø S A
16ø RA28/14 RA
14ø RA 10ø RA
8ø RA ø
R A
17/14 SA
9ø SA ø
R A ø
R A ø
R A ø
E A
6ø R
A
14ø E A
12ø RA
20/14 RA25/14 RA
ø
R A
12ø S A
14ø S
A
28/14 RA33/14 RA 18ø RA 16ø RA
/1
R
A ø R
A8 ø
R A ø
R A
/1
R
A ø
S A
12ø SA
12ø SA
/1
S
A
12ø S A ø S
A
8ø RA ø S
A
43/18 RA
ø
R A ø
R A ø
R A 8 ø
R A
22/14 SA
12ø SA
8ø SA ø
E A
14ø RA
/1
R
A
12ø R A
12ø RA
22/14 RA27/14 RA
ø R
A ø
R A
/3
R
A x R
A ø
R A
6ø RA
14ø S A
10ø S A
6ø SA
12ø SA
8ø S
A9ø SA
8ø SA ø
S A ø
S A
8ø S
A ø
S A ø
S A
17ø S
A ø S
A
6ø S
A ø S
A
8ø SA 8ø
S A
10ø S
A
6ø S
A
6ø S
A
14/12 S A ø
S A
#1
1 1
1 1
DOWN TO REGISTER
IN CEILING BELOW (TYP)
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:2
P
M
MD102
FIRST FLOOR INTERSTITIAL HVAC
DEMOLITION PLAN
3 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
SCALE: 1/8" = 1'-0"1 FIRST FLOOR INTERSTITIAL HVAC DEMOLITION PLAN 0 4 8 16 N
O R
TH
TRUE
1 DEMOLISH DAMPER, AND ASSOCIATED DUCT
BACK TO LIMITS OF DEMOLITION.
2 REMOVE EXISTING VAV COMPLETE.
3 DEMOLISH DAMPER, AND ASSOCIATED DUCT
BACK TO LIMITS OF DEMOLITION. CAP DUCT AT
MAIN.
1 COORDINATE ALL WORK WITH OTHER TRADES AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE PROJECT
LIMITS OF WORK.
2 ALL DEMOLISHED EQUIPMENT SHALL BECOME THE PROPERTY
OF THE CONTRACTOR UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL DISPOSE OF EQUIPMENT IN ACCORDANCE
WITH ALL VAMC REQUIREMENTS AND ENVIRONMENTAL
REGULATIONS.
3 CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS.
PRESERVE ANY EXISTING DUCTWORK, PIPING OR EQUIPMENT
THAT IS NOT INDICATED FOR DEMOLITION OR IS DISCOVERED IN
THE DEMOLITION PROCESS.
4 CAP EXISTING DUCTWORK AND PIPING AT THE LIMITS OF
DEMOLITION.
5 UNLESS OTHERWISE NOTED, WORK IS TO BE COMPLETED AS A
PART OF PHASE 1. REFER TO SHEET GI103 FOR PHASING AREA
DETAILS.
6 REFER TO SHEET GI104 FOR DEDUCT ALTERNATE DETAILS.
20.5 1515.816171818.9
E
G
H
I
G.3
F.7
F.5
E.8
E.5
2 2
1 1
H H
W S
1/
2" H
H W
S
H H
W R
1/
2" H
H W
R
HHWS3/4" HHWS
HHWR3/4" HHWR
H H
W R
1/
2" H
H W
R H
H W
S
1/ 2"
H H
W S
HHWS3/4" HHWS
HHWR3/4" HHWR
H H
W R
1/
2" H
H W
R
H H
W S
1/
2" H
H W
S
H H
W R
1/
2" H
H W
R
H H
W S
1/
2" H
H W
S
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
H H
W R
1/
2" H
H W
R H
H W
S
1/ 2"
H H
W S
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWR3/4" HHWR
HHWS3/4" HHWS
H H
W R
2" H
H W
R H
H W
S 2"
H H
W S
H H
W R
1/
2" H
H W
R H
H W
S
1/ 2"
H H
W S
H H
W R
2" H
H W
R
H H
W S
2" H
H W
S
H H
W R
1/
4" H
H W
R
H H
W S
1/
4" H
H W
S
HHWR1 1/2" HHWR
HHWS1 1/2" HHWS
H H
W R
1/
4" H
H W
R
H H
W S
1/
4" H
H W
S
H H
W R
1" H
H W
R
H H
W S
1/
2" H
H W
S
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS1" HHWS
HHWR1" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS1" HHWS
HHWR1" HHWR
HHWS1" HHWS
HHWR1" HHWR
HHWS1" HHWS
HHWR1" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
HHWS3/4" HHWS HHWR3/4" HHWR
HHWR1 1/4" HHWR
HHWS1 1/4" HHWS
HHWR1 1/4" HHWR
HHWS1 1/4" HHWS
HHWR1" HHWR
HHWS1" HHWS
H H
W R
1" H
H W
R
H H
W S
1" H
H W
S
HHWR1" HHWR
HHWS1" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
HHWR3/4" HHWR
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWR3/4" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS1 1/2" HHWS
HHWR1 1/2" HHWR
HHWS1 1/2" HHWS
HHWR1 1/4" HHWR
HHWS1 1/2" HHWS
HHWR1 1/4" HHWR
HHWS1 1/2" HHWS
HHWR1 1/4" HHWR
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
H H
W S
1/
4" H
H W
S
H H
W R
1/
4" H
H W
R
H H
W S
1" H
H W
S
H H
W R
1/
4" H
H W
R
HHWR1 1/4" HHWR
HHWS1 1/4" HHWS
HHWR1" HHWR
HHWS1 1/4" HHWS
HHWR1" HHWR
HHWS1" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
HHW
S
3/4" HHW
S
HHW
R
3/4" HHW
R
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W
RH
H W
S 3/
4" H
H W
S
H H
W R
3/ 4"
H H
W R
HHWS3/4" HHWS
HHWR3/4" HHWR
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:2
P
M
MD103
FIRST FLOOR INTERSTITIAL
MECHANICAL PIPING DEMOLITION
PLAN
4 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
SCALE: 1/8" = 1'-0"1 FIRST FLOOR INTERSTITIAL MECHANICAL PIPING DEMOLITION PLAN 0 4 8 16 N O R
TH
TRUE
1 DEMOLISH VAV, AND HEATING HOT WATER
PIPING TO LIMITS OF DEMOLITION.
2 DEMOLISH VAV AND HEATING HOT WATER PIPING
TO LIMITS OF DEMOLITION. CAP PIPES AT
VALVES.
1 COORDINATE ALL WORK WITH OTHER TRADES AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE PROJECT
LIMITS OF WORK.
2 ALL DEMOLISHED EQUIPMENT SHALL BECOME THE PROPERTY
OF THE CONTRACTOR UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL DISPOSE OF EQUIPMENT IN ACCORDANCE
WITH ALL VAMC REQUIREMENTS AND ENVIRONMENTAL
REGULATIONS.
3 CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS.
PRESERVE ANY EXISTING DUCTWORK, PIPING OR EQUIPMENT
THAT IS NOT INDICATED FOR DEMOLITION OR IS DISCOVERED IN
THE DEMOLITION PROCESS.
4 CAP EXISTING DUCTWORK AND PIPING AT THE LIMITS OF
DEMOLITION.
5 UNLESS OTHERWISE NOTED, WORK IS TO BE COMPLETED AS A
PART OF PHASE 1. REFER TO SHEET GI103 FOR PHASING AREA
DETAILS.
6 REFER TO SHEET GI104 FOR DEDUCT ALTERNATE DETAILS.
20.5 1515.816171818.9
E
G
H
I
G.3
F.7
F.5
E.8
E.5
125SD-B
125SD-B
125SD-B
120SD-B
120SD-B
120SD-B
120SD-B
120SD-B
120SD-B
90SD-A
125SD-A
110SD-B
110SD-B
55SD-A
50SD-A
50SD-A
160SD-B
70EG-A
70EG-A
85EG-A
80EG-A
70EG-A
125RG-B
125SD-B
50SD-A
160SD-B
160SD-B
160SD-B
160SD-B
125RG-B
125RG-A
125RG-B
120RG-B
55RG-A
50RG-A
120RG-B
50RG-A
120RG-B
120RG-B
120RG-B
105RG-A
50RG-A
160SD-B
160SD-B
160SD-B
160SD-B
160SD-B
65SD-A
160SD-B
160SD-B
160SD-B
160SD-B
160EG-B
120RG-A
90RG-A
480RG-D
480RG-D
480RG-C
470RG-D
110RG-A
55RG-A
110RG-A
50RG-A
-RG-A
-RG-A
50SD-A
225SD-B
185RG-B
70EG-A
SOILED
1A-804
CORRIDOR
C1A-718
RESUS 25
1A-805
CORRIDOR
C1A-774
RESUS 26
1A-807
EQUIPMENT
1A-740
EXAM 7
1A-738
SOILED
1A-739
STRETCHER
C1A-809
ISOL (NEG) EXAM
1A-794
TRIAGE
1A-761
CORRIDOR
C1A-712
CORRIDOR
C1A-713
CORRIDOR
C1A-712
CORRIDOR
C1A-718
STAFF WORK
1A-730 CORRIDOR
C1A-714
EXAM 1
1A-724
CORRIDOR
C1A-715
EXAM 12
1A-732
EXAM 10
1A-735
CORRIDOR
C1A-711
ALCOVE
1A-734A
EXAM 2
1A-723
EXAM 3
1A-722
EQUIPMENT
1A-725
CLEAN
1A-734
CORRIDOR
C1A-711
EXAM 8
1A-737
EXAM 9
1A-736
INTERVIEW
1A-765
EXAM 6
1A-728
EXAM 5
1A-727
EXAM 4
1A-726
ALC
1A-721
NOURISHMENT
1A-740A
EXAM 24
C1A-795
8ø R
A
6ø R
A
6ø S
A
6ø S
A
6ø S
A ø R
A ø R
A
8ø SA
ISOL (POS) EXAM
1A-791
ANTE
1A-790A
PSYCH EXAM 23
1A-796
ANTE ROOM
1A-795
EXAM 11
1A-733
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:4
P
M
MH101
FIRST FLOOR CEILING PLAN
5 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
A COORDINATE ALL WORK WITH OTHER TRADES
AND THE COR TO MINIMIZE DISRUPTION OF
AREAS OUTSIDE OF THE PROJECT LIMITS OF
WORK.
B UNLESS NOTED OTHERWISE, ALL DIFFUSERS AND
GRILLE RUN-OUTS ARE THE SAME SIZE AS ITS
NECK/DUCT CONNECTION SPECIFIED IN THE AIR
DEVICE SCHEDULE.
C ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
D SEE ARCHITECTURAL CEILING PLAN FOR CEILING
TYPES AS WELL AS DIFFUSER AND GRILL
PLACEMENT WITHIN THE CEILING.
E REUSE EXISTING INTERSTITIAL FLOOR
PENETRATIONS.
SCALE: 1/8" = 1'-0"1
FIRST FLOOR CEILING PLAN 0 4 8 16 N
O R
TH
TRUE
1 CONNECT NEW DUCT TO EXISTING DUCT AT
INSTERSTITIAL FLOOR PENETRATION
2 TRANSFER GRILLE, NO CFM SHOWN.
20.5 1515.816171818.9
E
G
H
I
G.3
F.7
F.5
E.8
E.5
25/14 RA 20/14 RA
ø
R A ø S
A ø S
A
6ø R
A
8ø SA 8ø SA
14ø SA ø
R A
8ø S
A
8ø S
A ø
S A
28/14 RA
ø
R A
6ø RA ø
R A ø
R A
16ø RA
18ø RA
8ø SA
8ø SA ø S
A
10ø SA ø
S A
8ø SA
14ø SA ø
S A ø
S A ø
E A16ø SA ø
S A
22/14 SA
16ø SA
14ø SA ø
S A
8ø SA
8ø SA
12ø RA
12ø RA ø
R A1 ø
S A
6ø SA 8ø SA
8ø S
A
8ø S
A
45/14 SA 38/14 SA
8ø SA
8ø RA
8ø SA ø
R A ø
S A
8ø S
A
6ø RA
8ø SA
8ø SA ø
S A ø
R A ø
S A ø R
A
6ø RA
6ø S
A ø
R A ø
R A
14ø E A
8x8 EA
6x6 EA
6x
EA
6x6 EA
6x6 EA
6x6 EA
8x8 EA 14ø EA
43/18 RA61/14 RA
ø
S A
/1
R
A
28/14 RA 16ø RA
14ø RA
10ø RA ø
R A
8ø RA
17/14 SA
9ø SA
/1
S
A
12ø SA
/1
S
A ø
S A
/3
S
A ø
S A
12ø SA ø
S A x R
A /3
R
A x R
A x S
A
41/14 RA
6ø RA
12ø RA
33/14 RA
8ø S
A ø
S A
9ø SA ø
E A
6ø R
A ø
R A
14ø RA
/1
R
A
TU26-70
TU26-69
TU26-68
TU26-21TU26-20
SB-1-26
TU26-60
TU26-65
TU26-66TU26-64
TU26-63
TU26-62
TU26-61
TU26-71
TU26-67
TU26-52
TU26-72
TU26-73
TU26-34
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:5
P
M
MH102
FIRST FLOOR INTERSTITIAL
COMPOSITE HVAC PLAN
6 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
A COORDINATE ALL WORK WITH OTHER TRADES
AND THE COR TO MINIMIZE DISRUPTION OF
AREAS OUTSIDE OF THE PROJECT LIMITS OF
WORK.
B UNLESS NOTED OTHERWISE, ALL DIFFUSERS AND
GRILLE RUN-OUTS ARE THE SAME SIZE AS ITS
NECK/DUCT CONNECTION SPECIFIED IN THE AIR
DEVICE SCHEDULE.
C ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
D SEE ARCHITECTURAL CEILING PLAN FOR CEILING
TYPES AS WELL AS DIFFUSER AND GRILL
PLACEMENT WITHIN THE CEILING.
E REUSE EXISTING INTERSTITIAL FLOOR
PENETRATIONS.
SCALE: 1/8" = 1'-0"1 FIRST FLOOR INTERSTITIAL COMPOSITE HVAC PLAN 0 4 8 16 N
O R
TH
TRUE
20.5 1515.816171818.9
E
G
H
I
G.3
F.7
F.5
E.8
E.5 ø S
A ø S
A
8ø SA 8ø SA
14ø SA 8ø
S A
8ø S
A ø
S A
8ø SA
8ø SA ø S
A
10ø SA ø
S A
8ø SA
14ø SA ø
S A ø
S A
16ø SA ø
S A
22/14 SA
16ø SA
14ø SA ø
S A
8ø SA
8ø SA ø
S A
6ø SA 8ø SA
8ø S
A
8ø S
A
45/14 SA 38/14 SA
8ø SA ø
S A
8ø S
A
8ø SA
8ø SA ø
S A ø
S A
6ø S
A ø
S A
17/14 SA
9ø SA
/1
S
A
12ø SA
/1
S
A ø
S A
/3
S
A ø
S A
12ø SA ø
S A x S
A
2 2
TU26-62
ø
S A
TU26-63
TU26-11
TU26-64
TU26-66
TU26-65
TU26-12
TU26-52
TU26-72
TU26-71
TU26-68
TU26-69
TU26-70
TU26-67
TU26-60
TU26-61
TU26-46
TU26-40
TU26-73
6ø SA 8x10 SA 6ø SA
TU26-34
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:5
P
M
MH103
FIRST FLOOR INTERSTITIAL HVAC
SUPPLY PLAN
7 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
A COORDINATE ALL WORK WITH OTHER TRADES
AND THE COR TO MINIMIZE DISRUPTION OF
AREAS OUTSIDE OF THE PROJECT LIMITS OF
WORK.
B UNLESS NOTED OTHERWISE, ALL DIFFUSERS AND
GRILLE RUN-OUTS ARE THE SAME SIZE AS ITS
NECK/DUCT CONNECTION SPECIFIED IN THE AIR
DEVICE SCHEDULE.
C ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
D SEE ARCHITECTURAL CEILING PLAN FOR CEILING
TYPES AS WELL AS DIFFUSER AND GRILL
PLACEMENT WITHIN THE CEILING.
E REUSE EXISTING INTERSTITIAL FLOOR
PENETRATIONS.
SCALE: 1/8" = 1'-0"1 FIRST FLOOR INTERSTITIAL HVAC SUPPLY PLAN 0 4 8 16 N
O R
TH
TRUE
1 PROVIDE VAV TERMINAL WITH INTEGRAL HOT
WATER REHEAT COIL. ENSURE MAINTENANCE
CLEARANCE AND ACCESS TO MAINTENANCE
CLEARANCE.
2 REBALANCE EXISTING TERMINAL UNIT. REFER TO
SINGLE DUCT AIR TERMINAL UNIT SCHEDULE ON
MH601 FOR AIR FLOWS.
20.5 1515.816171818.9
E
G
H
I
G.3
F.7
F.5
E.8
E.5
25/14 RA 20/14 RA
ø
R A
6ø R
A 12ø RA ø
R A
28/14 RA
ø
R A
6ø RA ø
R A ø
R A
16ø RA18ø RA ø
E A
12ø RA ø
R A
8ø RA ø
R A
6ø RA ø
R A ø R
A
6ø RA ø
R A ø
R A
14ø E A
8x8 EA
6x6 EA
6x
EA
6x6 EA
6x6 EA
6x6 EA
8x8 EA 14ø EA
43/18 RA61/14 RA
/1
R
A
28/14 RA 16ø RA
14ø RA
10ø RA ø
R A
8ø RA x R
A /3
R
A x R
A
41/14 RA
6ø RA
12ø RA
33/14 RA
ø
E A
6ø RA
12ø R A
6ø R
A
14ø RA
/1
R
A
22/14 RA
12ø RA
27/14 RA
8ø RA
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:0
P
M
MH104
FIRST FLOOR INTERSTITIAL HVAC
EXHAUST/RETURN PLAN
8 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
SCALE: 1/8" = 1'-0"1
FIRST FLOOR INTERSTITIAL HVAC EXHAUST/RETURN PLAN 0 4 8 16 N
O R
TH
TRUE
A COORDINATE ALL WORK WITH OTHER TRADES
AND THE COR TO MINIMIZE DISRUPTION OF
AREAS OUTSIDE OF THE PROJECT LIMITS OF
WORK.
B UNLESS NOTED OTHERWISE, ALL DIFFUSERS AND
GRILLE RUN-OUTS ARE THE SAME SIZE AS ITS
NECK/DUCT CONNECTION SPECIFIED IN THE AIR
DEVICE SCHEDULE.
C ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
D SEE ARCHITECTURAL CEILING PLAN FOR CEILING
TYPES AS WELL AS DIFFUSER AND GRILL
PLACEMENT WITHIN THE CEILING.
E REUSE EXISTING INTERSTITIAL FLOOR
PENETRATIONS.
1 CONNECT NEW DUCT TO EXISTING WHERE
INDICATED. REFER TO MH102 FOR SUPPLY
DUCTS TO COORDINATE ROUTING.
20.5 1515.816171818.9
E
G
H
I
G.3
F.7
F.5
E.8
E.5
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
HHWR3/4" HHWR
HHWS3/4" HHWS
HHWS1" HHWS
HHWR1" HHWR
HHWS1" HHWS
HHWR1" HHWRHHWR1 1/4" HHWR
HHWS1 1/4" HHWS
HHWR1 1/4" HHWR
HHWS1 1/4" HHWS
HHWR3/4" HHWR
HHWS3/4" HHWSHHWS3/4" HHWS
HHWR3/4" HHWR
HHWS1" HHWS
HHWR1" HHWR
HHWS3/4" HHWS
HHWR3/4" HHWR
H H
W R
1" H
H W
R
H H
W S
1" H
H W
S
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W
SH
H W
R 3/
4" H
H W
R
H H
W S
3/ 4"
H H
W S
HHWR1" HHWR
HHWS1" HHWS
HHWR1" HHWR
HHWS1 1/4" HHWS
HHWR1 1/4" HHWR
HHWS1 1/4" HHWS
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
HHWS3/4" HHWS
HHWR3/4" HHWR
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
H H
W R
1/
4" H
H W
R
H H
W S
1/
4" H
H W
S
HHWS1 1/2" HHWS
HHWR1 1/4" HHWR
H H
W S
3/ 4"
H H
W S
H H
W R
3/ 4"
H H
W R
HHWS1 1/2" HHWS
HHWR1 1/4" HHWR
HHWS1 1/2" HHWS
HHWR1 1/2" HHWR
H H
W R
3/ 4"
H H
W R
H H
W S
3/ 4"
H H
W S
TU26-62
TU26-61
TU26-46
TU26-63
TU26-11
TU26-64 TU26-65
TU26-12
TU26-41
TU26-67
TU26-60
TU26-68
TU26-70
TU26-69
TU26-72
TU26-71
HHWS3/4" HHWS
HHWR3/4" HHWR
TU26-52
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:2
P
M
MP101
FIRST FLOOR INTERSTITIAL
MECHANICAL PIPING PLAN
9 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
SCALE: 1/8" = 1'-0"1
FIRST FLOOR INTERSTITIAL MECHANICAL PIPING PLAN 0 4 8 16 N
O R
TH
TRUE
1 COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR,
OTHER TRADES AND THE COR TO MINIMIZE DISRUPTION OF
AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.
2 UNLESS OTHERWISE NOTED, WORK IS TO BE COMPLETED AS A
PART OF PHASE 1. REFER TO SHEET GI103 FOR PHASING AREA
DETAILS.
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN
VANES AND A 3/4" TRAILING EDGE.
4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.
W1
W
MAIN SUPPLY
DUCT
PROVIDE VOLUME
DAMPER
PROVIDE
VOLUME
DAMPER
1/4 W OR
4" MIN.
SUPPLY REGISTER OR
BRANCH DUCT
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN
FOR SPLIT
DIMENSION
TURNING VANES
AIR FLOW
AIR FLOW
A
IR
F L O
W
AIR SPLIT DUCT TAKE-
OFF PLAN VIEW
BRANCH DUCT TAKE-OFF
PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
MAIN SUPPLY
DUCT
CONICAL TAP
TERMINAL UNIT DUCT TAKE-
OFF PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
NOTES:
1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS.
ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/6 W
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/3 W
R
SHALL
EQUAL OR
BE
GREATER
THAN W
R
W
W
2/3W
R
/3
W
/3
W
1/2W
VAN
E
VAN
E R
W
1/6W
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
1-1/2" POCKET SLIP
DUCT
1-1/2" MIN. TO 3" MAX.
INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
1" FLANGE & HEM
BOLT ON 4" CENTERALTERNATE
POSITION OF
BOLT 1" x 1/8" BAND IRON
WASHER
FLANGED
CONNECTION ON FAN
SIDE
FLEXIBLE MATERIAL
AS SPECIFIED
5/16" FLANGE
BOLT ON 4" CENTERS
1" x 1/8" BAND IRON
WASHER
FLANGED
CONNECTION ON FAN
SIDE
1" x 1/8" DRAW BAND
FLEXIBLE
MATERIAL AS
SPECIFIED
SHEET
METAL
SCREWS ON
12" CENTERS
RIVET ON 4" CENTERS
DUCT
1-1/2" MIN. TO 3" MAX.
INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
RECTANGULAR FLEXIBLE CONNECTION
ROUND FLEXIBLE CONNECTION
1-1/2"1/2" 1/2"
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
NOTES:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR
FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
SECTIONSIDE ELEVATION
1/2" ROUND ROD PIN
1/8" CLEARANCE
ALL AROUND
INSIDE END
BEARING
INSULATION
STAND-OFF
DAMPER BLADE
HANDLE
WITH
LOCKING
QUADRANT
STIFFEN BLADE
AS REQUIRED
INSULATION SEE
SPECIFICATION
DUCT
OUTSIDE END BEARING
CARBON STEEL
LOAD BEARING CALCIUM
SILICATE INSULATION AT
ALL HANGER POINTS
PIPE
INSULATION
WITH
PROTECTIVE
SHEETMETAL
SHIELD
VIBRATION ISOLATORS
WHERE REQUIRED
NOM. SIZE (IN.)
PIPE (FT.)
TUBING (FT.)
5 FT
THRU 3/4
1 1 1/4
1 1/2
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR
LOW TEMPERATURE
PIPE)
PROVIDE HIGH
COMPRESSIVE
STRENGHT
INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD AT
HANGER
WELD
SADDLE
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE
SPECIFICATIONS
1/2" DIA. HANGER RODS WITH 36"
MAX. SPACING ON EACH CHANNEL
BAND
1-5/8" 12 GAUGE CHANNEL
OR 2" x 2" x 1/4" ANGLE
NOTES:
SEE SPECIFICATIONS FOR
DETAILED HANGER
REQUIREMENTS. SIDE VIEW TRAPEZE HANGER
FOR UP TO 1000 LB. UNIFORM
LOAD
1" MAX.
PROVIDE INSULATION SHIELD &
INSERT FOR ALL PIPING (8" MIN.)
2 2 1/2 3 4 5 6 8 10 12
11 12 14 16 17 19 22 23
9 10 12 13 14 16 - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
MAXIMUM PIPE/TUBING SUPPORT SPACING
RETURN
SUPPLY
COIL
DRAIN VALVE WITH HOSE
CONNECTION
MANUAL AIR VENT
UNION (TYPICAL)
2-WAY MODULATING
CONTROL VALVE
STRAINER WITH
DRAIN VALVE AND
HOSE CONNECTION
TEMPERATURE/PRESSURE TEST PORT
ISOLATION VALVE
CONCENTRIC REDUCERS,
IF REQUIRED (TYP.)
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:0
P
M
MH501
MECHANICAL DETAILS
10 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
SCALE: N.T.S.4
DUCTWORK SQUARE VANE ELBOWS
SCALE: N.T.S.2 SUPPLY DUCT TAKE-OFFS
SCALE: N.T.S.3
DUCTWORK RADIUS ELBOW
SCALE: N.T.S.5
FLEXIBLE DUCT CONNECTIONS
SCALE: N.T.S.1 VOLUME DAMPER DETAIL
SCALE: N.T.S.6
CLEVIS PIPE HANGER DETAIL
SCALE: N.T.S.7
PIPE HANGER
SCALE: N.T.S.8 VAV COIL PIPING DETAIL
POINT NAME:
ZONE TEMPERATURE
ZONE TEMPERATURE SETPOINT
AIRFLOW
DISCHARGE AIR TEMPERATURE
ZONE DAMPER
REHEATING VALVE
MAXIMUM OCCUPIED AIRFLOW SETPOINT
HEATING MODE
HEATING SETPOINT
COOLING SETPOINT
HIGH ZONE TEMPERATURE
LOW ZONE TEMPERATURE
HIGH DISCHARGE TEMPERATURE
LOW DISCHARGE TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
X
BI BO
SOFTWARE POINTS
AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TOTAL HARDWARE (8) TOTAL SOFTWARE (21)
6 2 3
X
X
X
X
12 5 11
X
X
X
X
X
X
HIGH ZONE HUMIDITY
MINIMUM OCCUPIED AIR FLOW SETPOINT
MINIMUM UNOCCUPIED AIRFLOW SETPOINT
ZONE HUMIDITY
ZONE HUMIDITY SETPOINT
X
X
X
X
X
X
X
X
X
X
X
DA
AO - REHEATING VALVE
HW
M
HWS HWR
T
AI - DISCHARGE AIR TEMP
AI - AIRFLOW
M
AO - ZONE DAMPER
SA
T AI - ZONE TEMP
AI - ZONE SETPOINT ADJUST
F
H AI - ZONE HUMIDITY
AI - ZONE HUMIDITYSETPOINT
VISIBLE ALARM
APPLY TO OPERATING
ROOMS ONLY
VAV TERMINAL UNIT
RUN CONDITIONS - CONTINUOUS:
THE UNIT SHALL RUN CONTINUOUSLY AND SHALL MAINTAIN:
• A 75°F (ADJ.) COOLING SETPOINT.
• A 70°F (ADJ.) HEATING SETPOINT.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING SETPOINT BY A USER
DEFINABLE AMOUNT (ADJ.).
• LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE HEATING SETPOINT BY A USER
DEFINABLE AMOUNT (ADJ.).
ZONE SETPOINT ADJUST:
THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE TEMPERATURE HEATING AND COOLING SETPOINTS AT
THE ZONE SENSOR.
REVERSING VARIABLE VOLUME TERMINAL UNIT - FLOW CONTROL:
THE UNIT SHALL MAINTAIN ZONE SETPOINTS BY CONTROLLING THE AIRFLOW THROUGH ONE OF THE
FOLLOWING:
OCCUPIED:
• WHEN ZONE TEMPERATURE IS GREATER THAN ITS COOLING SETPOINT, THE ZONE DAMPER SHALL
MODULATE BETWEEN THE MINIMUM OCCUPIED AIRFLOW (ADJ.) AND THE MAXIMUM COOLING AIRFLOW
(ADJ.) UNTIL THE ZONE IS SATISFIED.
• WHEN THE ZONE TEMPERATURE IS BETWEEN THE COOLING SETPOINT AND THE HEATING SETPOINT, THE
ZONE DAMPER SHALL MAINTAIN THE MINIMUM REQUIRED ZONE AIRFLOW (ADJ.).
• WHEN ZONE TEMPERATURE IS LESS THAN ITS HEATING SETPOINT, THE CONTROLLER SHALL MODULATE
THE HEATING VALVE OPEN TO MAINTAIN THE ZONE TEMPERATURE AT ITS HEATING SETPOINT.
ADDITIONALLY, IF WARM AIR IS AVAILABLE FROM THE AHU, THE ZONE DAMPER SHALL MODULATE BETWEEN THE MINIMUM OCCUPIED AIRFLOW (ADJ.) AND THE MAXIMUM HEATING AIRFLOW (ADJ.) UNTIL
THE ZONE IS SATISFIED.
UNOCCUPIED:
• WHEN THE ZONE IS UNOCCUPIED THE ZONE DAMPER SHALL CONTROL TO ITS MINIMUM UNOCCUPIED
AIRFLOW (ADJ.).
• WHEN THE ZONE TEMPERATURE IS GREATER THAN ITS COOLING SETPOINT, THE ZONE DAMPER SHALL
MODULATE BETWEEN THE MINIMUM UNOCCUPIED AIRFLOW (ADJ.) AND THE MAXIMUM COOLING AIRFLOW
(ADJ.) UNTIL THE ZONE IS SATISFIED.
• WHEN ZONE TEMPERATURE IS LESS THAN ITS UNOCCUPIED HEATING SETPOINT, THE CONTROLLER SHALL MODULATE THE HEATING VALVE OPEN TO MAINTAIN THE ZONE TEMPERATURE AT THE SETPOINT.
ADDITIONALLY, IF WARM AIR IS AVAILABLE FROM THE AHU, THE ZONE DAMPER SHALL MODULATE BETWEEN THE MINIMUM UNOCCUPIED AIRFLOW (ADJ.) AND THE AUXILIARY HEATING AIRFLOW (ADJ.)
UNTIL THE ZONE IS SATISFIED.
REHEATING COIL VALVE:
THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND MODULATE THE REHEATING COIL VALVE
OPEN ON DROPPING ZONE TEMPERATURE TO MAINTAIN ITS HEATING SETPOINT.
REHEATING - HIGH DISCHARGE AIR TEMPERATURE LIMIT:
THE CONTROLLER SHALL MEASURE THE DISCHARGE AIR TEMPERATURE AND LIMIT HOT WATER VALVE POSITION IF THE DISCHARGE AIR TEMPERATURE IS MORE THAN 15°F (ADJ.) ABOVE THE ZONE TEMPERATURE.
DISCHARGE AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE DISCHARGE AIR TEMPERATURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS GREATER THAN 100°F (ADJ.).
• LOW DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS LESS THAN 50°F (ADJ.).
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH HUMIDITY: IF THE SPACE RELATIVE HUMIDITY RISES ABOVE 60% A VISIBLE ALARM SHALL BE
INITIATED IN THE AFFECTED OR AND AT THE DDC MONITORING STATION.
ISOLATION ROOM CONTROL
GENERAL: THE SUPPLY AIR VAV BOX AND REHEAT COIL SHALL BE CONTROLLED AS SEQUENCED ON MH502.
SPACE PRESSURE CONTROL:
THE DDC SYSTEM SHALL MODULATE THE EXHAUST AIR VENTURI VALVE TO MAINTAIN A SET POINT OF +0.01 INCHES WATER GAUGE TO THE CORRIDOR. OPENING ON A FALL BELOW +0.01 IN FOR MORE THAN 5 SECONDS AND CLOSING ON A RISE ABOVE +0.01 FOR MORE THAN 5
SECONDS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• LOW DIFFERENTIAL PRESSURE IF THE PRESSURE FALLS BELOW 0.00 INCHES FOR MORE THAN 15 SECONDS. A LOCAL VISUAL ALARM
SHALL BE INDICATED AND AN ALARM SHALL BE ANNUNCIATED AT THE DDC MONITORING STATION.
VISUAL INDICATOR:
PROVIDE BALL-THRU-WALL MANUAL PRESSURE DIFFERENTIAL INDICATOR BETWEEN THE ANTE ROOM AND THE CORRIDOR.
FILTERS:
THE DDC SYSTEM SHALL MONITOR THE DIFFERENTIAL PRESSURE ACROSS THE HEPA PRE-FILTER AND THE HEPA FILTER. THE HEPA FILTER
SHALL BE PROVIDED WITH A VISUAL MANGEHELIC GAUGE AS WELL.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• WHEN THE PRE-FILTER DIFFERENTIAL PRESSURE EXCEEDS 1.0 INCHES OF WATER GAUGE.
• WHEN THE HEPA FILTER DIFFERENTIAL PRESSURE EXCEEDS 2.0 INCHES OF WATER GAUGE.
FAN CONTROL:
THE TWO FANS SHALL OPERATE IN A LEAD / STANDBY FASHION.
• THE LEAD FAN SHALL RUN FIRST AND THE STANDBY FAN ISOLATION DAMPER SHALL BE CLOSED.
• ON FAILURE OF THE LEAD FAN, THE STANDBY FAN SHALL RUN AND THE LEAD FAN ISOLATION DAMPER SHALL BE CLOSED.
THE DESIGNATED LEAD FAN SHALL ROTATE UPON ONE OF THE FOLLOWING CONDITIONS (USER SELECTABLE):
• MANUALLY THROUGH SOFTWARE SWITCH
• IF FAN RUN TIME (ADJUSTABLE) IS EXCEEDED
• WEEKLY
• MONTHLY
UPON A FALL IN DUCT STATIC PRESSURE AHEAD OF THE FILTER AT A SET POINT AS DETERMINED DURING TAB, THE VFD SHALL MODULATE
UP. ON A RISE THE VFD SHALL MODULATE DOWN.
ALARMS TO BOTH FANS SHALL BE PROVIDED AS FOLLOWS:
• FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
• RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
• RUNTIME EXCEEDED: STATUS RUN TIME EXCEEDS A USER DEFINABLE LIMIT.
DP
HOT WATER REHEAT COIL
SA
SA
ISOLATION ROOM
ANTE
CORRIDOR
3D-EAV-1-1
A0-POSITION
SP
DPS DPS
AI PRESSURE DROP
AI PRESSURE DROP
B0 - OPEN / CLOSE
BI - POSITION
ULTRA-LOW LEAKAGE DAMPER (TYP FOR 2)
3D-EF-4
3D-EF-3
VFD
CT
VFD
CT
B0 START / STOP
BI STATUS
A0 SPEED
B0 START / STOP
BI STATUS
A0 SPEED
B0 - OPEN / CLOSE
BI - POSITION
EA
EA
RED ALARM
GREEN
NORMAL
DP
LOW
HIGH
BALL-THRU-WALL
VISUAL INDICATOR
P R
E
H E
P A
T
SA
AI PRESSURE
MAGNEHELIC GAUGE
HWS
HWR
AHUFROM
TU
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:1
P
M
MH502
MECHANICAL CONTROLS
11 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
SCALE: N.T.S.2
VAV TERMINAL UNIT POINT LIST
SCALE: 12" = 1'-0"1 VAV TERMINAL SCHEMATIC
SCALE: 12" = 1'-0"3
VAV TERMINAL SEQUENCE OF OPERATION
SCALE: N.T.S.4
ISOLATION ROOM CONTROL SEQUENCE OF OPERATION
SCALE: N.T.S.5
ISOLATION ROOM CONTROL DIAGRAM
127914
R E E
N
I
IO
O F
P R
SS
E
L
N
L EA
SE NC
I N
DE
G
SILAS P. GEORGE
S
E T A
T ETFO
S
XA
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:1
P
M
MH601
MECHANICAL SCHEDULES
12 12SPG WRS
RENOVATE/EXPAND
EMERGENCY ROOM SYSTEM
2002 HOLCOMBE BOULEVARD,
HOUSTON, TX 77030 4298
MARCH 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
AIR FILTER SCHEDULE
LOCATION
AREA AND/OR BLDG
SERVED SYSTEM AND/OR SERVICE MERV RATING
APD
HOUSING TYPE # - CARTRIDGES
CARTRIDGES
REMARKSINITIAL CHANGEOVER SIZE ARRANGEMENT
ROOF PE ISOLATION 7 0.25 in-wg 0.75 in-wg SIDE LOAD 1 2" THICK 1 WIDE BY 1 HIGH 1
ROOF PE ISOLATION HEPA 1.00 in-wg 2.25 in-wg BAG-IN / BAG-OUT 1 27" x 30" x 24" 1 WIDE BY 1 HIGH 1
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
AIR DEVICE SCHEDULE (EXHAUST)
MARK TYPE
AIRFLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE NECK SIZE MAX NC DAMPER FINISH MATERIAL RemarksMIN. MAX.
EG-A SQUARE CONE 0 100 0.10 in-wg CEILING 24x24 6x6 20 No WHITE STEEL 1,2
EG-B SQUARE CONE 100 200 0.10 in-wg CEILING 24x24 8X8 20 No WHITE STEEL 1,2
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
AIR DEVICE SCHEDULE (RETURN)
MARK TYPE
AIRFLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE NECK SIZE MAX NC
DAMPER
DIFFUSER FINISH MATERIAL Description RemarksMIN. MAX.
RG-A EGG CRATE 0 100 0.16 in-wg CEILING 24x24 6"Ø 20 Yes STEEL RETURN 1,2,3
RG-B EGG CRATE 100 200 0.11 in-wg CEILING 24x24 8"Ø 20 Yes STEEL RETURN 1,2,3
RG-C EGG CRATE 200 350 0.11 in-wg CEILING 24x24 10"Ø 20 Yes STEEL RETURN 1,2,3
RG-D EGG CRATE 350 600 0.10 in-wg CEILING 24x24 12"Ø 20 Yes STEEL RETURN 1,2,3
NOTES:
1. COORDINATE WITH COR FOR GRILLE TYPE.
2. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
3. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
AIR DEVICE SCHEDULE (SUPPLY)
MARK TYPE
AIRFLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE
NECK SIZE
DAMPER wtwt MATERIAL REMARKSMIN. MAX. ROUND RECT.
SD-A SQUARE CONE 0 125 0.07 in-wg CEILING 24x24 6" -- No WHITE STEEL 1,2
SD-B SQUARE CONE 125 230 0.07 in-wg CEILING 24x24 8" -- No WHITE STEEL 1,2
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
SINGLE DUCT AIR TERMINAL UNIT SCHEDULE
MARK LOCATION ROOM SERVED
SYSTEM AIR
HANDLING VAV SIZE
AIRFLOW CONTROL
TYPE
CONTROL
SEQUENCE
REHEAT
ELEC
REHEAT
HW
HEATING COIL
REMARKSMAX MIN REHEAT ROWS EAT LAT EWT LWT FLOW CAPACITY
TU26-11 FIRST FLOOR INTERSTITIAL 1A-728 100-AH26 8" 115 35 60 VAV 5°F DEADBAND No Yes 1 55 °F 95 °F 180 °F 155 °F 0.21 GPM 2,600 Btu/h 3
TU26-12 FIRST FLOOR INTERSTITIAL C1A-701 100-AH26 14" 1120 335…
This is the start of the file's text. The full file is on GovTribe.